Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹1,200 (0.61%)Admitted-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹2.0 L+₹1,200 (0.61%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹3,495 (1.78%)Admitted-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹2.0 L+₹3,495 (1.78%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rakesh Kumar L3 | Naveen Kumar L2 | UDEY KUMAR L1 |
|---|---|---|---|---|---|---|
| 1.00Repair of 25 HP Motor Kirloskar Make set no.02 | ||||||
| 2.00 | Rewinding of 25 HP motor complete in all respect within all leads and lifts as per direction and to the satisfaction of Engineer-in-Charge. | 25 | HP | 810 ₹20,250 | 805 ₹20,125 | 800 ₹20,000 Lowest |
| 3.00 | Varnishing of motor complete in all respect as per direction of Engineer-in-charge. | 5 | Ltrs | 280 ₹1,400 | 275 ₹1,375 | 270 ₹1,350 Lowest |
| 4.00 | Providing and fixing of Epoxy Fanni to motor Solt in all respect as per direction of Engineer-in-charge. | 25 | Each | 80 ₹2,000 | 75 ₹1,875 | 70 ₹1,750 Lowest |
| 5.00 | Providing and fixing of paper F-Class for motor insulation in all respect as per direction of Engineer-in-charge. | 3 | Kg | 480 ₹1,440 | 475 ₹1,425 | 470 ₹1,410 Lowest |
| 6.00 | Providing and fixing Welding & turning router pulley size with Key in all leads and lift as per direction and to the entire satisfaction of Engineer in charge. | 1 | Each | 1,310 ₹1,310 | 1,300 ₹1,300 | 1,265 ₹1,265 Lowest |
| 7.00 | Providing and fixing of Bearing Sleeve in tappa in CI complete in all leads and lift as per direction and to the entire satisfaction of Engineer in charge | 2 | Each | 1,560 ₹3,120 | 1,550 ₹3,100 | 1,530 ₹3,060 Lowest |
| 8.00 | Providing & fixing of Ball Bearing NU- 307 make complete in all respect as per direction of Engineer-in-charge. | 2 | Each | 995 ₹1,990 | 975 ₹1,950 | 970 ₹1,940 Lowest |
| 9.00 | Providing and fixing of Connection plate to motor in all leads and lift as per direction and to the entire satisfaction of Engineer in charge | 1 | Each | 2,545 ₹2,545 | 2,535 ₹2,535 | 2,530 ₹2,530 Lowest |
| 10.00 | Providing & fixing of copper cable 10 mm2 for connection leads of motor as per direction and to the entire satisfaction of Engineer in charge
. | 12 | Mtr | 995 ₹11,940 | 975 ₹11,700 | 970 ₹11,640 Lowest |
Tender Value
₹1.9 L
EMD Value
₹3,830
Closing Date
9 Sept 2026, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Dharampur Bharari
Restoration of rain damages to LWSS Kot Dhawali in Tehsil Dharampur Distt. Mandi HP (SH. Repair of Crompton make motor 25.00 HP set No.2) LWSS Churru ka Balh (Repair of 20 HP pump, 9 stage set No.2) LWSS Kandapattan to Dhawali (Repair of submersible
2026_HPIPH_142414_1
7029-78 Dated 31-08-2026
Open Tender
Civil Works
Item Rate
30 days
Dharampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Executive Engineer
₹3,830
15 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair of 25 HP Motor Kirloskar Make set no.02 | - | - | - | - |
| 2 | Rewinding of 25 HP motor complete in all respect within all leads and lifts as per direction and to the satisfaction of Engineer-in-Charge. | 25 | HP | 100 | ₹2,500 |
| 3 | Varnishing of motor complete in all respect as per direction of Engineer-in-charge. | 5 | Ltrs | 100 | ₹500 |
| 4 | Providing and fixing of Epoxy Fanni to motor Solt in all respect as per direction of Engineer-in-charge. | 25 | Each | 100 | ₹2,500 |
| 5 | Providing and fixing of paper F-Class for motor insulation in all respect as per direction of Engineer-in-charge. | 3 | Kg | 100 | ₹300 |
| 6 | Providing and fixing Welding & turning router pulley size with Key in all leads and lift as per direction and to the entire satisfaction of Engineer in charge. | 1 | Each | 100 | ₹100 |
| 7 | Providing and fixing of Bearing Sleeve in tappa in CI complete in all leads and lift as per direction and to the entire satisfaction of Engineer in charge | 2 | Each | 100 | ₹200 |
| 8 | Providing & fixing of Ball Bearing NU- 307 make complete in all respect as per direction of Engineer-in-charge. | 2 | Each | 100 | ₹200 |
| 9 | Providing and fixing of Connection plate to motor in all leads and lift as per direction and to the entire satisfaction of Engineer in charge | 1 | Each | 100 | ₹100 |
| 10 | Providing & fixing of copper cable 10 mm2 for connection leads of motor as per direction and to the entire satisfaction of Engineer in charge
. | 12 | Mtr | 100 | ₹1,200 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Form6.pdf
Tender Documents • 0.79 MB
Form8.pdf
Tender Documents • 1.28 MB
TC.pdf
Tender Documents • 0.12 MB
BOQ_211586.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .