| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed | |
| 2 | L2₹5.7 L+₹42,012.33 (7.94%)Rejected-Finance | L2 | Rejected-Finance Second Bidder |
| Sl No | Description | Qty | Unit | HANEEFA P V L1 | SUVIN M P L2 |
|---|---|---|---|---|---|
| 1.00Rennovation work of Sunshade | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 25.2 | cum | 3,187.2 ₹80,317.44 Lowest | 3,440.15 ₹86,691.78 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1,387.93 | kg | 162.36 ₹2,25,344.64 Lowest | 175.25 ₹2,43,235.08 |
| 1.00 | OD38019/2026-2027:Providing and fixing 0.35mm or nearest size thick powder coated GI trafford sheet of good
quality up to any pitch including fixing J or Lhooks,bolts and nuts etc complete excluding
purlins rafters etc complete. 12.1 modified | 337.5 | sqm | 579.81 ₹1,95,685.88 Lowest | 625.83 ₹2,11,217.63 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 90 | sqm | 310.21 ₹27,918.9 Lowest | 334.83 ₹30,134.7 |
Tender Value
₹5.6 L
EMD Value
₹14,002
Closing Date
12 Jun 2026, 6:00 pmClosed
Superintending Engineer
O/o SE, Kozhikode Corporation, [email protected]
Please refer Tender document
2026_LSGD_854619_1
PP/EG7/2026-27/SE/11/14
Open Tender
Civil Works - Buildings
Item Rate
180 days
KOZHIKODE CORPORATION
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,235
Yes
₹14,002
Yes
27 Jul 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rennovation work of Sunshade | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.002 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.8 | kg | - | - |
| 1.003 | OD38019/2026-2027:Providing and fixing 0.35mm or nearest size thick powder coated GI trafford sheet of good
quality up to any pitch including fixing J or Lhooks,bolts and nuts etc complete excluding
purlins rafters etc complete. 12.1 modified | - | sqm | - | - |
| 1.004 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1444381.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PRELIMINARYAGREEMENTCOMMON.pdf
Tender Documents • 0.14 MB
ePay.pdf
Tender Documents • 0.01 MB
FIP.pdf
Tender Documents • 0.01 MB
Affidavit.pdf
Tender Documents • 0.31 MB
FOT.pdf
Tender Documents • 0.01 MB
BOQ_1444381.xls
BOQ • 0.30 MB
viewsbd14.pdf
Tender Documents • 1.64 MB
timeextension.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .