Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹14.1 L+₹4,092.76 (0.29%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹14.1 L+₹6,062.62 (0.43%)Accepted-Finance 411 D JEEWAN PURAM BISHT DHARA BITHORIYA NO 1 HALDWANI HALDWANI NAINITAL UTTARAKHAND 263139 | NAINITAL | UTTARAKHAND | 263139 | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | RAGHVENDRA SINGH BOHRA L3 | SHAGUN ELECTRICALS AND CONSTRUCTION L1 | CHAUHAN ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Supply of Decentralized material as per UPCL Norms. | ||||||
| 1.01 | PP & CLAMP WITH N&B ST | 56 | NOS | 352 ₹19,712 | 350 ₹19,600 Lowest | 351 ₹19,656 |
| 1.02 | LT CLAMP WITH N&B ST POLE | 48 | NOS | 338 ₹16,224 | 337 ₹16,176 Lowest | 337 ₹16,176 Lowest |
| 1.03 | Earth Wire Clamp | 150 | NOS | 326 ₹48,900 | 325 ₹48,750 Lowest | 325 ₹48,750 Lowest |
| 1.04 | Aluminium Lugs 'O' type size 95
m | 52 | NOS | 151 ₹7,852 | 150 ₹7,800 Lowest | 150 ₹7,800 Lowest |
| 1.05 | Shackle Insulator | 550 | NOS | 100 ₹55,000 | 99 ₹54,450 Lowest | 100 ₹55,000 |
| 1.06 | STAY INSULATOR | 150 | NOS | 100 ₹15,000 Lowest | 100 ₹15,000 Lowest | 100 ₹15,000 Lowest |
| 1.07 | STAY CLAMP FOR SP-33 | 28 | NOS | 351 ₹9,828 | 350 ₹9,800 Lowest | 351 ₹9,828 |
| 1.08 | MS NUT & BOLT OFF SIZE | 95 | KG | 122 ₹11,590 | 120 ₹11,400 Lowest | 122 ₹11,590 |
| 1.09 | LT Clamp For Pcc Pole | 500 | NOS | 326 ₹1,63,000 | 325 ₹1,62,500 Lowest | 325.5 ₹1,62,750 |
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
18 Mar 2026, 2:00 pmClosed
Executive Engineer
Office Of the Executive Engineer EDD UPCL Sitarganj
Con. of New 11/04 S/S 11 KV Line and DTR Capicity Increasing Under Nanakmatta S/S
2026_UPCL3_92578_1
34/2025-26 EDD SITARGANJ
Open Tender
Electrical Works
Piece-work
90 days
Under EDD UPCL SItarganj
As Per Tender Document
3 documents required · 3 mandatory
₹1,180
Yes
EE EDD Sitarganj
₹45,000
Yes
1 Apr 2026
2 Mar 2026
20 Mar 2026
2 Mar 2026
18 Mar 2026
2 Mar 2026
Supply of Decentralized material as per UPCL Norms.
PP & CLAMP WITH N&B ST
LT CLAMP WITH N&B ST POLE
Earth Wire Clamp
Aluminium Lugs 'O' type size 95 m
Shackle Insulator
STAY INSULATOR
STAY CLAMP FOR SP-33
MS NUT & BOLT OFF SIZE
LT Clamp For Pcc Pole
F-CLAMP
X ARM HOLDING CLAMP
Following work as per UPCL norms & site requirement.
MUFFING OF POLE
CARTAGE OF PETTY METERIAL 21-50 KM
EXCAVATION OF PIT FOR
ERECTION OF SINGLE PCC POLE
GROUTING OF STAY SET
ERECTION OF SP-33 DOUBLE POLE
EXCAVATION OF PIT FOR stay set
GROUTING OF POLE
CARTAGE OF 63 KVA DTR, 21-50 KM
LAYING OF WEASEL CONDUCTOR IN HT LINE
LAYING OF 1P 2W LT LINE(WEASEL
ERECTION OF EARTHING ROD
LAYING OF 3P 4W LT LINE (WEASEL)
CARTAGE SP-33 POLE, 21-50 KM
CARTAGE PCC POLE, 21-50 km
LAYING OF 2P 3W LT LINE (WEASEL)
INST. OF 63 KVA DTR ON POLE STRUCTURE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
tenderdocument34.pdf
Tender Documents • 1.64 MB
FormAandB.pdf
Other Document • 0.67 MB
BOQ_109583.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .