Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC | L1 | Accepted-AOC As being L1 and qualifies eligibility criteria | |
| 2 | Rejected-Technical OLD GM OFFICE HALDIBADI CHIRIMIRI DISTT MCB C G 497451 | CHIRIMIRI | KOREA | CHHATTISGARH | 497451 | - | Rejected-Technical Not taken for technical evaluation as not being L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not taken for technical evaluation as not being L1 | |
| 4 | Rejected-Technical WARD NO 15 PANKHA DAFAI HALDIBARI CHIRIMIRI DISTT KOREA C G 497451 | KOREA | CHHATTISGARH | 497451 | - | Rejected-Technical Not taken for technical evaluation as not being L1 |
Tender Value
₹37.6 L
EMD Value
₹47,100
Closing Date
6 Mar 2023, 5:00 pmClosed
Staff Officer (EnM), Chirimiri Area
Office of the General Manager, SECL Chirimiri Area , P.O. West Chirimiri Distt. MCB (C.G.) 497773
Marching/Shifting of UDMs , LHD Machines and shifting of Gate End Boxes, Drill Panels, Drill Machines amd support of cables and shifting of main ACBs, coupled ACBs with armoured cable and laying from 25S/45E to 25S/65E, 30S/45E to 30S/65E and 35S/45E
2023_SECL_272261_1
SECL/GM/CHRM/EM/e-Tender/ 22-23/22 dtd. 21.02.2023
Open Tender
Miscellaneous Works
Item Rate
307 days
Kurasia UG Mine, Chirimiri Area
As per NIT
3 documents required · 3 mandatory
₹47,100
26 May 2023
22 Feb 2023
7 Mar 2023
22 Feb 2023
6 Mar 2023
23 Feb 2023
23 Feb 2023 - 2 Mar 2023
Amount
Marching/shifting of SDL/LHD/UDM from surface to the underground working distt. and vice versa, also applicable for marching from one distt. to another district. (04 Nos. LHD and 04 Nos. UDM) (Total Distance = 950 mtrs., rate to be quoted for every 400 mtrs. marching, So, same activity is to be carried out 03 times) Carrying out the same activity 03 times. So, no. of shifting required = 8 x 3 = 24 nos.
Shifting of Gate End Box , Drill Panel , Drill Machine and their cables & support of cables within the district. (Gate End Box = 08 nos. and Drill Panel = 04 Nos.) (Total Distance = 950 mtrs., rate to be quoted for every 50 mtrs. shifting, So, same activity is to be carried out 19 times) Carrying out the same activity 19 times. So, no. of shifting required = 19 x 12 = 228 nos.
Shifting of Main ACB, coupled ACB with 100m armoured cables (50/70/90 sq.mm) laying thereof within the district in UG. (Total Distance = 950 mtrs.)
Total impact of GST for the purpose of CTC
VINOD KUMAR PANDEY
RAJ KUAMR SINGH
RU CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_281728.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .