| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹87,575.34Admitted-Finance | +3.00% | ₹87,575.34 | L1 | Admitted-Finance |
| 2 | L2₹89,275.83Admitted-Finance | +5.00% | ₹89,275.83 | L2 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
20 Jan 2026, 6:00 pmClosed
SE PHED CIRCLE BUNDI
SE PHED CIRCLE BUNDI
Annual Rate Contract for the Work of Drilling of 125 mm dia bore Well, for Hand Pumps with installation of Hand Pumps in various villages/towns under jurisdiction of Division Bundi and Lakheri in District BUNDI With Material Complete
2026_PHCJA_524757_1
NIT NO 07/2025-26 Item no 01
Open Tender
Miscellaneous Works
365 days
SE PHED CIRCLE BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE PHED BUNDI
₹2.5 L
Yes
9 Feb 2026
5 Jan 2026
21 Jan 2026
5 Jan 2026
20 Jan 2026
5 Jan 2026
Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. Nominal bore 125 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. Nominal bore 125 mm dia.
Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr.
Construction of tube well from ground level and up to 100 mtr. depth and above of following sizes in all types of soils in alluvium strata, unconsolidated formation such as pebbles, boulders etc. by bailing method and without gravel packing as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work includes formation of cavity at bottom by development with appropriate air compressor or bailer pumping and also lowering of casing pipe but excluding cost of the casing pipe. The tube well should have a throughout bore as per nominal dia of casing pipe. The work would be completed after obtaining sand free water Nominal bore 125 mm dia.
Supply of ERW M.S. black casing pipe ISI marked {IS:1239(Part-1:2004)} medium of following sizes at site of work. 125 mm dia NB( Thickness of pipe 4.8 mm & mass of tube 16.40 Kg/m)
Labour charges for making slots on blank pipes made of ERW MS black pipe ISI marked of following sizes, the slotting should be as per IS:8110-1985. 125 mm dia nominal bore
Supply & installation of GI pipe 32 mm medium class “B” with pipe sockets (heavy duty).
Supply and installation of ISI marked India Mark II Hand pump set complete with cylinder & 15 connecting rods.
Supply and installation of ISI Marked India Mark II Hand pump set Extra-Deep (EDW) complete with cylinder and connecting rods.
EDWHP + 20 Connecting rod.
EDWHP + 23 Connecting rod + 1 Weight.
EDWHP + 26 Connecting rod + 2 Weight.
EDWHP + 30 Connecting rod + 3 Weight.
Supply and installation of ISI mark connecting rod as per departmental specifications. of 3 meter length.
Installation of India Mark II/III E.D. I & II hand pump set complete on existing platform.
Construction of 185 cm. dia platform as per approved design & drawing of UNICE
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
125mmHP.pdf
Tender Documents • 1.47 MB
BOQ_936384.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid