Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAccepted-AOC | ₹32.7 L Quoted ₹33.3 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹34.2 L+₹92,677 (2.79%)Rejected-Finance | ₹34.2 L+₹92,677 (2.79%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹34.2 L+₹98,603 (2.96%)Rejected-Finance INDEX NO D 302 CC MOHALLA KANOON GOYAN BUKHARA FARIDPUR ROAD DAYAL CLINIC KANOONGOYAN MOHALLA FARIDPUR BAREILLY UP 243503 | BAREILLY | BAREILLY | UP | 243503 | ₹34.2 L+₹98,603 (2.96%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹34.5 L+₹1.2 L (3.63%)Rejected-Finance H NO 71B TILIYAPUR C B GANJ BAREILLY 243502 UP | BAREILLY | UTTAR PRADESH | 243502 | ₹34.5 L+₹1.2 L (3.63%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹34.6 L+₹1.3 L (3.99%)Rejected-Finance 10 MAKHAN LAL SADHUKHAN LANE PO PS BARRACKPORE KOLKATA 700120 W B | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700120 | ₹34.6 L+₹1.3 L (3.99%) | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M/S R S Constructions L1 | j u enterprises L2 | R K CONSTRUCTION L5 | NETRAPAL SINGH L6 | QUALITY CONSTRUCTIONS L4 | Vasundhra Enterprises L7 | KUSH TOMAR L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed. | 470 | Sqm | 12 ₹5,640 | 15 ₹7,050 | 10 ₹4,700 Lowest | 30 ₹14,100 | 15 ₹7,050 | 10 ₹4,700 Lowest | 10 ₹4,700 Lowest |
| 2.00 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 250 | Sqm | 12 ₹3,000 | 15 ₹3,750 | 10 ₹2,500 Lowest | 30 ₹7,500 | 20 ₹5,000 | 10 ₹2,500 Lowest | 15 ₹3,750 |
| 3.00 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc. complete all as specified and directed. | 11 | 10 Sqm | 100 ₹1,100 | 80 ₹880 | 100 ₹1,100 | 100 ₹1,100 | 50 ₹550 | 150 ₹1,650 | 20 ₹220 Lowest |
| 4.00 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove complete all as specified and directed. | 20 | Sqm | 10 ₹200 Lowest | 30 ₹600 | 25 ₹500 | 100 ₹2,000 | 20 ₹400 | 15 ₹300 | 10 ₹200 Lowest |
| 5.00 | Demolition of Concrete is ground floors andy pavings n exc 15 cm thickness (below or above ground level)complete all as specified and directed by Engineer-in-Charge. | 10.2 | Cum | 125 ₹1,275 | 130 ₹1,326 | 250 ₹2,550 | 400 ₹4,080 | 100 ₹1,020 Lowest | 250 ₹2,550 | 150 ₹1,530 |
| 6.00 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles complete all as specified and directed. | 5 | Cum | 95 ₹475 Lowest | 150 ₹750 | 250 ₹1,250 | 300 ₹1,500 | 100 ₹500 | 250 ₹1,250 | 200 ₹1,000 |
| 7.00 | Demolition of concrete of any description and in any position not otherwise specifically provided complete all as specified and directed. | 0.3 | Cum | 100 ₹30 Lowest | 140 ₹42 | 250 ₹75 | 300 ₹90 | 100 ₹30 Lowest | 250 ₹75 | 500 ₹150 |
| 8.00 | Taking down chowkats or frames not exceeding 1.5 Sqm each with shutter (without taking off shutter from the frame) removing from site complete all as specified and directed by Engineer-in-Charge. | 27 | Each | 60 ₹1,620 | 90 ₹2,430 | 50 ₹1,350 Lowest | 100 ₹2,700 | 50 ₹1,350 Lowest | 80 ₹2,160 | 150 ₹4,050 |
| 9.00 | Taking down chowkats or frames exceeding 1.5 Sqm but not exceeding 4 Sqm each with shutter (without taking off shutter from the frame) removing from site complete all as specified and directed by Engineer-in-Charge. | 18 | Each | 70 ₹1,260 | 80 ₹1,440 | 50 ₹900 Lowest | 100 ₹1,800 | 65 ₹1,170 | 80 ₹1,440 | 120 ₹2,160 |
| 10.00 | Taking down shutter of any description exc. 1 sqm but n.exc 2 sqm each and removing from site complete all as specified and directed by Engineer-in-Charge. | 32 | Each | 25 ₹800 Lowest | 80 ₹2,560 | 50 ₹1,600 | 100 ₹3,200 | 40 ₹1,280 | 80 ₹2,560 | 150 ₹4,800 |
Tender Value
₹48.7 L
EMD Value
₹97,380
Closing Date
28 Jul 2026, 6:00 pmClosed
CWE Bareilly
HEADQUARTERS, COMMANDER WORKS ENGINEER, MILITARY ENGINEER SERVICES, STATION ROAD, BAREILLY CANTT, PIN 243001
CA NO.CWE BLY/GE (E)/59 OF 2026- 2027SPECIAL REPAIRS TO OR BLDG NO. T-28 (01 TO 09) OF 6 MTN DIV SING REGT UNDER GE (EAST) BAREILLY
2026_MES_777038_1
8200/B/932/E8
Open Tender
Civil Works
Item Rate
180 days
Bareilly
As per NIT
6 documents required · 6 mandatory
₹500
GE (East) Bareilly
₹97,380
Yes
5 Sept 2026
7 Jul 2026
4 Aug 2026
7 Jul 2026
28 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed. | 470 | Sqm | -1 | - |
| 2 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 250 | Sqm | -1 | - |
| 3 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc. complete all as specified and directed. | 11 | 10 Sqm | -1 | - |
| 4 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove complete all as specified and directed. | 20 | Sqm | -1 | - |
| 5 | Demolition of Concrete is ground floors andy pavings n exc 15 cm thickness (below or above ground level)complete all as specified and directed by Engineer-in-Charge. | 10.2 | Cum | -1 | - |
| 6 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles complete all as specified and directed. | 5 | Cum | -1 | - |
| 7 | Demolition of concrete of any description and in any position not otherwise specifically provided complete all as specified and directed. | 0.3 | Cum | -1 | - |
| 8 | Taking down chowkats or frames not exceeding 1.5 Sqm each with shutter (without taking off shutter from the frame) removing from site complete all as specified and directed by Engineer-in-Charge. | 27 | Each | -1 | - |
| 9 | Taking down chowkats or frames exceeding 1.5 Sqm but not exceeding 4 Sqm each with shutter (without taking off shutter from the frame) removing from site complete all as specified and directed by Engineer-in-Charge. | 18 | Each | -1 | - |
| 10 | Taking down shutter of any description exc. 1 sqm but n.exc 2 sqm each and removing from site complete all as specified and directed by Engineer-in-Charge. | 32 | Each | -1 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_870212.xls
BOQ • 0.34 MB
PS_59.pdf
Tender Documents • 2.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .