Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | ₹15.0 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹15.1 L+₹2,964 (0.20%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | ₹15.1 L+₹2,964 (0.20%) | L2 | Rejected-Finance High |
| 3 | L3₹15.1 L+₹5,904 (0.39%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | ₹15.1 L+₹5,904 (0.39%) | L3 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | ORIENTAL ENGINEERING CO. L2 | DAS ENTERPRISE L1 | WEST BENGAL ENGINEERING CO. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation and guarding of 11 KV/ 0.433 KV , 1 No. 100KVA transformer, L.T. Panel board, 30 KVA Voltage Stabilizer including operation of 2 nos. 20 HP & 2 nos. 25 HP Centrifugal pumps with all accessories and ancillaries for 24 hours a day, sweeping of the work site daily by engaging skilled, semi skilled, unskilled personnel including watch & word personnel. | 12 | Months | 1,05,122 ₹12,61,464 | 1,05,065 ₹12,60,780 Lowest | 1,05,185 ₹12,62,220 |
| 2.00 | Periodical inspection, 2 times in a month (5 days in each visit) by Electrical Supervisor having valid Supervisors’ Certificate of competency from Directorate of Electricity (Licencing Board) Govt. of W.B. under any other state Govt. of India.
Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the sub-station building. The Supervisor requires to have thorough / in- depth inspection of all the electrical appliances to ascertain the healthy/ fault- free operational condition of each equipment i.e. VLE transformers, L.T. PDB, along with in- house lighting system etc. | 12 | Months | 8,599 ₹1,03,188 | 8,522 ₹1,02,264 Lowest | 8,635 ₹1,03,620 |
| 3.00 | Minor maintenance of pumping machinery & auxiliary & ancillary by providing necessary servicing materials such as gland packing , fuses , cotton waste, cleaning aids , Gloves , Aprons etc. | 12 | Months | 2,433 ₹29,196 | 2,390 ₹28,680 Lowest | 2,499 ₹29,988 |
| 4.00 | Cleaning of sump by providing suitable man power with necessary sundry materials. | 12 | Months | 9,508 ₹1,14,096 | 9,438 ₹1,13,256 Lowest | 9,588 ₹1,15,056 |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
16 Jan 2026, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer Mechanical_Electrical Division Berhampore PH Engineering Dte Netaji Subhas Road P H E River Side Complex Berhampore Murshidabad PIN_742101
Operation and Maintenance of Centrifugal Sludge pump andother accessories of Main sewerage pumping station at Berhampore under G.A.P. Ph-I in the dist. Of Murshidabad.
2025_PHED_972589_24
WBPHED/EE/MEDB/NIeQ-14 of 2025-26
Open Tender
MECHANICAL
Item Rate
365 days
Berhampore
Operation and Maintenance of Centrifugal Sludge pump andother accessories of Main sewerage pumping station at Berhampore under G.A.P. Ph-I in the dist. Of Murshidabad.
10 documents required · 10 mandatory
₹32,000
25 Aug 2026
17 Dec 2025
19 Jan 2026
17 Dec 2025
16 Jan 2026
17 Dec 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .