Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
8 Jan 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (P and P) UC
DGM (P and P) UC FACT LTD, Udyogamandal
OFC Cable Laying, MCT Fixing and Tray works in SO2 plants,Fert-UC ,Instrumentation.
2020_FACT_604229_1
3004/2020-2021/E22668
Limited
Miscellaneous Works
Item Rate
FACT UDYOGAMANDAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
9 Jan 2021
18 Dec 2020
9 Jan 2021
18 Dec 2020
8 Jan 2021
18 Dec 2020
90 days
Instrumentation OFC Cable Laying, MCT Fixing and Tray works in SO2 plants, Fert-UC
The scope of work includes installation/ laying of 2 OFC cables through HDPE conduit. 2 No’s OFC cable [ 13.2mm(approx.) OD ]to be inserted into 32mm or higher(suitable for two OFC cables) HDPE conduit (Suitable for use with Armoured OFC Cables, Colour: Orange/ Approved by Engineer in charge) and laying on existing cable tray/ rack / clamping on the wall / structure / routing under cavity floor / through GI pipe/trenches. The cables are to be laid from Local Control Rooms/ RIO rooms to Main control room. Dressing of cables in racks shall be by using Aluminium/ SS cable tie at intervals of minimum 1 meter on horizontal runs and 60 cm on vertical runs. Clamping of cables on structure shall be by welding and fixing suitable cleats. The scope of work includes making SS tags with cable numbers punched on it [as per cable schedule] and fixing them on both ends of the cables before entering the panels or control room. The tags may be tied to the cable using SS wires. Supply of all items other than OFC cables, required for the completion of installation of conduits and OFC cables, like HDPE conduits, Connectors, End Cap, Fittings, Sealing Materials, Aluminium strips, SS tags, SS wires, SS screw etc. are included in the scope of bidder.
The scope of work includes installation/ laying of 1 OFC cable through HDPE conduit. 1 No OFC cable [ 13.2mm(approx.) OD ]to be inserted into 32mm HDPE conduit (Suitable for use with Armoured OFC Cables, Colour: Orange/ Approved by Engineer in charge) and laying on existing cable tray/ rack / clamping on the wall / structure / routing under cavity floor / through GI pipe/trenches. The cables are to be laid from Local Control Rooms/ RIO rooms to Main control room. Dressing of cables in racks shall be by using Aluminium/ SS cable tie at intervals of minimum 1 meter on horizontal runs and 60 cm on vertical runs. Clamping of cables on structure shall be by welding and fixing suitable cleats. The scope of work includes making SS tags with cable numbers punched on it [as per cable schedule] and fixing them on both ends of the cables before entering the panels or control room. The tags may be tied to the cable using SS wires. Supply of all items other than OFC cables, required for the completion of installation of conduits and OFC cables, like HDPE conduits, Connectors, End Cap, Fittings, Sealing Materials, Aluminium strips, SS tags, SS wires, SS screw etc. are included in the scope of bidder.
Multi Cable Transit (MCT) fixing work in cable entry cut-outs of DCS Main Control Room (MCR). The work shall include: a. Arranging of cables to suit the MCT cut-out dimension. b. Covering and finishing of unused portion of existing cut-out with brick work and plastering. c. Fixing up of the frame/ opening the frame and taking in all the cables in respective windows. d: Sealing the cables with suitable MCT EPDM modules according to the cable size. e: Install the wedge at the top of window of the frame & tighten accordingly to seal it properly. No of cut-outs: 3 No's (1m x 0.4m) MCT Frame size, Cable size and quantity shall be as per attached Annexure C – MCT Summary (Sl No. 1, 2 & 3) Supply of MCT Frame with Blocks and all required accessories shall be in the scope of the contractor. The supply shall include Stainless Steel Frame & Compression Wedge, Galvanized Steel Stay Plates, Lubricant, etc. Supply of required plastering materials like brick, cement, sand etc. shall be under the scope of the contractor.
Multi Cable Transit (MCT) fixing work in cable entry cut-outs of DCS Acid Remote I/O Room (ACID). The work shall include: a. Arranging of cables to suit the MCT cut-out dimension. b. Covering and finishing of unused portion of existing cut-out with brick work and plastering. c. Fixing up of the frame/ opening the frame and taking in all the cables in respective windows. d: Sealing the cables with suitable MCT EPDM modules according to the cable size. e: Install the wedge at the top of window of the frame & tighten accordingly to seal it properly. No of cut-outs: 3 No's (a.0.9m x 0.3m, b. 0.9m x0.3m and c. 0.6m x0.3m) MCT Frame size, Cable size and quantity shall be as per attached Annexure C – MCT Summary (Sl No. 4, 5 & 6) Supply of MCT Frame with Blocks and all required accessories shall be in the scope of the contractor. The supply shall include Stainless Steel Frame & Compression Wedge, Galvanized Steel Stay Plates, Lubricant, etc. Supply of required plastering materials like brick, cement, sand etc. shall be under the scope of the contractor.
Multi Cable Transit (MCT) fixing work in cable entry cut-outs of DCS NP3 Remote I/O Room (NP3). The work shall include: a. Arranging of cables to suit the MCT cut-out dimension. b. Covering and finishing of unused portion of existing cut-out with brick work and plastering. c. Fixing up of the frame/ opening the frame and taking in all the cables in respective windows. d: Sealing the cables with suitable MCT EPDM modules according to the cable size. e: Install the wedge at the top of window of the frame & tighten accordingly to seal it properly. No of cut-outs: 3 No's (a.0.6m x 0.3m, b. 0.6m x0.3m and c. 0.3m x0.3m) MCT Frame size, Cable size and quantity shall be as per attached Annexure C – MCT Summary (Sl No. 7, 8 & 9) Supply of MCT Frame with Blocks and all required accessories shall be in the scope of the contractor. The supply shall include Stainless Steel Frame & Compression Wedge, Galvanized Steel Stay Plates, Lubricant, etc. Supply of required plastering materials like brick, cement, sand etc. shall be under the scope of the contractor.
Multi Cable Transit (MCT) fixing work in cable entry cut-outs of DCS NP4 Remote I/O Room (NP4). The work shall include: a. Arranging of cables to suit the MCT cut-out dimension. b. Covering and finishing of unused portion of existing cut-out with brick work and plastering. c. Fixing up of the frame/ opening the frame and taking in all the cables in respective windows. d: Sealing the cables with suitable MCT EPDM modules according to the cable size. e: Install the wedge at the top of window of the frame & tighten accordingly to seal it properly. No of cut-outs: 2 No's (a.0.6m x 0.3m and b. 0.6m x0.3m) MCT Frame size, Cable size and quantity shall be as per attached Annexure C – MCT Summary (Sl No. 10 & 11) Supply of MCT Frame with Blocks and all required accessories shall be in the scope of the contractor. The supply shall include Stainless Steel Frame & Compression Wedge, Galvanized Steel Stay Plates, Lubricant, etc. Supply of required plastering materials like brick, cement, sand etc. shall be under the scope of the contractor.
Fixing of Perforated Aluminium cable trays of size 2.5x50x25mm or Aluminium angles of size 50x50x6mm on to new/ existing MS supports in Fert-UC plants. The work shall include supply of SS304 nuts, bolts, washers required for the fixing of cable trays. Painting of MS supports with one coat of epoxy-based primer and two coats of epoxy paint of dark grey colour. Breaking of walls, sunshade etc to carry out the work comes under the scope of the contractor. Perforated Aluminium cable trays and MS structurals will be supplied by FACT free of cost.
Fixing of Perforated Aluminium cable trays of size 2.5x200x20mm or 2.5x300x30mm on to new/ existing MS supports in Fert-UC plants. The work shall include supply of SS304 nuts, bolts, washers required for the fixing of cable trays. Painting of MS supports with one coat of epoxy-based primer and two coats of epoxy paint of dark grey colour. Breaking of walls, sunshade etc to carry out the work comes under the scope of the contractor. Perforated Aluminium cable trays and MS structurals will be supplied by FACT free of cost.
Fabrication and errection of ladder type cable racks of size 65cm/40cm/30cm/20cm using Aluminium angles of size 50x50x6mm and Aluminium flats of size 50x8mm and their erection in wall/ supports in the Fert UC plants. Aluminium flat cable supports shall be provided as cross bar at intervals of 400mm by drilling two numbers of holes at each end and fixing it with fasteners SS304-size 8mm with 2nos of washers. The fixing of the fabricated rack shall be by using proper aluminium/ MS angle support or using proper anchor fasteners. The work shall include supply of SS304 nuts, bolts, washers required for the fabrication of cable trays, painting of MS supports with one coat of epoxy-based primer and two coats of epoxy paint of dark grey colour. Breaking of walls, sunshade etc to carry out the work comes under the scope of the contractor.The Aluminium angle & flat, MS structurals will be supplied by FACT free of cost.
INFANT JESUS SMITH AND ENNG WORKS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .