Loading…
Loading…
Tender Value
₹26.4 L
EMD Value
₹26,390
Closing Date
18 Sept 2026, 5:00 pm
Commissioner, Nagara Panchyat, Kamalapuram
Kamalapuram
APUFIDC - Laying of CC Road fromD No 15/376-1 to D No 15/375 (Paidiman Colony), D NO 15/420 to D No 15/418 (Akka Devathala Gudi), D NO 15/298 to D No 15/285-3 (Machireddy palli x road) in 9th EW & D No 13/477 to D No13/477-6, D No 13/356-7 to D No13/356-3, D No 13/356-6 to D No13/361, MPUP Urdu school to D No 13/364-4 of 12th EW & Construction of CC Drain from D No 13/18 to D No 13/112-4 (Hospital Back side) in 13th EW of Kamalapuram Nagara Panchayat
985721
04/2026-27/E1
OPEN - NCB
Road Work
YSR
7 documents required · 7 mandatory
₹935
₹26,390
4 Sept 2026
4 Sept 2026
4 Sept 2026
Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. Excluding Seingorage Charges
Construction of un-reinforced at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (laying and fixing of 125 micron thick polythene film, wedges including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scared and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21 - days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD (RBR-CCPV-5).
Removal of wet Silt and sludge from sullage drain with aid of baskets and vessels and labour charges etc,. Complete. As per SSR P11/40 (PH)
Excavation for drains as per drawing and technical specification clause 305.1 including other materials and disposal upto lead of 50m dressing of sides and bottom and back filling in trenches with excavataed suitable materials as per technical specifivcation by manual means in all soils.
Conveyance of surplus excavated earth to lead of 1 Km from work spot including all labour charges etc complete
Providing sand for filling in foundations with filling sand as per Technical specification including cost and conveyance of all materials from source to site and labour charges for filling,Watering,ramming etc., Complete
Providing Plain cement concrete M15 grade nominal mix (1:2.5:5) as approved by the department using 40 to 20 mm hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (concrete machine mixing) ((BLD-CSTN 2-12))
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering etc., complete and as directed by Engineer-in-charge of the work. for culvert slabs BLD-CSTN-2-13
Supplying, fitting and placing HYSD / TMT (Fe-500 / Fe-500D / Fe-550) with ISI Standard Mark bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18
1. Add GST @ 18%
2.Seignorage Charges
Note : The contractor should engage Technical personel during execution of work failing which necessary amount will be deducted from the contractor bill. The labour cess @1% shall be deducted from the contractor's bill without adding to the workdone as per the Government orders. The 3rd party QC charges shall be deducted from contractor bill from out of over head charges loaded in data.
Cutting road surface including stacking of excavated materials for pipe line trench work. a) Cutting open C.C. road surface.
Cutting road surface including stacking of excavated materials for pipe line trench work. b) Cutting open BT road surface.
Excavation for pipe in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH. (RBR-EECD-5-iii)
Earthwork in excavation for Pipeline as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing. Removed of stumps and other deleterios material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 MORD/304 MORTH (ordinary soil using manual means)
Manufacturing and Supply and delivery of Unplasticised PVCs pipes for potable water supplies conforming to IS:4985/2000(third revision) with bell ends (socket) as per specification in light Grey/Natural Lvory Grey/Any other Color (except White) inclusive of transporation to the sub -divisional stores anywhere in AP excluding Excise duty and including Sales Tax etc. 200 mm Dia PVC pipes 10kg/cm2
Lowering, Laying, Jointing and testing to hydralic test pressure including cost of water with minumum water lead of 50m for UPVC pressure pipes in ready made trenches true to alignment and gradient including all sundries but excluding cost & conveyance of pipes from source of supply and jointing materials as per BIS No.7634- Part III - 1975 . 200 mm Dia PVC pipes 10kg/cm2
Collection and supply of filling sand including cost and conveyance at site of work and labour charges for spreading , watering and ramming etc.., complete ( clause 305-89 MORD and 304 MORTH)(RBR-F NDN-2)
Supply and delivery of 110 mm x 90mm Tee - UPVC/SWR Pipe fittings
Supply and delivery of 110 mm dia PVC End caps
Supply and delivery of 110 mm dia PVC bends
Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated softsealing gate valves (Sluice valves) with bodybonnet of ductile cast iron of grade GGG40/ SG 400/12 or equivalent grade as per I.S.3896-part2- 1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846- 2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538.
1. Add VAT @ 5%
2. Labour Cess @ 1%
Note : The contractor should engage Technical personel during execution of work failing which necessary amount will be deducted from the contractor bill.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3RD FILE.docx
TENDER_DOCUMENT • 0.08 MB
3RD FILE.xlsx
TENDER_DOCUMENT • 0.02 MB
tender doc.docx
TENDER_DOCUMENT • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .