Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC CHURCHA COLLIERY WARD NO 14 CHURCHA COLLIERY P O CHURCHA COLLIERY DISTT KORIYA C G | BAIKUNTHPUR | KORIYA | CHHATTISGARH | 497339 | L1 | Accepted-AOC L1 BIDDER |
Tender Value
Refer Docs
EMD Value
₹34,000
Closing Date
25 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(Mining) Baikunthpur Area.
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 10 Nos. PCC Ventilation Stoppings and 02 Nos. Air Crossing for re-organisation of ventilation circuit in West Block of Churcha Mine (R.O).
2023_SECL_295421_1
SECL/BKP/SO(M)/23-24/CW/eT/62 Date 06.12.2023
Open Tender
Civil Works - Others
Item Rate
365 days
West Block of Churcha Mine (RO).
Please refer Tender document
3 documents required · 3 mandatory
₹34,000
19 Jan 2024
6 Dec 2023
26 Dec 2023
7 Dec 2023
25 Dec 2023
7 Dec 2023
7 Dec 2023 - 14 Dec 2023
Amount
Item Description/ Heading NOTE:-For PCC ventilation stopping, Sl. No. 1.01 to 9.0 and for air crossing, Sl. No. 10 to 21.
Groove cutting/Floor cutting for stopping/ manhole by chisel and hammer in coal (both side) ( Sl. No. 2d of GMSOR-2018)
Groove cutting in Floor and roof for stopping/manhole by chisel and hammer in hard stone (in Roof & Floor) ( Sl. No. 2a of GMSOR-2018)
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl. No. 14 of GMSOR-2018)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ( Sl. No. 12 of GMSOR-2018)
12 mm cement plaster of mix : 1:6 (1 cement : 6 fine sand) ( Sl. No. 11 of GMSOR-2018)
Loading of materials into tubs in surface. ( Sl. No. 8a of GMSOR-2018)
Unloading of materials at destination point in UG. ( Sl. No. 8b of GMSOR-2018)
Lead for transportation of materials for every 15 mtr or by head load for 50 mtr,(Average 1.20 leads involve awarded) ( Sl. No. 7 of GMSOR-2018)
Mulma cleaning /removal of debris from galleries and cleaning of belt roadway and stacking/loading within 50.0 m ( Sl. No. 1 of GMSOR-2018)
Groove cutting/Floor cutting for stopping/ manhole by chisel and hammer in coal (both side) ( Sl. No. 2d of GMSOR-2018)
Groove cutting in Floor and roof for stopping/manhole by chisel and hammer in hard stone (in Roof & Floor) ( Sl. No. 2a of GMSOR-2018)
Drilling/blasting in roof /sides in stone / drifting, and removal of excavated materials by manually and desposal upto 50m lead. (i) Drilling by power drill. ( Sl. No. 3 (ii) of GMSOR-2018)
Brick work with F.P.S Local Bricks in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) ( Sl. No. 9 of GMSOR-2018)
Brick work with F.P.S Local Bricks in super structure above plinth Level up to floor v Level in all shape and sizes in (Cement mortar 1:6 (1 cement : 6 coarse sand)) ( Sl. No. 10 of GMSOR-2018)
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl. No. 14 of GMSOR-2018)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 ( Sl. No. 13 of GMSOR-2018)
12 mm cement plaster of mix : 1:6 (1 cement : 6 fine sand) ( Sl. No. 11 of GMSOR-2018)
Loading of materials into tubs in surface. ( Sl. No. 8a of GMSOR-2018)
Unloading of materials at destination point in UG. ( Sl. No. 8b of GMSOR-2018)
Lead for transportation of materials for every 15 mtr or by head load for 50 mtr,(Average 1.20 leads involve awarded) ( Sl. No. 7 of GMSOR-2018)
MS Rod 10mm. (Market rate)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
techsummary_306005.pdf
PDF • 0.20 MB
finsummary_306005.pdf
PDF • 0.43 MB
AOC64CW62.pdf
PDF • 2.32 MB
finance_306005.pdf
PDF • 0.27 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .