Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC CHEMAGURI SAGAR | SAGAR | WEST BENGAL | ₹7.8 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹7.8 LRejected-Finance UKILPARA P O BARUIPUR DIST 24 PARGANAS S PIN NO 700144 | BARUIPUR | SOUTH 24 PARGANAS | WEST BENGAL | 700144 | ₹7.8 L | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹7.8 LRejected-Finance | ₹7.8 L | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹7.8 L
EMD Value
₹15,536
Closing Date
13 Feb 2026, 10:00 amClosed
EXECUTIVE ENGINEER-II CANALS DIVISION
OFFICE OF THE EE-II CANALS DIVISION_SECH ABASAN SALTLAKE SECTOR-III KOLKATA
Maintenance and repair to the right embankment of Tangra Branch Khal for a length of 200 M near Tangra Rest shed in GP - Karanjali, Mouza - Krishnachandrapur, Block and P.S - Kulpi, Dist. - South 24 Pgs.
2026_IWD_999594_2
WBIW/EE-II/CD /e-NIT-31(e)/2025-26
Open Tender
CIVIL WORKS
30 days
BLOCK-KULPI
Please refer Tender documents.
7 documents required · 7 mandatory
₹15,536
Yes
30 Apr 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
Extra rate over Item Nos.1.01, 1.02 & 1.03 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of E) Beyond 4.00 km and upto 5.00 km, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. (iii) 15 cm av. Diameter Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end.
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 15 cm av. Diameter. Note: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 15 cm. (i) Jhaw / Eucalyptus
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge. b) Two Coat
Supply of different materials as per approved specification. Bricks / Jhama / Bats. Sorted & stacked at site. (f) Brick bats. (The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage. Rates for Bats is complete rates at site and no other costs need to be considered.
Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg & above / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges. (d) Brick Bats
Brick pavement with 1st class / picked jhama bricks (as per direction of Engineer in charge) with joints set closed in cement mortar 1:6 including preparation of bed by cutting or filling with ramming the filled up earth to the same profile as that of the finished pavement. Rate is inclusive of cost of supply of all materials, labour and all incidental charges in this connection. (a) When laid with a cushion of sand below including cost thereof: (iii) One brick on edge pavement laid in herring bone bond pattern
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
FORMS.pdf
Tender Documents • 0.09 MB
serial2.pdf
Tender Documents • 0.10 MB
2911.pdf
Tender Documents • 0.44 MB
BOQ_2448669.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid