Loading…
Loading…
Tender Value
₹57.3 L
EMD Value
₹58,000
Closing Date
24 Aug 2026, 6:00 pmDue today
Executive Engineer, R & B Panchayat Division, Anand
Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
335287
06/2026-27
Open
Civil Works - Roads
Works
Anand
1 document required · 1 mandatory
₹2,400
Executive Engineer R And B Panchayat Division Anand
₹58,000
14 Aug 2026
14 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under Suvidhapath (Normal) Pkg.
No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
1 Construction of CC Pavement on Haidarpura Approach Road (VRNP) Km. 0/000 to 0/420 Ta.:- Khambhat Dist.:- Anand
2 Construction of CC Pavement on Vatra Vadiyapura Road (VRNP) Km. 0/000 to 0/150 Ta.:- Khambhat Dist.:- Anand
Bill of Quantities
Item of work Quantities Rate in Amount
Estimated Unit Figures in
1 Clearing and grubbing road land including uprooting rank vegetation grass 0.10 Ha. 28455.10
bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees
cut earlier and disposal of unserviceable materials (C) By mechanical means in
area of light jungle
2 Scarifying gravelled macadam or bitumen macadam surface 6 cm to 10 cm.depth 563.00 Sqmt 41.61
including stacking useful materials on road side and disposing off remaining stuff.
3 Earthwork for embankment including breaking clods, dressing with all lead and 101.00 Cum 180.88
lift (excluding watering and consolidation) (C) From Borrow area within
4 Box cutting the road surface to proper slope and camber for making a base for 650.00 Cum 109.42
road work including removing the excavated stuff and depositing on the road
side slope as directed upto all lead.
5 Providing laying and spreading mix material gradation equivalent to GSB grade 477.00 Cum 2060.53
II ,MCBT Metal 20-40 mm with Fine aggregate material in required proportion
so as to have, mixing in place with rotavator and grading with mortar grader at
OMC and compacted with vibratory roller 80 to 100 KN static weight to achieve
desired density etc. complete
6 Conveyance of excavated earth/ unuseable material available from box cutting/ 130.00 Cum 258.11
scarifying the existing road surface etc. up to 1.0 km. lead including loading,
unloading and spreading the material on road side as and where directed.
7 Supplying and fixing reinforced concrete heavy dutynon-pressure pipes with 49.50 Rmt 1053.39
collars for culverts includingsetting and joining the pipes in C.M. 1:2 watering
andlaying (To level of slops of I.S. 458 / 1971 Class NP4 offollowing internal
diameter. (i) 300 mm dia.
8 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete 391.00 Sqmt 706.93
block 60mm thick with grade of concrete M300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and filling the joint with sand in proper
line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
9 Dry Lean Cement Concrete Sub- base:- Construction of dry lean cement concrete 249.00 Cum 3162.80
Sub- base over a prepared sub-grade with coarse and fine aggregate conforming
to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement
ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-
1, cement content not to be less than 220 kg/ cum, optimum moisture content to
be determined during trial length construction, concrete strength not to be less
than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a
conventional method, compacting with 8-10 tonnes vibratory roller, finishing and
curing etc. complete.
10 Providing & Casting in situ ordinary cement concrete M-200 mix with Trimix 627.00 Cum 4613.68
C.C Road laid as directed including temping, vibrating, finishing, curing and
filling in joints with bitumen etc as per Engineer Incharge.
02. Sch B_Suvidhapath_Khambhat_Pkg_07 Page
Item of work Quantities Rate in Amount
Estimated Unit Figures in
11 Providing TMT Bar FE500D reinforcement for R.C.C. work including bending, 7508.00 kg. 77.29
binding and placing in position complete upto floor two level
12 Providing & fixing logo board of Suvidhapath as per standard design of National 2.00 Nos. 3651.15
Rural Road Development Agency diamond size 600 x 600 mm , 1.50mm thick
plate & board size 900 x 250mm , 1.50mm thick M.S. plate and 2.40 meter deep
length single angle 75 x 75 x 6 mm size incl. fitting & painting lettering with
luminous colour as per drawing including fixing in C.C. 1:3:6 etc. complete.
Rupees Fifty Seven Lakh(s) Twenty Eight Thousand Five Hundred Fifty Five And Paise Fifty Five Only
I / We am / are willing to carryout the work at ………..% above/Below percent (………………………. Percent above/Below)
(Should be written in figure and words) of the estimated rates mentioned above. Amount of my / our tender worked out as
Estimated amount put to tender Rs: ……………. Estimated amount put to tender Rs: …………...
Deduct……% below Rs: …………………………. Add……% above Rs: ………………………….…
(Please strike out which ever is not applicable.)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Quantities rate and wordings of items are as per estimate and calculation in the Sch. - B are airthmatically checked.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me and found
Sr.Divisional Account Officer Dy.Executive Engineer
Panchayat (R & B) Division Panchyat (R & B) Sub Division
Signaturre of contractor Executive Engineer
with seal Panchayat (R & B) Division
02. Sch B_Suvidhapath_Khambhat_Pkg_07 Page
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under Suvidhapath
(Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
INDEX OF SPECIFICATION
Applicable Separate Road
Specification booklet attached
Tender Discription of item as per schedule "B" of the tender.
Item No. Pg No.
1 Clearing and grubbing road land including uprooting rank vegetation grass Attached Separetely
bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut
earlier and disposal of unserviceable materials (C) By mechanical means in area of light
2 Scarifying gravelled macadam or bitumen macadam surface 6 cm to 10 cm.depth Attached Separetely
including stacking useful materials on road side and disposing off remaining stuff.
3 Earthwork for embankment including breaking clods, dressing with all lead and lift Attached Separetely
(excluding watering and consolidation) (C) From Borrow area within 1.0 Km.lead
4 Box cutting the road surface to proper slope and camber for making a base for road Attached Separetely
work including removing the excavated stuff and depositing on the road side slope as
directed upto all lead.
5 Providing laying and spreading mix material gradation equivalent to GSB grade II Attached Separetely
,MCBT Metal 20-40 mm with Fine aggregate material in required proportion so as to
have, mixing in place with rotavator and grading with mortar grader at OMC and
compacted with vibratory roller 80 to 100 KN static weight to achieve desired density
6 Conveyance of excavated earth/ unuseable material available from box cutting/ Attached Separetely
scarifying the existing road surface etc. up to 1.0 km. lead including loading, unloading
and spreading the material on road side as and where directed.
7 Supplying and fixing reinforced concrete heavy dutynon-pressure pipes with collars for Attached Separetely
culverts includingsetting and joining the pipes in C.M. 1:2 watering andlaying (To level
of slops of I.S. 458 / 1971 Class NP4 offollowing internal diameter. (i) 300 mm dia.
8 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block Attached Separetely
60mm thick with grade of concrete M300 pnumatic compressed / vibrated mechanically
and as per approved design Confirming to IS 15658 : 2006 including 35 mm Sand layer
for levelling and filling the joint with sand in proper line and level as per guidlines of
IRC : SP 63-2018 etc. Complete.
9 Dry Lean Cement Concrete Sub- base:- Construction of dry lean cement concrete Sub- Attached Separetely
base over a prepared sub-grade with coarse and fine aggregate conforming to IS:
the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed
15:1, aggregate gradation after blending to be as per table 600-1, cement content not to
be less than 220 kg/ cum, optimum moisture content to be determined during trial
length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a
batching plant, transported to site, laid with a conventional method, compacting with 8-
10 tonnes vibratory roller, finishing and curing etc. complete.
10 Providing & Casting in situ ordinary cement concrete M-200 mix with Trimix C.C Attached Separetely
Road laid as directed including temping, vibrating, finishing, curing and filling in joints
with bitumen etc as per Engineer Incharge.
11 Providing TMT Bar FE500D reinforcement for R.C.C. work including bending, Attached Separetely
binding and placing in position complete upto floor two level
Applicable Separate Road
Specification booklet attached
Tender Discription of item as per schedule "B" of the tender.
Item No. Pg No.
12 Providing & fixing logo board of Suvidhapath as per standard design of National Rural Attached Separetely
Road Development Agency diamond size 600 x 600 mm , 1.50mm thick plate & board
size 900 x 250mm , 1.50mm thick M.S. plate and 2.40 meter deep length single angle
75 x 75 x 6 mm size incl. fitting & painting lettering with luminous colour as per
drawing including fixing in C.C. 1:3:6 etc. complete.
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R & B) Division
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under Suvidhapath (Normal) Pkg. No.
AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
SCHEDULE FOR TESTING OF MATERIALS
For ensuring quality control and workmanship, various tests prescribed below for materials shall be taken at periodical intervals as stipulated below.
The material should be tested in GERI or Private laboratory approved by Govt. of Gujarat. Bill for testing charges should be paid Govt.
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
1 45 to 90 MC.Metal Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
2 40 to 63 M.C.Metal 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
3 25 to 40 M.C.Metal 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
4 Kapchi 20 mm Nominal 1168.30 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
5 Grit (6 mm) 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
6 Grit as Key aggregate (12 mm) 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
02. Sch B_Suvidhapath_Khambhat_Pkg_07
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
7 Water Suspended Solids (IS 3025 Part 17)
Sample taken at each source tested at
Sulphets (IS 3025 Part 24) an approved test house
Chlorides (IS 3025 Part 32)
7 Supplying of Quarryspall 0.00 Cum *Gradation,CBR One test per work
8 Supplying of Sand/ 370.00 Cum *Silt Content,F.M One test per 250 Cum.
9 Stonedust 181.26 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
10 Sel;ected Soil for Embankment 101.00 Cum P.I ,CBR,MDB
11 Rubble 0.00 Cum *Density & Los Angeles abrasion As per IRC:SP:116-2018
12 Asphalt (VG-30) 0.00 M.T. Viscosity Test Tanker test in Geri Lab. Only
as per I.S. 1206 Up to 10
Above 50 one per Tanker
Ductility Test As per I.S.
Specification Gravity test As per I.S.
Softening point test As per I.S.
Quality of binder test 3 test per 2 tankers on plant site.
13 Tack Coat *Binder Temperature for application
Irregular close in intervals
*Rate of spread of Binder. 2 test per Day.
02. Sch B_Suvidhapath_Khambhat_Pkg_07
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
14 Carpet & Seal Coat. Mix Grading One Test on Individual
Temperature of binder in Boilor Constituents and mixed aggregates from the
aggregates in the dryer and dryer for each 100 tonnes of mix subject to
mix at the time of laying and minimum of Two tests per plant per day.
rolling. ( Binder content One Test for each 100 tones of mix
vide 45/MD. 2172) subjects to minimum of two per Day.
Rate of Spreaded mix materials. Regular control through checks on layer
15 Cement (OPC) 280.621 M.T. *Consistency,Soundness 1 test @ 50.0 M.T. 100 T 2 tests,
*Setting time,Finessness Test 200 T 3 tests, 300 T 4 tests, 500 T 5 tests,
*Compressive Strength. 800 T 6 tests, 1300 T 7 tests & 8 testd
for large consingment.
16 Steel (TMT) 7.51 M.T. *Tensile, (TMT) As per Manual of Quality Control
Yield 1 test/40 tonnes / per category
17 C.C.Cube Test 1:2:4 *Compressive Strength. 1 to 5 cmt - 1 No
M300 0.00 51 to above - 4 +1 additional sample
for each 50 cu.mt. Or part there of.
02. Sch B_Suvidhapath_Khambhat_Pkg_07
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
18 Retro Reflective Sheeting for the signage 0.00 Nos. as per Test schedule attached GR SOR/1018/715/Part file/C-1 Dtd.4/6/19
19 Road studs / Cat Eyes 0.00 Nos. as per Test schedule attached GR SOR/1018/715/Part file/C-1 Dtd.4/6/19
20 Hot Applied Thermoplast Road Marking 0.00 Sqmt as per Test schedule attached GR SOR/1018/715/Part file/C-1 Dtd.4/6/19
Note (1):- In case of excess in quantity. Further more test shall be carried out as per required frequency.
Note (2):- Apart from above listed materials for carrying out various tests during Road / Structure
Construction Works , if any other than above mentioned material/s are to be used during road /
structure construction work then it must be tested as per prevailing criteria of Govt. of Gujarat (R &
B Deptt.) and necessary tests should be carried out as per prevailing norms.
Signature of Contractor. Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R & B) Division
02. Sch B_Suvidhapath_Khambhat_Pkg_07
Name Of Work :- Construction of CC
Pavement at Khambhat Taluka Dist.:-
Anand Under Suvidhapath (Normal) Pkg.
No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
QUANTITY SUMMARY STATEMENT
Sr No Name Of Work / Road Item No : 1 Item No : 2 Item No :
Clearing and grubbing road land including Scarifying gravelled macadam or bitumen Earthwork for embankment including
uprooting rank vegetation grass macadam surface 6 cm to 10 cm.depth breaking clods, dressing with all lead and
bushes,shrubs,sapling and trees girth up including stacking useful materials on lift (excluding watering and consolidation)
to 300 mm removal of stumps of trees cut road side and disposing off remaining (C) From Borrow area within 1.0 Km.lead
earlier and disposal of unserviceable stuff.
Unit Ha. Sqmt Cum
Qty Rate Amount Qty Rate Amount Qty Rate Amount
1 Construction of CC Pavement on
Haidarpura Approach Road (VRNP) Km.
0/000 to 0/420 Ta.:- Khambhat Dist.:-
2 Construction of CC Pavement on Vatra
Vadiyapura Road (VRNP) Km. 0/000 to
0/150 Ta.:- Khambhat Dist.:- Anand
Total Quantity 0.00 0.00
Consolidation Page
Name Of Work :- Construction of CC
Pavement at Khambhat Taluka Dist.:-
Anand Under Suvidhapath (Normal) Pkg.
No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
QUANTITY SUMMARY STATEMENT
Sr No Name Of Work / Road Item No : 4 Item No : 5 Item No :
Box cutting the road surface to proper Providing laying and spreading mix Conveyance of excavated earth/
slope and camber for making a base for material gradation equivalent to GSB unuseable material available from box
road work including removing the grade II ,MCBT Metal 20-40 mm with Fine cutting/ scarifying the existing road
excavated stuff and depositing on the aggregate material in required proportion surface etc. up to 1.0 km. lead including
road side slope as directed upto all lead. so as to have, mixing in place with loading, unloading and spreading the
Unit Cum Cum Cum
Qty Rate Amount Qty Rate Amount Qty Rate Amount
1 Construction of CC Pavement on
Haidarpura Approach Road (VRNP) Km.
0/000 to 0/420 Ta.:- Khambhat Dist.:-
2 Construction of CC Pavement on Vatra
Vadiyapura Road (VRNP) Km. 0/000 to
0/150 Ta.:- Khambhat Dist.:- Anand
Total Quantity 0.00 0.99
Consolidation Page
Name Of Work :- Construction of CC
Pavement at Khambhat Taluka Dist.:-
Anand Under Suvidhapath (Normal) Pkg.
No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
QUANTITY SUMMARY STATEMENT
Sr No Name Of Work / Road Item No : 7 Item No : 8 Item No :
Supplying and fixing reinforced concrete Providing and fixing pre-cast Rubber Dye Dry Lean Cement Concrete Sub- base:-
heavy dutynon-pressure pipes with collars / steel Dye inter locking concrete block Construction of dry lean cement concrete
for culverts includingsetting and joining 60mm thick with grade of concrete M300 Sub- base over a prepared sub-grade
the pipes in C.M. 1:2 watering andlaying pnumatic compressed / vibrated with coarse and fine aggregate
(To level of slops of I.S. 458 / 1971 Class mechanically and as per approved design conforming to IS: 383, the size of coarse
Unit Rmt Sqmt Cum
Qty Rate Amount Qty Rate Amount Qty Rate Amount
1 Construction of CC Pavement on
Haidarpura Approach Road (VRNP) Km.
0/000 to 0/420 Ta.:- Khambhat Dist.:-
2 Construction of CC Pavement on Vatra
Vadiyapura Road (VRNP) Km. 0/000 to
0/150 Ta.:- Khambhat Dist.:- Anand
Total Quantity 0.00 0.00
Consolidation Page
Name Of Work :- Construction of CC
Pavement at Khambhat Taluka Dist.:-
Anand Under Suvidhapath (Normal) Pkg.
No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
QUANTITY SUMMARY STATEMENT
Sr No Name Of Work / Road Item No : 10 Item No : 11 Item No :
Providing & Casting in situ ordinary Providing TMT Bar FE500D Providing & fixing logo board of
cement concrete M-200 mix with Trimix reinforcement for R.C.C. work including Suvidhapath as per standard design of
C.C Road laid as directed including bending, binding and placing in position National Rural Road Development
temping, vibrating, finishing, curing and complete upto floor two level Agency diamond size 600 x 600 mm
filling in joints with bitumen etc as per 1.50mm thick plate & board size 900 x
Unit Cum kg. Nos.
Qty Rate Amount Qty Rate Amount Qty Rate Amount
1 Construction of CC Pavement on
Haidarpura Approach Road (VRNP) Km.
0/000 to 0/420 Ta.:- Khambhat Dist.:-
2 Construction of CC Pavement on Vatra
Vadiyapura Road (VRNP) Km. 0/000 to
0/150 Ta.:- Khambhat Dist.:- Anand
Total Quantity 0.00 0.00
Consolidation Page
Name Of Work :- Construction of CC
Pavement at Khambhat Taluka Dist.:-
Anand Under Suvidhapath (Normal) Pkg.
No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
QUANTITY SUMMARY STATEMENT
Sr No Name Of Work / Road
Total Amount Amount of Credit
Total Amount Amount of Credit
of Dismentalling Not Put to
Total amount 18% GST Quality Control Contingency Materials & Tender
Total amount 18% GST Quality Control Contingency Materials & Tender
Materials Reused (2+3+4+5)
1 Construction of CC Pavement on
Haidarpura Approach Road (VRNP) Km.
0/000 to 0/420 Ta.:- Khambhat Dist.:-
2 Construction of CC Pavement on Vatra
Vadiyapura Road (VRNP) Km. 0/000 to
0/150 Ta.:- Khambhat Dist.:- Anand
Total Quantity 1.80
Consolidation Page
Name Of Work :- Construction of CC
Pavement at Khambhat Taluka Dist.:-
Anand Under Suvidhapath (Normal) Pkg.
No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
QUANTITY SUMMARY STATEMENT
Sr No Name Of Work / Road
Total Technical
Total Technical Sanction (1 +Round
Unit Deputy Executive Engineer
7 8 9 Panchayat (R & B) Sub Division
1 Construction of CC Pavement on Khambhat
Haidarpura Approach Road (VRNP) Km.
0/000 to 0/420 Ta.:- Khambhat Dist.:-
2 Construction of CC Pavement on Vatra
Vadiyapura Road (VRNP) Km. 0/000 to
0/150 Ta.:- Khambhat Dist.:- Anand
Total 6848976.82 13.19 6848990.00 Executive Engineer
Total Quantity -1.80 0.00 Panchayat (R & B) Division
Average Rate 6848976.82 11.39 6848990.00 Anand
Consolidation Page
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under
Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
GENERAL INFORMATION
1 Amount of administrative approval with Suvidhapath Normal (2025-26)
2 Cost of work put to tender Rs.
3 Amount of Technical Sanctioned with authority Ts. For Rs 5458280.00 By E.E.Panchyat
,Panchayat (R&B) Division, Anand as per
Item No 318 Pg No 43 in March
Ts. For Rs 1390710.00 By E.E.Panchyat
,Panchayat (R&B) Division, Anand, as per
Item No 51 Pg No 7 in May
4 Time limit provided for completion of work 6 (Six) Months (Including Monsoon Period)
(Basis for working out time limit to be given)
5 Details of materials provided in Schedule " A " NIL
(Calculation should be attached) ……….
6 Date of issue / Receipt of tender ……….
7 Budget provision …………………………
8 Whether work put to tender is for whole work Whole Work
or as sanctioned or, part of it ………………….
9 If work is splitting up, Details of splitting with Not splitted
authority approving the split
10 In case it is to be part of remaining work, NIL
reason as to why it is not included
11 The amount and details of items not included No Such items
in tender with reason there of and how you
prepare in executed the work with complete
financial picture…..
12 In case the work is abandoned by previous No
agency, action taken against defaulting agency
13 If, there is any variation from the sanctioned No
estimate, State
14 Certificate of Division A.E. / A.A.E. / D.E.E. for Attached
drafting of specification and proper preparation
of DTP. Schedule "A" including arithmetical
15 Weather correction slip in printed form are …….
16 Validity period 120 ( One hundred twenty ) days
17 Whether L.A. proceeding has been completed. N/A
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand
Under Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
(To be accompained with submission of D.T.P.)
(1) TENDER FORM
1. Whether the all clauses are enclose as per :- Yes
Government replaced by the latest ?
2. If so, state the number-wise details instructions :- Yes
3. Whether time limit is entered, it is proportion with the :- Yes
amount and nature of work
4. Whether the correct name of work as per sanctioned :- Yes
estimate is entered ?
5. Whether the other details viz. mention deposit etc. are :- Yes
written in the tender form ?
(2) SCHEDULE - A
1. Whether Schedule gives details of the materials to be :- Yes // No
supplied by the Department ?
2. Does it mention the correct place of delivery of :- Yes // No
materials to be supplied under Schedule-A
3. Whether the rates of materials are mentioned in :- Yes // No
4. Whether the rates of entered in Schedule-A is :- Yes // No
correctly derived ?
5. Whether quantity of materials is correctly arrived as :- Yes // No
(3) SCHEDULE - B
1. Whether the description of each item literally tally :- Yes
with the sanctioned estimate except specifying of
lead, lift etc.
2. Whether quantity of each item is as per sanctioned :- Yes
estimate, if not state the reasons with due justification
for deviation D.T.Ps.
3. Whether the rate for each item is as per sanctioned :- Yes
estimate ? if not, state the reasons with the
justification for deviation in covering letter of the
D.T.P. and incorporate the rate analysis in the D.T.P. ?
4. Whether the rates of each item in Schedule-B is :- Yes
mentioned in words in case of Item Rate Tender ?
5. Whether the unit of each item is as per sanctioned :- Yes
estimate ? If not, state the reasons with the
justification for deviation in covering letter of the
6. Whether the standard method is adopted in each items :- Yes
in writing the observed as Cum. and not C.M. etc.
7. Whether the Government remarks, if any, observed at :- Yes
the time of according sanction are fully incorporated
in the D.T.P. ? If so, submit the compliance report.
8. Whether correct name of work is entered at the top of :- Yes
9. Whether the standard form for Schedule-B is adopted :- Yes
10. Whether the standards words for discount or premium :- Yes
on tendered rate as I / We, am / are is mentioned at
11. Whether the amount worked out for each item is :- Yes
correctly calculated and summed up ?
12. Whether alternative items are proposed in the D.T.Ps. :- No
? If so, state the Item No. for proposed with reasons.
(4) DETAILED SPECIFICATIONS
1. Whether the detailed specification correctly reflect the :- Yes
2. Whether the item with specification lead and lift are :- Yes
covered in to with all lead and lifts ?
3. Whether the correct mode of payments is as :- Yes
4. Whether the correct mode of payment is as per :- Yes
5. Whether suitable use of excavated materials of cutting :- Yes
stuff is incorporated in the D.T.P. ?
6. Whether the mention, regarding the route to be :- Yes
carried out before execution is made in the D.T.P. ?
7. If so, state the Item No. with description and test to be :- Yes
carried out in brief ?
8. Whether the mention, regarding the tests to be carried :- Yes
during execution is made, state the Item No. with
description and details of test to be carried out in brief.
9. Whether reference to P.W.D. Hand Book, I.S. :- Yes
Specification or I.R.C. Clauses are mentioned
correctly and relevantly in the respectively item ?
10. Whether average rate of Earthe work is divided and :- Not Applicable
entered in Schedule-B ? If so, give Rate Analysis.
11. Whether the specification or alternative item, if any is :- Not Applicable
12. Whether the description of each item literally and :- Yes
exactly tally with that in Schedule-B ?
1. Whether statement of Item Not put to tender is :- Yes
incorporated with details ?
2. Whether the amount of sanctioned estimate tally with :- Yes
the total amount put to tender, amount of items not
the total amount put to tender, amount of items not
put to tender ?
3. Whether Page numbering in D.T.P. is made ? :- Yes
4. Whether permission to split up to work, if any is :- Question does not arise.
sought from the competent authority ?
5. Whether the general specification and other relevant :- Yes
records are incorporated in the D.T.P. ?
6. Whether Executive Engineer has signed the D.T.P. :- Yes
and all corrections are fully attested by him ?
7. Whether the D.T.P. are submitted in well bound :- Yes
volume and in tidy fashion ?
Dy. Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division, Panchayat (R & B) Division,
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under Suvidhapath
(Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
(To be issued by Deputy Executuve Engineer)
I have personally examined the D.T.P. & have personally
verified all the points and found to be in order. Further I have
satisfied my self with the fact that there is no ambiguity or
discrepancy in the D.T.P submitted herewith which may lead to
financial or contractual.
DRAFT TENDER PAPERS
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Divison Panchayat (R & B) Division
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under Suvidhapath
(Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
This is to certify that the specification of items drafted properly checked with schedule-"B" by me.
Add. Assistant Engineer of the
Executive Engineer
Panchayat (R & B) Division
This to certify that the Schedule - "B' of the tender is Arithmetically cheched by me.
Tender clerk of the
Executive Engineer
Panchayat (R & B) Division
This is to Certified that the specification of the items checked by me and same are prepare and as per situation
and sanction plan estimate. This is also Certifies that the correction made in circle office copy/ Govt. copy are
attached in other copies.
Dy.Executive Engineer
Panchyat (R & B) Sub Division
I have personally examined the Draft tender papers and I have personally verified all the order above points and
found to be in order. Further I have satisfied my self with the D.T.P. Submitted her with which may lead to
financial or Constructual implications.
DRAFT TENDER PAPERS.
Dy.Executive Engineer Sr.Divisional Account Officer Executive Engineer
Panchyat (R & B) Sub Division Panchayat (R & B) Division Panchayat (R & B) Division
Khambhat Anand Anand
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand
Under Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
STATEMENT SHOWING THE DIFFERENCE BETWEEN DTP & ESTIMATE AMOUNT
AMOUNT PUT TO TENDER
1 T.S. Estimate Amount : Rs. :
2 D. T. P. Amount : Rs. :
3 Difference : Rs. :
AMOUNT NOT PUT TO TENDER
ITEM CREATING DIFFERENCE
1 Difference due 1 % Q.C. Charges : Rs. :
2 Difference due 1 % Contigency
Charges : Rs. :
3 Road Safety Audit Rs. :
4 Add 18% GST Rs. :
5 Credit For Dismentalling & Rs. : - Deduct
6 Difference due to round figure in estimate : Rs. :
& Arithmatic Calculation Mistake
7 Difference due to Av. Rate in DTP : Rs. : (1.80)
8 Total Difference : Rs. :
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under
Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Taluka :Khambhat District : Anand
STATEMENT SHOWING CEMENT CONSUMPTION
cement to be Total Qty of
It No Item Unit Total Qty use in kg per cement
unit as per required in Kg.
1 7 Supplying and fixing reinforced concrete heavy dutynon-pressure Rmt 49.50 1.02
pipes with collars for culverts includingsetting and joining the pipes
in C.M. 1:2 watering andlaying (To level of slops of I.S. 458 /
Class NP4 offollowing internal diameter. (i) 300 mm dia.
2 9 Dry Lean Cement Concrete Sub- base:- Construction of dry lean Cum 249.00 220.00
cement concrete Sub- base over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm, aggregate cement ratio not to
exceed 15:1, aggregate gradation after blending to be as per table
600-1, cement content not to be less than 220 kg/ cum, optimum
moisture content to be determined during trial length construction,
concrete strength not to be less than 10 Mpa at 7 days, mixed in a
batching plant, transported to site, laid with a conventional method,
compacting with 8-10 tonnes vibratory roller, finishing and curing
3 10 Providing & Casting in situ ordinary cement concrete M-200 mix Cum 627.00 360.00
with Trimix C.C Road laid as directed including temping, vibrating,
finishing, curing and filling in joints with bitumen etc as per
Engineer Incharge.
4 12 Providing & fixing logo board of Suvidhapath as per standard Nos. 2.00 35.24
design of National Rural Road Development Agency diamond size
600 x 600 mm , 1.50mm thick plate & board size 900 x 250mm
1.50mm thick M.S. plate and 2.40 meter deep length single angle
75 x 75 x 6 mm size incl. fitting & painting lettering with luminous
colour as per drawing including fixing in C.C. 1:3:6 etc. complete.
STATEMENT SHOWING STEEL CONSUMPTION
Sr Total Qty in
It No Item Unit Qty
1 11 Providing TMT Bar FE500D reinforcement for R.C.C. work kg. 7508.00
including bending, binding and placing in position complete upto
floor two level
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of CC Pavement at Khambhat Taluka
Dist.:- Anand Under Suvidhapath (Normal) Pkg. No.
AND/SUVIDHAPATH/2025-26/07
DETAILS OF COST of Cement, Steel & Asphalt
Item Name of Material Qty Unit Rate Amount of
1 Cement OPC 53 Grade 280.62 MT 5234.00
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under
Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Sr No. Clause no Page
1 Principle Approval Date and - - :-
Amount (Attach letter)
2 Administrative Approval Date and - - :- APC/2024/Jo.No./14/D.1
Amount (Attach letter )
Dtd. 05/03/2026 Sr No. 9 for Rs.
lacs Under Suvidhapath Year 2025-26
Dtd. 10/03/2026 Sr No. 04 for Rs.
13.38 lacs Under Suvidhapath Year
3 Technical Approval Date and - - :-
Amount (Attach letter)
Construction of CC Pavement on Haidarpura Approach Road (VRNP) Ts. For Rs 5458280.00 By
Km. 0/000 to 0/420 Ta.:- Khambhat Dist.:- Anand E.E.Panchyat ,Panchayat (R&B)
Division, Anand as per Item No
Pg No 43 in March
Construction of CC Pavement on Vatra Vadiyapura Road (VRNP) Km. Ts. For Rs 1390710.00 By
0/000 to 0/150 Ta.:- Khambhat Dist.:- Anand E.E.Panchyat ,Panchayat (R&B)
Division, Anand, as per Item No
5 DTP amount IFB 4 :-
6 Tender Fee Rs. - - :- 2400.00 Rs
(As per GR- PRCH-102000-IB-
Above 10.0 Cr.- Rs 18000)
7 Earnest Money Deposit (Bid IFB 4 :-
Security-1% of DTP amount) Rs. point 6
8 Time Limit (Months) Section 3 41 :- 6 (Six) Months (Including Monsoon
9 Annual Financial Turnover Section 1 cl. 9 :-
Amount Rs. 4.5.3(a)
10 Defect Liability Period (In Section 3 46 :-
Months & includes no. of cl. 33.1 ( C ) 12 Months (including 1 monsoons)
11 Free Maintenance Guarantee Section 3 46 :-
Period (for Road & Bridge cl. 33.2 (b)
12 Registration/Category - - :-
required “D” class for Road and above
13 Site Possession Date Section 3 42 :- 1st day of Work order#
14 Period between Program Section 3 44 :- 30 days
Update (Days) cl.
15 Amount to be withheld for late Section 3 44 :- 1.00 Lakh
submission of Program cl.
16 Milestone: - Section 3 53 :- % of work Days
(A) Milestone 1 - - :- 25% 45 Days
(B) Milestone 2 - - :- 50% 90 Days
(C) Milestone 3 - - :- 75% 135 Days
(D) Milestone 4 - - :- 100% 180 Days
#In case of LA/FRA is in progress give likely date.
17 Price Adjustment Components Section 4 66 :- % Input
cl. 24 index/price*
(A) Labour, PL Section 4 66 :- PL= 19.43 Lo=
(B) Cement, PC Section 4 66 :- PC= 25.64 Co=
(C) Steel, PS Section 4 67 :- PS= 7.79 So=
(D) Bitumen, Pb Section 4 67 :- Pb= 0.00 Bo=
(E) POL, Pf Section 4 68 :- Pf= 4.54 Fo=
(F) Plant and Machinery Spares Pp Section 4 68 :- Pp= 14.25 Po=
(G) Other Materials, Pm Section 4 69 :- Pm= 28.36 Mo=
18 Amount to be withheld Section 3 56 :- 2.00 Lakh
for failing to supply “as cl.
built” drawings
19 Percentage Rate Contract Section 7 78 :-
*Input index/price for each component on 28 days preceding the date of opening of technical bid shall be
This is to certify that the contract document prepared for the work
Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under
Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
is based on the Standard Bidding Document Procurement of Civil Works published
by R&B department letter No. RBD/0346/10/2023 dated 12/10/2023.
No further modification and alteration in this standard format has been made by this office.
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Superintending Engineer
Panchayat (R&B) Circle
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under
Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
STATEMENT SHOWING THE PRICE ADJUSTMENT
Details of Component Tender Cost of
[F] Plant and Machinery Spares, Pp = 816212.27 x 100 / 5728553.545 = 14.25 %
Dy.Executive Engineer Sr.Divisional Account Officer Executive Engineer
Panchyat (R & B) Sub Division Panchayat (R & B) Division Panchayat (R & B) Division
Khambhat Anand Anand
Name Of Work :- Construction of CC Pavement at Khambhat Taluka Dist.:- Anand Under Suvidhapath (Normal) Pkg. No. AND/SUVIDHAPATH/2025-26/07
Component of Work for Price Variation
Estimated Cement Component Steel Component Asphalt Component Other Material Labour Component Plant and Machinary POL
Qty. Item of Work / BOQ Unit Consp. Amount Consp. Amount Consp. Amount
Rate Consp. 5.234 Consp. 59420 Consp. 40532 % Amount % Amount % Amount % Amount
Clearing and grubbing road land including uprooting
rank vegetation grass bushes,shrubs,sapling and trees
girth up to 300 mm removal of stumps of trees cut
earlier and disposal of unserviceable materials (C) By
Scarifying gravelled macadam or bitumen macadam
surface 6 cm to 10 cm.depth including stacking useful
materials on road side and disposing off remaining
Earthwork for embankment including breaking clods,
3 101 dressing with all lead and lift (excluding watering and 180.88 Cum 18268.88 0 0 0 0 5.29 966.42 66.3 12112.27 28.41
consolidation) (C) From Borrow area within 1.0 Km.lead
Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed upto all lead.
Providing laying and spreading mix material gradation
equivalent to GSB grade II ,MCBT Metal 20-40 mm
with Fine aggregate material in required proportion so
5 477 as to have, mixing in place with rotavator and grading 2060.53 Cum 982872.81 0 0 0 60 589723.69 20 196574.56 13 127773.47 7
with mortar grader at OMC and compacted with
vibratory roller 80 to 100 KN static weight to achieve
desired density etc. complete
Conveyance of excavated earth/ unuseable material
available from box cutting/ scarifying the existing road
6 130 surface etc. up to 1.0 km. lead including loading, 258.11 Cum 33554.3 0 0 0 0 30 10066.29 55 18454.87 15
unloading and spreading the material on road side as
and where directed.
Supplying and fixing reinforced concrete heavy
dutynon-pressure pipes with collars for culverts
includingsetting and joining the pipes in C.M. 1:2
watering andlaying (To level of slops of I.S. 458 /
Class NP4 offollowing internal diameter. (i) 300 mm
Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick with grade of
concrete M300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming
to IS 15658 : 2006 including 35 mm Sand layer for
levelling and filling the joint with sand in proper line
and level as per guidlines of IRC : SP 63-2018 etc.
Dry Lean Cement Concrete Sub- base:- Construction
of dry lean cement concrete Sub- base over a
prepared sub-grade with coarse and fine aggregate
conforming to IS: 383, the size of coarse aggregate
not exceeding 25 mm, aggregate cement ratio not to
exceed 15:1, aggregate gradation after blending to be
220 kg/ cum, optimum moisture content to be
determined during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days, mixed in
a batching plant, transported to site, laid with a
conventional method, compacting with 8-10 tonnes
vibratory roller, finishing and curing etc. complete.
Estimated Cement Component Steel Component Asphalt Component Other Material Labour Component Plant and Machinary POL
Qty. Item of Work / BOQ Unit Consp. Amount Consp. Amount Consp. Amount
Rate Consp. 5.234 Consp. 59420 Consp. 40532 % Amount % Amount % Amount % Amount
Providing & Casting in situ ordinary cement concrete
M-200 mix with Trimix C.C Road laid as directed
including temping, vibrating, finishing, curing and filling
in joints with bitumen etc as per Engineer Incharge.
Providing TMT Bar FE500D reinforcement for R.C.C.
11 7508 work including bending, binding and placing in position 77.29 kg. 580293.32 0 7.51 446125.36 0 5.77 33487.07 10.3 59770.21 6.87 39866.15 0.18
complete upto floor two level
Providing & fixing logo board of Suvidhapath as per
standard design of National Rural Road Development
Agency diamond size 600 x 600 mm , 1.50mm thick
plate & board size 900 x 250mm , 1.50mm thick M.S.
plate and 2.40 meter deep length single angle 75 x
x 6 mm size incl. fitting & painting lettering with
luminous colour as per drawing including fixing in C.C.
1:3:6 etc. complete.
Deputy Executive Engineer Sr.Divisional Account Officer Executive Engineer
Panchayat (R&B) Sub Division Panchayat (R & B) Division Panchayat (R&B) Division
Khambhat Anand Anand
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD_Suvidhapath_Khambhat_Pkg_07.pdf
02. Sch B_Suvidhapath_Khambhat_Pkg_07.pdf
03 Specifications_Suvidhapath_Khambhat_Pkg_.pdf
Drawing.pdf
GRs - SBD with Index - Part 1.pdf
GRs - SBD with Index - Part 2.pdf
RMC GR.pdf
Suvidha Path Guideline (1).pdf
Suvidhapath 3A.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].