Loading…
Loading…
Tender Value
₹22.4 L
EMD Value
₹44,900
Closing Date
3 Sept 2026, 4:00 pm
Executive Enginner Nyoma Division
office of the Executive Engineer Nyoman Division
DEVELOPMENT WORKS AT OFFICE PREMISES AT FIP KOYUL.
2026_PWD_19425_1
86 of Rnb Nyoma 2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Nyoma Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,245
Executive Engineer RnB Nyoma
₹44,900
24 Aug 2026
24 Aug 2026
4 Sept 2026
24 Aug 2026
3 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 55.99 | Cum | 278.09 | ₹15,570.26 |
| 2 | Dumping of solling stone in horizontal layer including cost of Stone complete job. | 16.97 | Cum | 953.03 | ₹16,172.92 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.86 | Cum | 5,725.33 | ₹10,649.11 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.25 | Cum | 11,102.31 | ₹91,594.06 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 925.6 | Kgs | 109.33 | ₹1,01,195.85 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 27.6 | Sqm | 635.45 | ₹17,538.42 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 8.21 | Sqm | 738.64 | ₹6,064.23 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m | 27.33 | cum | 220.41 | ₹6,023.81 |
| 9 | 12 mm cement plaster finished with a floating coat of neat cement of mix 1:3 (1 cement: 3 fine sand) | 66.92 | Sqm | 416.81 | ₹27,892.93 |
| 10 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) | 10.44 | Sqm | 257.87 | ₹2,692.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_46067.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].