| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC awarded | |
| 2 | L2₹2.6 L+₹12,726 (5.07%)Rejected-Finance MATTACKAL HOUSE KOIPURAM PO | L2 | Rejected-Finance higher rate |
| Sl No | Description | Qty | Unit | SAM ABRAHAM L2 | MANOJ PUNNOOSE L1 |
|---|---|---|---|---|---|
| 1.00Construction of compound wall | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 11.23 | cum | 350 ₹3,930.15 Lowest | 350 ₹3,930.15 Lowest |
| 1.00 | OD365523/2025-2026:DRY RUBBLE MASONRY -Random rubble masonry with hard stone, including through stone in foundation and superstructure including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per approved drawing and elevent technical specifications | 22.92 | cum | 3,990 ₹91,446.81 Lowest | 3,990 ₹91,446.81 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | cum | 8,230 ₹16,443.54 Lowest | 8,230 ₹16,443.54 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.29 | cum | 7,932 ₹2,284.42 Lowest | 7,932 ₹2,284.42 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 2.64 | sqm | 386 ₹1,019.04 Lowest | 386 ₹1,019.04 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 61.95 | kilogram | 108 ₹6,690.28 Lowest | 108 ₹6,690.28 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 7.68 | sqm | 1,008 ₹7,741.44 Lowest | 1,008 ₹7,741.44 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.3 | cum | 15,000 ₹19,530 | 12,772 ₹16,629.14 Lowest |
| 1.01 | 50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete | 10.01 | cum | 9,500 ₹95,104.5 | 8,640 ₹86,495.04 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,337
Closing Date
2 Jan 2026, 6:00 pmClosed
AE LSGD
AE LSGD Thiruvanvandoor GP
TVDR GP 2025-26-Project No. 180/26 Construction of Compound wall for Anganvadi No 149 at Ward 05
2025_LSGD_823636_1
180/AE/LSGD/TVDR/25-26
Open Tender
Civil Works - Buildings
Item Rate
90 days
Thiruvanvandoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
₹6,337
Yes
23 Jan 2026
26 Dec 2025
5 Jan 2026
26 Dec 2025
2 Jan 2026
26 Dec 2025
Amount
Construction of compound wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD365523/2025-2026:DRY RUBBLE MASONRY -Random rubble masonry with hard stone, including through stone in foundation and superstructure including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per approved drawing and elevent technical specifications
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
SAM ABRAHAM (BID ID -2450053)
Bidder Name
SAM ABRAHAM
MANOJ PUNNOOSE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1380666.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1380666.xls
BOQ • 0.30 MB
affidavit.pdf
Tender Documents • 0.24 MB
epay.pdf
Tender Documents • 0.24 MB
ipact.pdf
Tender Documents • 0.24 MB
preliminary.pdf
Tender Documents • 0.26 MB
viewsbd.pdf
Tender Documents • 1.86 MB
tenderform.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .