Executive Engineer rnb division Awantipora
Executive Engineer rnb division Awantipora
Upgradation of Trout rearing unit Dobiwan Tral B.W.O Construction of Dormitory and other allied works.
2026_PWDJK_315107_1
51/EEA/RNB/2026-27/2844-54 Dated 08-07-2026
Open Tender
Civil Works
120 days
Tral
as per NIT
5 documents required · 5 mandatory
₹800
JK Bank Account Bearing No 0470010200000099
₹47,780
8 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of manual Labour for clearance of site including disposal of same all complete as per the directions of EIC. | - | Labour | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, for a lead upto 1 meter from cutting edge All kinds of soil : | 1 | cum | 1 | ₹1 |
| 3 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | - | Cum | - | - |
| 4 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all wk upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 1 | Cum | 1 | ₹1 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 1 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kgs | 1 | - |
| 8 | Coursed Rubble Masonry with hard stone in foundation and plinth and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse Sand) Ist sort | - | cum | - | - |
| 9 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all wk upto plinth level 1:2:4 (1 cement 2coarse sand 4 20mm nominal size crushed stone agg.) | - | Cum | 1 | - |
| 10 | Centring and shuttering including proping, strutting & removal of the same for foundation footings base of columns etc. | - | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1021124.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid