Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
19 Aug 2026, 6:00 pmClosed
Executive Engineer Sgr Core
Office of the Executive Engineer Sgr Core
Revival and Restoration of Imambada Hasanabd.
2026_PWDJK_319293_2
31 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works - Canal
Percentage
250 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,500
Executive Engineer Sgr Core
₹5.0 L
3 Aug 2026
3 Aug 2026
20 Aug 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Part | |||||
| 1.01 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 meters lead :
Thickness above 10 mm upto 25 mm | 329.93 | SQM | 58 | ₹19,135.94 |
| 1.02 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead.
15.23.2 For thickness of tiles above 25 mm and upto 40 mm. | 682.16 | SQM | 89.95 | ₹61,360.29 |
| 1.03 | Dismantling stone slab/concrete flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead | 697.03 | SQM | 189.15 | ₹1,31,843.22 |
| 1.04 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of :
Asbestos sheet | 334.57 | SQM | 58.4 | ₹19,538.89 |
| 1.05 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50 meters lead :
Of sectional area 40 sqcm. and above. | 12.23 | CUM | 3,488.65 | ₹42,666.19 |
| 1.06 | Engagement of labours for removal of old damaged ceiling and damaged CGI sheets incl. disposal of unserviceble material | 5 | CUM | 650 | ₹3,250 |
| 1.07 | Carriage of disposal of Rubbish/Demolished Waste by MT
for an avg lead of 15 Km | 96.99 | CUM | 344.49 | ₹33,412.09 |
| 1.08 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately):
9.1.6 Second class kail wood | 3.57 | CUM | 1,01,081.85 | ₹3,60,862.2 |
| 1.09 | Providing hoisting and fixing trusses/purlins /rafters/posts/ post-plates or like components including cost of screws etc. complete
9.3.2 First class Budloo/Fir wood | 12.23 | CUM | 1,26,976.45 | ₹15,52,921.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1056915.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .