Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC NO 174 NEW NO 13 2 14TH E CROSS AGARAHARA DASARAHALLI BANGALORE 560010 | BANGALORE | BANGALORE | KARNATAKA | 560010 | ₹18.4 L | L1 | Accepted-AOC Lowest Evaluated Bidder (L1) |
| 2 | L2₹36 L+₹17.6 L (96.2%)Rejected-Finance MONARCH HOUSE CTS NO 434 1 B T KAWADE ROAD NEAR KAWADE PETROL PUMP GHORPADI PUNE 411 036 MAHARASHTRA | PUNE | PUNE | MAHARASHTRA | 411036 | ₹36 L+₹17.6 L (96.2%) | L2 | Rejected-Finance More than L1 Quoted rate |
| 3 | L3₹42.2 L+₹23.8 L (129.8%)Rejected-Finance | ₹42.2 L+₹23.8 L (129.8%) | L3 | Rejected-Finance More than L1 Quoted rate |
| 4 | L4₹95.7 L+₹77.3 L (421.4%)Rejected-Finance 1 ST FLOOR KUBERA CHAMBERS J M ROAD SHIVAJINAGAR PUNE PUNE MAHARASHTRA 411005 | PUNE | MAHARASHTRA | 411005 | ₹95.7 L+₹77.3 L (421.4%) | L4 | Rejected-Finance More than L1 Quoted rate |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Non Responsive |
| Sl No | Description | Qty | Unit | Mitcon Consultancy and Engineering Services Ltd L5 | Viraj Green Consultants Private Limited L1 | Monarch Surveyors & Engineering Consultants Limited L3 | Environmental Health and Safety Consultants Pvt Ltd L2 | CHAITANYA PROJECTS CONSULTANCY LIMITED L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Preparation of Environmental & Social Management Plan (ESMP): Semi Annual report (Total 4 reports) consisting of the data collection methodology, data analysis, and interpretation shall be submitted with each report for the Operational and Under Construction Phases of Bangalore Metro Rail Project, Phase-2. | 1 | Lumpsum | 95,67,000 ₹95,67,000 | 14,31,000 ₹14,31,000 Lowest | 36,00,000 ₹36,00,000 | 18,35,000 ₹18,35,000 | 42,17,008 ₹42,17,008 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
24 Apr 2026, 6:00 pmClosed
General Manager (Contracts)
Bangalore Metro Rail Corporation Limited, Annex-1, Project and Planning 4th Floor, BMTC Complex, KH Road, Shantinagar, Bangalore-560027
Preparation of Environmental and Social Management Plan (ESMP) for Phase-2 of the Bangalore Metro Rail Project.
2026_BMRCL_274440_1
BMRCL/2026-27/Ph2/ESMP/147
Open Tender
Consultancy
Lump-sum
Bangalore
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,360
Bangalore Metro Rail Corporation Limited
₹50,000
Bangalore
30 May 2026
10 Apr 2026
27 Apr 2026
10 Apr 2026
24 Apr 2026
19 Apr 2026
10 Apr 2026 - 16 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of Environmental & Social Management Plan (ESMP): Semi Annual report (Total 4 reports) consisting of the data collection methodology, data analysis, and interpretation shall be submitted with each report for the Operational and Under Construction Phases of Bangalore Metro Rail Project, Phase-2. | - | Lumpsum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_320379.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
ESMP147Ph2.pdf
Tender Documents • 7.00 MB
BOQ_320379.xls
BOQ • 0.39 MB
Annexure1toAandC1.pdf
PDF • 0.55 MB
Prebidreplies.pdf
PDF • 0.38 MB
AandC1ESMP147.PDF
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .