Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC HIMACHAL PRADESH HP | ₹3.1 L | L1 | Accepted-AOC Quoted rates at lower sides. |
| 2 | L2₹3.4 LRejected-Finance HIMACHAL PRADESH HP | ₹3.4 L | L2 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
| 3 | L3₹3.4 LRejected-Finance NIL | ₹3.4 L | L3 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
Tender Value
₹3.1 L
EMD Value
₹7,763
Closing Date
16 Feb 2026, 3:30 pmClosed
SR. XEN
ED, HPSEBL, RECKONG PEO
Tender for Strengthening of existing 22KV HT line by providing additional pole, replacement of worn-out ACSR Conductor, patially damages insulators, , rejumppering etc. in electrical Section Reckong Peo-II under Electrical Sub Division, HPSEBL, Recko
2026_HPSEB_127999_1
RPO/ED/DB-11/2025-26/111
Open Tender
Supply and Erection
30 days
RECKONG PEO
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹7,763
19 Mar 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Dismentalement Charges of 22kV HT line.
Dismentalement charges of ST poles D/Pole Str. (with complete accessories.)
Dismentalement charges of ST poles S/Pole Str. (with complete accessories.)
De-sagging of ACSR conductor 6/1/3.35mm. (Removal of conductor & De stringing only)
Erection of 22kV H.T Line
Erection of pole.Digging of pit, (ii) Laying of RCC muff (iv) Erection of pole (v) fixing of insulator,X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming D/Pole str. (Complete in all respect).
Erection of pole.Digging of pit, (ii) Laying of RCC muff (iii) Drilling of holes in X-bracing set, X-arms (iv) Erection of pole (v) fixing of insulator,X-arm, Knee bracing set, Top Clamp (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming i/c painting of pole S/Pole str. (Complete in all respect).
Erection of stay set (HT).
Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect.
SAGGING OF ACSR CONDUCTOR 6/1/3.35mm (Single wire).
stringing & sagging, Binding with insulator (only).
Fixing of Jumper (1No.)
For 1 KM H.T Line considering average distance from road to site of work 0.500 KM (Average distance 0.500 KM)
Steel tubular pole 10 mtr. long.
Other line material.
MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store).
Prov. RCC Muffs 2Mtr.
Prov. Disc Insulator Set (including Dead end clamp,Ballcleaves eye sockets, straight stapple & Bend Stapple etc.)
Prov. 22kV Pin Insulators with GI Pin.
Prov. stay Wire (7/3.15mm)
Prov. Nuts & bolts. (off soze)
Prov. Aluminium paint.
Prov. Stay clamp
Prov. Egg Insulator.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_189061.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid