Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹12.4 L+₹34,002.04 (2.81%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹15 L
EMD Value
₹37,500
Closing Date
9 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer KIP RB Division No II PulamonKottarakkara PIN 691531
Rectification of damaged lining
2020_Irrig_389001_1
7/ET/KIP/RB/DnII/2020-21
Open Tender
Civil Works - Canal
Item Rate
60 days
Udayagiri
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,910
Yes
SBI Kottarakkara
₹37,500
Yes
24 Dec 2020
1 Oct 2020
15 Oct 2020
1 Oct 2020
9 Oct 2020
1 Oct 2020
45 days
Amount
Scheme 1 - Rectification canal lining between ch. 5000m to 5070 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges as per specification and as per the direction of Engineer-in-charge.
Scheme 2 - Rectification canal lining between ch. 5070m to 5150m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges as per specification and as per the direction of Engineer-in-charge.
Scheme -3 Rectification canal lining between ch. 5150m to 5200m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges as per specification and as per the direction of Engineer-in-charge.
Scheme 4 -Rectification of Canal lining between ch. 5200m to 5270 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges as per specification and as per the direction of Engineer-in-charge.
Scheme 5 - Rectification of canal lining between ch. 5270m to 5360
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges as per specification and as per the direction of Engineer-in-charge.
Scheme -6 - Rectification of canal lining between ch. 5360m to5420 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc.complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour chargesetc.complete as per specification and as per the direction of Engineer-in-charge.
Scheme - 7- Rectification of canal lining between ch. 5420 m to 5500m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc.complete as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining etc.complete as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc.complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as per specification and as per the direction of Engineer-in-charge.
Scheme - 8 - Rectification of canal lining between ch.5500 m to 5550 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc.complete as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining etc.complete as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc.complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as per specification and as per the direction of Engineer-in-charge.
Scheme - 9 - Rectification of canal lining between ch.5550m to 5660m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc.complete as per specification and as per the direction of Engineer-in-charge.
od18032/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining etc.complete as per specification and as per the direction of Engineer-in-charge.
od18033/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc.complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc.complete as per specification and as per the direction of Engineer-in-charge.
AKASH JAYAN
Bidder Name
R.Rajendran Pillai
AKASH JAYAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_553137.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .