| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAccepted-AOC | ₹32.7 L | L1 | Accepted-AOC Qualified |
| 2 | L2₹34.8 L+₹2.0 L (6.23%)Rejected-Finance NANDNI VIHAR ADHOIWALA DEHRADUN | ₹34.8 L+₹2.0 L (6.23%) | L2 | Rejected-Finance Not Qualified |
| 3 | L3₹35.0 L+₹2.2 L (6.83%)Rejected-Finance | ₹35.0 L+₹2.2 L (6.83%) | L3 | Rejected-Finance Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to not fullfil all technical parameters |
| Sl No | Description | Qty | Unit | B.P. ENTERPRISES L4 | ESPY ASSOCIATES L3 | Rahul Bist L2 | FLAIR ENGINEERING L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing man power, materials and T&P etc. as per requirement complete as a Job for following works section :- | 12 | Months | 2,91,500 ₹34,98,000 | 2,89,880 ₹34,78,560 | 2,72,875 ₹32,74,500 | 2,69,000 ₹32,28,000 Lowest |
| 1.01Daily operation of treatment plant of 3.00MLD capacity | |||||||
| 1.02Daily operation of all constructed 78 nos. of sump/zonal/sub zonal and service reservoirs as per direction given by Engineer In Charge. | |||||||
| 1.03Daily removing of sludge from Inlet chamber,flocculator, pre settling tank, hopper bottom tank, filter units etc. | |||||||
| 1.04Removing the debris when needed from the inlet gate of intake well. | |||||||
| 1.0524 hrs. supervision of M.P.S. / I.P.S. 1 / I.P.S. 2 campus. | |||||||
| 1.06Cleaning of M.P.S. / I.P.S. 1 / I.P.S. 2 campus daily. | |||||||
| 1.07Supervision of all structures from Intake well to top CWR and Top reservoir to all various sub zonal & service reservoirs including cleaning of them (silt & sludge) in a regular interval as required, specially in any panic condition of natural calamity. | |||||||
| 1.08Supervision of whole pipe lines (Rising main – 12.80Km., Supply Main – 125.80Km. and Distribution System – 136.00KM) of the scheme from Intake well to top CWR, top CWR to all sub zonal & service reservoir and distribution system of all included villages in the scheme with execution of repair works including necessary welding work of pipeline, supply of all materials, specials, labour, T&P etc. as required complete. | |||||||
| 1.09To ensure uninterrupted supply of drinking water in the all reservoirs, constructed in various villages covered under the scheme including every single provided F.H.T.C. (total 2770 nos.) to the consumers. | |||||||
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
3 Apr 2021, 5:00 pmClosed
Executive Engineer
Construction Division Uttarakhand PeyJal Nigam Srinagar Garhwal
Tender for execution of complete annual maintenance and operation of various components such as intake well treatment plant pumping plant pipe line sump CWR FHTC and other appurtenants works under Dhikwal Gaon Khirsu GOV Pumping Water Supply Scheme
2021_MDPEY_31420_1
1125/G-03/414 dated 19.03.2021
Open Tender
Civil Works - Water Works
Item Rate
365 days
Srinagar Garhwal
As per tender document
3 documents required · 3 mandatory
₹2,950
Executive Engineer Peyjal Nigam Srinagar Garhwal
₹75,000
17 Oct 2025
23 Mar 2021
5 Apr 2021
23 Mar 2021
3 Apr 2021
25 Mar 2021
Amount
Providing man power, materials and T&P etc. as per requirement complete as a Job for following works section :-
Daily operation of treatment plant of 3.00MLD capacity
Daily operation of all constructed 78 nos. of sump/zonal/sub zonal and service reservoirs as per direction given by Engineer In Charge.
Daily removing of sludge from Inlet chamber,flocculator, pre settling tank, hopper bottom tank, filter units etc.
Removing the debris when needed from the inlet gate of intake well.
24 hrs. supervision of M.P.S. / I.P.S. 1 / I.P.S. 2 campus.
Cleaning of M.P.S. / I.P.S. 1 / I.P.S. 2 campus daily.
Supervision of all structures from Intake well to top CWR and Top reservoir to all various sub zonal & service reservoirs including cleaning of them (silt & sludge) in a regular interval as required, specially in any panic condition of natural calamity.
Supervision of whole pipe lines (Rising main – 12.80Km., Supply Main – 125.80Km. and Distribution System – 136.00KM) of the scheme from Intake well to top CWR, top CWR to all sub zonal & service reservoir and distribution system of all included villages in the scheme with execution of repair works including necessary welding work of pipeline, supply of all materials, specials, labour, T&P etc. as required complete.
To ensure uninterrupted supply of drinking water in the all reservoirs, constructed in various villages covered under the scheme including every single provided F.H.T.C. (total 2770 nos.) to the consumers.
Replacement of damaged or defunct different type of valves as required.
Rahul Bist
ESPY ASSOCIATES
B.P. ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_37255.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .