| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹8.3 LAccepted-AOC | l1 | Accepted-AOC agreement executed |
| Sl No | Description | Qty | Unit | SAMBHU V L1 |
|---|---|---|---|---|
| 1.00POND RENNOVATION | ||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 35 | hour | 342.27 ₹11,979.45 Lowest |
| 1.00 | OD42354/2025-2026:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials
useful for reuse for any thickness of walls in DR masonry including disposal of debris
within a distance of 150m. | 31.5 | cum | 750.35 ₹23,636.03 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 47.25 | cum | 255.19 ₹12,057.73 Lowest |
| 1.00 | OD42353/2025-2026:
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 134.55 | cum | 3,955.66 ₹5,32,234.05 Lowest |
| 1.00 | OD42352/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | 25.2 | cum | 1,699.64 ₹42,830.93 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.74 | cum | 9,148.54 ₹52,494.32 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 13.5 | sqm | 382.5 ₹5,163.75 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 506.62 | kilogram | 111.36 ₹56,417.31 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 11.25 | cum | 8,264.5 ₹92,975.63 Lowest |
Tender Value
₹8.6 L
EMD Value
₹21,408
Closing Date
24 Oct 2025, 4:00 pmClosed
ASSISTANT ENGINEER LIDEW OTTOOR GP
The Assistant Engineer LSGD Section OTTOOR Grama Panchayat
Retender OTTOOR GP 2025-26 PROJ NO 120 26 RENOVATION OF PUBLIC PONDS
2025_LSGD_796047_12
4/AE/LSGD/OTR/2025-26/TNDR
Open Tender
Civil Works - Others
Item Rate
180 days
OTTOOR
AS PER NIT
7 documents required · 7 mandatory
₹1,890
Yes
₹21,408
Yes
6 Jan 2026
15 Oct 2025
25 Oct 2025
15 Oct 2025
24 Oct 2025
15 Oct 2025
Amount
POND RENNOVATION
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD42354/2025-2026:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD42353/2025-2026: DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD42352/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Bidder Name
SAMBHU V
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_1351034.xls
BOQ • 0.22 MB
pond.rar
Tender Documents • 2.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .