Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 284 VEENA NAGAR CAMP DISTT JAGADHARI YAMUNA NAGAR 135001 HARYANA | YAMUNANAGAR | HARYANA | 135001 | ₹4.6 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹4.7 LRejected-Finance P O PURUWALA TEHSIL PAONTA SAHIB DISTT SIRMOUR 173025 H P | PAONTA SAHIB | SIRMOUR | HIMACHAL PRADESH | 173025 | ₹4.7 L | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹4.7 LRejected-Finance PLOT NO 6 NEAR RADHA SWAMI SATSANG BHAWAN JAMMU COLONY YAMUNA NAGAR HARYANA | YAMUNANAGAR | HARYANA | 133103 | ₹4.7 L | L3 | Rejected-Finance L3 BIDDER |
Tender Value
Refer Docs
EMD Value
₹4,602
Closing Date
24 Apr 2026, 11:00 amClosed
Resident Enginner
GIRI POWER HOUSE DIVISION HPSEBL GIRINAGAR
O and M of 220 Substation
2026_HPSEB_134436_1
REGPHD-13/2026-27
Open Tender
Repair and Maintenance Works
30 days
GIRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
₹4,602
25 Apr 2026
17 Apr 2026
24 Apr 2026
17 Apr 2026
24 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1O/M of 220/132kV Sub-station at Girinagar | |||||
| 1.01 | Complete dismantling of damaged 2 Nos gear box assembly of Bus Isolators including disconnection of operating pipe/rod, lifting from structure, complete overhauling, inspection of 2 Nos gears, shafts, worm assembly, bushes, bearings, oil seals, replacement of defective internal components, machining/rectification of worn-out parts if required, refilling of suitable grade gear oil, re-assembly, refixing on structure with precise alignment of operating mechanism, checking of limit setting, re-alignment of isolator (upper assembly), cleaning and greasing of male-female contacts with suitable conductive grease, re-assembly, proper setting, smooth operation trial (manual/motor operated), tightening of foundation bolts, greasing, testing ,trial operation and making the isolator fully operational in all respects as per site requirement and satisfaction of Engineer-in-Charge at 220 kV Sub Station HPSEBL Giri Nagar. | - | Job | 3,90,000 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
2026Tenderdocument13.pdf
Tender Documents • 1.17 MB
BOQ_198868.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid