| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC MEGHA SADAN GAGANNAGAR CURTI PONDA GOA 403401 | PONDA | SOUTH GOA | GOA | 403401 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹20.6 L+₹1.3 L (6.80%)Rejected-Finance 4 A RUKSHMANI PARK SOCIETY OPP SAMA WATER TANK NEW SAMA ROAD VADODARA 390 008 | VADODARA | VADODARA | GUJARAT | 390008 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹20.6 L+₹1.3 L (6.96%)Rejected-Finance C O BHAGYODAY STORES BAZAR CHOWK NALIYA KUTCH 370 655 | KACHCHH | GUJARAT | 370655 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹23.4 L+₹4.2 L (21.7%)Rejected-Finance | L4 | Rejected-Finance Being L4 |
Tender Value
₹27 L
EMD Value
₹54,000
Closing Date
4 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF BARODA
GE AF BARODA PO DARJIPURA BARODA 390022
MANNING AND OPERATION FOR ELECTRIC TAKE OVER POINT AT SUB STN NO 01 AND 02 AT MAKARPURA AF STN BARODA
2021_MES_473430_1
8646/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
GE AF BARODA
AS PER TENDER DOCUMENTS AND NIT
3 documents required · 3 mandatory
₹500
Yes
GE AF BARODA
₹54,000
Yes
23 Oct 2021
7 Sept 2021
6 Oct 2021
7 Sept 2021
4 Oct 2021
22 Sept 2021
8 Sept 2021 - 13 Sept 2021
60 days
Amount
Manning and operation of the MES Main Receiving Station round the clock in three shifts, (With One Electrician and One Mate Electrician Cum FGM) in all three shift of of 08 hrs. including Sunday & Gazetted holidays. For manning installation complete all as specified and directed.
Ist Shift - 0800 hrs to 1600 hrs
2nd Shift - 1600 hrs to 2400 hrs
3rd Shift - 2400 hrs to 0800 hrs
Main receiving station consisting of the followings: -
Vaccum circuit breaker 11 KV Make- CG - 05 Nos.
Main receiving two pole structure (GEB) for incoming HT supply with metering unit - 01 No.
Out going HT feeder to Officer Md Accn / Malhar camp on 04 pole structure - 01 No.
Out going HT Feeder to Tech area /AF NET - 01 Nos on pole 2 / 4 pole structure - 01 No.
Out going HT feeder to Palace bldg - 01 No. on 2 pole structure -1 No.
Out going HT feeder to Power House - 01 No. on 2 pole structure -1 No.
Maning and operation of the MES Main Reeiving Station round the clock in three shifts, 1 Electrician/ FGM in each shift of 08 hrs. including Sunday & Gazetted holidays for manning installation MES power House No 2 complete all as specified and directed.
Ist Shift - 0800 hrs to 1600 hrs
2nd Shift - 1600 hrs to 2400 hrs
3rd Shift - 2400 hrs to 0800 hrs
Note : - The contractor will ensure in all respect following points and maintained properly:-
All works related to HT/LT OH lines and restore the electric supply.
All complaints of no light area, sector as well as buildings.
All complaints of Sub station and restore the electric supply.
Any other duty assigned by the AGE E/M/ JE E/M
Main receiving Stn bldg including inventories & surrounding area should be maintained neat & clean.
He will maintain a record of breakdown of power supply from GEB and shut down given by tradesmen before taking any shut down contractor intimate JE E/M & AGE E/M and shut down shall be taken only in presence of JE E/M
Notes : For ser No 1.00 and 2.00
Staff (all trade) will always remain on duty duly wearing uniform and shall maintain the connected documents such as log book, Attendence register(Centralized attendance register duly signed by Engineer-in-Charge/ JE/Contractor) , installation running record book in a printed form, water sample maintained book etc and checking daily by Engr-In-Charge.
Contractor shall provide the T & P (Spanner set) to tradesman and also provide the log sheet, Plant running book, clothing etc and all records shall be maintained properly.
Installation and surrounding complex should be kept clean and tidy in presentable look, cutting the grasses in and around the installation as directed by the Engineer-in-Charge, otherwise a recovery at the double the market rate shall be charged if the installation and its complex are not kept clean all the times.
Negligence of duty during manning and operations, maintaining of records shall be taken seriously and compensation shall be made as per contract procedures.
Contractor shall ensure that no worker shall be deployed continuously more than 48 hrs in a week.
The shift staff may be detailed for any other works as required by AGE E/M and JE E/M.
FGM/AC operator shall be ITI pass or minimum matriculate with three years experience in the trade from recognized government institution. Necessary qualification details shall be submitted by the contractor within one month from the date of acceptance.
Contractor shall provide life insurance of min Rs 1 Lakh to all the employed manpower & copy of life insurance shall be deposited with department within one month of acceptance.
No one be absent on duty, if anyone found absent a recovery at the double the quoted rate shall be levied .
Staff shall remain on duty and will not leave installation without Staff. Staff shall leave the duty with releiver and proper handing/taking over is signed.
Tradesmen shall take preventive measure and shall use protective clothing as per code of practice of IE rules and deptt will not be responsible for any type of untowards incidents.
Each shift of one trade man is for 8 hours.
Log Sheet/Log Book of Plant running and running of installation, handing/taking over register atttendence register, will be maintained in proper form and duly binded will be issued in printed form by the contractor. All the documents shall be kept in the Sub Station and produced to GE/Vigilance Officer/Higher authorities during visit to installation.
Tradesman shall carryout normal maintenance of installation
All the above documents shall be produced to the dept (Sub Div/GE Office) at the time of claiming payments of RARs which is of mandatory requirement.
All the trades man payment details i.e., Proof of payment in the Bank, Proof of EPF, ESI and BONUS payments and attendence register and log book, Insurance certificate duly signed by all concerned shall be submitted along with RAR/MB and No payments shall be entertained by the department in the absence of the above said documents. .
Gayatri Associates
KRISHNA ENGINEERING
Shiv Projects
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .