Tender Value
₹27.7 L
EMD Value
₹27,720
Closing Date
30 Jun 2026, 4:00 pm
The Superintending Engineer
Work of Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari Sub-station under Deesa Division of Palanpur circle approved under R&M 22-23
312641
PTC/ET/57/2026
Open
Electrical Goods/Equipment
Banaskantha
14 documents required · 13 mandatory · 1 optional
₹1,180
Gujarat Energy Transmission Corporation Ltd
₹27,720
9 Jun 2026
9 Jun 2026
9 Jun 2026
30 Jun 2026
9 Jun 2026
Name of work: Work of Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari Sub-
station under Deesa Division of Palanpur circle approved under R&M 22-23
To create environment where Business confidence is built though best business practices and is fostered in an
atmosphere of trust and respect between providers of goods and services and their users for the ultimate
benefit of society a the nation.
GETCO COMMITEMNT PARTY’S COMMITEMENT
To maintain the highest ethical Not to bring pressure
standards in business and recommendations outside GETCO to
professional influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat,
satisfaction of stakeholders. inducement or pressure of any kind on
GETCO or any of its employees under
any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in
agreement / contract and to consider fulfilling the contract, agreement, legal
objectively the viewpoint of parties. obligations.
To ensure regular and timely release To provide goods and / or services
of 9payment on due dates for work timely as per agreed quality and
done. specifications at minimum cost of
To ensure that no improper demand is To abide by the general discipline to
made by employees or by anyone on be maintained in our dealings.
To give maximum possible assistance To be true and honest in furnishing
to all the Vendors / Suppliers / Service information including payment to
provider and other to enable them to agents / sub-agent.
complete the contract in time.
To provide all information to suppliers / Not to divulge any information,
contractors relating to contract / Job business details available during the
which facilitate him to complete the course of business relationship to
contract / job successfully in time others without the written consent of
To ensure minimum hurdles to Not to enter into carter / syndicate /
Vendors / suppliers / contractors in understanding whether formal / non
complete of agreement / contract / formal so as to influence the price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Seal and signature of bidder
Office of The Superintending Engineer
Circle Office, 66kv Sub-
Sub-station Compund, Near Circuit House,
Palanpur, Dist.: Banaskantha
Email: [email protected]
Regd. Office: Sardar Patel Vidyut Bhavan, Race Course,
TENDER NOTICE No: PTC/ET/57/2026
Superintending Engineer, Palanpur invites “On line Tenders” (e-tendering) for the Work of
Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari Sub-station under Deesa
Division of Palanpur circle approved under R&M 22-23 From registered Contractors. Bidders
should fulfil the all the qualification criteria. Otherwise their bids will not be considered & price bid
will not be opened. All the bidders should have valid e-tender vender registration. Tender Papers &
Specifications may be down loaded from Web site https://tender.nprocure.com (For
view, down load and on line submission) and GUVNL / GETCO web sites www.tender.guvnl.com
(For view & download only). Tender fee may be paid along with submission of tender by
NEFT/RTGS/ONLINE/Online only.
“NO COURIER SERVICE OR HAND DELIVERY” will be allowed.
Estimated Time Tender E.M.D.
Sr. Name of Work Cost Rs. With Limit Fee Rs. Rs.
Work of Installation of Mesh 27,71,337.38 03 Rs.1000+GST Rs.
type earthing at 66KV Months 18% 180=
PTC/C Switchyard of 400kv Kansari Rs
M1/N- Sub-station under Deesa
30/2026 Division of Palanpur circle
approved under R&M 22-23
On line (E-tendering) tender/ offer submission
1 last date up to 16.00 hours only (This is Dt. As per N Code
Date of opening of on – line b i d opening Dt. As per N Code
2 at 16.01 Hours.(If Possible)
3 Tentative Date of on – line opening of Price bid Shall be intimated separately.
Seal and signature of bidder
1. Bidder has to upload scanned copies of original (Notarized / self-attested copies of original – as specified
in tender document) documents with bid and no physical documents to be submitted by bidder including
Tender fee, EMD.
2. Bidders have to submit Technical bid as well as Price bid in electric format only on above mentioned
website till the date and time shown above. It is required that only online submission of tender fees, EMD
(NEFT/RTGS/ONLINE/Online transaction Slip) dully signed integrity pact to be done. However, of
anywhere in tender documents submission of other than this document physical submission
mentioned to be overlooked.
3. If the EMD amount is should be paid either by Payment of EMD by RTGS/NEFT/on line shall be
encouraged. Payment through RTGS/NEFT/online bidder has to mail following details to
[email protected]. The transection slip of payment made by RTGS/NEFT/Online is to
be uploaded in Nprocure with tender documents.
Sr No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details by email on the same date of payment so that
receipt can be generated.
4. GETCO beneficiary Bank Details as under
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
2 Account No. ‘01740200000624
3 Name of Bank Bank of Baroda
4 Branch Code PALANP
Transmission Circle, 66kv S/S
5 Address of Bank Campus, Abu Highway,
6 IFSC Code BARB0PALANP (“ Fifth Digit is Zero”)
7 PAN No AABCG4029R
8 TAN No AHMG02636E
9 GST No 24AHMG02636E1DV
5. In case short submission of documents with bid and / or clarification if any required from the bidder, the
required details / documents may be asked from bidder in physical form.
6. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF from) remain
legible and should not be password protected.
7. All the relevant scanned documents as per requirement of the tender are to be upload through online only
on n procure portal including Tender fee, EMD and attested Integrity Pact. Physical copies of Tender fee,
Sign & Seal of Contractor Page
EMD and Integrity Pact to be submitted in sealed cover on OR before due date and time. (All tender
documents including Price bid are not to be submitted with the physical documents including Tender fee,
EMD and Integrity Pact).
8. Tender will be evaluated on Data / Details / Documents of the online offer only.
9. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in scheduled
10. The bidders are required to fill up all the online annexure / forms. This is intended for transparency and
speedy evaluation of the bids. Instead of simply confirming / attached in bid, the Bidder shall fill in the
particulars against appropriate place in respect of each line appearing in each online annexure. Wherever
required, bidder shall invariably have to upload supporting authentic documents in the online bid.
(In the absence of required details in the online annexure, the owner has every right to evaluate the bids
accordingly and bidder cannot raise any objection against any point during evaluation.)
11. Bidders are requested to remain in touch with the web-site for any amendment / corrigendum or
extension of due date etc
12. No tender shall be accepted / opened in case of receipt after due date and time of tender, irrespective of
delay due to postal services or any other reasons and the Corporation shall not assume any responsibility
for late receipt of tender.
13. The Earnest Money Deposit and tender fee will be accepted by NEFT/RTGS/ONLINE/Online on any
Nationalized Bank only situated at “Palanpur” drawn in favor of “GUJARAT ENERGY TRANSMISSION
CORPORATION LTD.” EMD and Tender Fee NEFT/RTGS/ONLINE/Online with different purchaser or
agency shall not be accepted. Tender without EMD and tender fee shall be rejected.
14. The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason thereof.
Any technical questions, information and clarifications that may be required pertaining to this enquiry should
be referred to:
The S u p e r i n t e n di n g Engi neer ( TR),
Gujarat E ne r g y Tr a n sm i ssi on C o r p o r at i o n
Limited, Circle Office, Aroma Circle,
Palanpur, - 385
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (TR) GETCO,
Sign & Seal of Contractor Page
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Baroda hereinafter called ‘GETCO’/
‘OWNER’ intends to receive bids for Work of Installation of Mesh type earthing at 66KV
Switchyard of 400kv Kansari Sub-station under Deesa Division of Palanpur circle
approved under R&M 22-23. as detailed in the accompanying specifications in accordance
with Terms and Conditions herein. The bids shall be prepared and furnished as per these
2.0 Qualification Requirements of Bidders
Qualification Requirement
[A] Registration:
The Bidder shall be strictly a GETCO registered contactor of E-1 Class or above.
[B] Technical requirements:
- Bidder shall have executed minimum 01 no 66KV or higher class Substation with State or
central transmission utility or major industries or equivalent nos of 66KV or higher class
bays at same or different location. Substation include minimum two no’s of feeders bays,
one no’s of transformer bay. It must include work of mesh type earthing.
- Bidders should have executed minimum 3 Nos. 66KV and above class Substation Mesh
Earthing in Last Three financial year.
The bidder should have valid electrical license and approved vendor of GETCO/STU/CTU
registered under GST act and should have CPF/PF registration certificate. Attested Xerox
copy of work orders executed from GETCO and satisfactory completion certificate from
respective department should be submitted.
[C] Financial Criteria
The bidder shall submit the Latest bank solvency of the amount which is 20% of the total
estimated cost of the tender.
1 Following document required mandatory.
A. The bidder shall submit the bank solvency of the amount which is 20% of the total estimated
cost of the tender. He has adequate financial capability and stability to meet the financial
obligations arising out of the scope of works.
B. Income Tax will be deducted as per Rules from the Bill.
C. Payment of Tender Fee & EMD.
D. In addition, the Qualifying Requirements if any, in the ‘Special Conditions of Contracts ‘shall also
E. Provident Fund Code: Separate provident fund code number towards firm registered with
Regional P. F. Commissioner.
F. GST Registration: The Bidder shall be registered under the “GOODS AND SERVICE TAX –
ACT”. The certified photo copy of such registration under GST Act shall have to be submitted
along with the bid by the bidder.
Sign & Seal of Contractor Page
G. I.T. PAN CARD: The bidder should submit the attested photo copy of PAN Card of their firm.
H. Electrical contractor’s license: The bidders should submit the attested copy of GOG Electrical
Contractor licenses of firm with latest validation.
I. Registration of Workers Welfare Cess.
J. Profit & Loss Account Statement: The Bidder should submit certified Xerox of audited copy of
the Balance sheet with profit and loss account of last three Years. Last Three Years Audited
Balance sheet / Income Tax Returns of last 3-Years.
K. Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for signing the bid
documents in case of partnership firm & self-affidavit for proprietorship firm. All such documents
shall have to be NOTARISED.
L. Labor License: Bidder has available labor licensee for his firm as per Govt. rules. Registration of
Workers Welfare Cess.
M. List of Tools & Tackles: Bidders mentioned available tools with requirement of work.
The bidders must be attach submitted all above documents scanned copy on n-procure and
certified/self-verified copy of all documents in Technical bid online only.
2.1 The above-cited requirements are only indicative. The owner reserves the right to requisition any
other relevant information and also reserves the right to reject the Bid proposal of any Bidder, if in
the Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to perform the
Contract satisfactorily.
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/ liable
for these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
5.0 Knowing the Bid Documents
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein,
which may in any manner, affect the scope & content of work and the costs thereof. Submission of a
Bid not substantially responsive to the Bid Document in all respects and/or failure to furnish all
information required by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications
or is in doubt as to the true meaning of any part, he shall make a request, in writing not later than
the date of pre Bid discussion, to the owner in triplicate. The owner will issue explanations,
interpretations and clarifications as deemed fit in writing as a response to this request. On receipt of
such interpretations/clarifications, the Bidder may submit his Bid within the date and time stipulated
Sign & Seal of Contractor Page
in the Bid invitation. All such explanations, interpretations and clarifications from the Owner shall be
deemed as part of Bid Documents and shall invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his
representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document:
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at
his own initiative or in response to a clarification requested by the intending Bidder, modify the
Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have
received the Bidding Document at the address contained in the letter of request for issue of Bidding
document from the Bidders. Owner will bear no responsibility or liability arising out of non-receipt of
the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into account
in preparing their bids, the Owner may, at his discretion, extend the deadline for the submission of
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration
by the Bidders while they submit their bids and shall invariably enclose such documents as a part of
C. PREPARATION OF BIDS
8.0 Language Of Bid:
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid,
exchanged by the Bidder and the Owner, shall be written in the English language, provided that any
printed literature furnished by the Bidder may be written in another language so long as
accompanied by an English translation of its pertinent passages. Failure to comply with this may
disqualify a bid. For purposes of interpretation of the bid, the English translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding
any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which
may have any effect on the execution of the Contract covered under these documents and
specifications. The Owner shall not entertain any request for clarifications from the bidders,
regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and considered
while submitting the proposals. No claim for financial adjustment to the Contract awarded under
these specifications and documents will be entertained by the owner. Neither any change in the time
schedule of the Contract nor any financial adjustments arising thereof shall be permitted by the
Owner, which are based on the lack of such clear information or its effect on the cost of the works to
10.0 Documents comprising the Bid:
etc. furnished in the Bidding Documents, indicating, for the services to be rendered, a brief
description of services, quantity and price.
Sign & Seal of Contractor Page
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the
Qualification Requirements as detailed in Clause 2.0 above and Special Conditions of Contract
(including Clause 11 of I TB).
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and signed by
the Company Authorized Signatory wherever specified.
10.4 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific ITB.
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely
covering all the equipment erection and other installation services specified under the
accompanying Technical Specifications. It will include among others as specified therein the
The work includes work of painting of H-frame structure painting of various lines.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain conditions of
the bidding documents permitted by the Owner and therefore, the Bidders are advised that while
making Bid Proposals and quoting prices these conditions may appropriately be taken into
consideration. Bidders are required to furnish a certificate in this regard as per the format provided
in Special Conditions of Contract in a separate sealed envelope containing Bid security, which shall
accompany the Technical Bid. Any Bid not accompanied by such certificate shall be rejected by the
Owner and shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data
Sheets and specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid
Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate price
Schedules enclosed in bid proposal sheets to furnish under the contract. Prices quoted should be in
% Above/ Below on Estimated Cost. However, detail bifurcation of Taxes applicable should be
mentioned separately with Price bid.
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, clearly specified with valid
Declaration & Certificate from Department. In the event of withdrawal/cessation of the Supplier from
Composition scheme during the tenure of the contract, the rate (i.e. price) mentioned in the price bid
shall be final and any additional GST will have to be borne by the tenderer himself. In no case
additional amount towards GST or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable
for each item of Goods/Service. If not specifically mentioned, then COMPANY will have the option to
take the prices as exclusive of taxes and duties at maximum higher slab rates for the evaluation of
Sign & Seal of Contractor Page
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule- B).
The price bid submitted in physical mode shall not be considered.
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract
and shall not be subject to variation on any account saving for change in quantity. A bid submitted
with an adjustable price quotation shall be treated as non-responsive and rejected.
14.0 Taxes and Duties:
14.1 As regards the income Tax will be levied as per prevailing rate on payment to contractors. Any other
tax except specifically mentioned in tender will not be borne by GETCO. The bidder shall be liable
and rresponsible for payment of such taxes as attracted under the provisions of the law
14.4 As regards the income Tax, surcharge on income tax and any other corporate tax, including GST at
prevailing rate the owner shall not bear any tax liability whatsoever. The bidder shall be liable and
responsible for payment of such taxes as attracted under the provisions of the law.
14.5 Notwithstanding the tax liabilities as per the sub-clause14.1 to14.4 above the owner shall have the
right to make deduction at source from the amounts payable to the contractor in respect of Income
Tax (on the cost of items of supply included in the works contract) as may be mandatory in terms of
the law. The owner shall not bear any liability in this regard but shall issue necessary certificate in
respect of such deduction made.
14.6 In case any tax or duty is newly introduced by the Government applicable for this contract with effect
from the next day of the date submission of the bid and if the contractor is required to pay additional
tax or duty, then the owner shall reimburse the contractor the additional tax or duty so paid by the
contractor against submission by the contractor of documentary evidence to the satisfaction of the
owner. This provision will not be applicable to transaction between the contractor and his sub-
contractors. Besides the said statutory variation, no other statutory variation shall be payable by the
14.7 The owner’s liability for all taxes and duties under the contract shall be limited to those indicated by
the Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as per
Clause No. 14.7 supra.
If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced
by reasons of the making, passing or promulgation of any law after the date of submission of bid or
by any order, regulation or bye-law having the force of law the amount of such increase or reduction
shall be added to or deducted from the “Contract Price” as the case may be for direct transactions
between contactor & owner, and not for bought out items. It is the Bidders responsibility to furnish
details of taxes, duties, levies etc. applicable as on the date of submission of the bid.
14.8 No claim for any increase towards the statutory variation regarding enhancement of existing tax or
duty or introduction of a new tax or duty applicable shall be entertained by the Owner during the
extended period of contract, if any, provided the extension of the contract is required by causes
attributable to the contractor.
14.9 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of
a new tax or duty will be applicable only to the direct transaction between the contractor and the
14.10 In addition, the conditions detailed under Special Conditions of Contract shall apply.
Sign & Seal of Contractor Page
14.11 The contractor shall pay 1% welfare cess to the respective Govt. Department if applicable & the same
will be reimbursed on production of proof of payment before release of payment of final bill, the
contractor has to submit documentary evidence of payment of welfare cess of previous RA bill as well
as of the final bill.
14.12 The validity of tender is 180 days from the date of opening of technical bid.
14.13 Welfare cess
1) As per the Welfare cess Act, the welfare cess @ 1% is applicable on supply and erection items
for supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey
projects and civil works.
2) Contractor shall get registered under welfare cess Act before commencement of work. Office
of the factory inspector is authorized at present as a registering authority.
3) GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
4) The contacts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO contractor
on progressive basis of utilization. As this part of welfare cess is on GETCO account, the same
shall be reimbursed to the contractor on receipt of request letter along with documentary
evidence of payment. For calculation of welfare cess on supply part, valuation as per MR shall
be taken and informed to the contractor for payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
• On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit
the documentary evidence to the concern office.
• Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
• Before release of payment of subsequent R.A. Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
• Before release of payment of final bill, the contractor has to submit documentary evidence of payment
of welfare cess of previous R.A.Bill as well as of this final bill.
• If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has to
submit documentary evidence of registration under Welfare Cess Act and evidence of payment of
• The welfare cess shall be reimbursed to the contractor on submission of copy of documentary evidence
of payment by observing due formalities
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the time
schedule for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the major
factors in consideration of the bids.
16.0 Contract Quality assurance:
16.1 The Bidder shall include in his proposal the Quality Assurance Programme containing the overall
quality management and procedures which he proposes to follow in the performance of the Works
during various phases as detailed in relevant clause of the General Technical Conditions.
16.2 At the time of Award of Contract, the detailed Quality Assurance Programme to be followed for the
execution of the Contract will be mutually discussed and agreed and such agreed Programme shall
form a part of the Contract.
Sign & Seal of Contractor Page
16.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being
supplied wherever specifically indicated in the tender document shall supply only from those
vendors. Such details shall be accompanied by their list of previous supplies made performance
reports etc. However, in case of orders are placed, specific approval shall be obtained from the
owner for the vendor-supplied materials.
17.0 STORAGE-CUM-ERECTION INSURANCE:- The contractor shall take suitable storage-cum-
erection insurance cover at his cost to the extent of 100% cost of cost of sub-station / line materials,
which are required to complete the sub-station / line. Bidder shall have to take the comprehensive
Marine Cum Erection (MCE) insurance policy against any loss, damage, theft, pilferage, fire etc. for
the complete period of storage, erection and commissioning up to the time of taking over of the sub-
station / line by GETCO. However, if the work is not completed within stipulated time limit as
mentioned into work order, the MCE shall be extended by the contractor up to the work completion
and taking over of line or SS by GETCO. Moreover, the change for extension of insurance shall be
borne by contractor if the delay is attributed to the contractor. The charge for extension of insurance
shall be reimbursed by GETCO to the contractor on production of proof for extension of MCE if the
delay is attributed on the part of GETCO.
The contractor shall deal directly and pursue the claim with the insurance company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim.
The proof of insurance policy taken by the contractor shall be furnished / submitted to engineer-in-
charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further, in
absence of the above insurance policy, R.A. bill payment will be withheld.
18.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment
tools & tackles etc. which he proposes to bring to site for the purpose of erection, handling, testing
and commissioning including performance and guarantee tests of the equipment. If any such
equipment is listed anywhere else in the proposal and not specially mentioned in the above
schedule, it shall be deemed to have been included in the Bidder’s proposed scope of supply.
19.0 Brand Names:
19.1 The specific reference in these specifications and documents to any material/equipment by brand
name makes or catalogue number shall be construed as establishing standards of quality and
performance and not as limiting competition. However, Bidders may offer other similar
material/equipment provided they meet the specified standard, design and performance
requirements. The Bidder shall furnish adequate technical information about such alternative
material equipment to enable the Owner to determine its acceptability. The Owner shall be the sole
judge on the acceptability or otherwise of such alternatively material/equipment.
19.2 The bidder shall note that standards for workmanship material and equipment, and reference to
brand name of catalogue numbers designed by the Owner in its Technical Specifications are
intended to be descriptive only and not restrictive. The Bidder may substitute alternative standards,
brand name and/or catalogue numbers in its bid, provided that it demonstrates to the Owner’s
satisfaction that the substitutions are substantially equivalent or superior to those designed in the
Technical Specification.
20.0 Bid Security/EMD:
The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of
estimated cost to be paid as under:
Sign & Seal of Contractor Page
a) All the Bidders will be required to pay Tender Fees with applicable GST and EMD as
mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office
address specified in the tender document or by RTGS/ NET/online
20.1 Bid Validity: The offer should be valid for a minimum period of 180 days from the date of opening of
20.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be
made payable to the Owner without any condition whatsoever.
20.3 The Owner as non-responsive will reject any bid not secured in accordance with Para 20.1 above.
No exemptions are made in the furnishing of the security.
20.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three
months from the date of submission of tender whichever is later.
20.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
20.6 The bid guarantee may be forfeited.
b) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
c) If a bidder refuses to accept the contract or fails to commence the works ( including supplies
within thirty days of letter of award of contract )
20.7 On forfeiture of EMD, SD or guarantee under the terms and conditions of this tender, applicable
GST will also be recovered from the bidder / contractor and GETCO reserves all rights of such
recovery of such forfeited amount along with GST
21 Format of Bid:
21.1 The Bidder shall prepare one copy of the technical bid with all the documents. No Hard/Physical
copy of Price/Commercial bid required in physical submission. Technical as well as Price bid
must be considering from N-Code/Online only
21.2 The original and all copies of the bid shall be typed or written in indelible ink and shall be
signed by the Bidder o r a person o r persons d u l y au t h o riz ed b y the Bidder t o sign the
Contract. The letter of authorization shall be indicated by written power-of-attorney
accompanying the bid. All pages of the bid, except for un-amended printed literature, shall be
initiated by the person or persons signing the bid.
21.3 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct
errors made by the Bidder, in which case such corrections shall be initiated by the person or
persons signing the bid.
No Hard/Physical copy of Technical/Price/Commercial bid required in physical submission.
Technical Bid as well as Price bid must be consider from N-Code/Online only
22. Signature Of Bids:
22.1 The bid must contain the name, residence and place of business of the person or persons making
the bid and must be signed and sealed by the Bidder with his usual signature. The names of all
persons signing should also be typed or printed below the signature.
Sign & Seal of Contractor Page
22.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s) or
other authorized representative(s).
22.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by
the President/Managing Director or by the Secretary or other person or persons authorized to bid on
behalf of such Corporation/Company in the matter.
22.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’,
‘Agent’ or other designation without disclosing his Principal will be rejected.
22.5 If it is found that two or more persons who are connected with one another either financially or as a
principal and agent have bid under different names without disclosing their connection then such
bids will be liable for rejection. Satisfactory evidence of authority of the person signing on behalf of
the Bidder shall be furnished with the bid.
22.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
22.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
24.0 Deadline for submission of bids :
24.1 The Bidders have the option of sending the bid by registered post or by speed post. Bids submitted
by telex/telegram will not be accepted. No request from any Bidder to the Owner to collect the
proposals from airlines, cargo agent etc. shall be entertained by the Owner.
24.2 Bids must be received by the Owner at the address specified under Para 23.3, not later than the
time & date mentioned in the Invitation to Bid.
24.3 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the
Bidding Document in which case all rights and obligations on the Owner and Bidders previously
subject to the deadline will thereafter be subject to the deadline as extended.
25.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
26.0 Modification and withdrawal of bids :
26.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of
the modification or withdrawal is received by the Owner prior to the deadline prescribed for
submission of bids.
26.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of clause 23.0. The envelope should clearly indicate whether the
modification is for the Technical bid or the Price bid. No bid modifications notice by
Telex/Grams/Fax shall be entertained by the Owner.
26.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of
26.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the
expiration of the period of bid validity specified by the Bidder on the Bid Form.
Sign & Seal of Contractor Page
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of its bid
27.0 Information required with the proposal:
27.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of each
principal item of equipment proposed to be furnished and erected. The bid should also contain
drawings and descriptive materials indicating general dimensions, materials from which the parts
are manufactured, principles of operation, the extent of pre-assembly involved, major construction
equipment proposed to be deployed, method of erection and the proposed erection organizational
27.2 The above information shall be provided by the Bidder in the form of separate sheets, drawings,
catalogues, etc. in five copies.
27.3 Any bid not containing sufficient descriptive material to describe accurately the equipment proposed
may be treated as incomplete and hence rejected. Such descriptive materials and drawings
submitted by the Bidder will be retained by the Owner. Any major departure from these drawings
and descriptive material submitted will not be permitted during the execution of the Contract without
specific written permission of the Owner.
27.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement of the
equipment or any other matter will not be considered.
27.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to provide
additional information and data as deemed necessary by the Bidder.
27.6 The Bidder, along with his Proposal, shall submit a list of recommended erection equipment and
materials which will be required for the purpose of erection of equipment and materials supplied
under the Contract.
27.7 In case the ‘Proposal’ information contradicts specification requirements, the specification
requirements will govern, unless otherwise brought out clearly in the technical commercial deviation
E. BID OPENING AND EVALUATION
28.0 Opening of bids by owner:
28.1 The Owner will open the technical bids (Cover –I, II, and III) in the presence of Bidder’s
representatives who choose to attend on the date and time mentioned for opening of bids in the
Invitation to Bid or in case any extension has been given thereto, on the extended bid opening date
and time notified to all the Bidders who have purchased the bidding document. The Bidder’s
representatives who are present shall sign a register evidencing their attendance.
28.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the Owner,
at his discretion may consider appropriate, will be announced in the Technical Bid Opening.
28.3 The price bids to be filled up on line on website https://tender.nprocure.com
28.4 The Bidder’s name, lump sum Bid Price, all discounts if any, modifications in the Price Bid and any
such other details as the Owner, at his discretion, may consider appropriate, will be announced/
furnished in the Price Bid Opening.
28.5 No electronic recording/transmitting devices will be permitted during Bid opening.
Sign & Seal of Contractor Page
29.0 Purpose of evaluation of bids:
29.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these
specifications and documents. All technically responsive bids shall then be examined to determine
the LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
30.0 Policy for bids under consideration:
30.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and
until such time official intimation of award/rejection is made by the Owner to the Bidders. While the
Bids are under consideration, Bidders and/or their representatives and other interested parties are
advised to refrain from contacting by any means, the owner and/or his employee’s representatives
on the matters related to Bids under consideration.
30.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing
and no change in the price or substance of the bid shall be sought, offered or permitted.
31.0 Preliminary Examination:
31.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished, whether the
documents have been properly signed, and whether the bids are generally in order.
31.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the
unit price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a
discrepancy between the total bid amount and the sum of total costs, the latter shall prevail and the
total bid amount will be corrected accordingly. If there is a discrepancy between words and figures,
the amount advantageous to the Owner will prevail. If the Bidder does not accept the correction of
the errors as above, his Bid will be rejected and the amount of Bid Security will be forfeited. The
other. In the case of any inconsistency in the prices furnished in the specified prices schedules to be
identified in Bid Form for this purpose, the Owner shall be entitled to consider the highest price for
the purpose of evaluation and for the purpose of award of Contract use the lowest of the prices in
these schedules.
31.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid
to the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one which
conforms to all the terms and conditions of the Bidding Document without material deviations. A
material deviation is one which affects in any way the prices, quality, quantity or delivery period of
the equipment, completion of works or which limits in any way the responsibilities or liabilities of the
Bidder of any right of the Owner as required in these specifications and documents. The Owner’s
determination of a bid’s responsiveness shall be based on the contents of the bid itself without
recourse to extrinsic evidence.
31.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
31.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking
32.0 Evaluation of Price Bids:
32.1 Definitions and Meanings:
Sign & Seal of Contractor Page
For the purpose of the evaluation and comparison of bids, the following meanings and definition will
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of
d) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost
Compensation for Deviations.’
33.0 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison
shall be derived as under:
Differential Price (DP)=n1F1+n2F2…+nnFn, where F1, F2…Fn are the various factors in Indian
Rupees per unit of parameter differential or deficiency in the equipment and services offered as
stipulated in these specifications: n1, n2…nn are the respective parameter differential or deficiency
in the corresponding units to be determined from the Bidder’s proposal. The above factors and
corresponding units of parameter differential are derived from the Technical Specifications, Data
sheets and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value
(D) and from the Bidding Document while evaluating the bids. In determining the Rupee value of the
deviations the Owner will use parameters consistent with those specified in the specifications and
documents and or other information as necessary and available to the Owner.
33.1 Comparison of Bids
The bids shall be compared on the basis of lump sum prices (i.e., for erection services to be
rendered as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including other
components if any.)
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
evaluated bid and, as a result of this comparison, the lowest bid will be selected for the award of the
F. AWARD OF CONTRACT
34.0 Award Criteria
34.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further
that the Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall
be the sole judge in this regard.
34.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with
the terms and conditions specified in the accompanying Technical Specifications.
35.0 Owner’s right to accept any bid and to reject any or all bids:
Sign & Seal of Contractor Page
35.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and
reject all bids at time prior to award of contract, any without thereby incurring any liability to the
affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the grounds
for the Owner’s action.
36.0 Notification of award:
36.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will
notify the successful Bidder in writing by registered letter or cable or telex or FAX, to be confirmed in
writing by registered letter, that its bid has been accepted.
36.2 The notification of award will constitute the formation of the Contract.
36.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause
.0, the Owner will promptly notify each unsuccessful Bidder and will discharge its bid security,
pursuant to Clause 20.0.
37.0 Signing of contract:
37.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the
Owner will send the Bidder the detailed of Award, incorporating all agreements between the parties.
37.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same with
date and return it to the Owner.
37.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will
be signed within 30 (Thirty) days of notification of Award.
38.0 Contract Performance Guarantee:
38.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be
required to furnish a performance guarantee in form of Bank guarantee from a Public Sector Indian
bank/Scheduled, Commercial Bank in the form to be furnished. The guarantee amount shall be
equal to ten percent (10%) of the Contract price and it shall guarantee the faithful performance of
the Contract in accordance with the terms and conditions specified in these documents and
specifications. the guarantee shall be valid up to 90 days after the end of Warranty Period.
38.2 The Performance Guarantee shall cover additionally the following guarantees to the
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment
furnished and erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors
and installed by him shall be free from all defects in design, material and workmanship and shall
upon written notice from the Owner fully remedy free of expenses to the Owner such defects as
developed under the normal use of the said equipment within the period of guarantee specified
in the relevant clause of the General Terms and Conditions in the Part-I/Special Conditions of
38.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract.
However, it is not to be construed as limiting the damages under clause entitled “Equipment
Performance Guarantee” in Technical Specifications, Part-II and damages stipulated in other
clauses in the Bid documents.
38.4 The performance guarantee will be discharged without any interest at the end of guarantee period,
unless otherwise specified in Special Conditions of Contra.
38.5 Contractor has submitted certify copy of Reg. / Ele. Reg./ GST Reg./Partnership deed/PAN
Card/PF reg. and solvency certificate / Experience certificate in Technical bid.
38.5.1 Once price bid submitted same will be consider only. Revised after shall not consider at the time at
opening of tender. Tenderer has to submit only one price bid revised price bid will not be consider.
Sign & Seal of Contractor Page
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending engineer (TR.) GETCO PALANPUR or any of its
subsidiaries and shall include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works
and shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to
time for the purpose of the Contract.
1.5 The terms ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials to be
issued to the Contractor under the Contract.
1.6 ‘Works’ shall mean and include taking delivery of line materials labor and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract
and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and
the related facilities are to be erected or installed and any adjacent land, paths, street or reservoir
which may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the
contract agreement for the entire scope of the works.
1.10 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to
inspect the equipment; stores or Works under the Contract and/or the duly authorized
representative of the Owner.
1.11 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice issued
by the Owner notifying the Contractor that his bid has been accepted.
1.12 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.13 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.14 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined
shall mean calendar day or days of 24 hours each. A ‘Week’ shall mean continuous period of seven
1.15 Writing’ shall include any manuscript, type written or printed statement, under or over signature
and/or seal as the case may be.
Sign & Seal of Contractor Page
1.16 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’,
‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words
and phrases of like importance are used the approval, judgment, direction etc. is understood to be a
function of the Owner/Engineer.
1.17 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
1.18 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to
determine and demonstrate capacity, efficiency, and operating characteristics as specified in the
Contract Documents.
1.19 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and
Guarantee Tests, as specified in the accompanying Technical Specifications or otherwise agreed in
1.20 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship
which cannot be detected during inspection, testing etc, based on the technology available for
carrying out such tests.
1.21 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject
matter of the Contract.
1.22 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.23 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
1.24 Terms and expressions not herein defined shall have the same meaning as are assigned to them in
the Indian Sale of Goods Act (1930), failing that in the Indian Contract Act (1872) and failing that in
the General Clauses Act (1897) including amendments thereof, if any.
Sign & Seal of Contractor Page
1.25 In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance Security’.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by provisions in
other parts of the Contract.
The works carried out under this Contract shall conform to the all statutory regulation and provisions
the acts, mentioned in the Technical Specifications, and, when no regulations or standard is
mentioned, to the authoritative regulations or standards/ Act, appropriate to the works and such
stipulations shall be the latest issued by the concerned institution.
4.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices,
correspondences, operating and maintenance instructions, drawings or any other writing shall be
written in English language. The Metric System of measurement shall be used exclusively in the
5.0 CONTRACT DOCUMENTS
5.1 The term Contract Documents shall mean and include the following which shall be deemed to form
an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract and all other documents included under Volume- I
and the Special Conditions of Contract.
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) All the materials, literature, data and information of any sort given by the Contractor along with
his bid, subject to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and special
terms and conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred to
the Engineer whose decision shall be considered as final and binding upon the parties.
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or
on behalf of the Owner in connection therewith, to any person other than a person employed by the
Contractor in the performance of the Contract. Disclosure to any such employed person shall be
made in confidence and shall extend only so far as may be necessary for the purpose of such
Sign & Seal of Contractor Page
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the
site, dimensions, quantity, quality or other information, concerning the works unless prior written
permission has been obtained from the Owner.
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall
remain the property of the Owner and shall be returned (in all copies) to the Owner on completion of
the Contractor’s performance under the Contract if so required by the Owner.
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will
be treated as a single Contract.
Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect of all
the equipment material equipment/materials given by the owner after observing standard store
procedures for transport from owner’s stores, insurance, unloading storage handling at site
installation testing & commissioning.
7.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch
documents be required to execute an Indemnity Bond in favor of the Owner in the form acceptable
to the Executive engineer (TR.) GETCO Chhatral for keeping the equipment in safe custody and to
utilize the same exclusively for the purpose of the said Contract. Samples of Performa for the
Indemnity Bond will be furnished during award of Contract.
7.3 The Contract shall in all respects be construed and governed according to Indian Laws.
7.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into
various components only for the convenience of payment under the Contract(s) and for the
measurement of deviations or modifications under the Contract(s).
8.0 JURISDICTION OF CONTRACT
8.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of PALANPUR
shall have exclusive jurisdiction in all matters arising under this Contract.
9.0 EXECUTION OF CONTRACT:
9.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
9.2 The Agreement, unless otherwise agreed to, shall be signed within 10 days of the acceptance of the
Letter of Award, at the office the Owner at Jambuva on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate power of
attorney and other requisite materials. In case the Contract is to be signed beyond the stipulated
time, the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
9.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with
one signed original and the rest will be retained by the Owner.
Sign & Seal of Contractor Page
9.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings, and
descriptive materials submitted with the bid, to form a part of the Contract immediately after issue of
Letter of Award
9.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
10.0 ENFORCEMENT OF TERMS
10.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be construed to be a waiver
of such provisions, rights or options or in any way to affect the validity of the Contract. The exercise
by either party of any of its rights herein shall not preclude or prejudice either party from exercising
the same or any other right it may have under the Contract.
11.0 COMPLETION OF CONTRACT
11.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the
clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
12.0 TIME – THE ESSENCE OF CONTRACT
12.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner
without or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to
be the essence of the Contract. The Contractor shall so organize his resources and perform his
work as to complete it not later than the date agreed to.
12.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate
number of activities covering various key phases of the work such as field erection activities within
five (5) days of the date of Notification of Award. This network shall also indicate the interface
facilities to be provided by the Owner and the dates by which such facilities are needed. The
Contractor shall discuss the network so submitted with the Owner and the agreed network shall
form part of the Contract documents. During the performance of the Contract, if in the opinion of the
Engineer, proper progress is not maintained, suitable changes shall be made in the Contractor’s
operations to ensure proper progress without any cost implication to the Owner. The interface
facilities to be provided by the Owner in accordance with the agreed network shall also be reviewed
while reviewing the progress of the Contractor.
12.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by the
Contractor as directed by the Engineer.
12.4 Subsequent to the finalization of the network, the Contractor shall make available to the Engineer a
detailed programme in line with the agreed Contract network.
Such programme shall be reviewed, updated and submitted to the Engineer every month thereafter.
12.5 The above bar charts/ programme shall be compatible with the Owner’s computer
environment and furnished to the Owner on such media as may be desired by the Owner.
13.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement
given by the respective construction sub division unless otherwise provided in the notification of
14.0 PENALTY FOR DELAY
Sign & Seal of Contractor Page
14.1 If the Contractor fails to successfully complete the work within the time fixed under the Contract, the
Contractor shall pay to the Owner as penalty a sum specified for each specified period of delay. The
details of such penalty are brought out in the accompanying Special Conditions of Contract (SCC).
14.3 The completion time allowed for carrying out the work should be strictly observed. For any delay,
penalty will be levied at the rate of ½ % per week or part thereof on delayed portion of the work
subject to ceiling of 10% of total contract value plus GST as applicable will be imposed.
15.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious
loss or damages, repairs or adjustment may be made by the Engineer or a third party chosen by the
Engineer without advance notice to the Contractor and the cost of such work shall be paid by the
Contractor. In the event such action is taken by the Engineer, the Contractor will be notified
promptly and he shall assist wherever possible in making necessary corrections. This shall not
relieve the Contractor of his liabilities under the terms and conditions of the Contract.
15.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the
provision of this clause shall apply to portion of the works so rectified or corrected until the expiry of
six (6) months from the date of such rectification or correction. If any defects are not rectified within
a reasonable time, the Engineer may proceed to do the work at the Contractor’s risk and cost but
without prejudice to any other rights which the Owner may have against the Contractor in respect of
15.3 The rectification or correction of the work will be carried out free of cost by the Contractor. If any
rectification or correction is carried out on his behalf at the site, the Contractor shall bear the cost of
such rectification or correction.
15.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his
obligations under this clause.
15.5 At the end of the guarantee period, the Contractor’s liability ceases except for latent defects. For
latent defects, the Contractor’s liability as mentioned in Clause Nos. 15.1 through 15.4 above shall
remain till the end of 6 months from the date of completion of guarantee period.
16.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against
the Owner or the Contractor in pursuance of the Contract. In addition, the Contractor shall be
responsible for payment of all Indian duties, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
18.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner,
for the failure, omission or neglect on the part of the Contractor to perform any acts, matters,
covenants or things under the Contract, or for damage or injury caused by the alleged omission or
negligence on the part of the Contractor, his agents, representatives or his Sub-Contractors, or in
connection with any claim based on lawful demands of Sub-Contractors, workmen, suppliers or
employees, the Contractor shall in all such cases indemnify and keep the Owner, and the Engineer
and/or his representative, harmless from all losses, damages, expenses or decrees arising of such
20.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the
Contractor from all his liabilities under the Contract. Such final payment shall be made only at the
end of the Guarantee/Warranty period or after finalization of material account and final bill and till
Sign & Seal of Contractor Page
such time as the Contractual liabilities and responsibilities of the Contractor, shall prevail. All other
payments made under the Contract shall be treated as on-account payments.
21.0 ENGINEER’S DECISION
21.1 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
21.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15)
days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
21.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent
to the right to request arbitration. It is the intent of the Agreement that there shall be no delay in the
execution of the works and the decision of the Engineer as rendered shall be promptly observed.
22.0 POWER TO VARY OR OMIT WORK
22.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter
referred to as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made
by the Contractor except as directed in writing by the Engineer, but the Engineer shall have full
powers subject to the provisions hereinafter contained, from time to time during the execution of the
Contract, by notice in writing to instruct the Contractor to make such variation without prejudice to
the Contract. The Contractor shall carry out such variation and be bound by the same conditions as
far as applicable as though the said variations occurred in the Contract Documents. If any
suggested variations would, in the opinion of the Contractor, if carried out, prevent him from fulfilling
any of his obligations or guarantees under the Contract, he shall notify the Engineer thereof in
writing and the Engineer shall decide forthwith whether or not, the same shall be carried out and if
the Engineer confirms his instructions, the Contractor’s obligations and guarantees shall be modified
to such an extent as may be mutually agreed. Any agreed difference in cost occasioned by any
such variation shall be added to or deducted from the Contract Price as the case may be.
22.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to
the Contractor to enable him to work his arrangement accordingly, and in cases where goods or
materials are already prepared or any design, drawings or pattern made or work done as per the
contract requires to be altered, a reasonable and agreed sum in respect thereof shall be paid to the
22.3 In any case in which the Contractor has received instructions from the Engineer as to the
requirement of carrying out the alterations or additional or substituted work which either then or later
on, will in the opinion of the Contractor, involve a claim for additional payment, the Contractor shall
immediately and in no case later than thirty (30) days, after receipt of the instructions aforesaid and
before carrying out the instructions, advise the Engineer to that effect. But the Engineer shall not
become liable for payment of any charges in respect of any such variations, unless the instructions
for the performance of the same shall be confirmed in writing by the Engineer.
22.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing,
so to the extent of any change in the price, before the Contractor proceeds with the change.
22.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
Sign & Seal of Contractor Page
22.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to
instruct the Contractor, in writing, during the execution of the Contract to vary the quantities of the
items or groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in
section GCC of this Volume-I. The Contractor shall carry out such variations and be bound by the
same conditions as though the said variations occurred in the Contract Documents. However, the
Contract Price shall be adjusted at the rates and the prices provided for the original quantities in the
23.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT:
No subletting of contract is allowed. Contractor should carry out work on his own under his or his
authorized supervisor and by labors employed by him.
24.0 CHANGE OF QUANTITY
24.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms &
conditions. Such variations unless otherwise specified in the accompanying Special Conditions of
Contract and/or Technical Specifications, shall not be subjected to any limitation for the individual
items but the total variations in all such items under the Contract shall be limited to a percentage of
the Contract price as specified in the Special Conditions of Contract.
24.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for
the change in quantities as above. The base unit rates, as identified in the Contract shall however
remain constant during the currency of the Contract, except as provided for in Clause 33.0 below.
In case the unit rates are not available for the change in quantity, the same shall be subjected to
mutual agreement.
26.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting
Engineers and freely exchange with them such technical information as is necessary to obtain the
most efficient and economical design and to avoid unnecessary duplication of efforts. The Engineer
shall be provided with three copies of all correspondence addressed by the Contractor to other
Contractors and Consulting Engineers of the Owner in respect of such exchange of technical
information, wherever needed.
27.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents
nor any order by the Owner or the Engineer for payment of money or any payment for or
acceptance of, the whole or any part of the Works by the Owner or the Engineer, nor any extension
of time, nor any possession taken by the Engineer shall operate as a waiver of any provision of the
Contract, or of any power herein reserved to the Owner or any right to damages herein provided nor
shall any waiver of any breach in the Contract be held to be a waiver of any other or subsequent
28.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the
rights of the Owner against the Contractor or relieve the Contractor of his obligation for the due
performance of the Contract, or be interpreted as approval of the Works done or of the equipment
furnished and no certificate shall create liability for the Owner to pay for alterations, amendments,
variations or additional works not ordered, in writing , by the Engineer or discharge the liability of
the Contractor for the payment of damages whether due, ascertained, or certified or not or any sum
against the payment of which he is bound to indemnify the Owner, nor shall any such certificate nor
the acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of the
Owner against the Contractor.
Sign & Seal of Contractor Page
29.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own
cost submit periodic progress reports as may be reasonably required by the Engineer with such
materials as, charts, net-works, photographs, test certificates, etc. Such progress reports shall be in
the form and size as may be required by the Engineer.
30.0 TAKING OVER
Upon successful completion of work of erection of tower line by the Contractor, the Engineer shall
issue to the Contractor a completion Certificate as a proof of the final acceptance of the erected line.
Such certificate shall not unreasonably be withheld nor will the Engineer delay the issuance thereof
on account of minor omissions or defects which do not affect the commercial operation and/or
cause any serious risk to the erected line. Such certificate shall not relieve the Contractor of any of
his obligations which otherwise survive, by the terms and conditions of the Contract after issue of
such certificate.
C. CONTRACT SECURITY AND PAYMENTS
31.0 CONTRACT PERFORMANCE GUARANTEE
The Contractor shall furnish Contract Performance Guarantee(s) for the proper fulfillment of the
Contract in the prescribed form within fifteen (15) days of “Notice of Award of Contract”. The
performance guarantee(s) shall be as per terms prescribed.
32.1 The payment to the Contractor for the performance of the works under the Contract will be made by
the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfillment by the Contractor of all his liabilities under the Contract and production of
work completion certificate of the Sub-Station in-charge, after following the procedures of GETCO.
Payment will be made by concern Division offices under which work executed.
32.2 Currency of Payment: All payments under the Contract shall be in Indian Rupees only.
32.3 Terms: Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
33.1 Application for Payment: The Contractor shall submit application for the payment in the prescribed
preformed of the Owner. Performa for application for payment will be as prescribed.
Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the
equipment shipped/brought on to the site pursuant to the Contract up to the date mentioned in the
application and for the period covered since the last preceding certificate, if any.
Every interim payment certificate shall certify the Contract value of the Works executed up to the
date mentioned in the application for the payment certificate, provided that no sum shall be included
in any interim payment certificate in respect of the works that, according to the decision of the
Engineer, does not comply with the Contract.
34.3 Mode of Payment
Payment due on completion of work shall be made by the Owner through Owner’s Bank or directly
to the Contractor as per the payment schedule.
Sign & Seal of Contractor Page
All payments under the Contract shall be made as stipulated in the Special Conditions of Contract
after signing the Contract Agreement.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of
quality check points involved in the quantum of work billed.
35.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. All such claims shall
be billed by the Owner to the Contractor regularly as and when they fall due. Such bills shall be
supported by appropriate and certified vouchers or explanations, to enable the Contractor to
properly identify such claims. Such claims shall be paid by the Contractor within thirty (30) days of
the receipt of the corresponding bills and if not paid by the Contractor within the said period, the
Owner may then deduct the amount, from any monies due or becoming due by him to the
Contractor under the Contract or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
37.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to
the Works and obligatory in terms of law to protect his interest and interests of the Owner against all
perils detailed herein. The form and the limit of such insurance as defined herein together with the
under-writer in each case shall be acceptable to the Owner. However, irrespective of such
acceptance, the responsibility to maintain adequate insurance coverage at all time during the period
of Contract shall be of Contractor alone. The Contractor’s failure in this regard shall not relieve him
of any of his contractual responsibilities and obligations. The insurance covers to be taken by the
Contractor shall be in the joint name of the Owner and the Contractor. The Contractor shall,
however, be authorized to deal directly with Insurance Company or Companies and shall be
responsible in regard to maintenance of all insurance covers. Further the insurance should be in
freely convertible currency.
37.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into
satisfactory operation and all activities to be performed till the successful completion of
commissioning of the equipment shall be to the account of the Contractor. The Contractor shall be
responsible for preference of all claims and make good the damages or loss by way of repairs
and/or replacement of the equipment, damaged or lost. The transfer of title shall not in any way
relieve the Contractor of the above responsibilities during the period of Contract. The Contractor
shall provide the Owner with copy of all insurance policies and documents taken out by him in
pursuance of the Contract. Such copies of documents shall be submitted to the Owner immediately
after such insurance coverage. The Contractor shall also inform the Owner in writing at least sixty
(60) days in advance regarding the expiry/cancellation and/or change in any of such documents and
ensure revalidation, renewal etc., as may be necessary well in time.
37.3 The perils required to be covered under the insurance shall include, but not be limited to fire and
allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage
in transit, theft, pilferage, riot and strikes and malicious damages, civil commotion, weather
conditions, accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods
and other costs till the equipment is delivered at Site. The insurance policies to be taken should be
on replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be
liable to make good the full replacement/rectification value of all equipment/materials and to ensure
their availability as per project requirements.
Sign & Seal of Contractor Page
37.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s
account and will be included in Contract Price, However, the Owner may from time to time, during
the pendency of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and
in such a case, the parties to the Contract will agree for a mutual settlement, for reduction in
Contract price to the extent of reduced premia amount. The Contractor, while arranging the
insurance shall ensure to obtain all discounts on premia, which may be available for higher volume
or for reason of financing arrangement of the project.
37.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site.
37.6 Special Conditions of Contract details out the various insurance liabilities.
38.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
39.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
39.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner
or his authorized agents, then the Contractor shall be given due extension of time for the completion
of the Works, to the extent such omission on the part of the Owner has caused delay in the
Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall
39.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if
such delays have resulted in any increase in cost. The Owner shall examine the justification for
such a request for claim and if satisfied, the extent of compensation shall be mutually agreed
depending upon the circumstances at the time of such an occurrence.
40.0 DEMURRAGE, WHARFAGE, ETC.
All demurrage, wharf age and other expenses incurred due to delayed clearance of the material or
any other reason shall be to the account of the Contractor.
41.0 FORCE MAJEURE
41.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence
could not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the
other in writing of such causes.
41.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
Sign & Seal of Contractor Page
42.0 SUSPENSION OF WORK
42.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the
Works without invalidating the provisions of the Contract. Orders for suspension or reinstatement of
the Works will be issued by the Engineer to the Contractor in writing. The time for completion of the
works will be extended for a period equal to duration of the suspension.
42.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of
the works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to
some default on the part of the Contractor or his Sub-Contractor.
43.0 CONTRACTOR`S DE FAULT
43.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse
or neglect to comply with any reasonable order given to him, in writing by the Engineer in
connection with the works or shall contravene the provisions of the Contract, the Owner may give
notice in writing to the Contractor to make good the failure, neglect or contravention complained of.
Should the Contractor fail to comply with the notice within thirty (30) days from the date of serving
the notice, then and in such case the Owner shall be at liberty to employ other workmen and
forthwith execute such part of the works as the Contractor may have neglected to do or if the Owner
shall think fit, without prejudice to any other right he may have under the Contract to take the work
wholly or in part out of the Contractor’s hands and re-contract with any other person or persons to
complete the works or any part thereof and in that event the Owner shall have free use of all
Contractor’s equipment that may have been at the time on the Site in connection with the works
without being responsible to the Contractor for fair wear and tear thereof and to the exclusion of any
right of the Contractor over the same, and the Owner shall be entitled to retain and apply any
balance which may otherwise be due on the Contract by him to the Contractor, or such part thereof
as may be necessary, to the payment of the cost of executing the said part of the Works or of
completing the Works as the case may be. If the cost of completing of works or executing part
thereof as aforesaid shall exceed the balance due to the Contractor shall pay such excess. Such
payment of excess amount shall be independent of the liquidated damages for delay which the
Contractor shall have to pay if the completion of works is delayed.
43.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to
pay liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
43.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not
entitle the Contractor to reduce the value of the Contract Performance Guarantee nor the time
thereof. The Contract Performance Guarantee shall be valid for the full value and for the full period
of the Contract including guarantee period.
44.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
44.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other
than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an
event give fifteen (15) days’ notice in writing to the Contractor of his decision to do so.
44.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts
to the extent they are related to the work terminated and terms satisfactory to the Owner, stop all
further sub-contracting or purchasing activity related to the work terminated, and assist Owner in
maintenance, protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
Sign & Seal of Contractor Page
44.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies
and if the Contractor is a partnership concern and one of the partners dies then unless the Owner is
satisfied that the legal representatives of the individual Contractor or of the proprietor of the
propriety concern and in the case of partnership, the surviving partners, are capable of carrying out
and completing the Contract the Owner shall be entitled to cancel the Contract as to its incomplete
part without being in any way liable to payment of any compensation to the estate of deceased
Contractor and/or to the surviving partners of the Contractor’s firm on account of the cancellation of
the Contract. The decision of the Owner that the legal representatives of the deceased Contractor
or surviving partners of the Contractor’s firm cannot carry out and complete the Contract shall be
final and binding on the parties. In the event of such cancellation the Owner shall not hold the estate
of the deceased Contractor and/or the surviving partners of the estate of the deceased Contractor
and/or the surviving partners of the Contractor’s firm liable to damages for not completing the
45.0 FRUSTRATION OF CONTRACT
45.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section
56 of the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance
portion of the Contract, subject to provisions contained in sub-clause 45.3 below.
45.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for
reason of willful or flagrant breach by the Owner) and/or Contractor then the works under the
Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to
the Contractor in accordance with the terms of the Contract within three months of the event, the
parties hereto shall be relieved from carrying out further obligations under the Contract treating it as
frustration of the Contract.
45.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to arrive
at reasonable settlement on all issues including amounts due to either party for the work already
done on quantum merit basis which shall be determined by mutual agreement between the parties.
46.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the
Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on
his or their behalf in relation to the obtaining or to the execution of this or any other Contract with the
Owner, shall in addition to any criminal liability which it may incur, subject the Contractor to the
cancellation of this and all other Contracts and also to payment of any loss or damage to the Owner
resulting from any cancellation. The Owner shall then be entitled to deduct the amount so payable
from any monies otherwise due to Contractor under the Contract.
E. RESOLUTION OF DISPUTES
47.0 SETTLEMENT OF DISPUTES
47.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
47.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the progress
of the Works or after its completion or whether before or after the termination, abandonment or
breach of the Contract, it shall, in the first place, be referred to and settled by the Engineer, who,
within a period of thirty (30) days after being requested by either party to do so, shall give written
notice of his decision to the Owner and the Contractor.
47.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final
and binding upon the parties until the completion of the Works and shall forthwith be given effect to
by the Contractor who shall proceed with the Works with all due diligence, whether he or the Owner
requires arbitration as hereinafter provided or not.
Sign & Seal of Contractor Page
47.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has
been communicated to him by either party within thirty (30) days from the receipt of such notice, the
said decision shall become final and binding on the parties.
47.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after
being requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied
with any such decision, or within thirty (30) days after the expiry of the first mentioned period of thirty
days, as the case may be, either party may require that the matters in dispute be referred to
arbitration as hereinafter provided.
48.0 ARBITRATION
48.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not become
final or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this contract with reference to the
construction, interpretation, breach, termination or validity thereof (hereinafter referred as "the Dispute") shall, upon the written
request of either Party be referred to the authorized representatives of the Disputing Parties for resolution. The authorized
representatives shall promptly meet and attempt to negotiate in good faith a resolution of the Dispute within thirty days of the
service of the request.
(2) Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as indicated herewith in sub clause (1) of
Clause, arising under or in connection with the present works contracts, whether pertaining to works contracts alone or works and
procurement both, the same shall be referred to arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal
49.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering payments claimed
and the payments received vis-à-vis the works executed, for reconciliation of accounts with the
Owner. The Contractor shall also prepare and submit a detailed account of Owner Issue materials
received and utilized by him for reconciliation purpose in a format to be discussed & finalized with
the Owner before the award of Contract.
1. Relationship with employee: Every bidder should, at the time of submission of bid. Give a
declaration as under “If any bidder company/firm, the interest (i.e. Shareholding in Company and
share in partnership firm) of any employee of the tendering company or his/her relative as defined in
Section 2(77) of the Company’s act 2013 is 10% or more, the tendering Company will not deal with
such Company/Firm at all.” Tendered therefore, must specifically disclose this fact in his
technical bid. Non-disclosure of such facts would immediately disqualify the tenderer for
further dealing with the tendering company.
2. Conflict of Interest among Bidders/ Agents: A bidder shall not have conflict of interest with other
bidders for particular quoted item. Such conflict of interest can lead to anti-competitive practices to
the detriment of Procuring Entity’s interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or more parties in
this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from any of them; or
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that puts them in
a position to have access to information about or influence on the bid of another bidder; or
Sign & Seal of Contractor Page
e) bidder participates in more than one bid in this bidding process. Participation by a bidder in more
than one Bid will result in the disqualification of all bids in which the parties are involved. However,
this does not limit the inclusion of the components/ sub-assembly/ assemblies from one bidding
manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal manufacturers,
one agent cannot represent two manufacturers or quote on their behalf in a particular tender enquiry.
One manufacturer can also authorise only one agent/ dealer. There can be only one bid from the
following: 1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design or
technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units, or more
than one unit having common business ownership/ management, only one unit should quote. Similar
restrictions would apply to closely related sister companies. Bidders must proactively declare such
sister/ common business/ management units in same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as amended
from time to time. Every bidder should, at the time of submission of bid, give a declaration, that
bidder shall not have conflict of interest with other bidders, as above. Responsibility for
correctness of the information submitted in the bid lies with bidder. If any information
furnished in the bid is proved to be false at a later date, GETCO reserve right to reject the bid
and the bid will not only be rejected but the bidder will be BLACKLISTED as per GUVNL
Sign & Seal of Contractor Page
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these
specifications & document and shall govern the portion of the work of this Contract to be performed
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his
representative at Site suitably designated for the purpose of overall responsibility and coordination
of the works to be performed at Site. Such person shall function from the Site office of the
Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the
Payment of Wages Act (both of the Government of India) and the rules made there under in respect
of any employee or workman employed or engaged by him or his Sub-Contractor. He shall abide by
labor laws and others as specified in the special conditions of contract.
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract
shall be to the account of the Contractor. Should any such inspection or registration need to be re-
arranged due to the fault of the Contractor or his Sub Contractor, the additional fees to such
inspection and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all tower, H-frame, Stringing and other line material brought to the Site
for the purpose of erection, testing and commissioning of the line to be erected under the Contract.
The Owner shall continue to hold the lien on all such material throughout the period of Contract. No
material brought to the Site shall be removed from the Site by the Contractor and/or his Sub-
Contractors without the prior written approval of the Engineer.
4.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative shall
be communicated to the said authorized resident representative of the Contractor and the
representative shall be available at a stated address for this purpose.
5.0 CO-OPERATION WITH OTHER CONTRACTORS
5.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the
Owner and doing work in the vicinity of the Works under the Contract. The Contractor shall also so
arrange to perform his work as to minimize, to the maximum extent possible, interference with the
work of other Contractors and their workmen. Any injury or damage that may be sustained by the
employees of the other Contractors and the Owner, due to the Contractor’s work shall promptly be
made good at the Contractor’s own expense.
6.0 ACCESS TO SITE AND WORKS ON SITE
6.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in reasonable
6.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the Owner
may approve and the Owner shall give the Contractor reasonable facilities for carrying out the works.
Sign & Seal of Contractor Page
6.3 In the execution of the works, no person other than the Contractor or his duly appointed representative, Sub-
Contractor and workmen, shall be allowed to do work on the Site, except by the special permission, in writing
of the Engineer or his representative.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence of any
representative or employee of the Contractor at the Site, if in the opinion of the Engineer such
employee has misconduct himself or is incompetent or negligent or otherwise undesirable and then
the Contractor shall remove such a person objected to and provide in his place a competent
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method
of work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the
field activities. Such reviews shall also not be considered as an assumption of any risk or liability by
the Engineer or the Owner or any of his representatives and no claim of the Contractor will be
entertained because of the failure or inefficiency of any such plan or schedule or method of work
reviewed. The Contractor shall be solely responsible for the safety, adequacy and efficiency of plant
and equipment and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including
the safety of all persons employed by him or his Sub–Contractor and all the properties under his
custody during the performance of the work. This requirement shall apply continuously till the
completion of the Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall
highlight comparison to the schedules. The report shall also indicate the reasons for the variance
between the scheduled and actual progress and the action proposed for corrective measures,
wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours schedule
for the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to
the Contractor’s works and the Contractor shall be responsible for complete restoration of the
damaged works to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
Sign & Seal of Contractor Page
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging,
allowances and other payments to the Contractor’s employees shall be the sole responsibility of the
12.3 In case the Owner becomes liable to pay any wages or dues to Labor or any Government agency
under any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract
Labor Regulation Abolition Act or any other law due to act of omission of the Contractor, the Owner
may make such payment and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
13.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings
required for pre-assembly, erection, of the Towers, H-frame, string, earthing etc, covered under the
Contract. He shall submit a list of all such materials to the Engineer before the commencement of
work at Site. These tools and tackles shall not be removed from the Site without the written
permission of the Engineer.
13.3 The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personnel’s shall be trained in
administering first-aid.
14.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and
Conditions of Contract of this Volume-I, the following provisions will also apply to the portion of
works to be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
14.2 Workmen’s Compensation Insurance
The contractor should produce Insurance policy copy which covered Contractor’s employee & sub
contractor’s employee for the same. This insurance shall protect the Contractor against all claims
applicable under the Workmen’s Compensation Act, 1948 (Government of India). This policy shall
also cover the Contractor against claims for injury, disability, disease or death of his or his Sub-
Contractor’s employee, which for any reason are not covered under the Workmen’s Compensation
Act, 1948. The liabilities shall not be less than:
Workmen’s Compensation : As per statutory Provisions
Employee’s Liability : As per statutory Provisions
14.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities,
disease or death of members of public or damage to property of others, due to any act of omission
on the part of the Contractor, his agents, his employees, his representatives and Sub-Contractors or
from riots, strikes and civil commotion.
14.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-
Contractors, his agents and his employees have to perform work pursuant to the Contract.
14.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent both in
time and amount to take care of all his liabilities either direct or indirect, in pursuance of the
15.0 UNFAVOURABLE WORKING CONDITIONS
Sign & Seal of Contractor Page
The Contractor shall confine all his field operations to those works, which can be performed without
subjecting the equipment and materials to adverse effects during inclement weather conditions, like
monsoon, storms etc. and during other unfavorable construction conditions. No field activities shall
be performed by the Contractor under conditions, which might adversely affect the quality and
efficiency thereof, unless special precautions or measures are taken by the Contractor in a proper
and satisfactory manner in the performance of such Works and with the concurrence of the
Engineer. Such unfavorable construction conditions will in no way relieve the Contractor of his
responsibility to perform the Works as per the schedule.
16.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may
come across during the course of performance of his Works either during excavation or elsewhere,
are properly protected and handed over to the Engineer. Similarly, the Contractor shall ensure that
the bench marks, reference points, etc. which are marked either with the help of Engineer or by the
Engineer shall not be disturbed in any way during the performance of his Works. If any work is to
be performed which disturbs such reference the same shall be done only after these are transferred
to other suitable locations under the direction of the Engineer. The Contractor shall provide all
necessary materials and assistance for such relocation of reference points etc.
17.0 WORK & SAFETY REGULATIONS
17.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to GETCO or to others, working at the Site. The Contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the relevant
legislations and the Engineer, as he may deem necessary.
17.2 All equipment used in construction and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be
absolutely safe. All equipment shall be strictly operated and maintained by the Contractor in
accordance with manufacturer’s Operation Manual and safety instructions and as per
Guidelines/rules of GETCO in this regard.
17.3 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out
in accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall
be properly maintained by the Contractor and will be promptly produced as and when desired by the
Engineer or by the person authorized by him.
17.4 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
17.5 The Contractor shall provide safe working conditions to all workmen and employees at the Site
including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be
erected under the control and supervision of an experienced and competent person. For erection,
good and standard quality of material only shall be used by the Contractor.
17.6 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the Owner or other Contractors under any circumstances, whatsoever, unless
expressly permitted in writing by GETCO to handle such fuses, wiring or electrical equipment
17.7 Before the Contractor connects any electrical appliances to any plug or socket belonging to the
other Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
Sign & Seal of Contractor Page
b. Inform the Engineer of the maximum current rating, voltage and phases of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be
d. The Engineer will not grant permission to connect until he is satisfied that;
e. The appliance is in good condition and is fitted with suitable plug;
f. The appliance is fitted with a suitable cable having two earth conductors, one of which shall be
an earthed metal sheath surrounding the cores.
17.8 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No
weight of any description will be imposed on any cable and no ladder or similar equipment will rest
against or attached to it.
17.9 No repair work shall be carried out on any live equipment. The equipment must be declared safe by
the Engineer and a permit to work shall be issued by the Engineer before any repair work is carried
out by the Contractor. While working on electric lines/equipment, whether live or dead, suitable type
and sufficient quantity of tools will have to he provided by the Contractor to
electricians/workmen/officers.
17.10 In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his employees
due to any reason, whatsoever, it shall be the responsibility of the Contractor to promptly inform the
same to the Engineer in prescribed form and also to all the authorities envisaged under the
applicable laws.
17.11 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property, and/or equipment. In such cases, the Contractor shall be informed in writing about
the nature of hazards and possible injury/accident and he shall comply to remove shortcomings
promptly. The Contractor after stopping the specific work can, if felt necessary, appeal against the
order of stoppage of work to the Engineer within 3 days of such stoppage of work and decision of
the Engineer in this respect shall be conclusive and binding on the Contractor.
17.12 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to
safety reasons as provided in Para 31.18 above and the period of such stoppage of work will not be
taken as an extension of time for completion of work and will not be the ground for waiver of levy of
liquidated damages.
17.13 It is mandatory for the Contractor to observe during the execution of the works, requirements of
Safety Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so
as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire
prone areas and adequate firefighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient first
aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers, use of
gum boots for working in slushy or in inundated conditions are essential requirements to be
Sign & Seal of Contractor Page
17.14 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as may be
prescribed from time to time without any demur, protest or contest or reservations. In case of any
discrepancy between statutory requirement and GETCO Safety Rules referred above, the latter
shall be binding on the Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1, 00,000/- : These are applicable
Causing death per person for death
b. Major injuries or accident causing Rs. 20,000/- : injury to any person,
25% or more permanent disablement per person whosoever.
to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act.
The compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and rules
framed there under or any other applicable laws as applicable from time to time. In case the Owner
is made to pay such compensation then the Contractor is liable to reimburse the Owner such
amount in addition to the compensation indicated above.
18.0 MATERIALS HANDLING AND STORAGE
18.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received, unloaded,
transported and stored in the storage spaces by the Contractor.
18.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of any
damages, storage, discrepancy etc, for the purpose of Engineer’s information only. The Contractor shall
submit to the Engineer every week a report detailing all the receipts during the week. However, the Contractor
shall be solely responsible for any shortages or damages in transit, handling and / or in storage and erection of
the equipment at Site. Any demurrage, wharf age and other such charges claimed by the transporters, railways
etc, shall be to the account of the Contractor.
18.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment
materials received by him for the purpose of erection and keep such record open for the inspection of the
Engineer in-charge.
18.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment stored shall be
properly protected to prevent damage either to the equipment or to the floor where they are stored. The
equipment from the store shall be moved to the actual location at the appropriate time so as to avoid damage
of such equipment at Site.
18.5 All electrical panels, control gears, motors and such other devices shall be properly dried by heating before
they are installed and energized. Motor bearings, slip ring, commutators and other exposed parts shall be
protected against moisture ingress and corrosion during storage and periodically inspected.
18.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation resistance at least
once in three months from the date of receipt till the date of commissioning and a record of such measured
insulation values maintained by the Contractor. Such records shall be opened for inspection by the Engineer.
18.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected and
stored in a suitable manner to prevent damage or deterioration in quality by storage.
18.8 All the materials stored in the open or dusty location must be covered with suitable weatherproof and flame
proof covering material wherever applicable.
Sign & Seal of Contractor Page
18.9 If the materials belonging to the Contractor are stored in areas other than those earmarked for him, the
Engineer will have the right to get it moved to the area earmarked for the Contractor at the Contractor’s cost.
18.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment, which
require indoor storage. Normally, all the electrical equipment such as motors, control gears, generators,
exciters and consumables like electrodes, lubricants etc. shall be stored in the closed storage space. The
Engineer, in addition, may direct the Contractor to move certain other materials, which in his opinion will
require indoor storage, to indoor storage areas, which the Contractor shall strictly comply with.
19.0 CONSTRUCTION MANAGEMENT
19.1 The field activities of the Contractors working at Site, will be coordinated by the Engineer and the Engineer’s
decision shall be final in resolving any disputes or conflicts between the Contractor and other Contractors and
the tradesmen of the Owner regarding scheduling and coordination of work. Such decision by the Engineer
shall not be a cause for extra compensation or extension of time for the Contractor.
19.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be designated by the
Engineer. The Contractor shall attend such meetings and take notes of discussions during the meeting and the
decision of the Engineer and shall strictly adhere to those decisions in performing his works. In addition to
the above weekly meeting, the Engineer may call for other meetings either with individual Contractors or with
selected number of Contractors and in such a case the Contractors if called, will also attend such meetings.
19.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his works in
accordance with the specified construction schedule. If at any time, the Contractor is falling behind the
schedule, he shall take necessary action to make good for such delays by increasing his work force or by
working overtime or otherwise accelerate the progress of the work to comply with the schedule and shall
communicate such actions in writing to the Engineer, satisfying that his action will compensate for the delay.
The Contractor shall not be allowed any extra compensation for such action.
19.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or supply or
any other services to the Contractor except for the coordination work between various Contractors if any at
20.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract Documents
and any other supplementary data complete with all the latest revisions thereto. The Contractor shall also
maintain in addition the continuous record of all changes to the above Contract Documents, drawings,
specifications, and supplementary data, etc. effected at the field and on completion of his total assignment
under the Contract shall incorporate all such changes on the drawings and other Engineering data to indicate
as installed conditions of the equipment furnished and erected under the Contract. Such drawings and
Engineering data shall be submitted to the Engineer in required number of copies.
21.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
21.1 The Contractor shall bring to Site all equipment, components, parts, materials, including construction
equipment, tools and tackles for the purpose of the works under intimation to the Engineer. All such goods
shall, from the time of their being brought vest in the Owner, but may be used for the purpose of the works
only and shall not on any account be removed or taken away by the Contractor without the written permission
of the Engineer. The Contractor shall nevertheless be solely liable and responsible for any loss or destruction
thereof and damage thereto.
21.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or owing to
him by the Contractor, under, in respect of or by reasons of the Contract. After giving a fifteen (15) days
notice in writing of his intention to do so, the Owner shall be at liberty to sell and dispose off any such goods,
in such manner as he shall think fit and to apply the proceeds in or towards the satisfaction of such sum or
sums due as aforesaid.
Sign & Seal of Contractor Page
21.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of the
Engineer the materials such as construction equipment, erection tools and tackles, scaffolding etc. with the
written permission of the Engineer.
22.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
22.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner and the
employees of other Contractors and Sub-Contractors and all public and private property.
23.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and Conditions
of Contract of this Volume-I, the following provisions will also apply to the portion of works to be done
beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
24.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment shall be in
accordance with the relevant Codes and accepted good engineering practice, the Engineer’s drawings and
other applicable Indian recognized codes and laws and regulation of the Government of India.
Sign & Seal of Contractor Page
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars :
This part of the Bid Document relates to certain specific/special terms and conditions particular to
the Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC)
and Erection Conditions of Contract (ECC). The intent of provisions herein are specific to this
contract and are, in general, supplementary to related provisions under ITB,GCC and ECC.
However, in certain provisions which are contrary to those in ITB, GCC and ECC, the provisions in
these Special Conditions of Contract will prevail.
2.0 Tender Fee :
3.0 All the Bidders will be required to pay Tender Fees with applicable GST and EMD as
mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office address
specified in the tender document or by RTGS/ NET/online
3.0 Earnest Money Deposit (EMD):
4.0 3.1 All the Bidders will be required to pay Tender Fees with applicable GST and EMD as
mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office
address specified in the tender document or by RTGS/ NET/online
3.1 Validity period : The offers should be valid for minimum period of 180 Days from date of
opening of tender ( Technical Bid )
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make
the Bid invalid.
5.0 Qualifying Criteria:
5.1 TECHNICAL CRITERIA:
As per Criteria mentioned above in GCC Part-1
5.2 FINANCIAL CRITERIA:
As per Criteria mentioned above in GCC Part-1
6.0 Additional Documents:
Apart From various documents to be furnished along with the Bid as required in the GCC and ECC,
the following documents/details are to be furnished by the Bidder:
Vendor Registration: Vendor registration document
Provident Fund Code: Separate provident fund code number towards firm registered with
Regional P. F. Commissioner.
Profit & Loss Account Statement: The Bidder should submit certified Xerox audited copy of the
Balance sheet with profit and loss account of last three Years.
Nature of Firm: Attested copy of Partnership Deed, P o we r of Attorney, if any, for signing
the b i d documents in case of partnership firm &self-affidavit for proprietorship firm. All such
documents shall have to be NOTARISED
Sign & Seal of Contractor Page
I.T. PAN CARD: The bidder should submit the attested zerox copy of PAN Card of their firm.
GST Registration: The Bidder Should have to take registration under the “GOODS AND
SERVICE TAX(GST)”. The certified Xerox copy of such registration shall have to be
submitted along with the bid by the bidder.
Electrical contractor’s license: The bidders should submit the attested copy of GOG
Electrical Contractor licenses of firm with latest validation.
Welfare Cess registration: As per welfare Cess act., as the work allotted to bidder, he has to
take registration under well Cess of said site and submit the same to this office.
List of Tools & Tackles:
7.0 Price Inclusions (including Taxes & Duties):
7.1 The prices quoted shall be all inclusive of freight, Octroi, transportation, loading, unloading &
stacking of material or manpower.
7.2 Goods and Service Tax (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on
a given taxable goods and/or services within the original contractual delivery period. The amount
and % of GST and Cess as applicable should clearly be indicated separately. (GST/Cess means all
applicable Tax/Cess under GST Laws. GST Laws means IGST Act, GST (Compensation to the
State for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017 and all related
ancillary legislations).
You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder, certifying
that you have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall
not claim any such Refund, on a future date, from the concerned Authorities and if, any
Refund/Credit, in respect of such GST and Cess, is claimed by you, it will be immediately passed on
to the COMPANY, without COMPANY making any specific Claim, for the same, either from the
Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and
Cess is not mentioned clearly unless the bidder has opted for Composition Scheme under GST Act,
which should be clearly indicated in the price bid. COMPANY may at its discretion consider such
offer with presumption of highest applicable rate of VAT/GST/Cess prevailing when the price
quoted is inclusive of GST and Cess.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation
of the Supplier from Composition scheme during the tenure of the contract, the rate mentioned in
the price bid shall be final and any additional GST will have to be borne by the tenderer. In no case
additional amount towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further, any
additional liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier / contractor on account of GST
charged from the company; such refund shall have to be passed on to the company, along with
interest if any. Such refund along with interest needs to be passed on suo-moto by the supplier /
Sign & Seal of Contractor Page
Further, the Company has a right to recover the amount of GST along with penal interest at the rate
of 15% per annum if GST charged is not paid / short paid to the government or fail to upload the
details or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within the
stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable
for each item of Goods/Service. If not specifically mentioned, then COMPANY will have the option to
take the prices as exclusive of taxes and duties at maximum higher slab rates for the evaluation of
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder intends
to supply the goods / services, meaning thereby the bidder has to supply the goods / services from
the relevant declared / registered place of supply only.
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion
of any other additional item of their inputs / input services under the ambit of the Input Tax Credit
provisions under the GST Act, subsequent to the date of submission of the offer, the same should
be passed on to COMPANY and you should inform such changes to COMPANY from time to time.
GST Compliances:
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work executed
will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations and
notifications, circulars issued and in force time to time by Government and M/s. GETCO.
Contractors are required to clarify the product and services related HSN codes and SAC codes
Contractor required to submit the invoice as per the standard formats/contents of GST laws including
invoice ruling. GST will be reimbursed subject to proper/ valid matching of transactions/invoices on
GSTN (GST network).
The contractor is abiding by the all rules and regulations of corporation and amendments, which may
subsequently for compliance by field offices with respect to GST Laws
7.9 Statutory Variations:
Any statutory increase or decrease in the taxes and duties GST and Cess as applicable or in the
event of introduction of new tax/cess or cessation of existing tax/cess subsequent to your offer if it
takes place within the original contractual delivery date will be to the GETCO’s account subject to
the claim being supported by documentary evidence. However, if any decrease takes place after
the contractual delivery date, the advantage will have to be passed on to the GETCO.
7.12 Income Tax
Income tax at source at the prevailing rate will be deducted from bills in accordance with the
provision of Income-Tax Laws and to that effect a certificate will be issued to the contractor.
1) As per the Welfare cess Act, the welfare cess @ 1% is applicable on supply and erection items
for supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey
projects and civil works.
2) Contractor shall get registered under welfare cess Act before commencement of work. Office of
the factory inspector is authorized at present as a registering authority.
Sign & Seal of Contractor Page
3) GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
4) The contacts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare Cess on estimated cost of supplied items to GETCO contractor
on progressive basis of utilization. As this part of welfare cess is on GETCO account, the same
shall be reimbursed to the contractor on receipt of request letter along with documentary
evidence of payment. For calculation of welfare cess on supply part, valuation as per MR shall
be taken and informed to the contractor for payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
• On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office.
• Before release of payment of first R.A. Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
• Before release of payment of subsequent R.A. Bill, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A. Bill.
• Before release of payment of final bill, the contractor has to submit documentary evidence of
payment of welfare cess of previous R.A. Bill as well as of this final bill.
• If the R.A. Bill happens to be first and final bill, then before release of payment, contractor has
to submit documentary evidence of registration under Welfare Cess Act and evidence of
payment of welfare cess.
• The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities
8.0 SECURITY DEPOSIT-CUM-PERFORMANCE GUARANTEE DEPOSIT
8.1 The successful bidder has pay security deposit within 15 days of receipt of order.
8.2 The 5% of tender value will be required to be paid either in form of Demand Draft in favor of “Gujarat
Energy Transmission Corporation Limited” payable at Palanpur or in form of “Bank Guarantee” on
acceptance of tender as security deposit at Circle Office, Palanpur or by NEFT/RTGS/ONLINE as
per bank details mentioned in the tender notice. The Security Deposit will be paid within 15 days
of receipt of LOI. FDR not accepted as security Deposit. Bank Guarantee Format will be given from
8.3 This security deposit is for the performance of contract and the same is liable to be forfeited by the
in event of non-fulfillment of the term and conditions of this contract by the contractor
8.4 Corporate Guarantees are not admissible.
8.5 The ‘Signing of Contract ‘and ‘Contract Agreements’ will be done as per prevalent Terms and
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in materials, poor
workmanship or defect/ wrong design etc. for a period of one year from the date of commissioning
of transmission line.
9.0A BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating starting
and completion dates of each activity. This is mandatory condition the tenders without which shall
be liable to be rejected.
10.0 PENALTY FOR DELAY:
Sign & Seal of Contractor Page
10.1 The tenderer should note that the completion time allowed for carrying out the work should be
strictly observed. Any delay that may take place in work execution beyond Contractual cutoff date
stated as per stipulated delivery period shall be subject to the penalty at the rate of ½ % per week or
part thereof on delayed portion of the work subject to ceiling of 10% of total contract value plus
applicable GST on penalty amount will be impose.
10.2 The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
11.0 COMPLETION PERIOD
11.1 Overall Completion period for this Contract will be 03 Months from the date of Commencement
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
11.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the GETCO/Engineer and is complete in all
respects as per the terms and conditions of this Contract.
12.0 Presentation of Bills
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed including cost of
material consumed is to be prepared in triplicate and submitted to Site Engineers in-charge of the
work, for necessary payment. These bills shall be serially numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and passing of
final bill. The contractor has to submit the final bill along with the material consumption statement
and other required data of the work carried out within 3 months from the date of completion of work.
These bills shall be serially numbered with suffix SE-I.
12.3 All the bills in accordance with the above clauses must be submitted with the following information:
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the
respective RA bill shall be withheld and shall only be released at the time of final bill.
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of transmission line work.
13.1 For erection works.
(i) 90% payment of amount claimed covering various activity such as structure, equipment erection,
earthing installation, control wiring, battery charging etc. works against R.A. bills duly certified by
EIC within 60 days from the date of R.A. bill.
(ii) Balance 10% of erection value shall be paid against completion of work only after settlement of material
account statement of items used, erected and successful commissioning of transmission line the
same amount will be release in final bill only and payment will be made only after passing of final
14.0 TAKING DELIVERY AND INSURANCE
14.1 The contractor has to take delivery from construction store of Tower material, H-frame structure
material, conductor & line material keeps S/S materials in safe custody and transport to the
Sign & Seal of Contractor Page
respective sites and will be fully responsible for any damage to or loss of all materials at any stage
during transportation or erection or taking over of the line by GETCO.
14.2 The Contractor has to open site store and ensure for safe custody of all the stored materials at his
14.3 The Contractor shall have total responsibility for the entire tower & line materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable security
arrangements at his own cost to ensure the protection of all materials, equipment and works from
theft, fire pilferage and any other damages and loss. It shall be the responsibility of the contractor to
arrange for security till the works are finally taken over by the GETCO.
14.4 STORAGE-CUM-INSURANCE: -
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of
100% cost of cost of sub-station / line materials, which are required to complete the sub-station /
line. Bidder shall have to take the comprehensive Marine Cum Erection (MCE) insurance policy
against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over of the sub-station / line by GETCO. However, if the
work is not completed within stipulated time limit as mentioned into work order, the MCE shall be
extended by the contractor up to the work completion and taking over of line or SS by GETCO.
Moreover, the change for extension of insurance shall be borne by contractor if the delay is
attributed to the contractor. The charge for extension of insurance shall be reimbursed by GETCO to
the contractor on production of proof for extension of MCE if the delay is attributed on the part of
The contractor shall deal directly and pursue the claim with the insurance company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim.
The proof of insurance policy taken by the contractor shall be furnished / submitted to engineer-in-
charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further, in
absence of the above insurance policy, R.A. bill payment will be withheld.
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to lodge,
pursue and settle all the claims with the Insurance Company for all items, materials and the GETCO
shall be kept informed about it. Contractor shall replace the lost / damaged materials / items
promptly irrespective of the settlement of the claims by underwriter and ensure that the work
progress is as per agreed schedule. The loss, if any, such replacement will have to be borne by the
Contractor and GETCO will not entertain any claim / representation in this regard. However, it will
be contractor’s responsibility to insure the entire project till the transmission line is taken over by the
15.0 LABOR LAWS:
15.0.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be
employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid Labor license under the contract Labor (Regulation and abolition)
Act for employing necessary manpower required by him. In the absence of such license, the
contract shall be liable to be terminated without assigning any reason thereof.
15.0.3 The Contractor shall at his own expenses comply with all Labor laws and keep the GETCO
indemnified in respect thereof. Some of the major liabilities under various Labor and industrial laws
which the Contractor shall comply with, are as under:
1) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or other
Statutory Authority.
Sign & Seal of Contractor Page
2) Payment of deposit in respect of each contract Labor at the rate of Rs. 30/- or later prevailing
rate with the Office of Commissioner of Labor as per the Contract Labor (Regulation and
Abolition) Act.
3) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
4) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for
every 20 days of working.
5) Identity cards as prescribed under the Factories Act with photo affixed thereto, for identification.
6) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial
Dispute Act. Any payment to the Contractor’s employee arising out of any claim of disputes
under the Industrial Disputes Act 1947 or any other Labor Laws.
7) Payment of compensation in case of accidental injury.
8) Provision of crèche if the female Laborers employed are more than 30 Maternity Leave as per
the provisions of the Maternity Benefit Act.
9) The above are some of the major liabilities of the Contractor in addition to other liabilities
prescribed under the various Labor laws, in force from time to time, from Statutory Authorities
like State Government/ Government of India, which the Contractor shall have to comply with.
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction
against employees Provident Fund and Family Pension Scheme in respect of each concerned
employee. Provident Fund and Family Pension Scheme at the rate of 18% (or at the rate made
applicable by the Government from time to time of the wages. The Contractor’s contribution and his
worker’s contribution towards Provident Fund and Family Pension Scheme shall be deposited by
the Contractor with Regional Provident Fund Commissioner, Ahmadabad.
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of
the Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional
Provident Fund Commissioner, Ahmadabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmadabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labor, shall
be provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for
individual laborer which shall be duly verified, approved and certified by the authorized Officer of the
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the
liability insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pungency of the
15.6 The contractor shall employ adequate number of experienced skilled at site for daily supervision and
for maintenance of various registers and records required under the law and contract. No payment
for supervision shall be admissible.
15.7 CONTRCTOR TO INDEMNIFY THE GETCO:
Sign & Seal of Contractor Page
The Contractor shall Indemnify the GETCO and every member officer and employees of the
GETCO also, Engineer-in-Charge and his staff against all actions, proceedings, claims, demands,
costs and expenses whatsoever, arising out of or in connection with the matters referred herein
above elsewhere and against all actions, proceedings, claims, demands, costs and expenses which
may be made against the GETCO or Government for or in respect of performance of his obligation
under the contract documents. The GETCO shall not be liable for intervention of authority
Government for or in respect of performance of his obligation under the contract documents. The
GETCO shall not be liable for or in respect of or in consequence of any accident or injury to any
workman or other person in the employment of the Contractor or his Sub-Contractor and the
contractor shall indemnify and keep indemnified the GETCO against all claims, demands,
proceedings, cost, charges and expenses whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this
contract. If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide
workmen’s employer’s liability insurance for the latter’s employees, such employees shall be
covered under the Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates fixed
under the minimum wages act. The wages of every Contract Labor employed by him under this
contract shall also be paid by him before the expiry of 7th day of the last day of the month in respect
of the wages are payable (i.e. wages of a month have to be paid by him in the first week of the next
month). Any default will result in cancellation of contract forthwith or else the contractor shall be
punishable to the extent of Rs. 100/- per each day or as per the prevailing rules of Labor laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in
case of Labor trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his
office outside the factory work premises and the Contractor shall arrange to have his office outside
the factory work premises and the Contractor shall keep himself present throughout the working
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the
15.11 Termination of Contract:
In case of contractor fails to complete the transmission line work or part thereof within contractual
period or in case the work is found not in accordance with prescribed specification the GETCO shall
exercise its discretionary power either:
15.11.1To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To get the work done other contractor after giving due notice to the contractor on account and at
the risk of the contractor for such work executed or other similar description without canceling the
contract in respect of the works not yet due for completion or
15.12 To cancel the contract.
In the event of the risk works of similar description, the opinion of the GETCO shall be final. In the
event of action taken under clause (A) or (B) above, the contractor shall be liable to pay for any loss
which the GETCO may sustain on that account, but the contractor shall not be entitled to have any
saving on such purchases made against default.
Sign & Seal of Contractor Page
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any
time for rejection of the stores.
15.12.1MATCHING OF END COST: In case the GETCO decides to award contract on matching end-cost
basis, the bidder has to reduce all the quoted rates proportionately. The reduction on overall basis
will not be accepted (i.e. all unit rates of erection schedule shall be reduced proportionately by
difference in percentage). The confirmation for matching end cost shall be given within 7 (seven)
days from the letter from GETCO.
16.0 Agreement Bond: The contractor shall have to execute the contract agreement at his own cost on
the stamp paper of Rs. 300/- and have also submit Indemnity bond on the stamp paper of Rs. 300/-
as per the prescribed format appended with the specification enclosed.
17.0 Safety Cum Indemnity bond : The contractor shall submit Safety Cum Indemnity bond on the stamp
paper of Rs. 300/- as per the prescribed format appended with the specification enclosed.
1. In case if any safety related fatal Elect. /Mech. Accident occurred to any employee of the agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
compensation and liability as per statutory requirement, contractor/agency shall be penalized as
under with applicable GST.
Sr.No Amount of contract in Rupees. Penalty amount in Rupees.
1 Up- to 1 Lac. 5000.00 Plus GST as applicable
2 Above 1 Lac to 10 Lacs. 25000.00 Plus GST as applicable
3 Above 10 Lacs. To 100 Lacs. 100000.00 Plus GST as applicable
4 Above 100 Lacs. 1.00 % Plus GST applicable
The contractor shall inform concerned Ex. Engineer Const. /TR in Writing with in 24 Hours of
Fatal/Non-Fatal accident occurred to human being.
The GETCO investigating officer findings in to accident shall be final and binding to the
contractor/agency.
3. Safety requirements:
Kick-Off meeting exclusively for safety shall be done in each contract in presence of contractor’s site
in charge and supervisor. Safety document shall be handed over and vital safety norms & key points
of safety related to project shall be explained and recorded for commitment by erection contractor.
Such records are mandatory for clearing first erection bill.
During site visit by GETCO official of Executive engineer & above rank, the following checks during
the execution of work shall be covered.
Safety equipments available and utilized
(b) Safety belt
(c) Safety Shoes
(d) Live Line voltage detector
Safety procedure adopted
Sign & Seal of Contractor Page
(a) Permit to work
(b) Earthing at the place of work
(c) Adequate supervision
(d) Live Line voltage detector
T& P physical check (Healthiness & Quality)
(b) Wire rope and sling
(c) Earthing rod
If above mentioned safety requirements found violated in any of above three conditions, shall attract
penalty of Rs. 1,000.00 plus GST per occasion (Maximum Rs. 3,000.00 plus GST for violation of
three condition. During the sub sequent visit, if violation is found, then double penalty plus GST shall
be deducted from the bill of the contractor/agency
18.0 REGISTRATION AS A CONTRACTOR:
Registration with GETCO, PALANPUR or any other office GETCO is pre requisite for participating in
tender. It is required to furnish documents of registration along with offer in Technical bid and the
details at appropriate place in confirmation of details of bidder shall be given by the contractor.
SAFETY INSTRUCTION / SAFETY GUIDE LINE FOR CONTRACTORS DURING WORK
Following safety guidelines are mandatory for all contractors operating in GETCO premises/ on
transmission lines for Electrical, non-electrical & Civil works.
1. The contractors must provide advance planning of work to concerned in-charge of substation in writing.
2. The name, qualification, address & cell phone No. of supervisor.
3. The list of workers/labours with name and address.
4. The copy of group insurance policy with list of name of workers covered.
5. The list of T & P and safety equipment [PPE] having tested and checked by GETCO official at site.
6. The working procedure must be specified with timing of working hours indicating tea break & lunch break
7. Before starting any work “permit to allow to work” must be taken from control room in-charge.
8. Utilizing Electrical/non-electrical equipments, safety rules must be implemented.
9. All workers/labour & supervisors must be use safety equipment [PPE] during the work.
10. If the work is to be carried out on Sunday or public holiday, the necessary permission must be taken in
advance, requesting in writing.
11. Unwanted person including children of labours will not be allowed at working site in the
switchyard and in the prohibited area.
12. Any electrical work or electrical connection to equipment for any other work must be carried out by
certified electrician/wireman with adequate size of wire through MCB per I.E. Rule.Ensure that all
precautions are taken to prevent electrical & the installation/connection is certified by EIC.
13. No work should be done during night hours unless & until it is required under certain circumstances with
the approval of next higher authority and all necessary arrangement of adequate lighting with
safety precautions is made.
14. Any power line crossing, river crossing & railway crossing or any other hazards must be discussed with
workers by contractor in presence of EIC.
Sign & Seal of Contractor Page
15. Contractors must submit list of workers with name, qualification and experience who are engaged for
line maintenance/rectification job.
16. Line clear permit must be taken on power line crossing or passing nearby for safety of workers. This
must be ensured by GETCO supervisor/in-charge of sub station before starting the work.
17. Contractors must arrange for Shelter and drinking water facility for the labours/workers
engaged with the permission of S/S in charge.
18. The method of work, required T&P and manpower should be discussed between GETCO
supervisor, contractor’s supervisor and gang leaders.
19. Prior to execution of work a joint survey must be conducted by GETCO supervisor,
contractor’s supervisor and DISCOM line man in order to identify that following :
[a] HT/LT line or tap line crossing under each span of line of the work.
[b] Isolation point of each line crossing must be checked.
[c] Each line crossing & isolation point under each span must be discussed and noted in
maintenance register with sketch.
20. While execution of stringing work the identified line crossing must be isolated/ de-energized
and written clearance should be obtained from concerned DISCOM supervisor.
21. The isolation of Tap line must be physically seen and verified by Contractor.
22. Contractor’s supervisor must take LCP for EHV line and power line crossing.
23. AT D.O. fuse junction contractors person should be posted to ensure that no person restore
D.O. supply while work is under execution.
24. Contractor’s supervisor must ensure all isolations physically prior to give clearance to gang
leader for taking up job.
25. Earthing must be done at the place of work before execution of any work.
26. Live Line Detector should be used to check de-energisation of line before start of work.
27. Earthing material and tools of contractor shall be verified before starting of work.
28. No work done by contractor labour without their supervision.
29. Before starting of stringing work tightening punching, no member missing & any type of
tension tower provide back tension guy without joint & provide at appropriate depth.
30. Tree cutting should be completed before starting stringing work
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of fatal/Non-
fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3.0 Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s site in
charge and supervisor. Safety document shall be handed over and vital safety norms and key points of
safety related to project shall be explained and recorded for commitment by erection contractor. Such
records are mandatory for clearing first erection bill.
Sign & Seal of Contractor Page
3.2 During site visit by GETCO official of SUPERINTENDING Engineer and above rank, the
following checks during execution of work shall be covered.
3.21 Safety equipment available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
3.2 2 Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
3.3 If above-mentioned safety requirements found violated in any of the above three
conditions shall attract penalty of Rs.1000/-per occasion. (Max.Rs.3000/--for violation of
three conditions)
3.4 During subsequent visit, if violation is found, then double penalty shall be deducted from
the bill of the Contractor/Agency.
Sign & Seal of Contractor Page
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipment’s and other material from the GETCO’s stores, checking them, transporting to site's
stores and keeping in safe custody by contractor.
ii) To take suitable storage-cum-erection insurance of equipment’s/materials issued by the GETCO.
iii) Distribution of all materials to erection site at 66 KV above mention Sub Station.
iv) Structure/Equipment erection including fixing of attachments, accessories and tack-welding of structures.,
v) Stringing of ACSR/AAAC Panther/Zebra conductor bus with fixing of insulators, Hardware, dampers, spacers etc.
vi)Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete the substation for
3.1.3 The GETCO will supply equipment’s, structure materials, bolts-nuts, structure accessories / attachments,
insulators, insulator-hard wares, conductor, accessories, ground wire, ground wire accessories, GI Earthing strip,
Control cable etc. required for erection of equipments and other associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest Provisions under Indian Electricity Act
and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required during execution of work. The
Contractor solely is responsible for any damage and / or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till the complete substation is
taken over by the GETCO, and thereafter up till guarantee period.
3.1.7 The methods of erection are not dealt with in detail but are left to the Contractor who shall exercise his own judgment
with regards to actual handling of equipments & materials and in deciding upon the best methods to be adopted for
all the erection activities.
3.1.8 The successful bidder shall carryout all the erection works in accordance with structural drawings, and other erection
drawings etc. provided by the GETCO.
3.2.0 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The bidders are presumed to have
acquainted themselves with the site before submitting their offer.
3.2.2 The successful bidder has to collect from concerned field office the detailed layout drawing along with the following
drawings for the substation duly approved by the GETCO immediately on receipt of the Order. He shall also arrange
visit of proposed site jointly with GETCO’s representative for important marks coming across the scope of works
under the contract. Structural drawings of 66 KV Structures listed at Schedule –B 3.3.0
3.3 TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall fully comply with the relevant Indian
Standard. The IE rules and Acts in force from time to time shall also be applicable during pendency of the contract.
Sign & Seal of Contractor Page
3.4.0 ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles jigs and fixtures winches, alignment tools, welding sets, breaker
handling devices all consumable items and construction equipment as required to install the equipment’s and
to complete the work in all respects and shall necessarily include (but not limited to ) bolts, nuts, rivets,
welding rods, shims, wedges, packing sheets, packing compounds, oil installation and protection of
individual equipment in storage and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of and connection of cables,
fabrication supply and installation of all support structures for installation of various electrical equipment and
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables) shall also be arranged by
the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's instructions
3.4.6 All additional iron framework erected to put the equipment in operational condition shall be provided with two
coats of primer and two topcoats of finish paint.
3.4.7 Special care shall be taken to make the enclosed equipment protected against entry of rates, lizard, and
creeping reptiles, which may create electrical short circuits.
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the following activities have been
3.5.2 Moving of all equipments to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters instruments etc. as described in the job
specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric strength.
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of pain wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
3.60 ERECTION OF SWITCHYARD STRUCTURES.
3.6.1. Erection o f s w i t c h y a r d structure shall mean erection of gantry column, beams, equipment
support structure and lighting mast, VHF masts, watch and ward observation posts if any.
3.6.2 The foundation work of switchyard structure is not in the scope of this tender. The foundation with
concreted anchor bolts shall be made available by well in time to enable the contractor of this work to
get a clear working front.
Sign & Seal of Contractor Page
3.6.3. The switchyard structure shall be made available to the contractor in the knocked down condition either at
site or from any other store. Small parts like cleat, plate fasteners step bolts and other accessories (if any)
shall also be supplied as above separately
3.6.4. Before commencement of the erection work, the contractor shall check cast foundations and
anchor bolts for their individual and mutual distances and also for the correctness of concreted bolts in
terms of number and verticality. In case of any disagreement with the lay out drawing, the matter may
be referred to Engineer in charge for remedial measures who in turn will arrange such remedial
measures. However, the contractor shall also render necessary assistance in the matter.
3.6.5. The erection of structure shall be done strictly as per the approved set of structural drawings to be
given . The erected column for bringing the structure in alignment or bringing the structure in plumb
shall be allowed.
3.6.6. The erection of column/beams shall be done in phased manner on already erected column. The
elevation faces of the beam should be first fastened to the column one by one and thereafter plan
bracings should provide one by one to complete the beam geocentric Pre-stressing of beam member
for alignment should be avoided. In case of difficulty in fabricated material or otherwise, the
Engineer in charge should be contacted for remedial measures who in turn will take necessary
action. However the contractor shall also render necessary assistance in this work to Engineer in charge
for speedy completion of work. The load point’s rings bracing shall also be provided as per drawings.
3.6.7. The Cross-connected beams should be perfectly at right angle and matching with respective faces of
the column. No column or beam shall be erected with missing members.
3.6.8. The method of erection is not being dealt with in detail here. However, while making the rigging
arrangement, it should be ensured that no column beam or part thereof is damaged due to misjudgment.
All the members, plates, cleats, bolts, buts and other accessories should be fitted to the column, beam
support structure as per the approved drawing.
3.6.9. After the erection of beam and column, the bolt nuts should be properly tightened and center punched.
The thread protruding bolt should be dented in the contact surface of nut at 3 point 120 degrees apart to
eliminate loosening of bolt due to vibration. The stringing of bus bar conductor be done only after getting
certificate from Engineer. in charge that all bolts &nuts are provided as per approved drawings and tightened.
3.6.10. The equipment support structure should also be erected like gantry column. They should well be in
plumb with all members fitted as per approved drawings and bolt nuts properly tightened. The contractor
shall also take care to see that the alignment of foundation o f equipment support structure is well done.
The e q u i p m e n t s u p p o r t structures shall be erected as per the approved drawings.
3.6.11 SWITCH YARD LIGHTING & CONTROL ROOM ELECTRIFICATION
1. Rate is to be quoted with name of Company i.e. Bajaj/Crompton/Philips etc.
2. Inspection of the entire luminary is to be inspection at Bajaj/ Crompton/ Philips Show room then it is to be dispatched.
Sign & Seal of Contractor Page
3. All the Luminary is to be supplied with all the accessories like round plate, flexible wire, lamp starter 40W/ 20W
Fluorescent tube etc.
4. This work also includes commissioning of existing wiring with minor repairing / replacement of ceiling rose plate etc.
5. GI.pole is to be inspected at works at the cost of contractor.
6. Sample of Allu.cast J.Box will be given by GETCO. & supply as per sample
7. Excavation for pole, Earthing, cable lying is to be carried out in any type of soil, except Hard rock. In case of
excavation in Hard rock Rs. 420 per CMT shall be paid separately.
8. Tube light fixture fitting in CR is to be carried out with long GI Pipe & is to be properly hanged and fitting and ceiling as
9. Ceiling Fans is to be selected at authorized showroom & inspection is to be done at show room colour of fan should be
10. Exhaust Fan & Pedestal Fan should be purchased only after selection of make & model at authorized showroom.
11. Supply storage and installation of various lighting fixtures, complete with lamps and accessories.
12. Supply storage and installation of lighting panels.
13. Laying and termination of 415 V PVC armored power cable from lighting panel to the junction box at the bottom of the
gantry of lighting fixtures respectable and looping from one gantry to other shall be buried underground. Contractor
shall quote the unit price of cable erection separately. Cables glands and lugs are included in contractor’s scope.
14. Laying and termination by 415V PVC armored power cable from street lighting panel to street lighting poles and power
cable, for looping from one gantry to gantry shall be in scope of lighting contractor these cables shall be buried
underground. Cable glands and lugs are included in contractor’s scope.
15. The contractor shall fully co-ordinate the design and the work with engineer in charge and various other contractors of
16. Materials and components not specifically stated in this specification on and which are necessary for satisfactory
installation and operation of the lighting system shall be deemed to be included in the scope of the specification.
17. The design manufacture and performance of equipment should comply with all currently applicable states, regulation
and safety code in the lighting where the equipment will be installed nothing in this pacification shall be construed to
relieve the bidder on these responsibilities.
18. Unless otherwise specified, equipment offered shall conform to latest application Indian and IEE
19. standards equipments, complying with another authoritative standards such as British, U. S. A. VDE etc, will also be
consider if it insures performance equivalent of superior of Indian standards in each
20. cases the bidder shall clearly indicate the standard adopted and furnish a copy of the latest English version of the
along with the tender. Should there any dispute of design, work shall follow.
21. Indian standards as per latest amendment should be followed
22. IS : 1913 General & Safety requirement for electric lighting fitting.
23. IS : 3528 Water proof electric lighting fitting
24. IS : 4012 Dust proof electric lighting fitting
25. IS : 4013 Dust tight electric lighting fitting
26. IS : 1777 Industrial lighting fitting with metal reflectors.
27. IS : 3287 Industrial lighting fitting with plastic reflectors.
28. IS : 2493 Well glass lighting fitting for use underground in mines. (Non flameproof type)
29. IS: 1947 Specification of flood light.
30. IS: 2149 Luminaries for street lightings.
31. IS: 2183 High pressure mercury vapour lamps.
32. IS: 1534 Ballasts for use fluorescent lighting ( Part-1 ) fitting
33. IS: 1569 Capacitors for use in fluorescent lighting fitting
34. IS: 2215 Starters for fluorescent lamps.
35. IS: 2713 Tubular steel poles.
36. IS: 5133 Steel and cast iron Boxes.
37. IS: 2629 Hot dip galvanizing of iron & steel.
38. IS: 694 PVC insulated cables for working voltages up to and including 1100V
39. IS: 732 Code of practice for electrical wiring insulation (System voltage not exceeding 650 volts.)
40. IS: 3043 Code of practice for earthing.
41. Indian Electricity Act.
42. Indian Electricity Rules.
Sign & Seal of Contractor Page
43. The Standards mentioned above are available from Indian Standards institution. Manok Bhavan, 9, Bahadoor Shab
Zafar Marg, NEW DELHI – 110
44. All sodium/Mercury vapour lamps fixtures shall be complete and with accessories like ballasts, igniters, power factors
improvement capacitors etc.
45. This shall be mounted as per as possible in the fittings assembly only, if those cannot be accommodated inside then a
separate metal enclosed box shall be included to accommodate the accessories and in addition with fuse and terminal
block suitable for loop in loop out connections. Outdoor type fixtures shall be provided with outdoor type weather proof
box. They shall indicate starting time of these lamps to get full light output. Curves for starting characteristics and
variation of lamps characteristics with varying supply voltage etc. should be furnished by the bidder.
46. Each lighting fixture shall be provided with end earthing terminal suitable for connection to 8 SWG GI earthing
3.6.12 CABLE TERMINATION BOX :
1. Cable termination box for gantry structure shall be completely weather proof confirming to ISW 55 and provided with
lockable door and HRC fuse mounted on fuse carrier and fuse base assembly. The terminal shall be stud type and
suitable for two Nos. 4mm2 cable necessary arrangements for glanding cable along with supply of gland are included in
2. The bolts nut and screw required for erection is to be supplied by the contractor at his own cost.
3. Outside and inside the cable terminal boxes will be furnished in two coats light grey colours.
4. Finished painted appearance on equipment shall aesthetically pleasing appearance free from dots and uneven surfaces.
5. Touch up paint at site shall have to be done if necessary.
3.6.13 SECTION PILLARS:
1. The contractor shall supply and installation section pillars.
2. The section pillars shall be suitable for mounting on platform. The bracket bolts nut and screw required for the erection
shall be included in the installation rate.
3. Section pillars be of mentioned size and of 15 SWG 1.5mm sheet steel and shall have bolted cover with good quality
4. The section pillars shall have the following identification marking.
5. Circuit Nos. on the top.
6. Circuit no. with ferrules ( inside ) as per drawings
7. Danger sign in case of 415 volt section box.
8. The section pillars shall be weather proof type with gaskets confirming to IP-55 as per IS-2147. The connections shall be
property sealed for worming proofing.
9. Section pillar shall be provided with two separated and earthing terminals suitable to receive earthing strip of size 50 x
6mm C.I. Flat with section pillars.
10. Outside and inside the cable terminal boxes shall be finished in two coat of primers and finished paints shall be of slightly
different shade to affably inspection of painting.
11. Finished painted appearance on equipment shall present ethnically looking appearance freedom dots and uneven
12. Touch up paint at site shall have to be done if necessary.
13. The missionary platform for section pillar must be of size 3’ (L) x 1.5’(W) x 3’(H)
3.6.14 STREET LIGHT POLES:
1. These shall be of steel tubular type swaged type welded GI tubular pole with suitable arrangement at the top of the pole
for fixing the lighting fixture. The poles shall be fabricated out of medium class black steel pipe, seamless type with
specified thickness, IS-2713-1969, each pole shall be fabricated on automatic pole swaging machine tampered in and
shrunk with welding outside having overall length of 7.00 meters and the effective length of section as under:
2. Bottom 3.00 meters having outside diameter 114.3mm and wall thickness 3.61mm with base plate of size 3000 x 300 x
6mm which welded as shown in drawing.
3. Middle 2.00 meters having outside diameter 87.9mm and wall thickness 3.25mm.
Sign & Seal of Contractor Page
4. Top 2.00 meters having outside diameter 76.10mm and wall thickness
5. On the top of the tubular pole as fabricated above one single/double side brocket of 1 meter length ( diameter of pipe suit
fitting entry ) tilted at an angle of 20 shall be welded and fixed at the top by means of fixing bolts, 4 Nos, and top cap by
fixing bolts 2 Nos as shown in drawing. The most shall have attended a reducer having suitable diameter for mounting
street light fixture.
6. The pole and wall mounted G.I. pipe post shall be supplied with one M.S water-tight junction box fabricated from M.S.
sheet of 14 SWG with 15 Amp 4 way heavy duty Bakelite connector brass neutral link rewire-able fuse rubber gaskets
7. Inspection of poles shall be carried out at the work for various tests under IS-2713 & 1969 before it is dispatched to the
8. The junction box should be provided with proper bracing arrangement with poles by means of G.I. strips. The junction box
should have two/three holes at the bottom to accommodate two/three brass cable glands of suitable size for the cable to
be used the cable glands of approved make shall be supplied by the contractor.
9. The pole including junction box shall be painted with one coat of anti-corrosive oxide primer before dispatch to site and
two coats of aluminum paint of approved mark (preferable ASIAN paint )
10. The wall mounted G.I. pipe post shall be painted with one coat of anti-corrosive oxide primer and two coats of aluminum
paint. The junction box shall be applied one coat of anti-corrosive oxide primer and two coats of black enamel as per
instruction of engineer-in-charge.
3.6.15 INSTALLATION OF POLES AND WALL MOUNTED G.I. PIPE POST:
1. Installation of the poles shall be done as per drawing. The depth of pole to be done in ground shall be 1/5th of total pole
length or as specified in drawing whichever more. The pole shall be grouted in pit of 450 x 450 x 1500mm with cement
conceal (1:3:6) Before the placement of pole in the pit 100mm thick 450 x 450mm (1: 3: 6) cement concrete bed shall be
prepared and only after drying, poles shall cast all around the pole, Above finished ground level 2 Nos. of light duty
32mm or 38mm diameter PVC pipe, each of 1 meter length for cable entries and 10 SWG G.I. earthing wire shall also
be provided and laid during the pedestal casting by the contractor
2. The concrete shall be protected from premature drying by curing for at least seven days after pouring all concrete
surfaces from 150mm belowground level to top shall be finished concrete all the materials for civil and electrical works
shall be arranged and provided by the contractor.
3. The G. I. pipe post shall be fixed on the face of wall at suitable height by means of pairs of wall clamps must and bolts.
3.6.16 CABLE WORK: PVC insulated PVC outer and inner sheet armored copper conductor cables suitable for 1100 volts A.
C. as per IS: 1554 (Part-1-1964) of size as specified in schedule of quantities. The cables should be of approved make
any of following amicable/C.C.I / Unistar / Glostar C. C. of equivalent subject to approval of competent authority.
1. EARTHING OF TUBULAB POLES : For earthing tubular poles G. I. wire of size 8 SWG is to be laid, along with the
control cable in trench. The connection to the studs provided on tubular poles is to be carried out with this continuous
earth wire with required size of washers and nuts. Above earth wire laid along with the cable is to be connected at
earthing pits in switch yard as per instruction the same.
2. INSTALLATION STREET LIGHTING LUMINAIRE: This includes fixing of street light fitting complete with accessories and
clamps on the pipe/brackets, connecting it with 2 x 2.5 Sqr. Mm 7/0 57mm dia PVC insulated and PVC insulated copper
flexible conductor from water light junction box, testing and commissioning the same.
3. INSTALLATION POST TOP LUMINAIRE : This includes providing and installations of post of lantern complete with all
accessories and lamp, connection it with 2 x s 5 Sgr. mm 7/0. 67mm dia PVC insulated and PVC sheathed copper
fixable conductor testing and commissioning the same. All the
4. Fittings required for fixing the luminaries such as reducer coupler gasket and all type of hard wires shall be provided by
the contractor himself. All tools and tackles required for the entire work shall be arranged by the contractor. In any of
board will not provide any such facility whatsoever. All materials shall be got approved from E.E. (const) Mehsana
before commencement of work. If there is any dispute regarding interpretation of specifications the decision of Ex.
Engineer (Const) Mehsana shall be final and binding to the contractor.
3.7.0 GANTRY STRINGING (BUS BAR STRINGING)
Sign & Seal of Contractor Page
3.7.1 After the erection of gantry structure and equipment support structure is over, the contractor shall take
up bus bar and line gantry structure stringing.
3.7.2. The configuration of bus contractor shall obtain type of conductor to be used from the purchaser well in
advance. The sag and tension of the bus bar conductor and line conductor shall be coordinated with the
help of Engg in charge so that a mutual distance of the strung conductor and the ground clearance of
the strung conductor do not cross the limit set out in the electricity rules and acts.
3.7..4. The method of handling the conductor accessories is not dealt in details, however, contractor can
himself get informed about the same and sees that conductor and other material is handed over properly
and is string scratch free to the extent possible. No
joint or use of repair sleeve will be permitted in the bus bar and line gantry stringing. While stringing
between twin and quadruple bundle conductor, care shall be taken to keep tension in all sub conductors
equally. Adjustment in the sag shall be carried out by sag adjustment plate if provided in the tension
insulator strings.
3.7..5 All the insulator strings to be used on the structure shall be properly cleaned with the cloth. Compression
dead end joints of the conductor shall be made after proper marking. There should not be any
difference in he position of dead end compression joints amongst the sub conductors of a twin or
quadruple bundle conductors. All the tension insulator string shall be double tension type. The pilot
insulator string or a guide insulator string shall be single suspension type. The corona control ring
space clamp and other accessories if any on insulator stringing shall also erected as per the drawing.
3.7.6. The earth wire to shield the conductors from lighting stroke shall be provided along the column in each bay of
the switchyard and across, as per the switchyard layout and sectional view drawing and as per the
instruction of Engineer in charge. the earth wire shall be fitted with all accessories like suspension clamp,
tension clamp cross by clips, copper earth bold etc. completed. No mid span joint shall be
permitted in the switchyard earth wire stringing.
3.7.7. After the bus bar and line gantry stringing work is over, the contractor shall provide droppers for the
equipment connection to bus bar or line conductors by using prescribed clamps and connectors.
The configuration of dropper shall be obtained by contractor from the as per requirement. The dropper is
to be provided with ACSR Panther conductor.
3.8.0 ERECTON OF SECONDARY EQUIPMENTS.
3. 8.1. The secondary equipments like PI, CT, CVT, PT, LA (Surge arrestors) wave trap etc. shall be procured by
the contractor from the site store center or other store centers of the and transported to the site at the
cost of contractor. The contractor shall also do loading and unloading of the equipment.
3.8.2 After the arrival of equipment at site, packing shall be gently removed without causing any damage to the
equipment. The equipment shall be checked for its correctness of dimension, make etc. as per the
approved drawing. The equipment then shall be cleaned by a piece of cloth and made ready for erection.
3.8.3. The equipment shall be mounte3d on the ready pedestal (of masonry) or steel structure as the case may
be and checked the same for its verticality. Construction of masonry pedestal is not in the scope of this
3.8.5. In case of CT, PT and CVT, the junction box or terminal box of the equipment shall be opened, cleaned and
all their connections should be checked.
3.8.6 The arcing horns or corona control rings shall be provided as per the approved drawing. Similarly
all fittings etc. shall also be provided as per the approved drawings
3.8.7. The electrical connection of the equipments through jumpers or through 4" aluminum pipe shall be carried
out along with the cable connection of respective equipment to the marshalling kiosk or to the control
relay panels. The connection of high voltage terminal of equipment shall not be resorted to, unless
secondary connection or cabling work to control equipment is over. Testing of equipment shall also be
done to ensure the correct wiring sequence of the equipment and continuity before energizing
equipment by EHV
3.8.8. Polarity of the equipment to be connected on HV side should be checked prior to erection. The oil
level( if any) of the equipment should be checked for its totality. If level is found to be inadequate,
topping filling of oil should be resorted . The willl supply the quantity of oil required.
3.8.9. Fuse, links, etc provided in the secondary box of the equipment shall be checked for their position and
Sign & Seal of Contractor Page
continuity and any lacuna observed will be set right before taking the equipment for commercial use.
3.9.0 ERECTION OF CIRCUIT BREAKER :
3.9.1. The circuit breaker shall be taken delivery from the site/other stores of and transported to the work place
well in time on loading/unloading. The crates containing the insulators and important parts and
accessories shall be opened carefully keeping them in their proper position. Insulator parts and other
accessories shall be thoroughly cleaned for any deposits of dust or other particles.
3.9.2 The breaker shall be brought on the pedestal of masonry or steel frame as the case may be) in upright
position without any inclination. The main parts of the equipments shall be assembled as per approved
drawing to be submitted by the GETCO to arrange Service of commissioning engineer of circuit breaker
manufacturer. However, the contractor will not remain contended with the instruction and guidelines given
by the commissioning engineer and shall also use his own judgment in better erection of commissioning
practice of circuit breaker.
3.9.3 After the placement of circuit breaker in position the kiosk of the breaker shall be thoroughly inspected
and any lacuna found shall be reported to the Engineer in charge of the work. The HT terminal
connection shall be done only after the terminals of the equipment kiosk are made to the marshalling
kiosk and or to the control/relay panels.
Polarity of the equipments shall also be ensured before physical erection.
3.9.4. The method of erection of breaker is not dealt with in details; however, it is recommended that
breaker poles shall be erected only by using telescopic crane or other suitable mechanical
arrangement. The rigging should be tool proof.
3.9.5. The operating mechanism in the breaker Kiosk and contacts as well as the power supply circuits
(AC/DC) shall be properly checked for its operation worthiness. All piping for gas/air shall be laid as
per the approved drawing. The air receiver or compressor shall be positioned as per the relevant
drawing. Minor fittings and fabrication or grouting work required to place these articles or
accessories shall be done by the contractor without any extra cost to the purchaser. In case of breakers
with spring mechanism the trials of the mechanism by actuating should be done to ensure its' line
3.9.6 EHV side of the breaker should be aligned to a incoming and outgoing bus conductor.
While erecting the breaker, the operating mechanism without the porcelain insulator should be laid
perfectly to avoid any mal functioning of the breaker.
3.9.7. Earthing points of the breaker as well as attached Kiosk shall be connected to earth grid by means of risers
already available nearby the equipment. Any other erection checks and pre-cautions indicated in the
Manual furnished by the respective supplier of the equipment shall be studied well by the contractor and
the provisions there of shall be implemented as far as possible.
3.10.0 ERECTION OF POWER TRANSFORMER
3.10.1 The purchaser laid readily on the rails and plinth shall make a power transformer of appropriate capacity
available. However, the contractor using proper tools shall do minor adjustment or shifting requirement
for proper alignment of the equipment and tackles jacks taking due care.
3.10.2 Bushing of HV, LV, and IV side shall be picked up from the site or other store of the purchaser and shall be
made open by removing the casing/covers and packing whatsoever may be. The bushing shall be cleaned
by the cloth. The bushing shall be handled very carefully and preferably should be opened and erected in
presence of the Engineer In charge or his authorized representative. Before taking up the erection work of
bushing and accessories, conservator tank and the transformer tank should be thoroughly cleaned from
outside to remove all dust and other material deposited on it.
3.10.3. For fixing the bushing, the opening provided on the transformer tank/turret shall be removed and
bushing should be connected to it. The current transformer and other accessories in the turret should be
carefully handled while erecting bushings.
3.10.4 The radiators should be mounted on the pedestals already available at site. The proper leveling and
Sign & Seal of Contractor Page
alignment of the radiator should be done. Any minor nature of civil or foundation work, if required should be
done by the contractor at his cost. However, if already provided pedestal are totally misaligned and it is not
possible to erect radiators upon it with slight modifications, the matter should be brought to the
notice of Engineer in charge who will take appropriate action to remove the anomaly. As a matter of
fact, the contractor may, before taking up the erection work on hand, satisfy himself that the alignments of
pedestal provided for various radiator and piping headers are as per the approved drawing from the
respective supplier of transformer and remedial measures should be taken much ahead of actual erection
3.10.6. The Kiosk of the equipment shall be inspected for its internal wiring fuse, link temperature indicator,
de-humid fire power connection, control circuits etc. If any deviation compared to the approved drawing is
observed, the matter should be brought to the notice of Engineer in charge and if it is of trivial nature,
corrective measures should be taken by the contractor himself. All the piping or wiring from various
measuring points to the Kiosk should be checked for its trueness and continuity.
3.10.7. Buchholz relay will be erected on the transformer tank as per the standard practice.
3.10.8 After the erection of various accessories indicated above, filling of oil under vacuum should be started. If
required random sampling and testing of oil are being filled in should be carried out. The oil level in
the conservator tank, condenser bushing etc. should be checked for its desired mark. After the oil filling
work is over, final filtration of oil to obtain desirable low PPM should be done. Filter machine of
GPH capacity having one pass facility of reputed make approved by Engineer in charge for filling and
filtration work shall be brought by the contractor himself.
3.10.9. Internal testing on the transformer and its accessories for operation worthiness shall be done following oil
filtration work. However, the commissioning of the transformer either from LV or HV side should be
done only after the installation of control panels in the control room, its connections to the transformer and
complete unit testing of transformer. The commissioning work should be done as per the instruction
of Engineer in charge or his authorized representative.
3.11.0 ERECTION OF ISOLATORS.
3.11.1 Isolators of the switchyard shall be with or without earth blade type. centre breaks type etc.
The isolators shall be procured by the contractor from the site stores of the and transported to the work site.
All the spare parts shall be properly unpacked cleaned and made ready for erection.
3.11.2 Before erection, the contractor shall obtained copies of approved drawing of respective equipments. The
isolators shall be erected on the ready galvanized structures. However, foundation for them will be available
readily the respective points in the switchyard.
3.11.3 The contractor shall check the erected support structure for their alignment vertically and tightness of
fasteners before mounting the isolators parts on them. The contractor shall also verify the mounting
arrangement for the operating mechanism on this structure and suitable for the same. In case of any shortcoming
the matter may be reported to engineer in charge. Any modification of trivial nature for the structure of fixtures shall
be carried out free of cost.
3.11.4 The parts of the isolators, fixed and moving contacts earthing rode etc. shall be handled very carefully to avoid
breakage or distortions. The erection shall be carried out using mechanized erection tools. The polarity of the isolator
polls shall be properly identified and also the direction of the opening should be pre-determined. It should be
ensured that in the entire switchyard the isolator open and close uniformly (direction point)
3.11.5 The operating mechanism for the line contacts shall be thoroughly checked for their accessories as per approved
drawing and it should be ensured that all the connection fuses links dehumidifiers lighting sockets
electric motors are in their proper position. Any deviation from the approved drawing should be got sat right with
the help of engineer in charge. Position. Any deviation from the approved drawing should be got set right with
the help of Engineer-in- Charge.
3.11.6 While erecting the isolator, it should be ensured that it should be properly aligned with respect to bus conductors or
line conductor bus provided in the switchyard: The erected Isolator shall be within the plumb. The operating
mechanism rods, pole and rotating insulators shall be checked for their proper function. The testing of the wiring to
the kiosk should also be done to ensure its operation worthiness. The final commissioning of the isolator
should be done only after connection to control panel is affected. However prior to that it should be
Sign & Seal of Contractor Page
ensured that the physical movement of the fixed and moving contacts and reach of them is within the prescribed
3.12.0 ERECTION OF CONTROL AND RELAY PANELS.
3.12.1 The contractor shall procure the control and relay panel from site store or any other stores of the GETCO and
transport the same to the erection site. The cases containing the panel shall be unpacked carefully and shall be
nicely cleaned. In case any of external damage is observed, same shall be brought to the notice of Engineer
In charge. The panel shall be unpacked in upside up position. After an external visual inspection, the panel
door shall be opened a n d checked for the circuit connection, terminal connector, dehumidifier, power connection
3.12.2 A front side of the panel shall be checked for any damage to the meter indicator, hooter, and semaphore
3.12.3 Any lacuna in the equipments, circuits, fittings, dimensions etc. observed shall be brought to the notice of Engineer
in charge who will try to impose remedial measures
3.12.4 The relay panel should also be checked for type, of schemes adopted for protection, internal connection, fascia
indicator etc. Any difference observed should be brought to the notice of Engineer in charge who will take
necessary action.
3.12.5 The panel shall be erected along cut outs provided in the slab concrete, in the order, it is decided, by
Engineer in charge or which is approved by authorized drawing.
3.12.6 The size and number of cores of cables be brought from the equipment to control panel, control panel to relay
panel and back to equipment shall be pre-determined by study.
3.12.8 After the erection of control panel and relay, panel, all the equipments, accessories indicators etc. along with the
internal wiring and other accessories provided with the kiosk of the panels.
3.13.0 LAYING OF CONTROL CABLES AND TERMINATIONS THEREOF
3.13.1 Laying and termination of control Cable work shall generally Includes following:
a) Control and power cable from individual equipments kiosk to the field kiosk.
b) Laying and termination of Control and L.T power cable from field -kiosk to control room equipment (i.e. LT
switchgear, DC battery and control panel/relay panel.)
c) Laying and termination of Cable from the transformer kiosk to transformer panel and up to
AC/DC supply source.
d) Laying & termination of Control cables from control panel to relay panel and vice a versa.
e) Laying & Termination of cable from DC/AC source, battery room L/T switch gear room to control/relay panel.
g) Laying & termination of cable from 11KV/400 V Distribution transformer to LT switch gear room.
h) Laying & termination of cables from Station transformer to distribution transformer in the switchyard
as well as in the residential. Quarter area.
I) Laying & termination of LT power cable from station transformer to fire protection system kiosk (If
3.13.2 GETCO will provide the cable schedule for the various control schemes, protection schemes and metering
scheme as well as communication, scheme etc.
3.133 ‘The contractor shall procure’ the required size of control and power cable from the purchaser’s site store to any other
stores from where the same allotted and transport it to its site store.
3.13.4 The control cables shall be terminated using correct type of lugs and further prodded with ferules giving the
identification number of various cores of the cable. Correct type of tools for termination shall be used to secure a
rigid connection of the cable tray along with the cable trenches. Normally mild steel, racks and cable trays are
provided in the cable trench. However, the purchaser may it its’ own discretion prefer to utilize fiber reinforced poly
propylene (FRP) cable racks and trays. In such an event, the racks and trays will be supplied by the Purchaser to
Sign & Seal of Contractor Page
the contractor in a knocked down condition. The contractor shall assemble the rack and provide trays on them as per
the approved drawing given by the purchaser. If FRP trays and racks are to be utilized, the contractor will have to
take extra care while laying the cable through different layer and racks to avoid any displacement or distortion of
the FRP racks. However, if the laying of pre-fabricated FRP racks and trays fall in the scope or FRP rack/tray
supplier, the contractor shills co-ordinate and synchronize his cable laying activities with respective supplier of FRP
3.13.5 Utmost care shall be taken by the contractor to prevent damage to outer insulation and the armors of the
cables. No joint to the cable shall be permitted. Unless situation so warrants and Engineer in charge permits the
3.13.6 After .laying, all the power and control cable shall be properly identified giving the both a number and details of
end connections.
3.14.0 ERECTION OF BATTERY AND BATTERY CHARGER
3.14.1 The contractor shall procure the material required for installation of batteries sets and battery charger from the site
store or any other stores of the Purchaser and transport this material to the work site.
3.14.2 All the container/packing of the battery and battery charger shall be opened carefully to prevent any damage to the
equipment. The equipment than shall be cleaned to remove any dust or other un-warranted deposition. The battery
rack shall be placed in such a fashion that rows of battery cell can be conveniently connected to each other. The
contractor shall obtain the drawing of arrangement of battery racks and its connection to floats charger and
boost charger with reference to the floor space. The battery cells shall be filled with requisite amount of electrolyte
with proper specific gravity and up to the mark of maximum level indicated on the battery cells. All the cells
shall be connected in the series to obtain total voltage of the 224V AC. However. Individual cell shall also be
checked for their voltage across terminal before series connection.
3.14.3 The battery rack shall be provided with bottom insulating material to prevent any leakage of current to the earth.
Similarly individual battery cell shall be provided with insulation supports to wooden rack to prevent any body
leakage. The purchaser shall supply wooden racks and acid distilled water etc.
3.14.4 The connection. Of the battery shall be done through a cable. and same shall be terminated in the LV room
(AC/DC) before commissioning of the battery and battery charger. The entire battery room shall be completely
cleaned. Similarly racks and. battery cells shall also be cleaned for any deposits of electrolyte and other
3.17.5 A connection of boost charger shall be secured from the AC supply provided in the LT
switchgear room.
3.14.6 All the accessories supplied for measuring the specific gravity and testing etc. provided by the supplier shall be
return to the Engineer in charge or shall be placed at proper place in the battery room under intimation to
Engineer in charge.
3.14.7 Load test on the commissioned battery sets shall be taken as per the instruction of the Engineer in charge and
performance of the battery cells float boost charger shall be observed for few hours. Test load then shall be
removed and battery shall be ultimately connected to the LV room for its onwards utilization in control indication
and protection circuits.
3.14.8 The following checks are recommended for battery
i) Checking of completion of civil/ventilation requirement of battery room.
ii)Checking of adequacy of charger output/requirement with respect to current required for battery charging
as per the manual..
iii)Checking for availability of safety devices, water and first aid box.
iv)Checking the polarity of connections between battery and charger.
v)Visual inspection test for level and leakages.
vi)Checking of layout as per approved drawing.
vii)Checking of IR value from positive to earth and negative to earth. .
viii) Checking of voltage per cell and total voltage between positive negative and earth to
Sign & Seal of Contractor Page
positive/negative,
ix)Checking of tightness of connectors on each cell. .
x)Checking of capacity test and hourly measurement of specific gravity and voltage for each cell.
xi)Charging discharging cycle as per standard practice, and as per instruction of Engineer-in-charge.
3.14.9 The following checks are recommended for battery charger.
ii) Checking for charging mode of batteries, constant current and constant voltage mode.
iii) Load test on charges by running of DC drives (if there and by liquid resistance system).
iv) Checking of thickness of earthling connections.
viii) Check for functional operation of charger, auto manual change over from float to boost to float etc.
ix) Check for AC ripple in boost and float made after charging.
x) Check and polarity of cables connected to battery
3.14.1 The Contractor shall ensure that at the end of each sub-activity the
Surplus materials are immediately removed from the work-site and the surplus excavated earth is
spreader around to avoid loss or injury to the public/equipments.
3.14.2 The Contractor has to return all surplus materials after reconciliation of material account in good and
useable condition. The contractor shall settle the final bill including signature on all relevant papers
required for passing of final bill, excess/saving statement and time limit extension proposal. If any
within three months from the date of charging/commissioning or taking over by the GETCO of the
3.14.3. Most of all equipments should be erected in presence of the concerned engineer from OEM/GETCO
3.14.4. After complete erection and operation, contractor's supervisor should attend the site whenever
called from GETCO for further testing commissioning of equipments/panels etc.
3.15 MAINTENANCE FREE TREATED EARTHPIT
The bidder shall have to do the entire work of earth pits required for equipment earthing and for the pits at the corners of earth mat.
The product and the equipment covered by this specification shall, unless otherwise specified be in line with the requirement of any
of the latest applicable standards and will apply in order of priority as listed below: -
a) Indian Standards
c) ANSI (American National Standards)
d) BS (British Standards)
All the Earth Pit shall be with special Ground electrodes supplied by Getco Approved Manufacturer. These special electrodes are
provided with Ground enhancement material.
A. EARTHING PRODUCT COMPONENT SPECS
• The Earthing System should be based on use of Copper Bonded Earth Rods / Cu coated Pipe electrode / Cu coated PIP
electrode (for corrosion resistance) and Ground Enhancement Material (to reduce Soil Resistivity).
• It should be capable of providing any ohmic value as specified by the client, by inter-connection of ground rods to form a
• The system shall be totally maintenance free and require no periodic or scheduled maintenance for a period of at least
• There shall be no requirement to add water or any other chemical any time after initial installation.
Sign & Seal of Contractor Page
• The system shall provide constant low ohmic value for entire life cycle without any consideration for moisture or
temperature conditions.
• The manufacturer shall be a company of international repute engaged in the field of Facility Electrical Protection work.
(1) COPPER BONDED EARTH RODS
For 66 KV Substations:
The Earth Rods shall have a nominal (actual) dia of 20mm (Min.) and length of 3 M (Min.).lt shall be capable of handling
25 KA 1-Sec Short time current.
For 132KV ,220KV & 400 KV Substations:
The Earth Rods shall have a nominal (actual) dia of 32/40mm (Min.) and length of 3 M (Min.). lt shall be capable of
handling 40 KA 1-Sec Short time current.
The Rods shall have a steel core with molecular bonding of 250 micron of copper as per international standards.
A nickel layer is applied to steel core (and subsequently copper) by and electrolytic process forming a metallurgical bond
between the three.
• The copper used shall be type DHP alloy No. 122 CDA and rated at 99.95% copper. The thickness of copper layer shall
be uniform 250 micron.
• The Rods should be manufactured by a company of high repute to ensure quality of Copper Bonding.
• Type test report (tested at NABL accredited laboratory) shall be submitted satisfying minimum STC of 25 KA-1Sec for
KV S/S and for above class, STC shall be 40 KA-1 Sec
• Test report (tested at NABL accredited laboratory) of cu-coating shall be submitted satisfying our requirement of
(2) PIPE or PIP (Pipe-In-Pipe) ELECTRODE
For 66 KV Substations:
The Pipe or Pipe-ln-Pipe or Flat-ln-Pipe electrode shall have a nominal (actual) outer dia of 50 mm & 2.5 mm thickness (Min.) and
length of 3 M (Min.). lt shall be capable of handling 25 KA 1-Sec Short time current and shall have a molecular bonding of
micron of copper as per international standards.
For 132KV,220KV & 400 KV Substations:
The Pipe or Pipe-ln-Pipe or Flat-Pipe electrode shall have a nominal (actual) outer dia of 75.5 mm & 3 mm thickness (Min.) and
length of 3 M (Min.). lt shall be capable of handing 40 KA 1-Sec Short time current shall have a molecular bonding of 250 micron of
copper as per international standards.
ln case of P-l-P and Flat-ln-Pipe, the portion between pipes shall be filed with the conductive material.
Type test report (tested at NABL accredited laboratory) shall be submitted satisfying minimum STC of 25 KA-1Sec for 66 KV S/S
and for above class, STC shall be 40 KA-1 Sec.
Test report (tested at NABL accredited laboratory) of cu-coating shall be submitted satisfying our requirement of 250-micron
C. GROUND ENHANCE MENT MATERIAL / BACK FILL / GROUNDING
• Ground Enhancement Material/ Backfill / Grounding compound shall be permanent and maintenance free. (No re-
charging with salts or any other chemicals) and shall maintain its earth resistance with time.
• Ground Enhancement Material/ Backfill / Grounding compound shall confirm IEEE 80-2000 Clause No.14.5 (d). Ground
Enhancement Material/Backfill / Grounding compound in its set form shall have a resistivity of not more than 0.12 ohm-
Sign & Seal of Contractor Page
• Ground Enhancement Material / Backfill / Grounding compound shall comply the requirements and all applicable tests as
per part-7 of IEC62561. The same shall be tested at NABL accredited laboratory and report are to be verified.
1) Resistivity test using soil box
2) Leaching test
3) Sulfer determination
4) Corrosion test
• lt must set up firmly and not dissolve or decompose or otherwise pollute the soil or the local water table.
• It shall be suitable for use in dry form or slurry form.
• The Ground Enhancement Material/ Backfill / Grounding compound shall not depend on the continuous presence of
water to maintain its conductivity.
• The material shall be carbon based conductive concrete and shall not contain bentonite in any form. - Same shall be
applicable for conductive material used for filling in case of P-l-P and Flat-ln-Pipe type earth electrodes.
• The material should have been subjected to long term study to verify the claims made by manufacturers about its soil
resistivity reducing qualities
• The material shall have been tested in a reputed laboratory for not containing any hazardous chemicals as per EPA
• The bottom 300 mm of the bore hole shall be filled with good quality preferably black cotton soil. The balance length of the
bore shall be filled entirely with the backfill compound in pure form without mixing with soil. The compound shall bond
tightly with the electrode and become a solid mass
Each Earth Rod/Pipe/PlP must be provided with a suitable Cu plated clamp OR exothermic welding of Cu plated plate to facilitate
lnter-connection of rods and connection to Equipment Earth Bar using appropriate copper coated MS strip
• The product shall be guaranteed for trouble free operation for a period of 30 years from date of commission or arrival at
site whitch ever is later. Any defect discovered during this period shall be rectified free of charge.
• The pits shall be drawn with the help of a boring machine, an auger or any other means as required by site conditions
and nature of ground strata which shall be in the scope of supplier.
VERIFICATIONS & TESTS TO BE CARRIED OUT AT SITE:
Following verifications and tests shall be carried out by respective
E.E.(Construction)/TR while execution of work of maintenance free treated earth electrodes.
1. Type test report shall be verified satisfying minimum requirement of STC of 25 KA-1 Sec for 66 KV S/S and for above class
(i.e. 132 KV, 220KV, & 400 KV Substations), STC shall be 40 KA-1 Sec.
2. Test report of cu-coating shall be verified for 250-micron coating.
(ll) Ground enhancement material/ Back fill/Grounding material:
(A) Sampling of bag shall be 1 bag per lot of 50 bags received at site.
As per parl-7 of IEC 62561, resistivity test using soil box shall be carried out and value of the same shall be below
(B)As per part-7 of IEC 62561, following test certificates shall be verified at site for
1)Leaching test
2)Sulfur determination
3)Corrosion test
Sign & Seal of Contractor Page
Important Notes:
- For Normal soil drawing no.: GETCO/E/STD/P-021(1ot 2), R2 D1d.04.06.2015 shall be used for execution purpose and
supersedes earlier released drawings dated 30.07.14 & 08.10.14.
- For Rocky soii, drawing no.: GETCO/E/STD/P-021 (2 ot 2), R2 Dtd.O4.O6.2O15 for execution purpose and supersedes
earlier released drawings dated 30.07.14 & 08.10.14.
- ln Earthing Philosophy, terms "Cl Pipe Electrode" and "Treated Electrode “shall be read as "Maintenance free Treated Earth
pit" wherever indicated. Lt shall also be applicable for various equipment earthing drawings.
3.17.1 The Contractor shall ensure that at the end of each sub-activity the Surplus materials are immediately removed from the
work-site and the surplus excavated earth is spreaded around to avoid loss or injury to the public/equipments.
3.17.2 The Contractor has to return all surplus materials after reconciliation of material account in good and useable condition.
The contractor shall settle the final bill including signature on all relevant papers required for passing of final bill, excess/saving
statement and time limit extension proposal. If any within three months from the date of charging/commissioning or taking over by
the GETCO of the Sub Station.
3.17.3. Most of all equipments should be erected in presence of the concerned engineer from OEM/GEB engineer.
3.17.4. After complete erection and operation, contractor's supervisor should attend the site whenever called from GETCO for
further testing commissioning of equipments/panels etc.
TECHNICAL PARTICULARS FOR ERECTION
• The earth conductors (75X10, 50 x 6 /50x8 mm GI Strips/20/32/40 MM MS Round BAR) should be laid at depth of
Meter. This should be laid by excavating of earth 0.45 x 0.6 meter below ground level. The mesh of about 20/32/40 mm.
The rate of 150 mm overlaps of conductor for each joint inclusive in item
• Providing vertical ground rod (M.S. Round Bar) of 20/32/40 mm dia & 3 meter length to be driven at periphery and
junction points of the mesh for check pit. And at all such vertical ground rod Check Pit point to be driven at level 600 mm
belowground level i.e. at level of mesh.
• Installation of earthing pits as per as a “Maintenance free Treated Earthing” as per specification given above.
• Installation of earthing strips for riser & connection to GI structure/ Equipment’s with providing cleats wherever necessary
as per drawing. Lap welding and where ever asked arc welding is to be carried out as per instruction of EIC.
• Installation of earthing pit chambers as per drawing with BB masonry earthing pit chamber of 650 x 650 mm clear size
including heavy duty type approved GI cover with frame, necessary excavation, bottom concreting of BBCC 1:4:8
mm thick/225 mm thick BB masonry in CM (1:6) 12 mm thick cement plaster in CM (1:3) inside to all exposed faces up to
300 mm below ground level, curing etc. including disposal of surplus excavated earth up to radius of 500 mtrs .including
coats of white or color wash to all exposed finished surface etc. complete as directed by EIC with including supply of
cement BB masonry up to1 meter. This item includes supply of cement, bricks, C.I. Cover etc. by contractor.
• Laying of 7/10 G.I. Earth wire from tower top to pad type clamp by providing cleat type clamp with structure including
supply of T connector and pad type clamp.
• Work is to be carried out as per guidance given in IS 3043-1987 & as per I.E. Rules and CBIP manual for earthing
• All the earth conductor for mesh should be at depth of minimum 0.6 meter from the ground level and joint together with
the help of welding joint at all the junctions.
• If pipe line is passing above or below our mat it should be connected with mesh by clamp. And should be painted green
and one danger board should be provided stating caution of risk of high potential during fault.
• Reinforcement bars visible outside concrete structure to be welded with earthing mat.
• For entire Switch Yard there should be only one ground.
Sign & Seal of Contractor Page
• Vertical ground rod is to be driven into ground in 20/24/32/40 mm dia. Bore for Check Pit. As well as other vertical ground
• Wherever GI earthing strips are to be welded they should be overlap by 150 mm.
• All earthing pits are to be constructed as per drawing.
• All Check Pits are to be constructed as per drawing.
• The installation of earthing grid and mesh type earthing should be carried out as per design and drawing.
• The contractor has to carry out the work as per specification, instruction & direction of Engineer In-charge.
• Laying of GI strip in excavated trench 450 mm width X 600 mm depth including straightening, cutting of strip welding &
fastening of strips at crossing point and at vertical electrode point as per instruction of engineer in charge. The GI strip
sized 50X6 mm & M.S. round bar of 20/25/32 mm2 dia. for fabrication of grid will be supplied by the contractor at his own
• Excavation of trench in NDS/SR/BC is included but excavation in HR will be paid extra.
• The back filling of trench after lying welding of MS/GI Strips as per design attached herewith.
• The refilling of trenches by black cotton soil up to 300mm above the Mesh (to be brought from outside if required) &
remaining trench by excavated earth & leveling as per original ground.
• The excavated stuff to be removed from the site and throwing away as directed by engineer in charge.
• The excavation in hard rock, carried out with control manor or control blasting only. However, during blasting any damage
to GETCO’s property, costly material, and equipment etc. the cost will be recovered from contractor.
• For existing earthing of the structures / equipment’s, the contractor will have to join this earthing using 50X6 GI strip for
connection with the main grid of MS round bar of 20/25/32 mm2 . With two nut-bolt and required welding.
• The back filling of pit is to be carried out with black cotton soil salt and charcoal only. The black cotton soil to be brought
by contractor at his own cost.
• Preparation of mesh to be carried out as per attached drawing including fixing of pipe, fabrication of connection point top
of the pit including welding/jointing/cutting/bending.
• Power supply for required fabrication work at site will be provided by the GETCO free of cost. The power connection will
be provided by GETCO at one point only from where the contractor has to arrange for temporary connection and further
distribution is to be made at his own cost for welding/cutting etc. work.
• The contractor has sufficient capacity earth megger. The contractor has to give all the earthing parameter of earthing pit
and for earthing grid as per GETCO’s requirement.
• For welding work welding electrode used should be ISI mark only and should be approved before use.
• The welding work at crossing point and at fixing of ground bar point to be carried out as per instruction of engineer in
• All the fastening to be done with minimum two GI Nut Bolts.
• All the required Tools / Tackles etc., to complete the job are to be arranged by the contractor at his own cost.
• Any damage to the existing cable trenches, foundations, walls, water pipe line, etc., should be rectified by the concern
contractor at his own cost & should be made as per original.
• All the materials, viz Cast Iron pipe, , welding rods, cover, mesonary materials like cement ,sand, bricks etc. with cover,
block cotton soil, wood charcoal, salt, cement, sand etc., are to be arranged by the contractor at his own cost. Only 50 x
6 mm GI flat, 20/25/32 mm dia MS round bar, provided by GETCO & GI/MS nut bolts will be supplied by bidder.
• The work is to be carried out in exist s/s personal insurance of labours, workers, supervisor etc., are to be obtained by the
contractor at his own cost.
• All the materials to be supplied by the contractors should be comply with relevant IS it should be got approved by the
under signed before use at site
• Each earthing lead from the neutral of the power transformer / Aux. Transformer.LA, CVT is directly connected to
electrode which in turn should be connected to Main Earth Mat.
Sign & Seal of Contractor Page
1. connections between,
a) Below ground riser & above ground riser
b) Riser & Main earth conductor,
c) Between two main earth conductor made by electric arc welding with low hydrogen content electrode as below:
1 Flat-to-Flat 50mm x 6mm 3.5mm welding rod
2 Flat-to-Flat 75mm x 10mm 4.0mm welding rod
3 Rod –to- Flat 50mm x 6mm, 50mm x 8mm,75mm x 10mm, 75mm x12mm 6.0mm welding rod
4 Rod-to-Rod 20 to 40 mm dia 6.0mm welding rod
• All ground connection made by electric arc welding with low hydrogen content electrodes. Joints shall be allowed to cool
down gradually to atmospheric temperature before putting any load on it. All oxide films that may have formed during
welding must be removed from the welded joints. Two coats of red oxide & black powder applied after welding.
• Bending of rod to be done preferably by gas heating.
• Equipment & structure earthing as per drawing and IEC instruction.
• All earth strip should be taken along edge of structure.
• All equipment’s/ structures/steel columns should be connected to nearby earth conductor at least two risers.
• Every alternate post of the fence & gates should be connected to earthing conductor by one riser as shown in respective
• All structure/ equipment must be earthed as shown in respective drawings.
• As per Drawing GETCO/E/STD/P-012 all connection made with equipment.
SCHEDULE – ‘ A ‘
Following material will be supplied by GETCO “free of cost” for Mesh type earthing work:
1) G I earthing strip/MS rods etc.
Following materials / equipments will be procured / arranged by the contractor for Mesh type earthing work
1) Tools tackles required for Sub-Station erection activities and stringing.
2) Earthing sets.
3) Zinc rich paint for bolt-nuts welded portion
4) Earthing materials filter machine, hydraulic crane and hydraulic jointing machine/welding machines.
GI pipe, coal, salt etc.
5) Other materials and tools-tackles required for the work of mesh type earthing work
6) Wherever necessary cement, sand, metal, water for concreting works.
Line materials will be issued from following Store Centers:
Sr. Store Centers for issue of
No. line materials.
Sign & Seal of Contractor Page
1 Work of Installation of Mesh type earthing at Kansari Const Store /Soja
66KV Switchyard of 400kv Kansari Sub- Store /Any GETCO Store
station under Deesa Division of Palanpur
circle approved under R&M 22-23
Note: Generally, all required materials will be issued form above store center. In case of non-
availability of some items, contractor shall have to collect from other nearby store centers
without extra cost to the GETCO.
Scope of work to be included:
Bidder shall be note that material/equipment shall be issued from Above store and Bidder
shall arrange loading, unloading, transportation from Above store to work site.
Sign & Seal of Contractor Page
OUR ENDEVOUR Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered
in an atmosphere of trust and respect between providers of goods and services and their users for the
ultimate benefit of society the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution
of works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and manpower The method of work required T&P and manpower
should be discussed between GETCO should be discussed between GETCO supervisor,
supervisor, contractor’s supervisor and gang leaders.
contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey must be Prior to execution of work a joint survey must be
conducted by GETCO supervisor and contractor’s conducted by GETCO supervisor, contractor’s
supervisor for risk assessment supervisor and DISCOM line man in order to
•Clearly identify the work location, to distinguish identify the following:
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
equipment / part that may be live. line of the work.
•Disconnect equipment from supply. b. Isolation point of each line crossing.
•Protect against other live parts. c. Each line crossing & isolation point under each
•Take special precautions when close to bare span must be discussed and noted in maintenance
conductors / Bus bar. register with sketch.
Following safety guidelines are mandatory for all Contractor’s supervisor and GETCO Supervisor
contractors operating in GETCO premises for must ensure all isolations physically with adequate
Electrical, non-electrical & civil works. earthing technically prior to give clearance to gang
1. The contractors must provide advance planning leader for taking up job.
of work to concerned incharge of substation in While execution of stringing work, the identified line
writing. crossing must be isolated / deenergized and written
2. Before starting any work whether switch yard, clearance should be obtained from concerned
“permit to allow to work” must be taken from controlDISCOM supervisor.
room incharge. The isolation of Tap line must be physically seen
1. Utilizing Electrical / nonelectrical equipments, and verified by Contractor and GETCO supervisor.
safety rules must be implemented. At D.O. fuse junction contractors person should be
2. If the work is to be carried out on Sunday or posted to ensure that no person restore D.O. supply
Public holiday, the necessary permission must be while work is under execution
taken in advance, requesting in writing. Contractor’s supervisor must ensure that concern
3. Unwanted person including children of labours officer take LCP for EHV line and power line crossing.
will not be allowed at working site/ in the switchyard
and in the prohibited area.
4. Any electrical work or electrical connections to
equipment for any other work must be carried out by
Sign & Seal of Contractor Page
electrician/wiremen with adequate size of wire
through MCB as per I.E. Rule.
-Live penal area / bus bar must be isolated and
sealed / bifurcated with red colour tape for visible
warning. Display Board must hang on LCP panel.
-Transformer must be switched off whenever and
wherever contractor and line workers are not
satisfied with isolation, earthing or any equipment
performance of GETCO, it will be pointed out and
work shall begin only after resolution. Contractor
shall not take up job in absence of GETCO
authorized person. All wire temporary connection &
material whenever erection activity has any
connection and disconnection work of bus bar,
All workers / labour of contractor & All workers / labour of contractor &
supervisors must use personal protective supervisors must use personal protective
equipment (PPE) during the work like equipment (PPE) during the work like
gloves, safety belt, Safety shoes, Helmet, gloves, safety belt, Safety shoes, Helmet,
earthing rods, etc, duly approved by earthing rods, Live line detector etc, duly
GETCO. approved by GETCO.
The local earthing must be done at the The local earthing must be done at the place
place of work before execution of any work. of work before execution of any work.
11 kV breaker in panel must be switched Circuit breaker opening is not an isolation
off and racked out only after ensuring no and isolator on either side must be opened.
voltage in breaker and without door No work during rains and cloudy weather
opening. condition.
Transmission line activities.
1) Used of Voltage detector to ensure
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of
Local earthing of electrical equipments like
filter M/c, welding machine, testing kits etc.
Crane shall only be used for material
handling and erection. Working platform
shall only be used for work in switchyard.
Sign & Seal of Contractor Page
TENDER NO. PTC/CM1/N-30/2026
Sub. : Work of Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari Sub-
station under Deesa Division of Palanpur circle approved under R&M 22-23. .
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender Specification For Work of Work
of Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari Sub-station under
Deesa Division of Palanpur circle approved under R&M 22-23. .Complete with the entire tender
Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till
completion of the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation.
Further, I / we also agree that additional conditions / deviations, if any found in bid, the offer
shall be out rightly rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
Sign & Seal of Contractor Page
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD. Yes / No
4) Whether a l l pages of Bid Specifications are sealed and signed by the Bidder.
5) a) Whether the Bidder is registered with for Getco
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. &date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD/Tender fees paid. ( BG/NEFT/RTGS/Online ) Yes/no
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipment’s etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Company's Articles Of Association Yes / No
g) Details Of Partners / Directors Yes / No
h) B.R./P.A. Authorizing Person Yes / No
i) Power of Attorney of Consortium Members Yes / No.
J) Pan card Yes/No
K) GST Registration Yes/No
L) Electrical Contractor registration Yes/No
M) Solvency certificate Yes /No
8) Price: [FIRM ONLY] Yes/No
9) Security terms agreed Yes/no
10) Penalty terms agreed Yes/No
11) Terms agreed: Yes/no
12) Validity of the offer for 180 days from the date of
opening of the technical bid: agreed Yes/No
13 payment terms agreed:
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
1) DETAILS OF WORK ORDERS EXECUTED BY THE BIDDER OF VARIOUS
SIMILAR CONTRACTS
Sr. Order Description of Order Order Name of Order
No. No./Date work Qty.(Bay/ss) Amount placing authority
Completion date as Date of commencement of ual completion of work
2) SATISFACTORY WORK COMPLETION CERTIFICATE
Sr. Description Certificate No Date Order Certificate issuing
No. Amount authority
3) WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender [Tenderers
shall submit the information in the Format detailed here under]
Name Of Work and Anticipate
Location Order Value date of Remarks
No Quantity(Bay/SS)
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
FINANCIAL CAPABILITY
Sr. Details Amount Rs. In lacks Remarks
1. Solvency A scheduled Banker’s
Certificate of present
solvency be attached.
2. Price of the biggest job
3 Average Turnover of Last
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
ERECTION CAPACITY
Based on available men power, tools-tackles, machinery and financial resources, our erection capacity is as
Sr. Name of activity Unit Capacity per No. of Persons per
No. Annum per gang gang.
Sign & Seal of Contractor Page
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Firm Type (Proprietary/
Partnership/Corporate )
4 Contact Person Name and Designation
5 Qualification
6 Professional Experience
9 Contract Details
Note: All the correspondence, queries etc., will be asked on above E-Mail only. Bidder is
responsible to check and operation of e-mail ID.
Contractor’s Representative legible signature: ______________________
Seal of the company
Sign & Seal of Contractor Page
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Gujarat Energy Transmission Corporation Ltd at any of its offices or its parent Department i.e.
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of tendering
Sign & Seal of Contractor Page
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR BUSINESS DEALING /BLACK
SUB: Undertaking in regard to stop deal/Banned for Business dealing /Black list thereof)
Ref: Tender no:
All bidders will have to furnish the following undertaking duly filled in, Signed and stamped for each quoted
item of the tender along with the technical bid.
Authorized signatory of M/s _______________________________________________ here by certified
That M/S_____________________________________________________ and their proprietor/any partner
/any director of the firm is not stop deal and/or banned for business dealing and/or black listed by GUVNL
and/or their any subsidiary company viz. GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
Seal of Firm Signature of Tenderer
Sign & Seal of Contractor Page
QUALIFICATION REQUIREMENT.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr List of Documents
1 Registration(No, Class)
3 Partnership deed/Proprietor/AOA/MOA
(Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, last three years.
6 Latest Solvency certificate.
8 GST registration No
9 Experience certificate As per QR
10 Electrical contractor Certificate valid up
11 Man and tools and tackle detail
Signature of Tenderer Company’s Round Seal
Sign & Seal of Contractor Page
GENERAL TERMS & CONDITIONS OF TENDER
1.0 DEFINITION OF TERMS
“Owner” shall mean the Gujarat Energy Transmission Corporation Ltd.Vadodara or any of its group
companies i.e. GUVNL,GSECL,MGVCL,DGVCL,PGVCL,UGVCL and shall include its legal
representatives,successors and assigns.
2.0 CONTRACTOR’S DEFAULT
79.1 If the contractor shall neglect to execute the works with due diligence and expedition or shall refuse or
neglect to comply with any reasonable order given to him,in writing by the Engineer in connection with the
works or shall contravene the provisions of the Contract,the Owner may give notice in writing to the
Contractor to make good the failure,neglect or contravention complained of should the contractor fail to
comply with the notice within thirty (30) days from the date of serving the notice,then and in such case the
Owner shall be at liberty to employ other workmen and forthwith to execute such part of the works as the
Contractor may have neglected to do or if the Owner shall think fit,without prejudice to any other right he
may have under the Contract to take the work wholly or in part out of the Contractor’s hands and recontract
with any other person or persons to complete the works or any part thereof and in that event the Owner shall
have free use of all Contractor’s equipment that may have been at the time on the site in connection with the
works without being responsible to the Contractor for fair wear and tear thereof and to the exclusion of any
right of the contractor over the same, and if the sum that the contractor is entitled to be paid plus the costs
incurred by the Owner in completing the works,exceeds the Contract Price or the entire works if entire
works have been completed or the price for part of the works if part of the works have been
completed,the Contractor shall be liable for such excess.
If such excess is greater than the sums due to the Contractor,the contractor shall pay the balance to the
Owner and if such excess is less than the sums due to the Contractor, Owner shall pay the balance to
the contractor.For facilitating such payment,Owner shall encash the Bank Guarantees of Contractor
available with Owner/s and retain such other payments due to the Contractor under the Contact in
question or any other contract that the Owner/s may have the with contractor. Such payment of excess
amount shall be independent of the liquidated damages for delay which the contractor shall have to pay if the
completion of works is delayed.
SPECIAL CONDITIONS OF CONTRACT
1.0 Penalty for Delay
1.1 The parties agree that delay in completion of contract will result into loss of revenue and consequently
loss of profit to the Owner.However,the amount of loss of revenue on account of delay in commissioning the
works cannot be calculated accurately at this stage.The parties, therefore, agree that the Penalty stipulated
above is a genuine pre-estimate of the loss/damage which will be suffered on account of delay and/or breach
on the part of the contractor and the said amount will be payable by the contractor on demand.
1.2 In event of failure of the contractor to pay the amount of Penalty as demanded,the Owner shall be
entitled to deduct the amount of penalty for delay from the amounts payable to the contractors under
any bills raised under this contract or any other amount payable under any other contract with the
GUVNL and its Subsidiary Companies i.e. GETCO,GUVNL,
GSECL,MGVCL,DGVCL,PGVCL,UGVCL. It is permissible for the Owner to adjust the amount of
Penalty of delay against any Bank Guarantee furnished by the Contractor under this contract or any other
contract with GUVNL and/or its subsidiary companies.
Separate Clause to be incorporated in Special Conditions of Contract :
“Rights of the Owner :
Whenever any claim or claims for payment of a sum of money arises out of or under the contract against the
contractor, the Owner shall be entitled to withhold and also have a lien to retain such sum or sums in whole or
in part from the security, if any, deposited by the contractor and for the purpose aforesaid, the Owner shall be
entitled to encash and withhold the amount of Performance Bank Guarantee or other security. If any,
furnished as the case may be.The Owner shall also have a lien over the same pending finalization or
adjudication of any such claim.In the event of the security is insufficient to cover the claimed amount or
amounts, the Owner shall be entitled to withhold and have lien to retain to the extent of the such claimed
amount or amounts reffered to above, from any sum or sums found payable or which at any time-there after
may become payable to the contractor under the same contract or any other contract with the Owner or
GUVNL or its subsidiary companies pending finalization or adjudication of any such claim.
Sign & Seal of Contractor Page
Lien in respect of claims in other contracts :
A) Any sum of money due and payable, to the contractor(including the security deposit) under
the contract may be withheld or retained by way of lien by the Owner against any of its claim
in respect of payment of a sum of money arising out of or under any other contract made by
the contractor with the Owner or GUVNL or any of its subsidiary companies.
B) It is an agreed that the sum of money so withheld or retained under this clause by the Owner
will be kept withheld or retained as such by the Owner till its claim arising out of the same
contract or any other contract is either mutually settled or determined by the arbitrator or
competent court,as the case may be,and the contractor shall have no claim for interest or
damages whatsoever on this account or on any other ground in respect of any sum of money
withheld or retained under this clause and as may be duly notified to the contractor.
Sign & Seal of Contractor Page
SAFETY CUM INDEMNITY BOND
(On No judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we ……………………………………………by this
SAFETY CUM INDEMNITY BOND Executed on this ………………………….. I/We Having Registered Office
______________________[herein after called “THE CONTRACTOR” which expression shall mean and
includes my/our heirs, executors, administrators and legal representatives, successors and permitted
assigns] do hereby binds myself/ourselves and also our company/firms after having the power to bind] by
this promise and undertaking in favour of the Gujarat Energy Transmission Corporation Limited [GETCO],
Vadodara a State Transmission Utility under The Electricity Act, 2003 having its registered office at Sardar
Patel Vidyut Bhavan. Race Course, Vadodara.[ hereinafter called as GETCO, which expression shall mean
and include its legal representative, administrators assigns] has agreed under the terms and. conditions of
the Contract No. ……………………………………………………………………………………dated ……………
made between …………………………….and GETCO for the contract of the “Work of Installation of Mesh
type earthing at 66KV Switchyard of 400kv Kansari Sub-station under Deesa Division of Palanpur circle
approved under R&M 22-23.” value of ……………………….. interalia on production of Safety Cum Indemnity
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time to the
only) against. any losses or damages, costs, charges and expenses caused to or suffered by reason of the
CONTRACTOR while Project, R&M, O&M work including work carried out by outsourcing agency, failing to
take proper care or not complying the guidelines given hereunder as per Annexure-A and instructions which
may be given from time to time during the continuance of the contract and we further undertake to
unconditionally pay the amount claimed by the GETCO on demand and without demur to the extent
Whereas the CONTRACTOR has/have been awarded to execute the job/works under
…………………….. for “Work of Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari Sub-
station under Deesa Division of Palanpur circle approved under R&M 22-23” issued by the GETCO after
having observing necessary formalities, the details of which is described in the
and Whereas the said job/ works will be /likely to be done in places covered under Employees” State
Insurance Act, 1948 [ESI] and / or the Workmen Compensation Act,1923 and / or other laws relating to the
Labour Management and Welfare Act. [Respective Amendments]
And whereas according to the condition of the Contract the CONTRACTOR is under obligation to execute
this Safety cum Indemnity Bond before the commencement of actual execution of work.
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the. guidelines as
per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether there has
been any breach of the guidelines as per Annexure-A of this bond and as to the extent of the loss, damages,
costs, charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged because of the
change in the constitution of the GETCO or for the extension of the time limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes / undertake to indemnify and keep harmless the GETCO from all
claims, actions, proceedings and risk, damage danger to any person whether belonging or not
belonging to the CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation, damages
any proceedings in respect of any of its employee/workmen under the Workman Compensation Act or
any other laws for the time being in force.
Sign & Seal of Contractor Page
c. That, if during the course of execution of work as stated in the contract order mentioned hereinabove
issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with guidelines as per
Annexure-A or terms and conditions/ formalities within the meaning of Employees’ State Insurance
Act,1948 [ESI] or Workmen Compensation Act 1923 or any other laws relating to the Labour Welfare
for the time being in force, and also has not observed the safety norms in accordance with the law
prevailing at the place of works / job to the satisfaction of the GETCO, the GETCO shall have the
right to step the execution of work/job and the period of such stoppage shall not be taken into account
for the calculation of the total period of completion of work for which the CONTRACTOR is
responsible to complete the work/job and it will he deemed that discontinuance was due to default of
the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any such
compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any other
reason, the GETCO shall have the right to recover the said amount from any amount receivable by
GETCO or any bank guarantee deposited or anything payable whether in connection with this
contract or other contract by the CONTRACTOR to the OELIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of any
guidelines as per Annexure-A and terms and conditions mentioned in this Safety Cum Indemnity
Bond, GETCO shall have right to terminate the contract of work issued to the CONTRACTOR .
f. In case if any safety related fatal Electrical/Mechanical accident occurred to any employee of agency
or outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
compensation and liability as per statutory requirement, contractor/agency is hereby agreed to pay
the penalty amount as given below:
Sr. Amount of Contract in Rs. Penalty Amount
1 Up to → 1 Lac Rs.
2 Above 1 Lac to → 10 Lacs Rs.
4 > 100 Lacs 1.0% of contract value
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement of
claims under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/work is
performed or as per GETCO norms shall have the jurisdiction to decide the rights & liabilities of the
parties while adjudicating the matter of claims under this Safety Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in
Writing on the CONTRACTOR’s application after the Contractor has discharged all his obligations
under the order mentioned hereinabove and submitted a “NO DEMAND CERTIFICATE” from the
GETCO under the said order. The Safety cum Indemnity Bond shall be valid for a CONTRACT
PERIOD and renewable thereof [Claim Period].
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in
addition to And not by way of limitation or substitution for any other guarantee, indemnities Hereto
before given to the GETCO by the CONTRACTOR and this indemnity does not Revoke or limit such
indemnities or guarantees. IN WITNESS WHEREOF the Parties hereto have executed this indenture
the clay the year First hereinabove written.
[Signature with seal of The CONTRACTOR]
In the presence of:
Sign & Seal of Contractor Page
CONTRACT AGREEMENT
(To be submitting after Awarding of Contract)
(Non-judicial stamp paper of Rs. 300/-)
This agreement is made at GETCO, Circle Office, Palanpur on the _________________day of
__________in the Christian year __________ between
“THE CONTRACTOR” which expression shall unless excluded by or repugnant to context include
its successors or permitted assigns) of the one part and the Gujarat Energy Transmission
Corporation Limited, having their Office at _________________________________________,
(hereinafter called “Corporation” which expression shall unless excluded by or repugnant to the
context include its successors or assigns) of the other part.
“WHEREAS” the aforesaid Corporation has accepted the tender of the aforesaid contractors for
Work of Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari Sub-station under Deesa Division of
Palanpur circle approved under R&M 22-23. as per Corporation’s Order No.
hereinafter called “The works” and more particularly described enumerated or referred to in the
specification, terms and conditions prescribed in the order letter, covering letter arid other letters
and schedule of price which for the purpose of identification have been signed by Shri
________________________________________ on behalf of the Contractors and by
__________________________________________on behalf of the Corporation, a list where of is
made out in the schedule hereunder written and all of which said documents are deemed to form
part of this contract and included in the expression ‘The Works” wherever herein used, upon the
terms and subject to the conditions hereinafter mentioned. AND WHEREAS THE GETCO has
accepted the tender of the contractor for the work of Work of Installation of Mesh type earthing at 66KV
Switchyard of 400kv Kansari Sub-station under Deesa Division of Palanpur circle approved under R&M 22-23. of
Gujarat State for the sum of
subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND DECLARED
1. The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein or there from respectively or are reasonably necessary
for the completion of the works as mentioned and at the times, in the manner and subject to the
terms conditions and stipulations contained in this contract, and in consideration of the due
provision, executions, construction and completion of the works agreed to by the contractors as
aforesaid, the Corporation doth hereby covenant with the contractor to pay all the sums of
money as and when they become due and payable to the contractors under the provisions of
the contract. Such payment to be made at such times and in such manner as is provided by the
2. The conditions and covenants stipulated hereinbefore in this contract, are subject to and
without prejudice to the rights of the Corporation to enforce penalty for delays and / or any other
rights whatsoever including the right to reject and cancel on default or breach by the contractors
of the conditions and the covenants as stipulated in the general conditions, specifications,
forms, or tender schedule, drawing, etc. attached with Corporation’s Order
3. The contract value, extent of works / supply, completion / delivery dates, specifications and
other relevant matters may be altered by mutual agreement and if so altered shall not be
deemed or construed to mean or apply to affect or alter other terms and conditions of the
Sign & Seal of Contractor Page
contract and the general conditions and the contract so altered or revised shall be and shall
always be deemed to have been subject to and without prejudice to said stipulation.
In witness whereof the parties here to have set their hands and seals this day and month year
first above written.
Signed, Sealed and Delivered by
In the presence of, signature with names and
Signed, Sealed and Delivered by
for and on behalf of Gujarat Energy Transmission Corporation Limited,
In the presence of, signature with names and
Sign & Seal of Contractor Page
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
TRANSMISSION CIRCLE, PALANPUR
TENDER SPECIFICATION
(TO BE SUBMITTED ONLINE – N-Code Only)
Work of Installation of Mesh type earthing at 66KV Switchyard of 400kv Kansari
Sub-station under Deesa Division of Palanpur circle approved under R&M 22-23
(Through N-code Only)
TENDER NO. PTC/CM1/N-30/2026
Sign & Seal of Contractor Page
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
CIRCLE OFFICE, MEHSANA
CIRCLE OFFICE, PALANPUR
Name of Work: Bi-Annual Rate Contract for Mesh type earthing work at Various sub-stations
under Palanpur circle approved under R&M plan 24-25.
Description of work/Supply Unit Qty Rate Amount
Installation of earthing strips / MS round bar in any
kind of soil except Rocky(HR/SR) Soil as per
earthing philosophy of GETCO
1) Including digging of 600mm depth and 450mm
2) Cutting, bending, laying and fixing of Earthing
grid conductor.
3) 75x10mm / 50x6mm GI strips: Fixing of two bolt
at each straight joints and lap welding, removing
oxide films formed during welding, applying two
coats of red oxide and black powder after welding
and applying zinc rich paint on welded joints.
4) 25/32/36/40MM dia MS Rod: Lap welding at each
straight & cross joints, removing oxide films formed
during welding, applying two coats of red oxide and
black powder after welding and applying zinc rich
paint on welded joints. 5) Including supply of red
oxide paint, black powder, HDGI Nuts & bolts as per
6) Back filling of the trench with yellow/ Normal soil.
Structure & Equipment earthing:
1) Including digging of 600mm depth and 450mm
2) Cutting, bending as per required shape, laying
and fixing of risers from Grid to structures and
3) Lap welding, removing oxide films formed during
welding, applying two coats of red oxide and black
powder after welding and applying zinc rich paint on
welded joints including supply of HDGI Nuts & bolts
for all connections including suporting to structures
etc as per specification.
4) Back filling of the trench with yellow/ Normal soil.
1 a) 75 x 10 mm GI strip / MS round bar (25 to 40 Mtr 5200 52
Providing Bore type earthing with drilling of
minimum 200mm dia bore upto following mentioned
depth in Rocky (HR/SR) Soil as per earthing
philosophy of GETCO.
1) Work includes inserting 20/25mm dia MS Rod (for
66kV S/S) / 40 mm dia MS Rod (for EHV S/S) in
bore depth and to be connected to the earthing grid
at junction point by proper welding at both end.
Sign & Seal of Contractor Page
2) This includes cutting, fabrication & welding of flat.
3) Refilling and compression of surrounding areas
with No.rmal/yellow soil, ground enhancement
material etc. wherever applicable as per approved
Soil strata and earthing design calculation.
4) Required G.I. Earthing strip/ MS rods will be
supplied by GETCO Free of Cost.
5) Earthing material like Normal/yellow soil, ground
enhancement material (0.5CMT/Meter depth),
water, etc. shall be supplied by contractor.
(c) Supply, Installation, Testing and commissioning
of maintenance free treated earth electrodes
suitable for No.RMAL SOIL as per drawing No..
GETCO/E/STD/P-021 (1 OF 2) R3 dated 29-05-
2020 and technical specifications GETCO/E/TS-
Maintenance free earth pits/R1 dated 04-06-15 for
132,220 & 400 kV substations with ground
enhancement material/ back fill / grounding
3 compound as per IEEE 80-2000 Clause 14.5 (d) No. 109 18171.00
and as per part-7 of IEC-62561 Using Copper
bonded earth electrode (with 250 micron copper
coating) having 38 mm dia (min) and 3000 mm
length which shall be capable of handling STC of
work also includes Providing BB masonary
inspection chamber(manhole) incl. light type CI
Estimated Amount including GST
Superintending Engineer (TR)
1. GST at applicable rate will be reimbursed in actual to the contractor only after submission of sufficient
proof of such payment made to the Govt. For claiming refund of GST agency has to submit invoice in the
format as prescribed by the Act.
2. The contractor shall pay 1% welfare cess to the respective Govt. Department if applicable & the same will
be reimbursed on production of proof of payment. Also, bidder has to take registration of said site and submit
the same to this office.
Sign & Seal of Contractor Page
I/We/am/are willing to carry out work at _______ % Above / Below of (estimated amount at (A))
(In words ________________________________ % Above / Below) the Estimated rates at (A)
mentioned above. Amount of Tender work out as under. Total amount of My Tender (E)
mentioned above. Amount of Tender work out as under. Total amount of My Tender (E)
Rs._______________________ ( Amount in words Rupees
Signature of Contractor. With stamp
Sign & Seal of Contractor Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final Tender Document mesh type earthing.pdf
Download all tender documents and submit your bid