| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | LINU RAJ L1 |
|---|---|---|---|---|
| 1.00 | 2.32
Clearing grass and removal of the rubbish up to a distance of 50 m outside the
periphery of the area cleared. | 9 | sqm | 8.93 ₹80.33 Lowest |
| 1.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.6 | Cum | 346.33 ₹4,363.76 Lowest |
| 1.00 | 4.1.4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse
sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.57 | Cum | 8,725.53 ₹13,742.71 Lowest |
| 1.00 | 5.1.3
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | 1 | Cum | 9,593.27 ₹9,593.27 Lowest |
| 1.00 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 1.05 | Cum | 10,098.6 ₹10,643.92 Lowest |
| 1.01 | 14.72
Providing and fixing double scaffolding system (cup lock type) on the exterior side,
upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre,
horizontal & vertical tubes joining with cup & lock system with M.S. tubes,
M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for
working platform etc. and maintaining it in a serviceable condition for the required
duration as approved and removing it there after. The scaffolding system shall be
stiffened with bracings, runners, connection with the building etc wherever required
for inspection of work at required location with essential safety features for the
workmen etc. complete as per directions and approval of Engineer- in Charge. The
elevational area of the scaffolding shall be measured for payment purpose. The
payment will be made once irrespective of duration of scaffolding. Note:- This item to
be used for maintenance work judicially, necessary deduction for scaffolding in the
existing item to be done . | 13.5 | Sqm | 344.08 ₹4,645.08 Lowest |
| 1.01 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations,
footings, bases of columns, etc for mass concrete | 37.64 | Sqm | 371.79 ₹13,994.18 Lowest |
| 1.01 | 5.9.6
Centering and shuttering including strutting, etc. and removal of form for:Columns,
Pillars, Piers, Abutments, Posts and Struts | 0.5 | Sqm | 971.03 ₹485.52 Lowest |
| 1.01 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels,
beams, plinth beams, girders bressumers and cantilevers | 40.36 | Sqm | 734.5 ₹29,644.42 Lowest |
| 1.01 | 5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended
floors, roofs, landings, balconies and access platform | 40.05 | Sqm | 925.48 ₹37,065.47 Lowest |
Tender Value
₹5.5 L
EMD Value
₹13,730
Closing Date
7 Feb 2026, 5:00 pmClosed
Divisional Forest Officer, Thenmala
Divisional Forest Office, Thenmala
Construction of Water tank at Staff quarters in Thenmala Forest Range during 2025-26
2026_FD_832384_1
C3-46683/25
Open Tender
Civil Works - Others
Item Wise
90 days
Thenmala Range
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,296
₹13,730
14 Oct 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
7 Feb 2026
31 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | 2.32
Clearing grass and removal of the rubbish up to a distance of 50 m outside the
periphery of the area cleared. | 9 | sqm | 100 | ₹900 |
| 1.002 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.6 | Cum | 100 | ₹1,260 |
| 1.003 | 4.1.4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse
sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.58 | Cum | 100 | ₹157.5 |
| 1.004 | 5.1.3
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | 1 | Cum | 100 | ₹100 |
| 1.005 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 1.05 | Cum | 100 | ₹105.4 |
| 1.006 | 14.72
Providing and fixing double scaffolding system (cup lock type) on the exterior side,
upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre,
horizontal & vertical tubes joining with cup & lock system with M.S. tubes,
M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for
working platform etc. and maintaining it in a serviceable condition for the required
duration as approved and removing it there after. The scaffolding system shall be
stiffened with bracings, runners, connection with the building etc wherever required
for inspection of work at required location with essential safety features for the
workmen etc. complete as per directions and approval of Engineer- in Charge. The
elevational area of the scaffolding shall be measured for payment purpose. The
payment will be made once irrespective of duration of scaffolding. Note:- This item to
be used for maintenance work judicially, necessary deduction for scaffolding in the
existing item to be done . | 13.5 | Sqm | 100 | ₹1,350 |
| 1.007 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations,
footings, bases of columns, etc for mass concrete | 37.64 | Sqm | 100 | ₹3,764 |
| 1.008 | 5.9.6
Centering and shuttering including strutting, etc. and removal of form for:Columns,
Pillars, Piers, Abutments, Posts and Struts | 0.5 | Sqm | 100 | ₹50 |
| 1.009 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels,
beams, plinth beams, girders bressumers and cantilevers | 40.36 | Sqm | 100 | ₹4,036 |
| 1.01 | 5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended
floors, roofs, landings, balconies and access platform | 40.05 | Sqm | 100 | ₹4,005 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1399181.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
PRELIMINARYAGREEMENT-1.pdf
Tender Documents • 0.83 MB
EPAYMENT-1.pdf
Tender Documents • 0.06 MB
TENDERCONDITION-1.pdf
Tender Documents • 35.78 MB
POWEROFATTORNEY1.pdf
Tender Documents • 0.12 MB
BOQ_1399181.xls
BOQ • 0.24 MB
DECLARATION.pdf
Tender Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .