| 1 | L-1₹110.6 CrAccepted-AOC | ₹110.6 Cr | L-1 | Accepted-AOC The Consortium of M/s DB and EC with M/s Hill International has quoted lowest price for this work. |
| 2 | L-2₹137.7 CrRejected-Finance | ₹137.7 Cr | L-2 | Rejected-Finance M/s Ayesa 2nd lowest bidder. |
| 3 | Rejected-Technical 701 HARBHAAJAN BUILDING CST ROAD KALINA SANTACRUZ EAST MUMBAI 400 098 | MUMBAI SUBURBAN | MAHARASHTRA | 400098 | - | - | Rejected-Technical The bidder did not qualify in the technical criteria |
| 4 | Rejected-Technical | - | - | Rejected-Technical The bidder did not qualify in the technical criteria |
| 5 | Rejected-Technical | - | - | Rejected-Technical The bidder did not qualify in the technical criteria |
Tender Value
Refer Docs
EMD Value
₹1.4 Cr
Closing Date
10 Dec 2024, 3:00 pmClosed
MD - GURUGRAM METRO RAIL LIMITED
C3, HSVP Complex, Sector-6, Panchkula Haryana.
APPOINTMENT OF GENERAL CONSULTANTS GC) FOR METRO LINE BETWEEN MILLENNIUM CITY CENTRE AND CYBER CITY
2024_HBC_371674_1
GMRL/PRO/2024 /GC/01
Global Tenders
Consultancy
1440 days
Gurugram
Please ref. tender document
3 documents required · 3 mandatory
₹1 L
₹1.4 Cr
Video Conferencing
14 Jul 2025
8 May 2024
10 Dec 2024
8 May 2024
10 Dec 2024
15 May 2024
15 May 2024
Amount
Appendix XVI- 2
Summary of Costs in Local and Foreign Currency
A . Remuneration of Experts and other Expenditures
I (a) Remuneration of All Key Experts (i.e. K1 and K2 Categories)
I (b) Remuneration of Professional Support Staff- (S-18, 19, 20 & 21)
II Remuneration of other Support Staff (S-1 to S-17)
III Duty Travel to Site (Reimbursable)
IV Rent for office accommodation (Reimbursable)
V Office Supplies, Utilities & Communications & Misc. (Reimbursable)
VI Office Furniture and Equipment (Reimbursable)
VII Reports and Documents Printing.(Reimbursable)
VIII Travel fro factory / Site Visits
Sub-Total Local Personnel [A]
B. Foreign Personnel other Expenditure
I.Mobilization and Demobilization (Reimbursable)
II. Accommodation for Consultant’s Staff
III. Other Costs (Reimbursable)
Sub-Total other expenditure of Foreign Personnel other than remuneration [B]
C Total (of A+B)
Description of Work / Item(s)
Appendix-XVI .5 - I Mobilization and Demobilization. 1.1 International Air fares (Economy class). Note: Total costs for round trips Home office to Delhi by shortest distance at cost per person per round trip should confirm to the official IATA economy class fares.
1.2 Unaccompanied Luggage Allowance ( Fixed Rate)
1.3 Other Miscellaneous Charges (Note: Other Misc. Charges including inland travel ( in their home country / overseas country, but not employer’s country),the cost of transportation to and from airports, airport taxes, excess luggage allowance, relocation / storage allowance, travel documents, temporary lodging, establishment allowance, exit charges etc. (Fixed Rate).
II Accommodation for Consultants’ Foreign Personnel (To be paid as per ‘actuals’ subject to total cost as indicated herein)
II.1 Per Diem Allowance ( In Indian Rupees)
Note: Per day accommodation chatge will not exceed INR 4000/- and no
escaltion on this item will be applicable.
AAAAAAAAAAAA
II.2 Housing / stay in India (Indian Rupees) (Fixed Rate)
Note: Per day accommodation chatge will not exceed INR 4000/- and no
escaltion on this item will be applicable.
AAAAAAAAAAAA
Total of II.1+II.2
III Other Cost (To be paid as per 'actuals' subject to total cost as indicated herein)
Documents (Budget for purchase of documents, books, maps, International standards etc. to be reimbursed at cost, subject to the upper limit (amount to be specified by GC).)
Total of I+II+III
Description of Work / Item(s)
Appendix- XVI 7. REMUNERATION TO POOL OF EXPERTS
1. The pool of experts whose CV’s have been provided for by the Consultants should be available to advice on problems in their respective fields, by giving proper solutions, which may not be available to the various key personnel’s provided, by the GC for the project.
2. The said pool of experts may work if required from their headquarters and need not necessarily be available or come to Gurgaon for sorting out the said problems.
A. Rate per such occurrence incase visit to site is necessitated
B. Rate per occurrence in case the solution is provided from the consultant’s headquarter
Description of Work / Item(s)
Appendix- XVI 8. PROVISIONAL SUM
1. THE ABOVE AMOUNT SHALL NOT BE CONSIDERED FOR EVALUATION OF THE FINANCIAL BID
2. Any amount from provisional sum will be used by the General Consultants only after the approval of MD/ HMRTC
3. This amount will not be taken into account for the the evaluation of the bids.
1. ProvisionaL Sum in INR
Description of Work / Item(s)
APPENDIX XVI-3 (Part III)
Note: Log Books for the vehicles will be maintained in proof of utilisation of vehicles.This amount will be reimbused on actual basis within 15 days of submission of bill with proof (Bill of Transporter in the end every month). The amount will not exceed the total calculated amount as below.
Duty Travel to Site((to be paid as per actuals within the Total cost as indicated herein by GC)
Description of Work / Item(s)
Appendix-3 (Part IV). Rant for GC’s office accommodation ( To be paid as per ‘actuals’ subject to total cost as: Note : GMRL will provide rent-free air-conditioned office space of 400 SqM. (approx) floor area with reasonably adequate electrical switch points. For any additional requirement of office space over the above area of 400 SqM. (approx), GC will make his own arrangement. The rent for the same shall be reimbursed subject to the Rate / Total cost as indicated herein by GC. AND All office furniture and furnishings including chairs, tables etc. as required, office equipments including computers, telephones etc., have to be arranged by the consultant. Power consumption charges and telephone charges are to be borne by the consultant. Security and housekeeping will also be provided by Consultants.
(a) Rent for additional accommodation including cost of interiors, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services, etc. payable shall be:
(b) Cost of furnishing, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services, etc. payable for the rent free office space to be provided by HMRTC shall be:
Description of Work / Item(s)
Appendix- XVI-3 (Part V). Office Supplies, Utilities and Communications & Misc. charges ( To be paid as per ‘actuals’ subject to total cost as indicated herein by GC)
Description of Work / Item(s)
Appendix-3 (Part VI). Office Furniture and Equipment for accommodation (To be paid as per ‘actuals’ subject to total cost as indicated herein by GC)
OFFICE EQUIPMENTS (INCLUDING COMPUTERS, TELEPHONE INSTRUMENTS.
Description of Work / Item(s)
1.1 Project In-charges
a) Project Director/Project Leader/ Project Coordinator
b) Deputy Project Director
1.2 Contract and Project Management
a) Chief Contracts Expert
b) Senior Contract Expert
c) Chief Construction Planning & Monitoring Expert
d) Senior Program Expert
e) Senior Financial Advisor
f) Senior Cost Control Expert
1.3 Project Manager / System (System Integration)
a) Chief Project Expert/System (System Integration)
b) Senior Project Expert/System (System Integration)
2. Engineering
2.1 Civil / Track Design and execution
a) Geotechnical
i) Senior Geo Technical Expert
b) Structures – Elevated
i) Chief Structures Design expert – Elevated
ii) Senior Structures Design expert – Elevated
iii) Chief Resident Engineer
iv) Dy Chief Resident Engineer-1(package-1)
v) Dy Chief Resident Engineer-2(package-2)
vii) Senior Survey Expert (Elevated)
c) Architecture
i) Senior Architectural Expert-1
i) Senior Architectural Expert-2
d) Track
i) Chief Track ( Permanent Way) Expert
ii) Senior Track Design Expert
iii) Senior Track Installation Expert
(e) Girder Launching
i) Sr Girder casting and launching Expert
2.2 Traction Power and distribution (190)-Third Rail
a) Chief Traction distribution, SCADA and MIMIC Panel Integration Expert.
b) Senior Traction Power Expert
c) Senior Traction distribution, SCADA and MIMIC Panel Integration Expert.
3. Quality, Safety & Environment
a) Quality
i) Chief Quality Assurance Expert
ii) Senior Quality Assurance Expert (Civil)
iii) Senior Quality Assurance Expert (Systems)
b) Safety
i) Chief Safety Expert (SHE)
ii) Senior Safety Expert
c) Environment
i)Senior Environmental Expert
d) Social safeguard Expert
4. Signaling and Telecommunications – design and installation
a) Signaling
i) Chief Signaling Expert
ii) Senior Signalling Expert
b) Telecommunication
i) Chief Telecom Expert
ii) Senior Telecom Expert
c) Automatic Fare Collection
i) Senior Automatic Fare Collection Expert
5. Other utilities – design, installation and Commissioning.
a) Illumination, Lifts, Escalators , Fire etc.
i) Chief E & M Expert
ii) Senior Illumination, Lifts, Escalators, Fire etc. expert
6. Depot and Workshop – Planning, Design and Installation of Plant and Machinery
a) Chief Depot facility Expert (M&P)
b) Senior Depot Planning Engineer
c) Senior Depot Resident Engineer
d) Senior Installation Expert
e) Senior Mechanical Design Expert
f) Senior Electrical Design Expert
7. Rolling Stock
a) Chief Rolling Stock Expert
b) Chief Rolling Stock Testing and Commissioning Expert
c) Senior Rolling Stock Expert (Electrical)
d) Senior Rolling Stock Expert (Mechanical)
8 Testing and Commissioning
i)Chief Testing and Commissioning Expert
ii)Senior Testing and Commissioning Expert
9. Operations and Maintenance (O & M)
a) Chief Operations and Maintenance Expert
b) Senior Maintenance Expert for Rolling Stock, Signaling & Depot.
c) Senior Maintenance Expert for Traction, Telecom, AFC and E&M.
d) Senior Maintenance Expert for Civil Structures including Viaduct, Stations, Track etc.
e) Senior Training mobilization Expert
10. Multimodal Transport Planner
11. 5D BIM Software Application
i) Senior BIM Expert
i) BIM Manager
ii) Asset Information Manager & BMS Manager
12. Real estate, property development and non-fare revenue expert
I(a) Total Amount K1 & K2- INR
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer (Electrical)
Site Engineer (Electrical)
Site Engineer (Electrical)
Site Engineer (Electrical)
Site Engineer (Signalling & Telecom)
Site Engineer (Signalling & Telecom)
Site Engineer (Signalling & Telecom)
Site Engineer (Signalling & Telecom)
Site Engineer Track Installation
Site Engineer Track Installation
I(b) Total Amount Prof. Support
IT-Manager
IT Engineer
Receptionist-1
Receptionist-2
Secretary to P.D.
Secretary to D.P.D.
Office Manager
Office Assistant
Office Assistant
Office Boy
Office Boy
Office Boy
Pantry Boy
Pantry Boy
Pantry Boy
Finance Manager
Account Asst.
Account Asst.
Account Asst.
Account Asst.
Senior Cad Operator
Senior Cad Operator
Document Control
Asst. Document Controller
Asst. Document Controller
Asst. Document Controller
Quantity Estimator
CAD Draftsman - Elevated Stations + Structures
CAD Draftsman - Elevated Stations + Structures
CAD Draftsman - (E&M)
II.Total Amount Other Support
Description of Work / Item(s)
Appendix-3 (Part VII). Report Documents Printing (To be paid as per 'actuals) (the numbers of reports given below are approximate and are assumed for the purpose of evalution of bids. The same may vary during the contract period as per requirement and shall be piad accordiingly
* Note: Includes Procurement Report, SHE Report, Quality Report and Financial Report.
** To be paid as per ‘actuals’. The approximate qty is assumed for the purpose of evaluation of bid. In actual this number may vary.
Note: Here items are not complete and also rates may vary. This in only for estimation some rough quatntiies have been taken. More application of mind will be needed at the time of evaluation. Biiders have been asked to quote as per their esimate.
Inception Report
Monthly Reports*
Bid Evaluation Reports
Quarterly Reports.
Annual Reports
Supervision Reports.
Engineering Reports
O & M Manuals
Draft Completion Report
Final Report.
Completion Report
Completion Report Executive Summary
Drawings (GAD’s, GFC’s, CSD’s
Description of Work / Item(s)
Note: 1. Any Mistake in calculation for Column 4 to 11 will be the responsibility of Bidder as the figures arrived in Column 12 will only be considered.
Note:2. Deleted
Note: 3. We hereby confirm that the basic salaries indicated above are taken from the organizational roll records and reflect the current salaries of staff members listed, which have not been raised other than the normal annual salary increase policy as applied to all the organizational staff.
Note: 1) The basic salary should also include components of other financial benefits payable to the staff, such as vacation pay, sick leave pay, insurance etc. (not covered under social charges).
2) Overheads should also take into account all other expenses to be incurred by the consultant excepting the “Reimbursable” component of the consultancy charges.
1.1 Project In-charges
a) Project Director/Project Leader/ Project Coordinator
b) Deputy Project Director
1.2 Contract and Project Management
a) Chief Contracts Expert
b) Senior Contract Expert
c) Chief Construction Planning & Monitoring Expert
d) Senior Program Expert
e) Senior Financial Advisor
f) Senior Cost Control Expert
1.3 Project Manager / System (System Integration)
a) Chief Project Expert/System (System Integration)
b) Senior Project Expert/System (System Integration)
2. Engineering
2.1 Civil / Track Design and execution
a) Geotechnical
i) Senior Geo Technical Expert
b) Structures – Elevated
i) Chief Structures Design expert – Elevated
ii) Senior Structures Design expert – Elevated
iii) Chief Resident Engineer
iv) Dy Chief Resident Engineer-1(package-1)
v) Dy Chief Resident Engineer-2(package-2)
vii) Senior Survey Expert (Elevated)
c) Architecture
i) Senior Architectural Expert-1
i) Senior Architectural Expert-2
d) Track
i) Chief Track ( Permanent Way) Expert
ii) Senior Track Design Expert
iii) Senior Track Installation Expert
(e) Girder Launching
i) Sr Girder casting and launching Expert
2.2 Traction Power and distribution (190)-Third Rail
a) Chief Traction distribution, SCADA and MIMIC Panel Integration Expert.
b) Senior Traction Power Expert
c) Senior Traction distribution, SCADA and MIMIC Panel Integration Expert.
3. Quality, Safety & Environment
a) Quality
i) Chief Quality Assurance Expert
ii) Senior Quality Assurance Expert (Civil)
iii) Senior Quality Assurance Expert (Systems)
b) Safety
i) Chief Safety Expert (SHE)
ii) Senior Safety Expert
c) Environment
i)Senior Environmental Expert
d) Social safeguard Expert
4. Signaling and Telecommunications – design and installation
a) Signaling
i) Chief Signaling Expert
ii) Senior Signalling Expert
b) Telecommunication
i) Chief Telecom Expert
ii) Senior Telecom Expert
c) Automatic Fare Collection
i) Senior Automatic Fare Collection Expert
5. Other utilities – design, installation and Commissioning.
a) Illumination, Lifts, Escalators , Fire etc.
i) Chief E & M Expert
ii) Senior Illumination, Lifts, Escalators, Fire etc. expert
6. Depot and Workshop – Planning, Design and Installation of Plant and Machinery
a) Chief Depot facility Expert (M&P)
b) Senior Depot Planning Engineer
c) Senior Depot Resident Engineer
d) Senior Installation Expert
e) Senior Mechanical Design Expert
f) Senior Electrical Design Expert
7. Rolling Stock
a) Chief Rolling Stock Expert
b) Chief Rolling Stock Testing and Commissioning Expert
c) Senior Rolling Stock Expert (Electrical)
d) Senior Rolling Stock Expert (Mechanical)
8 Testing and Commissioning
i)Chief Testing and Commissioning Expert
ii)Senior Testing and Commissioning Expert
9. Operations and Maintenance (O & M)
a) Chief Operations and Maintenance Expert
b) Senior Maintenance Expert for Rolling Stock, Signaling & Depot.
c) Senior Maintenance Expert for Traction, Telecom, AFC and E&M.
d) Senior Maintenance Expert for Civil Structures including Viaduct, Stations, Track etc.
e) Senior Training mobilization Expert
10. Multimodal Transport Planner
11. 5D BIM Software Application
i) Senior BIM Expert
i) BIM Manager
ii) Asset Information Manager & BMS Manager
12. Real estate, property development and non-fare revenue expert
I(a) Total Amount K1 & K2- INR
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer(Civil)-Stations and Viaduct
Site Engineer (Electrical)
Site Engineer (Electrical)
Site Engineer (Electrical)
Site Engineer (Electrical)
Site Engineer (Signalling & Telecom)
Site Engineer (Signalling & Telecom)
Site Engineer (Signalling & Telecom)
Site Engineer (Signalling & Telecom)
Site Engineer Track Installation
Site Engineer Track Installation
I(b) Total Amount Prof. Support
IT-Manager
IT Engineer
Receptionist-1
Receptionist-2
Secretary to P.D.
Secretary to D.P.D.
Office Manager
Office Assistant
Office Assistant
Office Boy
Office Boy
Office Boy
Pantry Boy
Pantry Boy
Pantry Boy
Finance Manager
Account Asst.
Account Asst.
Account Asst.
Account Asst.
Senior Cad Operator
Senior Cad Operator
Document Control
Asst. Document Controller
Asst. Document Controller
Asst. Document Controller
Quantity Estimator
CAD Draftsman - Elevated Stations + Structures
CAD Draftsman - Elevated Stations + Structures
CAD Draftsman - (E&M)
II.Total Amount Other Support
Description of Work / Item(s)
Appendix- XVI - 3 (Part VIII). Travel for Factory/ Site Visits(Payment will be made as per actuals)
FAT/Inspection Oversees
FAT/Inspection Local
AYESA Ingenieria y Arquitectura, S.A.U (BID ID -1106145)
DB Engineering & Consulting GmbH (BID ID -1082797)
AYESA Ingenieria y Arquitectura, S.A.U (BID ID -1106145)
AYESA Ingenieria y Arquitectura, S.A.U (BID ID -1106145)
DB Engineering & Consulting GmbH (BID ID -1082797)
DB Engineering & Consulting GmbH (BID ID -1082797)
AYESA Ingenieria y Arquitectura, S.A.U (BID ID -1106145)
AYESA Ingenieria y Arquitectura, S.A.U (BID ID -1106145)
DB Engineering & Consulting GmbH (BID ID -1082797)
AYESA Ingenieria y Arquitectura, S.A.U (BID ID -1106145)
AYESA Ingenieria y Arquitectura, S.A.U (BID ID -1106145)
Bidder Name
AYESA Ingenieria y Arquitectura, S.A.U
DB Engineering & Consulting GmbH
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid