Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.0 L+₹2,818.93 (0.48%)Admitted-Fee/PreQual/Technical/Finance | ₹6.0 L+₹2,818.93 (0.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Shaju Mathai L1 | BINDIA L2 |
|---|---|---|---|---|---|
| 1.00Maintenance | |||||
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 62.04 | sqm | 372.24 ₹23,093.77 Lowest | 375 ₹23,265 |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 621.6 | sqm | 24.09 ₹14,974.34 Lowest | 25 ₹15,540 |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 621.6 | sqm | 363.85 ₹2,26,169.16 Lowest | 365 ₹2,26,884 |
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 196 | sqm | 16.01 ₹3,137.96 Lowest | 17 ₹3,332 |
| 1.00 | OD159972/2026-2027:Providing and Laying of Interlocking Concrete Block Pavements using 100 mm M40 hydraulic blocks of approved size, design & shape, laid in required pattern over and including a compacted
bed of 6mm stone aggregate of 75mm average thickness, etc. all complete as per the direction of Engineerin- charge. | 196 | sqm | 1,394.4 ₹2,73,302.4 Lowest | 1,400 ₹2,74,400 |
| 1.01 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 5.69 | cum | 9,186.73 ₹52,309.24 Lowest | 9,200 ₹52,384.8 |
Tender Value
₹5.9 L
EMD Value
₹14,825
Closing Date
19 Sept 2026, 5:00 pmClosed
AE
AE
Proj No. 56/26-27-Ward 11 Kanjiramkunn Kallunkal Colony Road Maintenance Keerampara Gp
2026_LSGD_868076_1
ET1-8/AE/LSGD/KEPA/26-27
Open Tender
Civil Works - Roads
Item Rate
180 days
Keerampara Gp
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,310
Yes
₹14,825
Yes
22 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
7 Sept 2026 - 19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.001 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 62.04 | sqm | - | - |
| 1.002 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 621.6 | sqm | - | - |
| 1.003 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 621.6 | sqm | - | - |
| 1.004 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 196 | sqm | - | - |
| 1.005 | OD159972/2026-2027:Providing and Laying of Interlocking Concrete Block Pavements using 100 mm M40 hydraulic blocks of approved size, design & shape, laid in required pattern over and including a compacted
bed of 6mm stone aggregate of 75mm average thickness, etc. all complete as per the direction of Engineerin- charge. | 196 | sqm | - | - |
| 1.006 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 5.69 | cum | - | - |
stage.html
html • 0.02 MB
finance_1470188.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1470188.xls
BOQ • 0.30 MB
sbd56.pdf
Tender Documents • 1.76 MB
DATECORIGENDAM1.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .