Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.0 LAdmitted-Finance ANANDAM APARTMENT GR FLOOR 6 ABDUL HALIM LANE KOLKATA 700016 | KOLKATA | KOLKATA | WEST BENGAL | 700016 | L1 | Admitted-Finance | |
| 2 | L2₹67.8 L+₹82,600 (1.23%)Admitted-Finance ANANDAM APARTMENT KOLKATA GROUND FLOOR 6 ABDUL HALIM LANE VILLAGE TOWN TALTALA CITY KOLKATA KOLKATA WEST BENGAL 700016 INDIA | KOLKATA | WEST BENGAL | 700016 | L2 | Admitted-Finance | |
| 3 | L3₹73.1 L+₹6.1 L (9.09%)Admitted-Finance VILL ADISAPTAGRAM PO MOGRA | L3 | Admitted-Finance | |
| 4 | L4₹77.5 L+₹10.6 L (15.8%)Admitted-Finance MECHEDA NEAR PNB PURBA MEDINIPUR MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical 38 4 NEW SANTOSHPUR 1ST LANE KOLKATA 700075 | KOLKATA | WEST BENGAL | 700075 | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | MULTI SERVICE L2 | HANSESWARI CORPORATE MANPOWER MANAGEMENT LIMITED L3 | NOBLE ENTERPRISE L1 | MANNA CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.0005 heads manpower for T&A dept | |||||||
| 1.01 | Labour supply of 05 nos. non-listed manpower for maintenance supporting work under T & A Department | 24 | Months | 1,13,800 ₹27,31,200 Lowest | 1,26,247.63 ₹30,29,943.12 | 1,26,000 ₹30,24,000 | 1,20,000 ₹28,80,000 |
| 1.02 | Cost of Profit & Overhead, Tools & Tackle Consumables, PPEs ,(price included profit, Tools-tackles, Consumables , cost of PPEs). | 24 | Months | 16,000 ₹3,84,000 Lowest | 17,741.36 ₹4,25,792.64 | 17,750 ₹4,26,000 | 16,500 ₹3,96,000 |
| 1.03 | GPA & INSURANCE | 1 | LUMPSUM | 1,530 ₹1,530 Lowest | 1,700 ₹1,700 | 1,700 ₹1,700 | 1,700 ₹1,700 |
| 2.00ARC job under T&A dept | |||||||
| 2.01 | DMCW-PHE cleaning of Unit#5 | 16 | Number | 18,000 ₹2,88,000 | 18,876 ₹3,02,016 | 15,500 ₹2,48,000 Lowest | 22,500 ₹3,60,000 |
| 2.02 | HP Welding Job for per Joint for Pipe OD 28 mm to 90 mm | 50 | Number | 2,300 ₹1,15,000 | 2,286.26 ₹1,14,313 | 1,500 ₹75,000 Lowest | 2,500 ₹1,25,000 |
| 2.03 | Painting Job- One Coat Red Oxide Primer & 2 Coat Synthetic Enamel (Berger Paints Make) including supply of paint | 500 | Square meter | 85 ₹42,500 | 87.09 ₹43,545 | 70 ₹35,000 Lowest | 95 ₹47,500 |
| 2.04 | BFP cartridge replacement of Unit-2 | 3 | Number | 83,000 ₹2,49,000 | 81,745.66 ₹2,45,236.98 | 70,000 ₹2,10,000 Lowest | 80,000 ₹2,40,000 |
| 2.05 | TW Screen overhauling ( Unit#2&5) | 4 | Number | 95,000 ₹3,80,000 | 98,773.37 ₹3,95,093.48 | 75,000 ₹3,00,000 Lowest | 1,10,000 ₹4,40,000 |
Tender Value
₹82.7 L
EMD Value
₹83,000
Closing Date
6 Aug 2026, 3:00 pmClosed
GM BTPS
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin-712503
05 heads manpower supply including diff jobs on ARC basis under TandA dept BTPS
2026_WBPDC_1030947_1
WBPDCL/BTPS/NIT/E2860/26-27
Open Tender
Support/Maintenance Service
Item Rate
730 days
Bandel Thermal Power Station
Please refer Tender documents
5 documents required · 5 mandatory
₹0
₹83,000
Yes
Administrative Building, BTPS, Hooghly
5 Oct 2026
4 Jul 2026
8 Aug 2026
6 Jul 2026
6 Aug 2026
15 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 105 heads manpower for T&A dept | |||||
| 1.01 | Labour supply of 05 nos. non-listed manpower for maintenance supporting work under T & A Department | - | Months | 1,26,247.63 | - |
| 1.02 | Cost of Profit & Overhead, Tools & Tackle Consumables, PPEs ,(price included profit, Tools-tackles, Consumables , cost of PPEs). | - | Months | 17,741.36 | - |
| 1.03 | GPA & INSURANCE | - | LUMPSUM | 1,700 | - |
| 2ARC job under T&A dept | |||||
| 2.01 | DMCW-PHE cleaning of Unit#5 | - | Number | 23,595 | - |
| 2.02 | HP Welding Job for per Joint for Pipe OD 28 mm to 90 mm | - | Number | 2,857.83 | - |
| 2.03 | Painting Job- One Coat Red Oxide Primer & 2 Coat Synthetic Enamel (Berger Paints Make) including supply of paint | - | Square meter | 108.86 | - |
| 2.04 | BFP cartridge replacement of Unit-2 | - | Number | 1,02,182.08 | - |
| 2.05 | TW Screen overhauling ( Unit#2&5) | - | Number | 1,23,466.71 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_2531740.xls
BOQ • 0.30 MB
DATECORRIGENDUM.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .