Chief General Manager (Thermal)
Surat Lignite Power Plant - 4X125 MW, Unit - I to IV: RCC structural repairs and external protective anti - corrosive, anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of Crusher foundations, Silos, critical RCC structures of LHS, AHS, ELHS and anti - chloride, anti - sulphate coating on affected areas of ID Fan foundations, etc... (Year: 2026-27).
321214
SLPP/Civil/Str. Repair & Coating/2026
Open
Repair and Maintenance
Surat
₹2,950
Gujarat Industries Power Company Limited
₹88,000
10 Jul 2026
10 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
Any error in description or quantity or omission in the contract document shall not
vitiate the contract or release the contractor from executing the work comprised in
the contract according to scope of works, magnitude of the works, requirement of
materials, equipment, tools & tackles, labour, etc. Contractor has to complete the
work in accordance with the contract documents irrespective of any defects,
omissions or errors that may be found in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as access to site, communication, transport, working
condition including approaches, height of structures, provision & requirements of
scaffolding (standard MS sections only), site safety requirements, quantum of
dusting, temperature, running equipment, importance of work, round the clock
working conditions, work permit system, right of way, high flood level in River, flow of
water during monsoon/dry season in the River/Nallah, the type and number of
equipment & facilities required for the satisfactory completion of work, the quantity of
various items of the work, the availability of local labour, availability and rates of
material, local working conditions, uncertainties of weather, obstructions and
hindrances that may arise, etc which may affect the work or cost thereof, before
submission of his Bid.
Ignorance of site conditions shall not be accepted by the GIPCL as basis for any
claim for compensation. The submission of a Bid by the BIDDER will be construed
as evidence that such an examination was made. Any later claims / disputes in regard
to rates quoted shall not be entertained or considered by the GIPCL.
The rate quoted by BIDDER shall be based on his own knowledge and judgment of
the conditions and hazards involved and shall not be based on any representations
of the Engineer.
It is also desirable to study tender documents thoroughly before site visit.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
5. ELIGIBILITY CRITERIA (SELF ATTESTED COPIES OF
SUPPORTING DOCUMENTS MUST BE SUBMITTED FOR
EACH OF FOLLOWING ELIGIBILITY CRITERIA)
The following criteria will be adopted for qualifying the Bidders for consideration of
the Bid for the further proceeding.
5.1 Bidder should possess minimum Three years of experience during last five years
(ending last day of the month previous to the one in which tender is invited) in
similar nature of jobs (as per clause no. 5.1.1 herein below) with using specialized
repair chemicals/materials for Civil RCC (Reinforced Cement Concrete) structure
rehabilitation jobs, Civil structure strengthening works, etc(not general civil
construction)… for repair & protection of structures in/for Power Plants / Process
Industries / Corporation / Corporate Sectors / Institutes and should enclose proof of the
Bidder shall submit necessary evidence for the same like self attested copies of work
orders/Work Execution/Work Completion certificates from clients. The work
completion certificate shall comprise of Order value & Executed value. Bidders
should have executed the work directly. The work executed as a sub-contractor or
subletting agency shall not be taken in to consideration. However, experience as a
sub-contractor, except the works sublet by specialized civil repair agency, may be
allowed on sole discretion of GIPCL subject to submission of supporting
evidence/documents like copies of work orders with relevant Invoices of completed
works & verification of work performance from client of main contractor.
5.1.1 Definition of Similar Work:
For the purpose of this tender, "Similar Work" shall mean execution of specialized
Civil RCC (Reinforced Cement Concrete) structural rehabilitation, strengthening,
retrofitting, corrosion protection and protective coating works involving following
activities using specialized repair systems/materials such as epoxy, polymer modified
repair mortars, micro-concrete, corrosion protection systems, bonding agents, anti-
carbonation coatings, crack injection systems, or equivalent specialized repair
Structural concrete repair and rehabilitation.
RCC strengthening and retrofitting.
Removal of distressed concrete, reinforcement treatment and reinstatement.
Epoxy crack injection and structural crack repair.
Micro-concreting, polymer modified mortar repairs and jacketing.
Protective coating systems including anti-carbonation, anti-corrosion, anti-
chloride, anti-sulphate or equivalent protective treatments for RCC
Structural durability enhancement works executed using specialized repair
chemicals/materials.
The above works shall have been executed in Power Plants, Process Industries,
Petrochemical Plants, Refineries, Fertilizer Plants, Steel Plants, Cement Plants,
Ports, Large Industrial Establishments, Government Organizations, Corporations,
Corporate Sector or other heavy industrial facilities.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
5.1.2 The following works shall not be considered as Similar Work:
General civil construction, residential or commercial building construction, masonry
works, plastering, flooring, waterproofing, roofing, routine maintenance works,
painting works, renovation works, road works, drains, boundary walls, or any
conventional civil works not involving specialized RCC rehabilitation and protection
5.2 Bidder should produce evidence of having successfully completed similar works
(as per above clause no. 5.1) during last five years ending last day of the month
previous to the one in which tender is invited, satisfactory progress of ongoing
works (Ongoing works shall not be considered for value qualification unless
at least 80% of the contract value has been executed and certified by the
client.) etc… secured from clients along with self attested copies of documentary
evidence preferably photo copies of work experience. The experience should be
either of the following:
a. One similar completed/executed work each costing not less than the
amount equal to Rs.62,21,032/-.
b. Two similar completed/executed works each costing not less than the
amount equal to Rs.41,47,355/-.
c. Three similar completed/executed works each costing not less than the
amount equal to Rs.31,10,516/-.
5.2.1 For evaluation of the bid, the executed value mentioned in the work completion
certificate will be considered.
5.2.2 In case of total order or total order executed value also consists other Civil works
and / or other Civil repair & maintenance works, the executed value of similar
works (in line with items of SoR Section-E of this tender, i.e. specialized
retrofitting, strengthening, protective coatings, etc… for RCC structures) shall
only be considered for verification of eligibility under this clause no. 5.2. In such
case, bidder shall get specific certification of executed value of similar work/items
from the client.
5.2.3 For the purpose of evaluation under Clause 5.2, the qualifying executed value
shall exclusively represent Specialized RCC Rehabilitation, Strengthening,
Retrofitting and Protective Coating Works as defined under Clause
(Definition of Similar Work). Executed values pertaining to demolition,
conventional RCC construction, masonry, plastering, flooring, waterproofing,
roofing, structural steel works, painting, road works, drains, earthwork or any
other unrelated conventional civil works and conventional civil repair &
maintenance works shall not be considered for evaluation of eligibility.
5.2.4 The bidder shall submit a client-certified breakup of the executed value clearly
indicating the value of specialized RCC rehabilitation and protective coating
works. In the absence of such certification, GIPCL shall consider only the value
that can be clearly established from the submitted documents, and its decision
shall be final and binding.
Bidder should specifically mention fulfilling of above criteria in his offer along with
details of work orders & work completion/execution certificates issued by clients.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
5.3 Tender fee: The tender fee shall be submitted through RTGS or through online
payment only as per details provided in clause no. 7 hereinunder. Demand Draft will
not be accepted for Tender Fee.
5.4 EMD: The EMD shall be submitted in the form of DD/RTGS/online or irrevocable
Bank Guarantee given by Bank as described in subsequent clause no.
5.5 Bidder should have separate Employees Provident Fund code number towards
registration of firm with RPF commissioner, as applicable.
5.6 Attested copies of relevant documents duly signed & seal on each & every page shall
be submitted. GIPCL may verify the documents, experience certificates issued by
concern authority. After opening of technical Bid, if any required attested documents
found missing in the Technical Bid submitted by the Bidder, the tender inviting
authority may inform to that Bidder by E-mail to submit the missing required
documents within stipulated time limit. If Bidder/Bidders fail to submit within stipulated
time, their Bid will be declared technically disqualified and no further correspondence
will be entertained.
5.7 Bidder should have average annual turnover of Rs.31,10,516/- during last three
financial years (average of financial years of 2024-25, 2023-24 and 2022-23).
Bidder shall furnish annual audited financial statement duly certified by Chartered
Accountant for the last three financial years as above to demonstrate the financial
healthiness of the company. The balance Sheet and Profit & Loss Account must be
in the name of the company. Any type of MOU for this purpose will not be entertained.
Note: In case, the annual turnover is less than the statutory guideline which does not
require audit, the bidder shall submit the turnover certificate from Chartered
5.8 The Bidder has to submit INCOME TAX Permanent Account Number (PAN) and GST
registration number. Copies of the same shall be submitted.
5.9 The net worth of the bidder should be positive as evidenced from audited
accounts of last financial year (2024-25), audited (or where, as per extant laws of
the land, audit is not applicable, certified) by a qualified Chartered Accountant who
should be a member of the Institute of Chartered Accountants of India.
5.10 In case Bidder is a Consortium/Joint deed of undertaking of company, the above
requirements/credential of consortium leader/bidder shall be considered unless
otherwise specifically mentioned in the tender.
5.11 If Bidder or its Partner(s) or Director(s) is /are/was Black Listed / Deregistered /
Stopped or banned from dealing in the past by any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations, Bid of that party may be liable to be rejected. Bidder agrees and
undertakes to accept decision of GIPCL in this regards as final and binding on the
Bidder without any demur and that no further correspondence shall be done in this
regard at any stage. Bidder shall have to submit “Declaration for Contractual
Litigations” as amended in Annexure-H in Section-F / Form attached.
5.12 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of
Safety Laws and Regulations” on his company letter head as amended in Annexure-
G in Section-F / Form attached.
If any Major Violation of any safety law(s) / Rule(s) is / are found during
the preceding Three (3) years, Bid of that party will be liable to be rejected.
Bidder agrees and undertakes to accept decision of GIPCL in this regards
as final and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage.
If any of the details submitted in the prescribed Annexure-G & H in Section-
F / Form to the Bid is/are found to be false, incorrect at any time in future,
then the Contract awarded to that Bidder / Contractor shall be liable to be
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
terminated forthwith without any notice / correspondence and Bidder
agrees and undertakes to accept decision of GIPCL in this regards as final
and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage. Further,
Performance / Security Deposit will also be liable to be forfeited. Any dues
to GIPCL from the Bidder / Contractor shall be recovered from the pending
bills or any other dues payable to the Bidder / Contractor, if any or
otherwise through any other recourse available under the Laws.
The Bidder shall submit all the evidences, documents, attested copies of work orders
& work completion certificates etc… as a proof with EMD & Tender Fee and also
provide the requisite details online for meeting the prequalification requirements.
GIPCL will verify the experience, performance, capability & strength of Bidders,
independently for executing the job. GIPCL may visit the site & consult the owner of
the industry/property where similar job is executed by the Bidder. GIPCL reserves
the right to accept/cancel/reject any/all Bids without assigning any reason thereof.
The tenders of qualified Bidder/Bidders shall only be considered for further
5.13 Site Visit is mandatory prior to submission of bid to understand the scope of work,
Technical requirements, working conditions, site conditions, equipments, tools &
tackles, labor deployment, associated risk, surrounding etc.
5.14 Bidder shall submit all supporting documents as per tender eligibility requirements.
6. LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents relating to
the Bid exchanged by the Bidder and the Company, shall be written in the English
language. Any printed literature furnished by the Bidder, written in another language
shall be accompanied by an English translation for the purpose of interpretation of
7. EARNEST MONEY DEPOSIT (EMD) AND TENDER FEE
7.1 An EMD of Rs.88,000/- (Rupees Eighty Eight Thousand only) and nonrefundable,
Tender fee of Rs.2,950/- (Rupees Two Thousand Nine Hundred Fifty only), inclusive
of applicable GST shall accompany with Bid. Tender fee shall be submitted through
RTGS / online mode of payment only.
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in favor
of Gujarat Industries Power Company Limited from any Schedule Public Sector Bank
or Schedule Private Sector Bank (except Yes Bank) as per Performa of BG
enclosed with this tender document under Section-F (Annexure-C).
Bank for EMD DD Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
Alternatively, EMD & Tender Fee may also be submitted through RTGS mode of
payment by the bidders as per the details given below:-
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
1. BANK NAME:- State Bank of India
2. BRANCH:- Nani Naroli
3. IFSC CODE:- SBIN0013423
4. BENEFICIARY NAME: Gujarat Industries Power Company Limited
Also, EMD & Tender fee may be submitted through online payment gateway of
company’s website: www.gipcl.com (online Payment Form) as per detail
provided in Section-F (Annexure-J) herein under.
7.3 In case EMD is paid in the form of irrevocable BG, the same shall be valid for a period
of 180 days after the due date for submission of the bid
7.4 The EMD of the successful bidder will be returned after payment of Security Deposit
or submission of irrevocable PBG by successful bidder. Alternatively, EMD will be
converted into SD and successful bidder shall submit SD or performance bank
guarantee for the balance amount.
7.5 The earnest money deposit will be refunded to the unsuccessful/disqualified BIDDER
after the tender is finalized and after award of LOI/Work Order.
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Tender fees and
EMD should be submitted to GIPCL.
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after acceptance or
(ii) withdraws his tender before the expiry of the validity date of the tender.
7.9 SCHEDULE OF EMD, TENDER FEE & OTHER SUPPORTING DOCUMENTS
Details/receipts of EMD & Tender fee Address for Submission: -
paid by RTGS/online or EMD in physical
form by way of DD/BG (as applicable) Chief General Manager (Thermal)
with other documents duly self-attested GUJARAT INDUSTRIES POWER CO. LTD.,
are to be submitted in physical form in (Surat Lignite Power Plant)
sealed cover as per details mentioned Village: Nani Naroli,
in NIT. Bid No. shall be mentioned at Taluka: Motamiya-Mangrol,
the top of cover/envelope. District: Surat.
PIN: 394 112, Gujarat.
E-Mail: [email protected]
8. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
A: MODE OF SUBMISSION
The bids shall be submitted online through website: https://tender.nprocure.com or
https://gipcltender.nprocure.com within the dates specified in the NIT along with the
details of tender fees, EMD in two parts as under:
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
(a) Pre-qualification and Techno-commercial Bid without price.
Further briefing of above Part (a) and (b) are as under;
(a) Pre-qualification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with techno-
commercial deviations, if any, shall accompany the bid. The following Information
shall be provided in the techno commercial bid:
1. Qualification and experience of Site-in-charge.
2. Schedule of Deviation (Annexure-F in Section-F) Technical as well as
commercial, if any.
3. Qualification & experience of Supervisors/Engineers.
4. List of available equipments, tools & tackles which are required to perform the
scope of works as specified in this tender.
The following supporting documents shall also be submitted in physical form
along with EMD & Tender Fee:
1. The tender documents dully signed in all pages without price bid along with
techno-commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria as mentioned in
tender document.
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any).
6. Turn over for the last three years, audited annual accounts/financial statements
i.e. profit & loss account and balance sheet and net worth certificate for last
financial year duly certified by a practicing CA will be required as specified in
clause nos. 5.7 & 5.9 above.
7. P.F. Number and Allotment Letter.
8. PAN Number / Copy of PAN card.
9. Goods & Service tax registration number/certificate copy.
10. Bidder should submit duly filled Annexure-K provided under Section-F of
Tender document.
11. Bidder should submit Annexure-F (Schedule of Deviation) under Section-F
either marking NIL or desired deviations.
12. Bidder should submit Declaration-cum-Undertaking for Compliance of Safety
Laws & Regulations and Contractual Disputes / Litigations as per Performa
Annexure-G & Annexure-H under Section-F.
13. Bidder should submit duly filled Form-A (List of Qualified Staff) & Form-B (List
of available equipment, tools & tackles) as provided under Section-F of Tender
14. Bidder should submit Declaration-cum-Undertaking on Letterhead regarding
deployment of experienced Civil Engineer / Experienced site-in-charge as per
Performa Annexure-M under Section-F.
15. Bank Mandate (if not submitted earlier) as per Annexure-N under Section-F duly
signed, & stamped by bidder and respective Bank, along with original cancelled
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
16. Vendor Registration Form (in case of first time bid participant of GIPCL’s
Tender) as per Annexure-O under Section-F.
17. Bidders should provide his User ID for e-Reverse auction on website:
https://e-auction.nprocure.com
1. Percentage Rate Price Bid shall be submitted only in soft form through e- portal
The Estimate includes the cost of all manpower (skilled, semi-skilled, unskilled),
experienced / qualified Civil Engineer (experienced Site-in-charge),
experienced site supervisors, tools, tackles, equipment, and any hired or
outsourced resources required for job-specific works.
Total Estimated Value includes cost of all GIPCL approved makes of Civil
structure repair chemicals & materials, protective coatings, primers,
crack sealers / fillers, thinner, other required materials and standard tools
& tackles, standard equipment as recommended by approved
manufacturers, consumables, safe storage of materials, wastage,
application on various damaged civil structures through experienced
applicators/operators, helpers, labour, supervision, safety supervisor,
shifting, transportation, loading, unloading, equipment, machinery, all
tools & tackles, standard approved MS scaffolding (as per item
description), approved suspended platform for work at height, scaffolding
arrangement at work site as per approval of GIPCL’s Safety Officer, safety
equipments & PPEs, site safety arrangements, legal & statutory
compliances, Royalties, Rents, Stamp Duties, Central or State
Government or Local body or Municipal Taxes or Duties (including GST).
The contractor shall comply with all statutory and legal requirements, including
labour laws (minimum wages, EPF, ESI, bonus, etc… as applicable), safety
regulations, and environmental norms. All applicable taxes and duties, including
GST, are deemed included. The total estimated SoR amount is inclusive of
GST, considered at the current rate of 18%. However, GST must be shown
separately in invoices, and any change in rate shall be adjusted at actuals upon
submission of valid proof.
2. The bidder’s percentage (%) offer shall be based on the Total Estimated
Amount, inclusive of GST. However, at the time of billing, GST shall be
shown separately in the invoice, with reverse calculation as per prevailing GST
laws. The applicable GST rate shall be charged at actuals, subject to
submission of valid documentary evidence, in line with the rates notified by the
Central Government.
3. The bidder shall quote the rates in the form of a percentage (%) as follows:
“At Estimated Value” or “_____ % below the Estimated Value” or “_____ %
above the Estimated Value”.
4. The quantities indicated in the Schedule of Rates (SoR) under Section-E are
tentative and based on preliminary estimation. These quantities are subject
to variation during actual execution, depending on site conditions and final
recognition of damages as directed by GIPCL Engineer.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
5. The quoted rate/offer shall remain firm and fixed throughout the contract
period and any extension thereof, if required, for completion of the entire scope
of work. The rates shall not be subject to any escalation or adjustment on
any account, including but not limited to increases in the cost of materials, fuels,
statutory levies, Minimum Wage Rates (MWR), overheads, idle charges for
labour or machinery, or any other unforeseen expenses. No escalation or
compensation shall be payable to the contractor for any such revisions or
changes during the contract period / till completion of entire scope of work.
B: METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence & place of
business of the person/persons submitting the Bid and must be signed & sealed
by the Bidder with his/her usual signature. The name of all persons signing the
documents shall also be typed or printed below the signature on each page.
(ii) Bid by a joint venture/partnership firm must be furnished with full names of all
partners and be signed with the partnership name, followed by the signature and
designation of one of the authorized partners or other authorized
representative(s). A certified copy of the power of attorney authorizing such
partner or representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e. by the President/Managing Director/Secretary or
other person or persons authorized to Bid on behalf of such
Corporation/Company. A certified copy of the board resolution/power of attorney
authorizing such partner or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the
(v) Erasures or other changes in the Bid Documents shall be initialed by the person
signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
9. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
b. No Bid shall be modified subsequent to the deadline for submission of Bids.
c. No Bid shall be withdrawn in the interval between the deadline for submission of
Bids and the expiration of the period of bid validity.
10. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the
bid and till official intimation of award/rejection made by the Company to the
b. While the Bids are under consideration, Bidders and / or their representative or
other interested parties are advised to refrain from contacting by any means, the
Company. The OWNER, if necessary, will obtain clarifications on the Bids by
requesting for such information from any or all the Bidders, in writing as may be
necessary. The Bidder will not be permitted to change the price or substance of
the Bid after the Bid has been opened.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
11. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and
eighty (180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid. The Company shall always
be at liberty to reject or accept any Bid or Bids at his sole discretion and any
action will not be called into question and the Bidder shall have no claim in that
regard against the GIPCL.
12. OPENING OF BIDS
12.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case
may be, in presence of Bidder's representatives whenever such a procedure
has been specified. Otherwise the tender will be opened by the authorized
officers of GIPCL.
12.2 Preliminary Examination:
12.2.1 The Company will examine the Bids for any computational errors, for
sureties furnished by bidder, for authentication of documents
submitted and completeness of the Bids.
12.2.2 Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price
that is obtained by multiplying the unit price and quantity, the unit
price shall prevail and the total price will be corrected & will be binding
to the bidders.
(b) If there is a discrepancy between the Total Bid Amount and the sum
of total prices, the sum of total prices shall prevail and the Total Bid
Amount will be corrected & will be binding to the bidders.
13. EVALUATION & COMPARISON OF BIDS
13.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the
lowest evaluated Bid in conformity with the specifications of the tender
13.2 The Technical Bids will be examined for minor matters regarding qualification
of bids. Subsequent to correspondence with the respective bidders, the
decision of Tender Committee will be final.
13.3 All responses to requests for clarifications shall be in writing and shall be
presented to the Company through e-mail or in a sealed envelope on or before
the given date requested by the Company. If the Technical clarifications sought
by the Company do not reach the Company on or before due date, the Bid will
13.4 The comparison of all the Bids shall be carried out with reference to the scope
of work as per the technical specification. Any deviation/omission shall be
evaluated at highest quoted price of the deviation/omission quoted by any of
the Bidder. In case a separate price (for omission) is not given by any other
Bidder, a reasonable price of the same shall be taken & the same shall be
binding to the Bidders.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
13.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par.
The loading shall be carried out at an interest rate of 2% above PLR of SBI.
13.6 A Bid to be substantially responsive shall be one which on evaluation confirms
to all the terms, conditions and specifications of the Bid documents without any
material deviation or reservation.
13.7 For the above referred purpose, a ‘material deviation’ shall be one which:
(a) Which affects in any substantial way the scope, quality or performance of
the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with the
Bid documents, GIPCL’s right or the Bidder’s obligations, under the
(c) Whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
14. RIGHT OF REJECTION OF TENDERS
14.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding
process and reject all Bids at any time prior to award of contract, without thereby
incurring any liability to the affected Bidder or Bidders or any obligation to inform
the affected Bidder or Bidders regarding the same.
14.2 Any Tender without EMD and Tender fee will be treated as non-responsive and
shall be rejected at the outset & no further correspondence shall be entertained
regarding this.
14.3 GIPCL reserves the right to debar any Bidder from participation in future Bids if
such Bidder has quoted an abnormally low rate in the Bid document/price Bid.
15. AWARD OF CONTRACT.
15.1 GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest
quotation in conformity with the requirements of the specifications and
documents contained herein, provided further that the bidder is determined and
evaluated to be qualified to perform the contract satisfactorily.
15.2 The successful bidder shall be intimated of his/her selection through the Letter
of Intent or Letter of Award/ Work Order which shall be sent to him/her through
e-mail, courier, fax or registered mail.
15.3 GIPCL reserves the right to cancel/short close the contract during the contract
period without assigning any reason.
15.4 GIPCL reserves the right to split the contract quantity between vendors.
16. CONTRACT / COMPLETION PERIOD
16.1 The contract / completion period for scope of works shall be 09 (nine) months
from the date of issuance of the Letter of Intent (LoI) and/or Work Order,
whichever is earlier (except 03 months of peak Monsoon, i.e. July, August &
16.2 GIPCL reserves the right to extend the contract period by up to an additional
(three) months on the same rates, terms, and conditions, without any price
escalation and without entering into a new contract on sole discretion of GIPCL
only. However, delay attribute to contractor beyond above schedules will
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
attracts penalty as LD (Liquidated Damages) as per specific clause mentioned
in Special Conditions of Contract (Section-D).
16.3 If the scope of work is not completed by the Contractor, necessary LD will be
deducted as per specific clause mentioned in Special Conditions of Contract
(Section-D) and in the interest of work completion, GIPCL will extend the
contract period appropriately (along with deduction of LD) as per contract
requirement on the same rates, terms, and conditions without any price
escalation or new contract on sole discretion of GIPCL.
16.4 GIPCL reserves the right to short-close the contract at any time by giving
(one) month’s notice, without assigning any reason.
17. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency.
18. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
(i) The Contractor shall deploy suitably qualified and sufficient manpower for timely
& satisfactorily execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled
manpower separately to properly complete the job in given/scheduled time.
(iii) The Contractor shall depute its own workmen/labour with proper identification to
enter the plant premises after ensuring that the jobs are scheduled.
(iv) At the time of deploying manpower, the Contractor shall strictly comply all the
applicable labour laws/Acts norms including but not restricted to the age of the
workers, women workers and shall also ensure that a police verification, security
check, pre-employment medical fitness check-ups & induction safety training for
all the workmen/labour engaged at the GIPCL site is done and necessary
documents regarding the same shall be submitted to the GIPCL’s authorized
representative/Engineer-in-charge. Any default in complying with the same or
any misrepresentation regarding compliance of the same shall compel GIPCL to
initiate appropriate civil or criminal proceedings regarding the same.
(v) The Contractor shall also comply with the safety requirements and provide his
workmen/labor with safety equipment like helmets, masks, gum boots and other
necessary PPEs for properly undertaking the operations involved under this
contract. Following are also to be issued by contractor
a) Safety shoes (standard approved ISI make)
b) Safety helmet (standard approved ISI make in yellow colour only)
c) Safety Goggles / face shield.
d) Ear plug / Ear muff.
e) Hand gloves like electrical hand gloves / cotton hand gloves /
Chemical hand gloves.
(vi) Contractor shall nominate /authorize senior experienced person in writing as site-
in-charge to co-ordinate with GIPCL engineer / operation team and who shall
bear overall responsibility for performance of the contract. Such person shall
remain available at site during execution of scope of work. Contractor has to
submit the authority letter and documentary proof for the same.
(vii) The Contractor shall appoint minimum required site supervisors who shall co-
ordinate with GIPCL’s Engineer-in-Charge for daily entrusted jobs. They have to
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
maintain daily records dully signed for the works carried out and duly certified by
concern Engineer-in-Charge. The Contractor, in co-ordination with the Engineer-
in-Charge, shall ensure the availability of adequate manpower, consumables,
materials, tools & tackles, etc… to carry out the job satisfactorily as per GIPCL’s
requirements as directed by Engineer-in-charge. As per the instruction of
Engineer-in-Charge, they have to allot the work and execute the same in
specified time limit.
(viii) During execution of the works, one or more jobs may be required to be done
simultaneously and the Contractor shall mobilize additional resources
(ix) During emergency or similar situations, the Contractor shall be required to
mobilize resources as per need within the period of 04 (four) hours or even earlier
of that, depending upon criticality and also during odd hours, as directed by
GIPCL. If the contractor fails to mobilize sufficient manpower to complete the job
in time, GIPCL will execute the job through other agency at the risk and cost of
the contractor with 10% supervision charges, including GST & the same will be
recovered from the Contractor’s bill.
Important Note: Whenever any of the Unit at SLPP remains under outage due
to any reason, the contractor shall mobilize sufficient work force at site within a
period of four hours from the time of intimation to the site-in-charge or via mail to
your office. Generation loss occurred due to want of manpower as well as
resources will be viewed very seriously and will invite appropriate punitive
measures as decided by competent authority.
(x) During working in high risk area like hot lines of steam/ water/ oil, the workman
must wear a suitable safety apron, safety belt, safety hand gloves and goggles.
It is the contractor’s/contractor’s supervisor’s responsibility to ensure it without
(xi) During unit overhauling, the contractor has to enhance the site manpower as per
the requirement to ensure the timely completion of work (During overhauling
period quantum of work increases substantially). For this, enhanced work shall
be completed by deploying additional manpower with supervisor as per site
necessity. Payment will be made on item rate basis only under respective
section. The work during the overhauling period is to be carried out round the
clock as per instructions of Engineer-in-charge. Contractor should mobilize
sufficient number of manpower with other required equipment/resources and
execute the work in all shifts with independent manpower after receipt of such
instructions. Contractor should not continue the same manpower for more than
B: TOOLS & TACKLES:
(i) All standard tools & tackles, standard specialized repair & coating equipment,
vehicles, consumables, approved makes of materials, etc… (as required to
execute the contract are in the scope of the contractor) to execute the contract
are in the scope of the contractor. The contractor should ensure that all such
tools & tackles/equipments/vehicle are in healthy & working condition. All
consumable items would be in the scope of the contractor.
Note: If work is suffered due to want of sufficient manpower, tools &
tackles, vehicle, equipments and/or required consumables/materials then
25% of the total job cost including GST will be levied as a penalty for each
and every instance.
(ii) For proper execution of the work as per the scope, the contractor is required to
maintain sufficient quantity of tools & tackles, equipments, etc… in good working
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
condition at site as per day to day work load and emergency situations to
complete the work in stipulated time.
(iii) In case of breakdown of equipment, the contractor should work round the clock
for putting back the area in service immediately within minimum time. In case of
any emergency arising during night hours the contractor should be in a position
to mobilize the manpower immediately within minimum time.
(iv) Arrangement for lighting at the work spot has to be made by the contractor. He
has to arrange all lighting equipment such as power cable, hand lamps, supply
boards, cables, etc… as per requirement in sufficient quantity. The contractor
has to take prior approval for taking electrical power supply. The contractor
should keep hand lamps of 24Volt for confined space and sufficient quantity of
240 Volt halogen lamp for other area ensuring safety at work place.
(v) Pin sockets of IS standards should be used for all connections. For any accident
take place & any damage to the equipment and/or injury to human due to
carelessness in loose connection, contractors will be held responsible & liable
for any recovery/actions.
19. CLARIFICATION OF BIDDING DOCUMENTS
If any Bidder requires any further information or clarification in the Bidding
Documents, may notify the Company before one week of last date of submission of
online Bid, in writing or by E-mail at the GIPCL's mailing address [email protected]
as indicated in the 'Invitation to Bids'.
The GIPCL's response (including an explanation of the query) will be sent in writing
or by E-mail to all prospective Bidders who have received the Bidding Documents.
20. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for performing the specified 'Works'.
21. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND SPECIFICATIONS
The Bidder is required to carefully examine the specifications & documents, all the
conditions and matters work wise & cost wise. If any Bidder finds any discrepancies
or omissions in the specifications and documents or is in doubt for any meaning of
any part, he shall request in writing for an interpretation/ clarification to the GIPCL.
All such interpretations and clarifications shall form a part of the Bid documents.
All the payments against the work order shall be in Indian currency and payable
through cheque or RTGS (online payment) system only based on submission of
required documents like bank mandate form with original cancelled cheque.
23. POINTS TO BE CONSIDERED DURING QUOTING ONLINE PRICE BID
a. The schedule of rates (Section-E) shall be read in conjunction with Instructions to
Bidders, General conditions of contract, Special conditions of contract and Technical
specifications.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
b. The quantities given in the schedule of rates (Section-E) are estimated and payment
will be made as per actual work carried out as per the rates of work order.
c. The method of measurement of completed work for payment shall be in accordance
with the method of measurement specified in the Tender in Section-D or as per
standard IS practice. Mode of measurement mentioned in Tender will be prevail.
d. No separate amount shall be payable for use of auxiliary equipment incidental to or
in day to day operation in the course of fulfillment of contractual obligation of the
Note: Interested bidders are requested to submit the online tender at least two days
in advance from the due date set for online submission of bid in order to avoid non-
participation of e-tender due to probable technical problem in e-tender system.
The quantities specified are estimated and for tendering purpose only. Payment will
be made, based on actual work done as certified by Engineer-in-charge of GIPCL.
Quantities of individual items may be revised during the course of contract period
(within overall order value) based on any unavoidable alterations/deletions in concept
as per approval of GIPCL. Contractor shall not be entitled for any compensation on
ground of such alteration in given estimated quantities within overall limits of awarded
contract price. GIPCL reserves the right to operate or increase/decrease quantities
in each item or omit any item included in Schedule of Quantity at its discretion.
Contractor shall have no claim, whatsoever, on grounds of loss of anticipated profit
etc. on account of the same.
After commencement of the work, GIPCL, for any reason may not require to be
carried out the whole/part of the work as specified in the tender, the ENGINEER-in-
charge shall inform the fact for thereof to the CONTRACTOR and contractor shall
have no claim for any payment or compensation whatsoever on account of any profit
or advantage which he might have derived from the execution of the work in full but
which he did not derive in consequence of the full amount of the work not having
been carried out nor shall he have any claim for compensation by reason of any
change having been made in the original specifications and instructions which shall
involve any curtailment of the work as originally contemplated.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING & E-
REVERSE AUCTION
SR. DESCRIPTION
1. Tender documents are available only in electronic format and same can be
downloaded from the website: https://tender.nprocure.com or
https://gipcltender.nprocure.com and It can also be viewed from Company’s
website www.gipcl.com
2. Price bid should be submitted online through the website
https://tender.nprocure.com or https://gipcltender.nprocure.comonly. No
physical submission of price bid will be entertained as it should be furnished
3. Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate (Class III) as per Information Technology
Act-2000, using which they can sign their electronic bids. Bidders can procure
the same from any of the license certifying Authority of India or can contact
(n)code solutions- a division of GNFC Limited, who are licensed Certifying
Authority by Government of India
4. All bids should be digitally signed. The bidders are required to contact at the
below mentioned address for detailed training on on-line tendering and also
for requirement.
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Info tower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India).
E-mail: [email protected], website: https://tender.nprocure.com
Interested bidders are requested to submit the online tender at least two days in
advance from the due date set for online submission of bid in order to avoid non-
participation in case of any technical issues (website and/or network) at last moments.
E-REVERSE AUCTION:
i. GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
ii. E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders
(rounded to the next higher whole number) from the total bids received OR (b) Minimum
three (03) lowest bidders, whichever is higher, shall be invited for participation in e-
Reverse Auction through n-procure platform.
iii. Opening Price (including GST), Decrement value and duration for the e-Reverse Auction
shall be informed to the qualified bidders before start of e-Reverse Auction.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
iv. After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract
Price (including GST).
v. To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
website: https://e-auction.nprocure.com that the bidder shall be allowed to participate
the e-Reverse Auction.
vi. In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required for
participating in online e-reverse bidding, then the Bidder can contact the following office
for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://tender.nprocure.com for information regarding e-tendering
registration process.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security/Performance Bank Guarantee, the successful Bidder, to
whom the work is awarded, shall be required to furnish a Performance Bank
Guarantee (PBG)/Contract security deposit (SD) in favour of Gujarat Industries
Power Company Limited for an equivalent amount of ten percent (10%) of the
“Contract Price excluding taxes and duties” from all Nationalized Banks or Axis Bank,
ICICI Bank, HDFC Bank, Kotak Mahindra Bank, IndusInd Bank, Federal Bank,
Bandhan Bank, IDBI Bank and Karur Vysya Bank in the in the format attached in
SECTION-F, and it shall guarantee the faithful performance of the 'Contract' in
accordance with the terms and conditions specified in these documents and
specifications. Contract security deposit/PBG shall be submitted strictly within twenty-
one days from the date of LOI or work order, whichever is earlier.
The PBG/ Security Deposit shall be valid up to “Defect Liability Period” of 12 (Twelve)
months after the date of actual contract completion/contract expiry date (whichever
later) as certified by GIPCL (necessary BG extension/amendments should be carried
out by contractor accordingly as desired by GIPCL). The Contract security/Guarantee
amount shall be payable to the Company in Bidder's home currency without any
condition whatsoever. GIPCL reserves the right to forfeit Performance Bank
Guarantee (PBG)/Contract security deposit.
The Performance Bank Guarantee (initial security deposit) will be returned to the
Vendor/Contractor without any interest at the end of the “Defect Liability Period” after
completion of contract and on fulfilling contractual obligations throughout the “Defect
Liability Period”. However, any delay in submission of SD will result in equivalent late
release of entire SD after “Defect Liability Period”.
Bid security/EMD will be refunded to the successful bidder on receipt of Performance
2. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of
contractor or any other reasons attributed to contractor the decision of
Engineer-in-charge regarding the amount of recovery shall be final and
binding subject to a maximum of 10% of contract value, including GST.
Recovery will be affected from the monthly bills and/or retention
money/security deposit.
(ii) If the contractor fails to execute the work as per directions of Engineer (I/c)
within the time frame given in work order and as per day to day instructions
by Engineer-in-charge, GIPCL shall get the work done by third party at the
risk & cost of the contractor with 10% additional overhead charges of GIPCL,
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
3. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under the
contract the contractor is liable, shall be recovered by the GIPCL.
The contractor shall pay all such claims within 15 days of claim, failing which the
same shall be deducted from the bills of contractor.
4. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible for completing the jobs within agreed time schedule
and in case contractor fails to complete the given jobs related to this contract, GIPCL
will engage third party and will recover expenses from contractor’s R.A. bills, Security
Deposit and / or whatsoever for expenses incurred to complete the job along with
additional 10% overhead charges, including GST.
In case if contractor’s services are not found satisfactory with respect to mobilization
to meet emergency requirements, time bound activities, workmanship & safety
(OH&S policy of GIPCL) then GIPCL has right to terminate the contract at any time
by giving 15 days advance notice to contractor without assigning any reason and will
make the alternate arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages
after giving 15 days advance notice to the contractor if any of the following events
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to commence the works, or has, without any lawful excuse under
these conditions suspended the progress of the works for fourteen days after
receiving written notice from the OWNER to proceed.
iv. Contractor fails to proceed with the work with due diligence as per requirements
of the contract and failed to make such due progress as would enable the works
to be completed within the time agreed upon.
v. Contractor fails to remove materials from the site or to pull down and replace
works within 15 days after receiving written notice from the OWNER that the said
materials or work were condemned and rejected by the OWNER under these
vi. Contractor fails to the detriment of good workmanship or in defiance of the
OWNER/ENGINEER’S instructions to the contrary sublet any part of the
vii. Contractor has neglected or failed persistently to observe or perform any of the
acts, matters or things, which as per the contract are to be observed and
performed by the contractor.
viii. Contractor repetitively violating the safety norms for more than three incidents.
ix. Any major contradiction of applicable labour laws.
x. Any major deviations from contractual terms and conditions including quality of
xi. GIPCL reserves the right to terminate the contract without giving any reason
whatsoever and forfeit the PBG/SD.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
5. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCL/ ENGINEER
requiring compliance, with such further drawings and / or the GIPCL /ENGINEER
instructions fails within seven days to comply with the same, the GIPCL /ENGINEER
may employ and pay other agencies to execute any such work whatsoever as may
be necessary to give effect thereto and all costs incurred in connection therewith shall
be recoverable from the CONTRACTOR by the GIPCL on a certificate by the
GIPCL/ENGINEER as a debt or may be deducted by him from any money due or to
become due to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources and
equipments as per direction of GIPCL/ENGINEER within time frame given and/or
fails to carry out progress of work as per agreed schedule of work planning and/or as
per directions of GIPCL / ENGINEER within the time frame given and/or violating the
GIPCL’s safety rules & regulations, GIPCL/ ENGINEER shall get the work done by
third party at the risk & cost of the CONTRACTOR with additional 10% overhead
charges of GIPCL, including GST and all costs incurred in connection therewith shall
be recoverable from the CONTRACTOR by the GIPCL /ENGINEER as a debt or may
be deducted by him from any money due or to become due to the CONTRACTOR.
In case if contractor’s services are not found satisfactory with respect to mobilization,
time bound activities, workmanship & safety (OH&S policy) then GIPCL has rights to
terminate the contract at any time by giving you 15 days advance notice without
assigning any reason and will make the alternate arrangement at the risk and cost of
the Contractor.
6. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the contract
to the extent possible shall be settled amicably between the parties. If amicable
settlement cannot be reached all the disputed issues shall be resolved through
arbitration before a Sole Arbitrator appointed by Managing Director, GIPCL
according to the provisions of The Arbitration and Conciliation Act
(Amendment 2021), as amended from time to time. The place of arbitration shall
be at Vadodara/ Surat or any other place within state of Gujarat.
b. Work under the contract shall be continued by the contractor during arbitration
proceedings unless GIPCL shall order suspension thereof or any part thereof in
writing or unless the matter in such work cannot possibly be continued unless the
decision of the Arbitration proceedings is obtained.
7. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification,
the decision Chief General Manager (Thermal) / HoM will be final and binding on the
8. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his workmen/employees,
staff applicable under the Employee Compensation Act 1923 or any amendment
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
thereof from time to time as also insurance cover for third party liability. The contractor
shall keep the GIPCL indemnified from all liabilities arising out of his action in
pursuance of this contract. The E. C. Policy should be obtained from Surat
Jurisdiction and shall be assigned to GIPCL. EC policy should cover the specified
contract period.
9. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labour laws, rules,
orders and notifications whether central or state or local as applicable to him or to
this contract from time to time. These Acts/Rules include without limitation the
1. Contractor shall be solely responsible and shall fully comply with all the provisions
of all the labour laws applicable such as the Minimum Wages Act, 1948, Contract
Labour (Regulation & Abolition) Act 1970, Factories Act, 1948, Payment of Bonus
Act 1965, Employees Provident Fund and Miscellaneous Provision Act
Industrial Dispute Act 1947, Workmen Compensation Act 1923, Payment of
Gratuity 1972, Interstate Migrant Workmen Act 1979, Equal Remuneration Act
with Rules, Order and Notifications issued/made there under and as amended
from time to time.
2. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present or future
applicable to the contractor from time to time for performing the contract job.
2.1. The Contractor shall provide and be responsible for payment of Wages, Salaries,
Bonus, Social charges, Insurance, Food, Accommodation, Transport, Medical and
Canteen facilities and other statutory privileges and facilities to his personnel as
per law/rules/regulations and orders of the Central Government, State
Government, Local Authorities or other authorities as are in force from time to time.
All employees of the Contractor shall be employee of the Contractor.
2.2. The contractor shall have a valid license obtained from Licensing Authority under
the Contract Labour (Regulation & Abolition) Act,1970 as amended from time to
time at the time of execution of the contract covering all his employees working at
SLPP site and furnish the same failing which GIPCL may terminate the contract at
its sole discretion.
2.3. The Contractor shall at the time of execution of the contract have a EPF Code
Number obtained from the Authorities concerned under the Employees Provident
& Miscellaneous Provisions Act, 1952, as amended from time to time and remit
contributions in respect of the employees employed by him at SLPP Site to the
P.F office concerned every month failing which GIPCL will recover from the
outstanding payment to the contractor from GIPCL.PF code of Gujarat region
should be taken.
2.4. The Contractor shall maintain all records/registers required to be maintained by
him under various labour laws mentioned above and produce the same before the
Statutory Authorities whenever required.
2.5. The Contractor shall also submit periodical reports / returns to the various statutory
authorities such as those under the Contract Labour (Regulation & Abolition) Act-
1970, Employees Provident Fund Act, as amended from time to time, etc., under
intimation to HR & Admin. Dept.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
2.6. The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding categories.
2.7. The Contractor shall be responsible for payment of overtime wages to his
workmen, if any, in case they are required to work beyond the prescribed hours
under law as per applicable rates.
2.8. The contractor shall take Workmen Compensation Insurance Policy for all his
employees working at GIPCL. The contractor shall indemnify the company against
any liability due to any work injury or accident to any of its employees.
2.9. The Contractor shall in the event any of his workmen / employee sustains any
injury or disablement due to an accident arising out of and in the course of his
employment, provide necessary medical treatment and pay compensation as
applicable, required under the Workmen’s Compensation Act, 1923 as amended
from time to time.
2.10. If any of the persons engaged by the Contractor misbehave with any of the officials
or the Company or commit any misconduct with regard to the property of the
Company or suffer from any serious communicable disease, the Contractor shall
replace them immediately.
2.11. The Contractor shall not engage / employ persons below the age of 18 years.
Employment of women shall be strictly according to applicable laws.
2.12. GIPCL will have right to deduct and disburse the claims of the individual / parties
being a principal employer on any account whatsoever in relation to their
employment with the contractor. The Security deposit will be released to the
contractor at the end of the contractual tenure subject to an undertaking by the
contractor that in the event any of his workmen or the heirs of workmen puts up a
claim for recovery of money due to him from the contractor before the appropriate
authority under the I.D.Act 1947 or under any other labour laws or for
compensation under the Workmen’s Compensation Act, 1923 as amended from
time to time and the appropriate authority has given a direction for making payment
the contractor will meet the same or indemnify GIPCL if in the event GIPCL pays
it as Principal Employer.
2.13. The contractor shall make payment of wages to his employees on fixed date within
the period specified under the applicable Law, in presence of representative of the
company. He will submit a true copy of wage sheet, attendance register and P.F.
remitted challans on monthly basis to HR&A dept. for verification and record.
2.14. The Contractor shall provide Safety items/kits to his employees such as safety
shoes, goggle, ear plug, hand gloves, safety belt etc, if any, required under law.
2.15. The contractor shall conduct pre-induction and periodic medical checkup of his
workmen as per applicable laws.
2.16. The contractor shall be solely responsible for any accident caused to his workers
and should adhere to all rules / regulations as per labour laws of Government and
other statutory laws as applicable.
2.17. The contractor should register himself under the Contract Labour Act, Employee
Compensation Act and PF Act, as amended from time to time (Code no. to be
mentioned) and submit the copy of registration certificate and should possess the
same from the date of commencement of work, failing which the contract is liable
to be cancelled. The E.C. Policy copy should be submitted to the GIPCL before
commencement of the work and Labour License should be obtained within one
week from the date of issue of form-V. Contractor should apply for Form-V
immediately after receipt of LOI. A copy of Labour License shall be submitted to
GIPCL, HR & A Department.
2.18. Contractor shall have to insure his workmen /supervisors etc. under Group
Insurance scheme.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
2.19. The Contractor shall be responsible for compliance of all statutory rules,
regulation, act enforced from time framed by the government such as Factory Act,
Employee Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’,
Provident Fund Act, All Labour Laws Act, as amended from time to time in respect
of employees engaged by him for the work and shall have to maintain necessary
records. In case any amount becomes due to be payable by him to his employees
or to the Government under the above rules, regulation, Acts, GIPCL reserves the
right to recover the same from the running bill of the contract.
2.20. Documentary evidence of deposit of PF paid shall have to be produced by the
contractor along with the next bill.
2.21. Records as per the provisions of various statutory Acts will have to be maintained
by the contractor and submitted as and when required.
2.22. All employees of contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the contractor to remove any such
person who does not comply with it.
2.23. The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new statute
shall automatically and immediately become applicable.
2.24. All laws, rules, regulations, notifications, etc. stated in this tender document shall
be applicable as amended from time to time. Where applicable self-certified true
copies of the required documents to be furnished, unless stated otherwise
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act, as amended from time to time to the
workers employed by him/her.
2. Contractor shall obtain requisite license to carry out this contract under the provisions
of Contract Labour Act, 1970, as amended from time to time and maintain necessary
records and registers under the said Act.
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act, as amended from time
to time within one week time, from the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within
the premises of the GIPCL and carry match box / lighter or any other explosive and
/or inflammable material inside the plant.
5. Contractor shall abide by all the statutory rules and regulations like P.F, Labour Laws,
as amended from time to time, etc.
6. Contractor shall issue an appointment order to each casual labourer stating therein
the nature of job to be performed by him/her and fix time for which the concerned
labourers are likely to be deployed. Contractor shall also issue a temporary identity
card specifying the period for which the labourer has been deployed.
7. Contractor is fully liable for the persons engaged by him/her for above work; however,
GIPCL reserves the right to deduct any amount legally justified towards any liability
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment
of the manpower.
9. If the contractor fails to complete the allocated job within specified time frame, GIPCL
shall get the work done by third party at the risk and cost of contractor.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
10. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund
Act, Payment of Bonus Act, Labour Law Act, maternity benefit act, as amended from
time to time in respect of employees engaged by him for the work and shall have to
maintain necessary records.
In case any amount becomes due to be payable by him/her to his
employees/agencies or to the Government under the above rules, regulation, Acts,
GIPCL reserves the right to recover the same from the running bill of the contract.
11. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third-party
workmen due to any act omission / indiscretion on contractor part while undertaking
the work and contractor shall fully abide by the statutory requirements of the
employee's compensation act.
GIPCL shall not be liable for any compensation due to accident, death or injury to
any of contractor’s workmen or any third party due to negligence, act or omission on
contractor part.
Contractor shall arrange & provide sufficient General area lighting as well as work
area specific lighting. Contractor shall also arrange DG set of required capacity for
day to day work requirements and lighting requirements in case any power supply
interruption from GIPCL.
13. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at
night/Sunday/holiday.
14. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the GIPCL
which are at present in force and which may come into force during the pendency of
the contract. Any violation of any rules and regulations will entail immediate
termination of the contract.
When contractor moves his/her lifting tools and tackles to the plant area, required
test certificates as per the Factories Act 1948, as amended from time to time and the
state factories rules has to be submitted to safety Dept. Safety Dept. will check the
certificates and if found okay, then only materials will be allowed to enter inside the
plant. Material inward gate pass will be made only after certification from Safety Dept.
Security Dept. will inform to Safety Dept., as & when such tools and tackles brought
at the gate for making entry in the maintenance site.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
The contractor has to submit the list of required safety gears along with safety
equipments available with him/her to safety Dept. Safety Dept. will check for quantity
and quality of the safety gears and then allowed permission of work. Poor quality
material will not be allowed to take inside the Plant. If quantity of required safety
equipments is not satisfactory, contractor will not be allowed to carry out the work
using such safety gears inside the Plant for the work.
15. GENERAL SAFETY CLAUSES
1. The Contractor shall observe and comply, with regard to his workmen working at the
SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the SLPP Plant & Mines
premises and the Contractor shall brief them regarding the same and use of the
Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that
his workmen wears the protective equipments at all times during the work operation.
Following brand of the safety shoes and helmet shall be issued to contract workmen.
Contractor shall issue safety shoes every year.
Sr No. Model Company Specifications
01. Tough Hat, HP-TH Sure Safety
IS : 2925 – 1984, ANSI / ISEA
03. PN 521 - Shelmet Karam
SR. No. Name of Manufacturer Model
SSTEELE (Strom) – Double Density or
1 Acme Fabrik Plast Co.
TRIMAX(Adjacent) – Double Density
2 Favourite Safety Products. Waves Nile D/D or FSP Nile DD
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots,
full body safety uniform and belts, safety net etc. shall be issued and used as per the
job requirements. Safety helmet shall be of YELLOW COLOUR ONLY. Contractor
will procure safety shoes & safety helmet from a reputed company with at least
months’ guarantee and shall produce the guarantee certificate and IS standard
certificate to the safety department. Contractor should purchase safety shoes of
reputed brands. Safety shoes will be issued every year. IS certificate and guarantee
certificate must be obtained from the vendor and submitted to the Safety department.
Safety shoes should be heat, water, oil and chemical resistant, having an anti-
slippery sole of 15298- 2002 make.
5. It is the duty of contractor to ensure that his workmen are wearing required PPEs as
per work requirement. Contractor should ensure that their workers are wearing Safety
helmet, safety shoes, dust mask, goggles, ear plug etc. at all times when they are at
work throughout the contract period. The contractor may be asked to maintain the
PPE issue registers with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical help
and treatment to his workmen in the event of any accident or injury.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
8. If it is observed that contractor is not issuing required PPEs timely and that of required
quality, GIPCL will issue the required PPEs to contract workers and back charge the
same with 25% overhead charges of GIPCL, including GST.
9. All lifting tools and tackles shall be duly certified by competent person in conformity
with the statutory requirements and certificate in form no. 10 as per rule 60 of Gujarat
Factories Rules, 1963 and section 29 of the Factories Act, 1948, as amended from
time to time shall be submitted every year before using such tools and tackles. In
case of purchase of new lifting tools and tackles, form no. 10 as per the said rules
shall be submitted before they are taken into use. All lifting tools and tackles shall be
of reputed make having International manufacturing standard and shall be
maintained in proper and workable condition.
10. The Contractor shall nominate one Safety Officer with required qualification for
supervising the daily job/ shutdown jobs for observing and maintaining the safety
aspects at site. He is solely responsible for any safety measures during maintenance
work. He has to ensure that all the workmen working at site are equipped with
essential PPE’s and proper safety arrangement is made at the SLPP site.
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks,
D-shackles, wire ropes, winch machines, Mobile crane, Hydra etc. shall be offered
for inspection with all above statutory test certificate before using at site for any work.
They should use all tools and tackles only after certification by GIPCL
representative/safety officer.
12. When working at height, working on ceiling or roof covered with fragile materials, full
body harness safety belt, ladders and crawling boards, fall arrester, etc. shall be used
to prevent accident. Further, during working on height, contractor should arrange
proper scaffolding of still pipes, safety net, full body safety belt, fall arrestor system
etc. Advice and instructions of Engineer-in-charge/ safety in charge shall be strictly
complied with in this regard. All necessary safety precautions shall be taken by the
contractor to prevent accident and personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting torch,
on DA cylinders and on O2 cylinder. Cylinder caps also required for handling the
cylinders at the work at height area. Gas cylinders shall be transferred through gas
cylinder trolley only with cylinder cap and stored up right (vertical) position only. All
gas cylinders shall be hydro tested / certified as per gas cylinder rules 2004. Gas
cylinders shall be stored, handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested
as per Government approved RTO guidelines. All Vehicles must be parked in Parking
space designated by GIPCL. If any vehicle is found inside the plant premises other
than the parking area such vehicles shall be handed over to Security dept. and their
entry shall be cancelled for movement inside the plant premises with immediate
15. All electrical equipment shall be in good condition and free from any defect. Electrical
tools & equipments i.e. welding machine, grinding and drill machine etc. may be
checked by the electrical engineer of the contractors regularly, every six month at
least and report to be submitted to concerned HOD and safety depts.
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets
to prevent falling and spreading of sparks and hot material on and around the work
area. Contractor will procure and use such items. ELCB / RCCB shall be provided
with rating of 9-30 milli amperes on welding machine and all portable power tools.
17. The contractor shall fill – up Incident notification form (S-I), Incident Investigation form
(S-II) and near miss report within time limit as specified in forms, if any accident,
Incident, near miss occurred while working at SLPP site.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
18. Major AMC / ARC contractor (Where the man power strength is more than 50 and
above) should appoint / nominate one qualified safety officer and he shall be
responsible for addressing all the safety related aspects of execution of contract jobs
and he will in close co ordination with safety officer of SLPP and attend all safety
related meeting such as safety committee, on job safety training etc. Where the
contractual man power is less than 50, the site incharge of the contractor will act as
a safety officer and he will perform all the duties of safety officer as mentioned above.
19. No loose connection / joints allowed in electrical cables during performance of any
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is
required as per RTO guidelines.
22. The Contractor’s nominated safety officer shall be imparted regular on-job safety
training like tool-box talk etc. and submit a record of such training in safety dept,
respective dept and HR&A dept.
23. The Contractor shall comply all the new requirements related with safety as informed
by the HOD / Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards /
Guidelines as per practices. The list provided below is an indicative list to explain the
principles behind safety practice.
If the contract workmen fail to comply with safety standards as per category A, B & C
below, penalty shall be levied on the contractor as per the table mentioned below:
Category Classification Examples / Cases Penalty
A PPEs Working without helmet, shoes, safety Rs.100 /- per instant.
Related belt, gloves etc.
B WI Related Failure to adhere to HSE
guidelines/plans, careless attitude in Rs.500 /- per
material handling, instant.
Machine being used with damaged
machine guard, unsafe electrical work - After three
workout plug top/improper electrical incidence,
joints/cables lying on ground, electrical Per incidence
equipment working without proper Rs.2500/-
earthing, machine being used without
machine guard, Welding machine Continuous
without ELCB / RCCB of proper rating, unsafe acts
Gas cylinder without test certificate, will disqualify
Cylinder cap, NRV / Flash back the contractor
arrester, Cylinder trolley etc. from further
Unsafe working practices at height in tender
more than 3 meters of/contract
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Working without permit or non- with GIPCL-
compliance with permit conditions like SLPP.
hot work, height work etc. as applicable,
lifting tools and tackles being used
without third party inspection
certificates in form no. 9/10 as per
Factories Act – 1948 etc..
C Unsafe Breach of safe practices by a particular Suspend the entry gate
Practices person repeatedly for three times. pass for one week.
After two suspensions
his gate pass will be
Penalty so levied against the contractors and company employees will be used during the
observation of National Safety Day.
The contractor, workmen following good safety practices in their work area
continuously will be rewarded / honored on National safety day.
15.1 GENERAL ELECTRICAL SAFETY RULES & REGULATIONS
Electrical safety
a. All the electrical apparatus including welding machine (either 3-phase or single
phase) should be provided with Earth Leakage Circuit Breaker (ELCB/RCCB/RCBO)
of 30mA rating.
b. Bidder/Contractor should ensure periodic checking of ELCB provided in their
electrical apparatus.
c. Bidder/Contractor should ensure that there should not be any joint in the power
supply cable of any machine. All cables should be in good condition with no bare
insulation or frayed wires
d. Any power supply switchboard/extension boards brought by Bidder/Contractor
should have ELCB of 30mA rating and it should have sockets along with 3-pin plug.
e. Any type of cable brought by Bidder/Contractor should not have any joint and should
be of sufficient capacity for the respective job.
f. Bidder/Contractor to bring their own 24V rating portable hand lamps along with cable
of (apparatus should be having 230V / 24V transformer) for the temporary lighting
arrangement required at site for the respective jobs.
g. Bidder/Contractor should bring sufficient quantity no. of temporary light fixtures (230V
or 24 V as per requirement of job/contract), extension boards, cables to draw supply
from nearest power point.
h. Hand-held and portable machines shall be equipped with a built-in switch to switch
off power in case of emergency
i. Bidder/Contractor to ensure healthiness of their electrical equipment whenever
brought to GIPCL site and get them tested / verified by GIPCL Electrical Department
representatives before start using.
j. Bidder/Contractor to ensure - All portable electric apparatus shall be regularly
examined, tested and maintained to ensure that the apparatus and leads are in good
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
k. Only three-core cable shall be used for single phase operated tools with the third core
connected to earth.
l. Ensure that all metallic portable appliances are provided with 3 pin plug and socket
connections with third pin be connected to the ground terminal where ever possible.
Also, the metal work of the apparatus is effectively earthed.
m. All cables and connections should be sound and of adequate capacity and properly
insulated while using any welding machine and other power connections.
n. The earthing arrangements should be properly made with earthing clamps or a bolted
terminal while using any welding machine
o. Electric holders when not in use, should be placed on an insulated hook or the holders
should be fully insulated while using any welding machine
p. Whenever the welder stops or leaves work for any appreciable time, the power supply
to welding machine shall be effectively disconnected while using any welding
q. GIPCL will provide either single phase OR 3-phase 3 wire power supply from the
nearby point at job site. Bidder/Contractor to supply the required cable between
GIPCL power supply point to equipment brought by Bidder/Contractor for the
specified job. Further, if Bidder’s/Contractor’s equipment requires 3-ph 4 wire supply
then they should derive 3-ph 4 wire supply from GIPCL 3-ph 3 wire supply system by
incorporating sufficient capacity transformer. Like for hydro jet cleaning system, mixer
machine, induction heating machine, SR machine etc., GIPCL will provide 3-ph 3 wire
r. Cable between welding machine to GIPCL power supply point should have cable
TOP plug towards GIPCL power supply point of Make BALS having rating as 63 Amp.
Contractors not following above electrical safety points at any point of time are liable to
penalty and their machine/ apparatus shall be seized by GIPCL.
16. REJECTION OF WORK
If, as a result of inspection, examination or testing, the GIPCL’s
Representative/Engineer decides that any materials, work or workmanship is
defective or otherwise not in accordance with the Contract, the GIPCL/Engineer/
GIPCL’s Representative may reject such plant, materials, work or workmanship and
shall notify the CONTRACTOR promptly, stating his reasons. The CONTRACTOR
shall then promptly make good the defect and ensure that the rejected item complies
with the Contract. If Contractor failed to rectify the rejected work or workmanship,
GIPCL/Engineer reserves the right to deduct or withhold amount against rejected
work or Workmanship. CONTRACTOR shall not entitle for any claim or release of
hold payment until rectify the defect up to satisfactory of GIPCL. If Contractor failed
to rectify any such defective work or workmanship, GIPCL reserve the right to rectify
at risk and cost of the CONTRACTOR and deducted by the GIPCL from any amount
due, or to become due, to the CONTRACTOR’s dues.
If the GIPCL’s Engineer/GIPCL’s Representative/Consultant requires such materials,
work or workmanship to be retested, the tests shall be repeated under the same
terms and conditions. If such rejection and retesting cause the GIPCL additional costs
for the traveling and lodging costs of GIPCL/Engineer’s personal for attending the
retest, such costs shall be recoverable from the CONTRACTOR by the GIPCL and
may be deducted by the GIPCL from any amount due, or to become due, to the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
17. GENERAL TERMS AND CONDITIONS
a. All tools & tackles, manpower, labours, supervisors, approved makes of materials,
consumable items, tools & tackles, equipments, etc… to execute the contract are in
the scope of the contractor. The contractor should ensure that tools & equipments
are in healthy condition.
b. The decision of the Engineer-in-charge shall be final and binding on the contractor
for defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to take
suitable action.
d. Contractor shall depute full time independent experienced site-in-charge and
independent site supervisors/Engineer at site. They shall co-ordinate with GIPCL
engineer and shall bear overall responsibility of contract including taking daily work
instructions, work permits, gate-pass, site executions, maintaining records of work,
material, inward challans, material consumption & balance records, material &
manpower gate-pass, joint measurement recording, billing etc... Such person shall
function from site office of contractor at SLPP.
e. Contractor shall also nominate one safety supervisor at site and shall submit
nomination of safety supervisor in writing before commencement of contract. Safety
supervisor shall arrange small safety talk on every day morning or whenever required
with all workers working under this contract. He shall coordinate with concern
Engineer-in-charge on daily basis and report daily observations, tool-box talk records
etc. The work shall not be allowed without deploying/nominating safety supervisor
and a penalty equal to Rs.1,000/- per day absent of nominated safety supervisor shall
be levied from Contractor.
f. Contractor shall strictly follow the existing work permit system of the GIPCL and any
future revisions.
g. The contractor has to take EC insurance policy for their workmen. The contractor has
to submit labour license (if applicable) and PF account number to the Engineer-in-
charge before start the work.
h. The contractor has to do the job timely. GIPCL shall not compromise in delay. In case
of delay of work without any valid reason, the GIPCL reserves the rights to carry out
the work by deploying other agencies at the risk & cost of contractor with additional
10% overhead charges.
i. Contractor shall mobilize the resources as per need within the period of four hours.
If the contractor fails to mobilize sufficient resources to complete the job in time,
GIPCL will execute the job through other agency at the risk and cost of the contractor
with additional 10% overhead charges including GST.
j. Contractor should mobilize all resources for efficient & smooth execution of contract
within seven to fifteen days from the date of issue of Letter of Intent/Work Order.
k. The prices / item rates quoted (based on quoted % above/equal or below SoR) shall
remain firm till completion of the contract and any agreed extensions thereafter and
shall not be subject to any escalation, idle charges for labour, machinery, overhead
expenses etc… due to any reason whatsoever. No price escalation / idle charges
shall be entertained due to delay in work on unavailability of work front, any changes
/ modification / alteration of plan, non-issue of work permit, holding of work permit for
any reason, unavailability of contractor’s supervisor/Engineer, unavailability of
contractor’s safety supervisor, violation of safety rules, unsafe act by any of
contractor’s worker, negligence & ignorance of safety & quality instructions of GIPCL
Engineer-in-charge or any other reason whatsoever.
l. Contractor must fulfill all the safety regulations and to take safety measures to avoid
hazards. Contractor shall arrange all standard adequate healthy safety PPEs like but
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
not limited to approved quality safety shoes & safety helmets, standard dust masks,
safety goggles, safety hand gloves, safety belts, fall arrestors, other required safety
tools, etc… as required and shall use exclusively under this contract for all the time
during working at specified locations failing which, the Engineer-in-charge may hold
the work and will take necessary action including penalty as decided. If the contractor
repeatedly violates safety rules/regulations (more than three successive incidents),
Engineer-in-charge may take necessary action against the contractor, including
appropriate financial penalty (Maximum of Rs.1,000/- per incident per man-day and
as per above clause no. 15) and/or termination of contract.
m. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
n. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activity and complete the jobs as per the time
given by and under the supervision of the Engineer-in-charge and shall ensure that
sufficient manpower is deployed for the same.
o. The contractor has to complete the works as per the planning schedule and their
respective supervisor has to interact with Engineer-in-Charge for PTW (Permit to
work), work instruction, Return of permit.
p. The contractor has to submit daily reports / information of work carried out with details
of available manpower, equipments / material etc… as directed by Engineer-in-
q. Any job other than the listed jobs in work order shall be executed by the contractor
on instruction from GIPCL and payment shall be made to the contractor on respective
item rate only.
r. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October
2006. The Bidder shall confirm whether your organization is registered under the
Micro, Small and Medium Enterprises Development Act, 2006, as amended from time
to time. If your organization is registered under the Act, please specify the category
i.e., Micro Enterprise, Small Enterprise or Medium Enterprise under which it is
registered and kindly attach a copy of your registration certificate.
s. The Bidder shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc of the
respective State Government. It is to be noted that large scale industries and trading
firms have been excluded from the purview of the Act.
t. GIPCL is an ISO 9001-2015 (Quality), ISO 14001-2015 (Environment), 45001-2018
(OH&S) and 50001-2018 (EnMS) certified company, and GIPCL gives extreme
importance to maintain these global standards. Contractor shall be required to
observe these standards as amended time to time while working with GIPCL.
Contractor should ensure that his workmen/labour work in accordance with them.
18. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a qualified
experienced site-in-charge of the works with adequate experience in handing of jobs
of this nature and with the prior approval of the GIPCL / ENGINEER. Such in-charge
shall be constantly in attendance at the site during working hours. During
CONTRACTOR’S supervisory engineer absence during working hours, if
unavoidable, and also beyond working hours, when it may be necessary to give
directions, orders may be given by the ENGINEER / GIPCL and shall be received
and obeyed by the CONTRACTOR’S superintendent or Foreman who may have
charge of the particular part of the work in reference to which orders are given. If
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any
directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be
deemed to have been given to the CONTRACTOR. The representative of the
CONTRACTOR shall have all necessary powers to receive materials from the
GIPCL, issue valid receipts for the same, engage labour or purchase materials and
proceed with the work as required for speedy execution.
None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour
should be withdrawn from the work without due notice being given to the GIPCL /
ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL
/ ENGINEER such withdrawals will jeopardize the required pace of progress /
successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such persons
as area careful, skilled and experienced in their respective trades, and the GIPCL
shall be at liberty to object to and require the CONTRACTOR to remove any person
employed by the CONTRACTOR in or about execution of works who in the opinion
of the OWNER misconducts himself or is incompetent or negligent in the proper
performance of his duties and all such persons shall not again be employed upon the
works without the prior permission of the GIPCL. Neither the CONTRACTOR and the
PURCHASER nor the ENGINEER shall hire or employ any employee of the other
party except by mutual consent.
19. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND
All loose materials, wastage, packing materials, empty paint drums, cut pieces or
other matter of an offensive nature shall not be deposited on the surface, but shall at
once be carted away by the CONTRACTOR to some pit or place provided by him
away from the site of work and approved by local authorities.
As a part of the work included in this contract, the CONTRACTOR shall completely
remove and satisfactorily dispose of all temporary works & remove scaffolding
materials to the extent directed. He shall tear down and dispose of all temporary
works, shall remove or grade, to the extent directed, all plant and equipment, shall
satisfactorily dispose off all rubbish resulting from the operations under this contract
and shall do all work necessary to restore the territory embraced within the site of his
operations to at least as good order and conditions as at the beginning of the work
under this contract.
20. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the site:
a. Electricity & water at nearest available one point as available. Further distribution
to be done by contractor at their cost.
b. Quarter/room & food for supervisors/engineers on chargeable basis in GIPCL’s
township as available. Food on chargeable basis at GIPCL’s Industrial Canteen
as available. If not available, contractor to make his own arrangement for lodging
and boarding locally or as appropriate at his cost.
c. Workshop facility as available at site only. However, contractor may visit the
workshop to ensure the existing facility. For the facilities other than available,
contractor has to carry out the job outside at their own cost.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
d. GIPCL may also provide free hydra (based on availability) only for shifting of
heavy items also erection/execution for heavy structures, etc… on discretion &
directives of Engineer-in charge of GIPCL.
e. Space for contractor’s office & store as decided by GIPCL based on availability.
f. First aid facilities as available on chargeable basis. If not available contractor to
make his own arrangement for the same locally or as appropriate at his cost.
Apart from the above, no other facilities shall be provided by GIPCL.
B. GIPCL shall also conduct an orientation program appraising the workmen
regarding the safety norms and measures to be observed during work operations
at the plant site.
21. WORK CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should be
fully conversant with modern practices and should be able to carry out works
independently of large thermal power plant. The contractor shall therefore be
required to engage qualified/ experienced personnel to undertake the work as per
specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records
and maintain the data.
c. All the work measurements shall be jointly recorded in a measurement
sheet/register/relevant documents by the contractor / authorized representative
of the contractor and the Engineer-in-charge.
d. The measurements shall be clearly written indicating date of measurement,
location, reference to drawings, if any and jointly signed.
e. The Contractor shall be required to furnish satisfactory job completion report to
GIPCL. The submission of report should be on daily basis for executed works.
The monthly bill payment shall be released based on the certified reports of the
f. Inspection of work will be done by Engineer-in-charge or his authorized
representative. If the work is not found satisfactory Engineer-in-charge reserves
the right to take suitable action and shall be binding to the contractor.
22. FORCE MAJEURE
i. In the event of either party being rendered unable by Force Majeure to perform
any obligation required to be performed by them under this Contract, relative
obligation of the party affected by such Force Majeure shall be treated as
suspended during which the Force Majeure Clause lasts.
ii. The term “Force Majeure” shall have herein mean riots (other than among the
Contractor’s employee), Civil commotion, War (whether declared or not),
invasion, act of foreign enemies hostilities, civil war, rebellion, revolution,
insurrection, military coup, damage from aircraft, nuclear fission, embargoes,
quarantines, acts of god such as earthquake (above 7.0 magnitude on Richter
scales), lightning, unprecedented floods, fires not caused by the Contractors
negligence and other causes which the Contractor has no control and accepted
as such by GIPCL whose decision shall be final and binding. Normal rainy season
and monsoons are not Force Majeure.
iii. Upon occurrence of such causes and upon its termination, the party alleging that
it has been rendered unable as aforesaid, thereby, shall notify the other party in
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
writing by registered notice within 24 (twenty-four) hours of the alleged beginning
and ending thereof giving full particulars and satisfactory evidence in support of
iv. Time for performance of the relative obligation suspended by the Force Majeure
shall stand extended by the period for which such clause lasts.
v. If works are suspended by Force Majeure conditions lasting for more than two (2)
months, GIPCL shall have the option of cancelling this Contract in whole or part
thereof, at its discretion.
vi. The Contractor shall not claim any compensation for Force Majeure conditions
and shall take appropriate steps to insure men and materials utilized by it under
the Contract well in advance.
The Contractor shall indemnify and keep harmless GIPCL from and against all
actions, proceedings, claims, demands, losses, costs, damages and expenses
whatsoever which may be brought against or suffered by GIPCL which it may sustain,
pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor. In case, in any
litigation pertaining to labour employed through contractor if any direction or order is
issued by court at any point of time the contractor shall comply with and implement
such direction or order whether passed at the time of award of contract or during the
pendency of contract.
Further, the Contractor shall indemnify the GIPCL against all consequences arising
and affecting GIPCL owing to the compliance of the orders by the Contractor.
24. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the
Courts at Surat shall have jurisdiction regarding the same.
25. Where any portion of the General Condition of Contract is repugnant to or at variance
with any provisions of the Special Condition of Contract, then unless a different
intention appears, the provision of the Special Conditions of Contract shall prevail to
the extent of such repugnancy or variance.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
SPECIAL CONDITIONS OF CONTRACT
1. DETAIL SCOPE OF WORKS
1A. STRUCTURE REPAIR & COATING:
The scope of work in general comprises RCC structure repairing, rehabilitation &
protective coating as specified in the SoR (Section-E) for various RCC structures,
Civil infrastructures, buildings, etc… of Power Plant & other associated areas at
various segregated locations of SLPP through experienced applicators (skilled
Specific locations are as under:
ELHS Stacker Beam.
Phase-2 (Unit-3 & 4) Bed Ash Silos & Fly Ash Silos.
Phase-2 Primary Crusher & Secondary Crusher.
In-Plant Stacker Beam.
Phase-2 (Unit-3 & 4) Cooling Tower external hot duct, cells & walls.
Initial joint survey shall be carried out with GIPCL Engineer for identification of exact
damaged areas on each structure in order to fix the scope of work at initial stage.
However, contractor shall ensure that the total quantity of individual item should not
exceed over specified quantity in the schedule (Section-E) without intimation to
GIPCL. To carry out any extra quantity of work, a confirmation shall be obtained from
GIPCL before proceeding. In any case, the executed value of works should not be
exceeded to total order value without written approval by GIPCL.
The scope of works shall be carried out by using specialized & GIPCL approved
makes of repair & coating materials, preferably of “Fosroc Chemicals (India)
Limited”, “Sika India Pvt. Ltd.”, “Krishna Conchem Pvt. Ltd.”, “MYK Arment
Bidders will also be allowed for other similar equivalent makes of materials from other
reputed brands at the discretion of GIPCL, for which, bidder should propose
equivalent proven brand with their technical bid. Bidders should submit their technical
bid along with manufacturer’s credential, client’s performance certificates, material
test reports, MSDS, TDS, technical equality comparisons, etc…of proposed make for
similar Industrial use / in Thermal Power Plants / PSUs (Industries). GIPCL will review
the credential & client’s performance certificates in Industrial use for approval
purposes. However, approval or rejection will be at the sole discretion of GIPCL
without giving any reason and will be bound to the contractor. On rejection of bidder’s
proposed make/makes of materials by GIPCL, the contractor should be ready to
execute the works with above mentioned approved makes of materials only. Also,
even after approval, in view of GIPCL, if performance of other brand/make material
not found satisfactory then contractor shall stop using it and shall continue the scope
of work with above specified brands/makes of materials only.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
1A (i) Following activities shall be carried out for rehabilitation works as per
detail specifications of SoR (Section-E) with GIPCL approved makes of
materials as above.
Chipping off loose and damaged plaster and / or cover concrete up to good parent
concrete or up to reinforcement level using chisel & hammer/Breaker and cleaning
the reinforcement & concrete surfaces with wire brush to receive further treatment.
MS Scaffolding will be paid at actual as per GIPCL approval in specific item of
scaffolding work.
CORROSION REPAIR: A). Surface preparation by removal of all disintegrated
materials, cleaning the concrete surface with metal wire brush, cleaning of
reinforcement and applying 1 coat of alkaline rust converter followed by 1 coat of
Migratory corrosion Inhibitor to arrest the corrosion in embedded concrete. The rust
remover shall be alkaline in nature and its PH shall be around 8.5 to 9. The Migratory
corrosion inhibitor shall be tested by premier research institute/approved laboratory
and shall have a successful case history in Indian condition. B). Applying two coats
of interpenetrating polymer network rebar coating to the exposed reinforcement as
directed by Engineer-in-charge and as per manufacturer’s recommendations.MS
Scaffolding will be paid at actual as per GIPCL approval in specific item of scaffolding
work. Material: "Fosroc" make "Reebarklens RR" & "Nitozinc primer std" or equivalent
approved materials from "Sika", "MYK Arment" or "Krishna Conchem".
Providing & applying single component, dual shrinkage compensated, fiber
reinforced thixotropic polymer modified repair mortar in varying thickness from 10 mm
to 40 mm (44 KG repair mortar used shall be considered as 1 m2) as directed by
Engineer-in-charge and as per manufacturer’s recommendations as per respective
item descriptions in SoR. MS Scaffolding will be paid at actual as per GIPCL approval
in specific item of scaffolding work. Material: "Fosroc" make "Renderoc SP40" or
equivalent approved materials from "Sika", "MYK Arment" or "Krishna Conchem".
STRENGTHENING OF RCC WITH EPOXY GROUTING: Drilling holes of 16 mm dia
into concrete to required depth, cleaning the holes, fixing suitable standard nozzles
(SS grouting nozzles or injection packers for high pressure injection grouting) for
grouting purpose, sealing the gap around the nozzle at about 0.50M spacing in cracks
and sealing the cracks with epoxy putty of approved makes. MS Scaffolding will be
paid at actual as per GIPCL approval in specific item of scaffolding work. Grouting to
be carried out by injecting very low viscosity (2 - 5 CPS), High Molecular Weight
Thermoset Polymer or GIPCL approved quality EPOXY GROUT with a pressure up
to 2 Kg/cm2. Grouting is to be continued till nozzle refuses to accept further grout.
MS Scaffolding will be paid at actual as per GIPCL approval in specific item of
scaffolding work. Material: "Fosroc" make "Conbextra EP10 M" or equivalent
approved materials from "Sika", "MYK Arment" or "Krishna Conchem".
Providing & repairing cracks by using epoxy resin-based putty including making 'V’
groove by using grinder machine etc. complete as directed by Engineer-In-Charge
and manufacturer specifications. MS Scaffolding will be paid at actual as per GIPCL
approval in specific item of scaffolding work. Material: "Fosroc" make "Nitocote VF"
or equivalent approved materials from "Sika", "MYK Arment" or "Krishna Conchem".
Providing & applying three coats (primer, middle & top coat) of approved
manufacturer make anti corrosive & anti carbonation coating system (Base: Solvent
based pure Aliphatic Acrylate System) on RCC structural members by using
mechanical sprayer of “WAGNER”, “GRACO” or equivalent make as approved by
GIPCL, including preparation of surface by thoroughly cleaning of depositions, ash,
oil, dirt, dust, rust, scraping of all external RCC surfaces by wire brushing, power tool
cleaning, sealing the cracks with polymer putty, providing & applying three
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
successive coats of approved anti corrosive & anti carbonation coating system, each
coat of 65-70 micron DFT, as per manufacturer's specifications, including MS
scaffolding, arrangement of approved working platform for working at height, etc...
complete as per detail specifications and as directed by Engineer-in-charge (MS
Scaffolding included). Material: "Fosroc" make "Dekguard S" or equivalent
approved materials from "Sika", "MYK Arment" or "Krishna Conchem" make
1A (ii) In addition to above activities listed under clause no. 1A (i), following
specific activities shall be carried out for rehabilitation & strengthening
of Unit-3 ID Fan foundations as per detail specifications of SoR
(Section-E) with GIPCL approved makes of materials as above.
Crack Stitching + Injection: Drill holes @ 300–500 mm c/c across cracks, Insert U-
shaped shear dowels (Fe500, 10–12 mm dia), Seal surface. MS Scaffolding will be
paid at actual as per GIPCL approval in specific item of scaffolding work.
Drilling holes of 16 mm dia into concrete to required depth, cleaning the holes, fixing
suitable standard nozzles (SS grouting nozzles or injection packers for high pressure
injection grouting) for grouting purpose, sealing the gap around the nozzle at about
0.50M spacing in cracks and sealing the cracks with epoxy putty of approved makes.
MS Scaffolding will be paid at actual as per GIPCL approval in specific item of
scaffolding work.
Grouting Low viscosity epoxy grout “Fosroc Nitofill EPLV”, "Fosroc Conbextra EP10
M", “Sika Injection-201 CE”. MS Scaffolding will be paid at actual as per GIPCL
approval in specific item of scaffolding work.
Providing & fixing in position watertight shuttering from good quality shuttering ply for
column, beams, slab etc. at all heights, application of de-shuttering oil, extra care for
water tightness, removing after completion work etc. completed as per specification
& directed. All the crevices in the form work shall be arrested using Plaster of Paris
so as to ensure water tight form at various required locations as directed by Engineer-
in-charge. MS Scaffolding will be paid at actual as per GIPCL approval in specific
item of scaffolding work.
Micro-Concrete Jacketing (Preferred)
Use flowable, shrinkage-compensated micro-concrete with Fosroc Renderoc
RG / Microcrete or SikaGrout-214 / Sika MonoTop-615
Fix formwork (leak-proof) as per above item.
Apply bonding agent: Nitobond EP / Sika Latex
Pour micro-concrete (NOT hand plastering). Ensure proper venting for air
escape Thickness: Average 75 mm jacketing.
MS Scaffolding will be paid at actual as per GIPCL approval in specific item
of scaffolding work.
Material: "Fosroc" make "Renderoc RGS" or equivalent approved materials
from "Sika", "MYK Arment" or "Krishna Conchem".
Providing & applying three coats (primer coat DFT 55-65 micron, middle coat DFT
100-125 micron & top coat DFT 40-50 micron) of "IPNET High Build" anti-corrosive
protective epoxy coating system (IPNET primer one coat and IPNET Hi-Build Epoxy
coating two coat of approved manufacturer) on external RCC structural members of
ID Fan foundations by using mechanical sprayer of “WAGNER”, “GRACO” or
equivalent make as approved by GIPCL, including preparation of surface by
thoroughly cleaning of depositions, ash, oil, dirt, dust, rust, scraping of all external
RCC surfaces by wire brushing, power tool cleaning, sealing the cracks with polymer
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
putty, providing & applying three successive coats of "IPNET" as per manufacturer's
specifications, etc... complete as per detail specifications and as directed by
Engineer-in-charge. MS Scaffolding will be paid at actual as per GIPCL approval in
specific item of scaffolding work. Material: "Fosroc" make "Nitocote BCS 300" or
equivalent approved materials from "Sika", "MYK Arment" or "Krishna Conchem"
1A (iii) To carry out the scope of works as per Section-D & Section-E, contractor
shall arrange his own standard MS scaffolding and same shall be used
as per site requirements & approval by GIPCL’s safety department. The
approved scaffolding based on site requirements shall be paid
separately (except for Item No. 19, 20, 21, 22 & 23) as per specific Item
No. 32 of providing safe MS scaffolding for work at height more than &
equal to 3.00M where, according to GIPCL, there is no other option to
execute the work without scaffolding. Approximate size of scaffolding
requirement shall be pre-approved through GIPCL before execution.
Charges includes providing & fixing approved double layer scaffolding
materials (MS pipes with clamps, base plates, etc), erection of standard
scaffolding as approved by GIPCL, make proper & safe approach &
platform with safe guard and dismantling & demobilization of the same
after completion of given scope of work. No any idle charges will be
considered due to delay from either side due to whatsoever reason. For
measurement of double layer scaffolding, height up to top working
platform level and approved length will be measured. In case of single
layer scaffolding, 50% of measured quantity will be considered.
Contractor shall carryout the work as given in tender documents and the works shall
conform to high standards of workmanship and quality plan as recommended by
manufacturer. The work should be carried out in presence of full time experienced
1B. SPECIFIC SCOPE FOR PROTECTIVE COATINGS:
The scope of work in general comprises “Application of protective coating by
specified DFT of various specified nos. of coats for various RCC surfaces of various
specified structures.
Contractor shall strictly follow manufacturer’s recommendation for required mix
proportion of coating material at site. The coating material must be applied strictly in
accordance with the manufacturer’s technical datasheet including surface
preparation, mixing, placing, applying, curing, etc… complete as per manufacturer’s
instructions and as directed by Engineer-in-charge. This consists of surface
preparation by thoroughly cleaning of oil, dirt, dust, rust, scraping of all external RCC
surfaces for removing algae, muck, weeds and scale by wire brushing, power tool
cleaning, blower cleaning & drying of all surfaces, sealing the cracks with polymer
putty, applying specified nos. of successive coats of protective coating with minimum
specified DFT per coat, as per manufacturer's specifications by mechanical sprayer
of “WAGNER”, “GRACO” or equivalent make as approved by GIPCL, using MS
scaffolding, arrangement of platform for working at height, etc... complete as per
detail specifications and as directed by Engineer-in-charge.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Contractor shall deploy & provide sufficient nos. of manpower, full time experienced
supervisors for supervision of work, providing & fixing metallic scaffolding, ladders,
arrangement of platform for working at height, safety belts, safety shoes, goggles,
dust masks, safety net, helmets, etc… with tools & tackles, sufficient nos. of lighting
equipments, power cables of sufficient length according to site requirement, sufficient
cleaning equipments like blower to dry the concrete surface and any other incidental
activities or works which are not envisaged but likely to be carried out for satisfactory
& timely completion of entire scope of work as directed by Engineer-in-charge.
It is not the intent to specify herein all the works in the scope of this contract. The
scope also includes all works necessary, which are not specifically mentioned here
but required, for completion of entire scope of work in all respect within time bound
period and are deemed to be included in the scope of the CONTRACTOR. All works
shall conform to the specification. The works shall conform to high standards of
quality and workmanship.
1B (i) GENERAL SPECIFICATIONS FOR PROTECTIVE COATINGS
1. Contractor has to ensure that the different layers of coatings are being applied after
getting inspected by Engineer-in-charge of GIPCL. After obtaining stage wise clearance,
including surface preparation, contractor should proceed for further work. One register
shall be maintained by contractor for this purpose and shall submit the same with bill.
2. Contractor shall maintain the sequence of work for proper recording, certification and
handing over of next coat front by GIPCL.
3. Coating has to be applied uniformly over the surface of CONCRETE structure.
4. All the consumables like wire brush, mechanical tools, blowers, lighting equipments,
sufficient length power cable, ladders, ropes, containers for handling the material, cloths
if required for cleaning the surface etc… are to be arranged by the contractor.
5. For coating at different elevations, contractor has to make arrangement for safe
scaffoldings of MS pipes, Metallic jail, H frames etc...
6. Contractor has to make their own sub-store for storing the materials & his belongings at
7. Manpower required for carrying out the entire scope of work will be in contractor’s scope.
8. Contractor has to depute their full-time independent site-in-charge & supervisors for work
execution as per specification.
9. Contractor has to take all safety measures and has to follow safety clauses of General
Conditions of Contract, during the execution of work including providing safety
equipments and/or safety gears to the workmen. List of the provided safety equipments
and safety gears is to be submitted to GIPCL’s Safety Department for prior approval and
permission before taking up the work.
10. The contractor shall possess a valid ‘Permit to work’ duly signed by GIPCL during the
execution of the job.
11. Work of coating of cooling towers, silos, ID fan foundation, crusher foundations, etc… has
to be carried out even during the time when system is in operation. Hence, experienced
supervisors are to be deployed for supervision of work.
12. Further layer of coatings has to be applied after giving sufficient drying time to previous
layer of coating, minimum 2 (two) hours or as per manufacturer’s guideline 9whichever is
13. Contractor has to arrange & get inspected thickness of each layer as mentioned above
by the help of Alco meter from the Engineer-in-charge of GIPCL before proceeding to
application of next layer. Supply of measuring instrument is in the scope of contractor.
14. Coating shall be carried out only on thoroughly dry surfaces. Contractor shall have to
arrange required nos. of blower to dry the concrete surface properly, if required. Coating
shall be applied as spraying by means of approved mechanical sprayers of WAGNER”,
“GRACO” or equivalent make as approved by GIPCL only. The workmanship shall be of
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
best quality. The workmanship shall generally confirm to the requirement of IS 1477 (Part-
15. The type of coating, thickness of dry film, number of coats etc. shall be as specified in the
16. All the surfaces shall be thoroughly cleaned of oil, dirt, dust, rust and scale. The methods
to be adopted using solvents as per recommendation of manufacturer, wire brushing,
power tool cleaning etc. and as indicated in the item of work.
17. Quality Check: - Contractor shall maintain location wise register entry and get the daily
check from concern GIPCL engineer for cleaning, first coat (Primer), second coat
(Middle), third coat (top) & thickness of each coat. The same shall be enclosed with bill
for payment. GIPCL reserves the right to ask the contractor for re work, if the coat is
applied without satisfactory surface preparation. GIPCL also reserves the rights to not
offer further front, if contractor repeatedly violates technical specifications, quality of work
and safety rules. GIPCL will not entertain any correspondence from contractor for slow
progress & delay in work completion due to any rework or due to regular work inspection
of GIPCL to get quality works as per specifications and to maintain proper safety at work
18. The rate shall be for good finishing. However, if the required quality and finishing is not
achieved, contractor shall apply additional coat to get good finishing without any
additional cost to GIPCL.
19. Contractor shall follow the recommendation of manufacturer without any additional
implication to GIPCL.
1C. GENERAL SPECIFICATIONS & REQUIREMENTS:
Contractor shall keep up to date material inward records and consumption record of
his materials. Contractor shall strictly follow manufacturer’s recommendation for
required mix proportion of material at site. The material must be applied strictly in
accordance with the manufacturer’s technical datasheet including surface
preparation, mixing, placing, applying, curing, etc… complete as per manufacturer’s
instructions and as directed by Engineer-in-charge.
Contractor shall deploy & provide sufficient nos. of manpower, full time experienced
supervisors for supervision of work, providing & fixing metallic scaffolding, ladders,
arrangement of platform for working at height, safety belts, safety shoes, goggles,
dust masks, safety net, helmets, hand gloves, etc… with tools & tackles, sufficient
nos. of lighting equipments, power cables of sufficient length according to site
requirement, electrical safety gadzets, sufficient cleaning equipments like blower and
any other incidental activities or works which are not envisaged but likely to be carried
out for satisfactory & timely completion of entire scope of work as directed by
Engineer-in-charge.
The specified material/compounds must be applied strictly in accordance with the
manufacturer’s technical datasheet including surface preparation, mixing, placing,
applying & curing. This consists of surface preparation by thoroughly cleaning of dirt,
dust, loose concrete, scraping for removing algae and scale by wire brushing or
power tool cleaning, blower cleaning & drying of all surfaces before application, etc…
as per site requirement.
The scope of work is also include removal of all debris, unwanted materials, scrape
materials etc including loading, unloading, shifting and disposal outside the plant
premises for all lead & lift without any additional cost to GIPCL.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Where any specifications of manufacturer are repugnant to or at variance with any
provisions and/or specifications mentioned in this document, then unless a different
intention appears, the provision and/or specifications mentioned in this document
shall prevail to the extent of such repugnancy of variance.
STANDARAD MANUFACTURER’S METHODOLOGY:
Contractor shall propose & implement entire repair system of any one single
manufacturer out of specified approved manufacturers for RCC structure repairing
scope (except protective coating works, for which any of approved make /
manufacturer’s material, meeting with technical specifications, shall be used as per
manufacturer’s standard methodology).
It is not the intent to specify herein all the works in the scope of this contract. The scope also
includes all works necessary, which are not specifically mentioned here but required, for
completion of entire scope of work in all respect within time bound period and are deemed
to be included in the scope of the CONTRACTOR. All works shall conform to the
specification. The works shall conform to high standards of quality and workmanship.
1.1 GENERAL SPECIFICATIONS:
1. Contractor has to ensure that the stage wise activities are being executed after
getting inspected by Engineer-in-charge of GIPCL. After obtaining stage wise
clearance, including surface preparation, contractor should proceed for further
work. One register shall be maintained by contractor for this purpose and shall
submit the same with bill.
2. Contractor shall maintain the sequence of work for proper recording, certification
and handing over of next front by GIPCL.
3. Final finishing shall be carried out uniformly over the surface of structure.
4. All the consumables like wire brush, mechanical tools, blowers, lighting
equipments, sufficient length power cable, ladders, ropes, containers for handling
the material, cloths if required for cleaning the surface etc… are to be arranged
by the contractor.
5. For scope of work at different elevations, contractor has to make arrangement of
required standard MS scaffolding, fall arrestors, life line, standard approved
“suspended rope platform” with double safety provisions, Metallic jail, H frames
6. Contractor has to make their own sub-store for security and storing of his
materials & belongings at site.
7. Manpower required for carrying out the entire scope of work will be in contractor’s
8. Contractor has to depute their full time site-in-charge & supervisors for work
execution as per specification.
9. Contractor has to take all safety measures and has to follow safety clauses
mentioned in General Conditions of Contract, during the execution of work
including providing safety equipments and/or safety gears to the workmen. List of
the provided safety equipments and safety gears is to be submitted to GIPCL’s
Safety Department for prior approval and permission before taking up the work.
10. The contractor shall possess a valid ‘Permit to work’ duly signed by GIPCL during
the execution of the job.
11. Work has to be carried out even during the time when system is in operation.
Hence, experienced supervisors are to be deployed for supervision of work.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
12. Subsequent applications as per given sequences has to be executed after giving
sufficient drying time to previous application.
13. Contractor has to arrange & get inspected each application of work as per given
sequence from the Engineer-in-charge of GIPCL before proceeding to next
application. Supply of site measuring instruments are in the scope of contractor.
14. Work shall be carried out only on thoroughly dry surfaces. Contractor shall have
to arrange required nos. of blower to dry the surface properly, if required. Coating
shall be applied by spraying by means of approved mechanical sprayers. The
workmanship shall be of best quality.
15. All the surfaces shall be thoroughly cleaned of oil, dirt, dust, rust and scale. The
methods to be adopted using solvents as per recommendation of manufacturer,
wire brushing, power tool cleaning etc. and as indicated in the item of work.
16. Quality Check: - Contractor shall maintain location wise register entry and get
the daily check from concern GIPCL engineer for various sequential applications.
The same shall be submitted with bill for payment. GIPCL reserves the right to
ask the contractor for re work, if the material applied without satisfactory surface
preparation. GIPCL also reserves the rights to not offer further work front, if
contractor repeatedly violates technical specifications, quality of work and safety
rules. GIPCL will not entertain any correspondence from contractor for slow
progress & delay in work completion due to any rework or due to regular work
inspection of GIPCL to get quality works as per specifications and to maintain
proper safety at work site.
17. The rate shall be for good finishing. However, if the required quality and finishing
is not achieved, contractor shall apply additional coat/coats of the application to
get good desired finishing without any additional cost to GIPCL.
18. Contractor shall follow the recommendation of manufacturer without any
additional implication to GIPCL.
1.2 SAFE STORAGE OF MATERIALS
Contractor shall be responsible for safe storage of all their equipments, scaffolding &
materials to avoid pilferage, loss, damage, theft and he shall be responsible till
handing over. Contractor shall be responsible for security of their materials,
scaffolding materials & equipments at their own.
1.3 REPAIR & COATING MATERIALS
All repair and coating materials shall be of GIPCL’s approved make specialized
materials as per respective item specifications under SoR (Section-E) and as
per detail scope of work mentioned in the above clause no. 1 (Section-D).
Contractor has to maintain record of each and every material brought to site with
material test certificate and plant gate entry at GIPCL-SLPP.
Contractor shall arrange to get joint inspection of the procured materials along with
the concern Engineer-in-charge after the same is inward in GIPCL and the bill /
challan of it shall be got stamped & signed from GIPCL’s Security personnel present
at gate. Further, this bill / challan shall be enclosed with the Invoices when submitted
as per the “Terms of Payment”. GIPCL may verify the reconciliation of materials
supplied at GIPCL-SLPP with respect to work executed based on manufacturer’s
standard consumption factor. Any major variation shall not be acceptable. All
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
chemicals shall be of fresh stock with minimum expiry validity five months during
application or as approved by GIPCL.
Third party testing:-
Contractor shall arrange third party testing of materials supplied at GIPCL-SLPP for
jointly collected random samples of materials as directed by Engineer-in-charge. All
cost towards testing shall be borne by the contractor. The testing laboratory shall be
as decided by GIPCL.
1.4 DISPOSAL OF SCRAP & EMPTY BARRELS
Contractor shall be responsible for removal and disposal of all the empty
drums/barrels of all materials supplied by contractor, debris, unwanted materials
etc... as per prevailing GPCB norms outside GIPCL premises on every billing period
basis. GIPCL will not be held responsible for any subsequent consequences
regarding improper disposal of empty drums/barrels/scrap by the contractor.
Contractor shall be required to submit written undertaking as per format provided in
Annexure-L of enclosed Section-F with the final bill that all the empty
chemicals/primer/thinner drums & scrap/debris are disposed off at outside plant
premises at designated location as per prevailing Government guideline and
contractor shall indemnify, keep harmless the GIPCL against any future liabilities or
consequences in this regard.
Contractor’s final bill shall be processed only after written confirmation & compliance
for disposal of all such empty drums, containers, other scrapes, debris, unwanted
materials etc… to outside premises in accordance with prevailing GPCB norms
based on submission of letter of undertaking by the contractor and certificate from
Engineer-in-charge along with the bill.
1.5 GENERAL SCOPE OF CONTRACTOR
1. All tools & tackles, equipments, manpower, approved materials, consumables,
etc… to execute the contract will be in the scope of the contractor. The contractor
should ensure for healthiness/working conditions of tools, tackles, equipments,
2. All consumable items like repair & coating materials, grouting chemicals, rust
removers, crack sealer, thinner, turpentine, primer, putty, cloth, cotton waste,
kerosene, gas, diesel, lubricants, etc… will be in the scope of the contractor.
3. The Contractor shall have to make necessary arrangement for safe storage &
security of their materials, tools & tackles, scaffolding materials, equipments at
their own cost.
4. All safety PPEs & site safety arrangements required during work at site are to be
arranged by the contractor.
5. The Contractor shall have to provide necessary facilities including
accommodation for their labour at their own cost.
6. The contractor has to arrange transportation for lifting/shifting the materials at
7. Contractor has to depute their full time experienced site-in-charge & independent
supervisors for work execution as per specification and for day to day work
planning & coordination with Engineer-in-charge, to obtain day to day Location
wise work permits, to get daily location wise work supervision, to record Location
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
wise joint work done reports/measurements, to prepare & apply for manpower
gate pass, to maintain statutory & legal compliance records, etc…
8. Contractor has to maintain record of each and every material brought to site with
material test certificate and gate entry.
9. Contractor shall submit quality plan prepared jointly with authorized
representative of approved manufacturer.
1.6 PLANNING & MONITORING OF WORK PROGRESS
1. After award of the work, Contractor has to submit schedule of work planning for
completion of work with resources (i.e. manpower and material) mobilization
planning within seven days.
2. Contractor shall mobilize the resources at site within 15 days from the date of LOI
or work order whichever is earlier. GIPCL will closely monitor the agreed schedule
against actual progress of work at site. If contractor failed to carry out work as per
agreed schedule and if contractor failed to mobilize required resources
(manpower & materials) within seven days from written communication, GIPCL
will execute the job through other agency at the risk and cost of the contractor
with additional 10% overhead charges (including GST).
2. PRICE & RATES
This tender is based on the Schedule of Rates (SoR), and the final item rates will be
determined based on the lowest gross total price offered through the e-Reverse
Auction process, inclusive of GST.
Following the price discovery through the e-Reverse Auction, a pro-rata reduction will
be applied to the quoted prices of all SoR items. The resulting item rates shall be
comprehensive and including but not limited to skilled and unskilled manpower,
supervisors, engineers, safety supervisors, insurance, safety PPEs, site safety
arrangements, provision for site storage/site office, approved safety equipment, all
necessary tools, tackles, equipment, machinery, spares and maintenance, staging,
shuttering and scaffolding materials, hiring of specialized equipment and outsourcing
to experienced agencies, all approved materials, wastage of material (if any), shifting,
transportation, loading, unloading, equipment, machinery, all tools & tackles,
providing & fixing standard approved MS scaffolding at work site as per approval of
GIPCL’s Safety Officer (as per item description), providing & fixing approved
“suspended rope platform” (wherever required), providing & fixing shuttering
materials, safety equipments & PPEs, providing all necessary site safety
arrangements as directed/approved by GIPCL, survey works, site visits for work
identification, transportation, communication, mobilization and demobilization,
loading, unloading, safe storage of materials, security and safety, fuel and
consumables, and idle charges for labor, operators, drivers, machinery, and
equipment due to unavailability of the work front, holding of work permits, or any
unavoidable circumstances. The rates also include all applicable taxes, duties,
royalties, rents, stamp duties, and other statutory levies imposed by Central, State,
Local, or Municipal authorities (Note: Item rates exclude GST, which is accounted for
separately at 18% in the total estimated SoR value), legal & statutory compliances,
labour compliances, and such other costs that are not specifically mentioned herein
but will be incurred by the contractor for the satisfactory and timely completion of the
scope of work as per specifications and terms & conditions of this tender inquiry.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
The whole item rates shall be deemed to include for everything mentioned in the
specification, all leads & lifts, contractor’s overheads & profits for due performance of
the work under this contract and such other costs that are not specifically mentioned
herein but will be incurred by the contractor for the satisfactory and timely completion
of the work. The rates shall also include cost for mobilization / demobilization of
manpower, equipments, materials, etc... as per work requirement.
The prices / item rates so derived based on final recovery of lowest offer from Bidder
shall remain firm till completion of the entire contract period and also during
extensions thereafter (if required & approved by GIPCL). GIPCL will not entertain any
escalation towards labour rates, material rates, fuel rates and whatsoever due to any
reason and also no idle charges for manpower, machinery, tools & tackles,
equipments & scaffolding, overhead expenses, etc...
No price escalation / idle charges shall be payable due to delay in work by contractor
or due to non-availability of work front by GIPCL or any other reason whatsoever.
Contractor shall at his expense comply with all labour & industrial laws and such other
acts & statutes as amended from time to time as may be applicable to this contract
in respect to pay etc... On account of any default in respect of all liabilities and in case
of non compliance of the above, the company can withhold their payments till all legal
liabilities are discharged.
The offer price shall be considering mobilization of all required manpower, tools &
tackles, materials, equipment, vehicles, consumables, etc… for timely and
satisfactory completion of all scope of work.
The value and/or quantum of work may be increased or decreased depending upon
actual requirements to achieve desired result by Engineer-in-charge. However, item
rates & total order value remains unchanged and the payment shall be made as per
the actual quantity executed as informed & certified by GIPCL representatives.
3. CONTRACT / COMPLETION PERIOD AND LIQUIDATED DAMAGES
3.1 The contract / completion period for scope of works shall be 09 (nine) months from
the date of issuance of the Letter of Intent (LoI) and/or Work Order, whichever is
earlier (except 03 months of peak Monsoon, i.e. July, August & September).
3.2 GIPCL reserves the right to extend the contract period by up to an additional
(three) months on the same rates, terms, and conditions, without any price
escalation and without entering into a new contract on sole discretion of GIPCL only.
However, delay attribute to contractor beyond above schedules will attracts penalty
as LD (Liquidated Damages) as per LD clause mentioned herein under.
3.3 If the scope of work is not completed by the Contractor, necessary LD will be
deducted as per LD clause mentioned herein under and in the interest of work
completion, GIPCL will extend the contract period appropriately (along with
deduction of LD) as per contract requirement on the same rates, terms, and
conditions without any price escalation or new contract on sole discretion of GIPCL.
3.4 GIPCL reserves the right to short-close the contract at any time by giving 01 (one)
month’s notice, without assigning any reason.
3.5 The Contractor should prepare a detailed activity wise detail time schedule jointly
with the Engineer-in-Charge within 07 days of receipt of LOI/Work Order as per
contract period with each milestone. The WORK shall be executed strictly as per
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
the time schedule which includes the time required for mobilization, testing,
rectification (if any) and completion of given scope of work in all respects in
accordance with Contract Document to the entire satisfaction of the Engineer-in-
3.6 The above detail time schedule (PERT/BAR network) shall be reviewed periodically
and reports shall be submitted by the Contractor as directed by the Owner/GIPCL.
At any time, if contractor fails to execute the work or fails to mobilize the resources
and equipments as per agreed schedule of work planning and/or as per directions
of GIPCL / ENGINEER within the time frame, GIPCL shall get the work done by
third party at the risk & cost of the CONTRACTOR with additional 10% overhead
charges of GIPCL, including GST and all costs incurred in connection therewith
shall be recoverable from the CONTRACTOR by the GIPCL /ENGINEER as a debt
or may be deducted by him from any money due or to become due to the
3.7 In any case, contractor shall not be eligible to claim any compensation or
reimbursement or price escalation which attributed to poor progress, poor quality
work, rework, holding the work by GIPCL in case of decision or modification in
proposed layout or due to any whatsoever reason.
3.8 Contractor shall not have any right for time extension or compensation or price
escalation on account of delay due to late handing over of particular front by the
GIPCL or any other reason whatsoever. However, GIPCL at its sole discretion may
grant time extension only against the justifications submitted by the contractor in
3.9 In order to complete the works timely as per approved completion schedule,
contractor shall mobilize sufficient nos. of manpower & required material, resources,
tools & tackles etc at locations simultaneously, including independent site
3.10 DELAY AND EXTENSIONS OF TIME
3.10.1 The time allowed for carrying out the work as entered in the contract shall be
strictly observed by the CONTRACTOR and shall be deemed to be of the
essence of the contract on the part of the CONTRACTOR. The
CONTRACTOR shall be allowed admittance to the site on the ‘Date of
Commencement’ and he shall there upon and forthwith begin the work and
shall proceed with the work with due diligence.
3.10.2 The CONTRACTOR agrees that the work shall be commenced and carried on
at such points and in the order of precedence and at such times and seasons
as may be directed by the OWNER/ ENGINEER in accordance with the
schedule for completion of the work as outlined elsewhere. The
CONTRACTOR declares that he has familiarized himself with the site and
rights-of-way, with all the local conditions, and with all the circumstances
which may, or are likely to affect the performance and completion of the work,
and that he has allowed for such conditions. However, if a time schedule is
submitted by the CONTRACTOR so as to keep the phasing of work generally
in line with the time schedule drawn up and such time schedule after approval
from the OWNER/ENGINEER shall be accepted and complied with by the
CONTRACTOR and it shall form a part of the contract. The progress of work
will be checked at regular monthly intervals and the percentage progress
achieved shall be commensurate with the time elapsed after the award of the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
3.10.3 If the CONTRACTOR shall desire an extension of time for completion of work
on the grounds of his having been unavoidably hindered in its execution or
any other ground, he shall apply in writing to the OWNER within 7 days of the
date of hindrance on account of which he desires such extension as
aforesaid. This application shall invariably be accompanied by sufficient
supporting valid documentation giving reasons for seeking such extension.
No application for such extension shall be entertained if it is not received in
sufficient time to allow the OWNER / ENGINEER to consider it and the
CONTRACTOR shall be responsible for the consequences arising out of such
3.10.4 No necessity for an extension of time is anticipated but if untoward or extra-
ordinary circumstances beyond the control of the CONTRACTOR should
arise, which in the opinion of the OWNER/ENGINEER should entitle the
CONTRACTOR to a reasonable extension of time; such extension may be
granted but shall not operate to release the CONTRACTOR from any of his
obligations. For purpose of this clause, untoward and extraordinary
circumstances are defined under clause 22.0 of General Condition of
Contract. Under above circumstances, only extension of time may be granted
but the CONTRACTOR will not be entitled to any additional compensation. In
case of strike or lockout, the CONTRACTOR shall, as soon as possible, give
written notice to the OWNER / ENGINEER, but the CONTRACTOR shall
delay and shall do all that may reasonably be required to the satisfaction of
the OWNER / ENGINEER to proceed with the work.
3.10.5 The OWNER shall have the right to require the discontinuance of the work, in
whole or in part, for such time as may be necessary, should the condition of
the weather or of flood or other contingencies make it desirable to do so in
order that the works shall be well and properly executed. The CONTRACTOR
shall have no claim for idle time, escalation etc. However, the OWNER will
grant such extension of time for completion of the contract as he may think
proper and sufficient in consequence of such delay.
3.11 LIQUIDATED DAMAGES (LD) FOR DELAY
3.11.1 In the event of the contractor failing to comply with the approved time schedule
and if failing to complete the scope of works (as specified in clause no. 1 of
special condition of contract), he shall be liable to pay as compensation, a
sum equal to half percent (1/2%) of the “Total Contract Value” per week of
delay as Liquidated Damages (LD). However, the above amount of LD will be
subject to maximum of 10% of the Total Contract Value. The LD from R.A bill
will be deducted based on total contract value. However, at the end of
contract, the LD will be calculated based on the executed value as per final
bill on completion of entire given scope of works and excess amount of LD
deduction, if any, will be refunded back to the contractor.
3.11.2 The OWNER may without prejudice to any other method of recovery, deduct
the amount of such damages from any money due or which may become due
to the CONTRACTOR. In the event of extension of time being granted by the
OWNER in writing for completion of work, this penalty clause will be
applicable after the expiry of such extension period.
3.11.3 All sums payable by way of Liquidated Damages shall be considered as
reasonable compensation to be applied to the use of the OWNER without
reference to the actual loss or damage sustained and whether or not any
damage has been sustained.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
4. TERMS OF PAYMENT
A. Conditions of Payment:
The contractor shall raise the running invoices on monthly/quarterly basis in
duplicate, one original in physical form and soft copy in MS Excel format (soft copy
of measurement sheets & bill abstract with original joint measurement records shall
be submitted one week prior to submission of bill/invoice) as directed by Engineer-
in-charge in respect of the work performed or completed along with the documents
as mentioned hereinafter & in subsequent clauses.
However, respective R.A. Bill of contract shall only be entertained for 100% payment
as per following terms, only if contractor provides satisfactory progress of works
(minimum pro-rata completion of works with respect to actual quantities and
stipulated completion period). GIPCL may decide & recommend for release of partial
payment of such R.A. bill/s as deemed to suit based on review of ongoing progress
of foundation works.
On receipt of the invoice complete in all respects and with all the said documents, the
payment in respect of the same shall be made within 21 days of such receipt of a
complete invoice as per the following terms of payment:
(i) 100% of monthly RA bill along with 100% taxes shall be released against the
work executed duly certified by GIPCL. Income Tax (IT) will be deducted at
source from monthly RA bills as per the rules in force.
(ii) Contract Security deposit/irrevocable PBG at 10% of contract value
(excluding GST) shall be submitted as per clause no.: 1 of Section-C.
(iii) GST shall be paid along with bills after fulfillment of following terms.
(a) Submission of copy of registration certificate issued by GST Authority (to
be furnished only once).
(b) Citing the GST Registration no., HSN/SAC Code and the date of issue of
registration certificate on invoices.
(c) Citing GIPCL’s GST no. along with contractor’s GST registration no. and
the date of issue of registration certificate on invoices.
(d) Claim of GST amount with percentage (%) separately shown on the
(e) The contractor shall be required to submit the proof of payment of GST
of previous month/quarter, as may be applicable as & when demanded
by GIPCL/Owner/company.
(f) Contractor shall inform the GIPCL in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(g) The contractor shall also mention on their invoice the HSN/SAC code as
applicable under the GST laws under which GST is levied and a self-
certified authentic third-party evidence (www.cbic-gst.gov.in) shall be
adduced to that effect by the contractor.
(iv) At the time of submission of the first RA Bill, the Contractor shall submit a
certificate from Engineer-in-charge regarding availability of tools & tackles,
equipments, vehicles, etc at site as per requirement of contract. The
Contractor shall also furnish the checklist as per ANNEXURE-A enclosed with
the Section-F of tender document along with the RA bill of respective month
(v) While making running account payment, the following deductions may be
made by GIPCL, if applicable:
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
a. Cost of materials issued, if any, by GIPCL and to the extent consumed in
b. Security deposit recoverable if any.
c. Advance on materials / work progress advance payments, if any.
d. LD/Penalty for delayed delivery, penalty for delayed execution of work,
recovery of charges for the work done by other contractor due to delay or
any other reason, if applicable.
e. Any other dues recoverable by GIPCL from the contractor under the
(vi) The contractor, along with monthly RA/final bill shall submit copy of P.F.
Challan, wages register, attendance sheet & ECR statement indicating the
employee and employer's P.F contribution with respect of employees
employed by him for the contract at GIPCL site along with format for
submission of these documents provided in Section-F (Annexure-I).
(vii) The Contractor shall submit his Final Bill within a period of four months of the
expiration or earlier termination of the contract or any extensions that may be
granted by GIPCL to the Contractor. GIPCL shall not entertain any bill for any
work item after expiration of period of four months. After the final bill amount
is certified by GIPCL for payment and the same is made known to the
contractor by GIPCL & accepted by contractor, “No claim - No arbitration
certificate” to be submitted to GIPCL to release the Final Bill.
(viii) The Contractor shall include all his claims in the Final Bill submitted by him
and accordingly the final bill submitted by the Contractor shall be deemed to
be inclusive of all and whatsoever the claims that the Contractor may have
from GIPCL. The Contractor shall not be entitled to claim any amounts which
are not mentioned in the Final Bill and the Contractor shall be deemed to have
waived any claims not mentioned in the Final Bill and shall not be entitled to
recover the same from GIPCL subsequent to the submission of the Final Bill
on any account and GIPCL shall stand absolved of all its liabilities in respect
of any such claims not raised by the Contractor in his Final Bill.
B. Validity and Uniformity of Rates
The rates shall be valid and shall remain unaltered and firm for the Contract Period
and for any agreed extension thereof.
5. SCOPE OF GIPCL
Available Electric power, water & air shall be provided free of charges at any one
point nearer to work site as convenient to GIPCL. Contractor shall make his own
arrangements for drawl and distribution to the work site. However before drawl of
such energy, contractor shall take prior permission of the same.
However, due to unavoidable circumstances or any other reason whatsoever, on
unavailability of power supply or water, contractor shall proceed with the scope of
work by making own alternate arrangements without any extra cost to GIPCL. GIPCL
will not be held responsible for the delay, interruption or denying for power supply
and water due to any reason whatsoever.
6. TO REMEDY DEFECTIVE WORK
If the work or any portion thereof shall be damaged in any way excepting by the acts
of the GIPCL, or if defects not readily detected by proper inspection shall develop
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
before the final completion and acceptance of the whole work, the CONTRACTOR
shall forthwith make good, without compensation, such damage or defects in a
manner satisfactory to the ENGINEER / GIPCL. In no case shall defective or
imperfect work be retained even if contractor followed all technical specifications.
GIPCL will not compromise for quality of materials, works & workmanship.
CONTRACTOR shall remain liable under the provisions of this clause
notwithstanding the passing by the GIPCL of any certificate, final or otherwise or the
passing of any accounts.
7. DAILY DIARY AND PROGRESS REPORT
A daily progress shall be provided to Engineer-in-charge. The CONTRACTOR will
supply general information every day at 9:00 hours for the day preceding. Day to day
instructions will be conveyed by GIPCL Engineer to contractor and contractor shall
acknowledge same and submit compliance on it as per requirement. A work
instruction book may be maintained by contractor for proper accounting & follow-ups.
The CONTRACTOR’S representative shall report every day to see these instructions
and acknowledge them. Alternatively, looking to COVID-19 pandemic, this
diary/instruction report can also be executed / maintained digitally.
The CONTRACTOR shall supply all information regarding availability of manpower,
equipments, tractors, machinery, etc… and progress of work, as is required by the
ENGINEER for compiling the ongoing progress of work.
8. JOINT MEASUREMENT RECORDING & MODE OF MEASUREMENT
All the works shall be paid based on joint measurements of all the works actually
executed at site. Actual measurements of executed works as per scope shall be
carried out jointly with GIPCL’s Engineer-in-charge concern and contractor’s
representative.
In order to carry out joint measurement recording at site, contractor shall provide
following facilities & arrangements at site for GIPCL’s Engineer-in-charge.
(1) Proper approachable safe scaffolding with ladders, standard hand rails &
(2) Arrangements of required safety PPEs like but not limited to standard approved
double harness safety belts, safety goggles, fall arrestors, safety net, hand
(3) Contractor shall also provide one Engineer along with two or three assistant
helpers to GIPCL’s concern Engineer-in-charge during joint measurement
recording. Contractor’s Engineer & helpers shall assist and follow the
instructions of GIPCL’s concern Engineer-in-charge for safe measurement
recording of every completed scope of works.
(4) Necessary standard & calibrated valid measuring devices like but not limited to
measuring tape, Alco meter & other required tools & tackles.
(5) Any other site specific arrangements or requirements as directed by Engineer-
in-charge concern.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
The payment will be done according to actual work carried out as per joint
measurement by contractor & GIPCL Engineer-in-charge for unit of quantity as
specified in respective items in BoQ (Section-E), up to three decimal places.
Measurements shall be in accordance with the unit of measurements specified in
respective item description in schedule of quantity (Section-E) up to three decimal
places. Payment will be made for actual work done as per field measurements
certified by Engineer-in-charge.
The measurement shall be in item wise unit mentioned in Schedule of Quantity for
finished product of work done as per detailed technical specifications mentioned in
schedule of quantity (Section-E) and Clause No. 1 of Section-D.
Wherever any dispute regarding mode of measurement arise, the decision of the
Engineer in-charge shall be final and binding to you.
9. SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents to the Engineer-in-charge for verification
purpose of the bill:-
(i) Measurement sheet (as per mode of measurement) along with joint
record of work done in the form of joint inspection report duly signed by
authorized representative of contractor and GIPCL Engineer.
(ii) Contractor’s material incoming challans duly stamped & signed by plant gate
(iii) Contractor’s supplied material test certificate/reports/MSDS as applicable as
directed by Engineer-in-charge.
(iv) Any other required documents and/or records in support of claim made by
contractor in his bill as directed by Engineer-in-charge.
The bill will not be entertained without submission of any of above documents which
are demanded by Engineer-in-charge.
10. SUBMISSION OF STATUTORY COMPLIANCES WITH EACH BILL
Contractor shall submit the bills of work carried out along with following documents.
(i) Copy of statutory compliance like labour license, wages payment register, EC
Policy, PF paid Challan with ECR, TRRN confirmation by EPFO/Bank, Bank
statement, etc… along wage certificate pertaining to respective bill period /
previous month/s of bill period with Annexure-I provided in Section-F.
(ii) Notarized Indemnity Bond in case of Final bill.
(iii) No claim - No arbitration certificate as per Performa (Annexure-D in Section-F),
after the final bill amount is certified by GIPCL for payment and the same is made
known to the contractor by GIPCL & accepted by the contractor.
Bill submitted without any of the above applicable documents shall not be processed
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
11. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 24 hours from the time
of intimation given by GIPCL.
b) Contractor shall provide separate & independent site supervisors who will be
responsible for supervision and execution of job in specified time with respect
to quality, specifications, site preparations, safety, co ordination with GIPCL,
issue of work permits, joint measurements, etc... The supervisors shall
coordinate with the Engineer-in-charge of GIPCL for proper execution of the
c) The resources required for execution of above jobs will vary from time to time,
hence contractor shall mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by him for
the work at his own cost.
12. DEFECT LIABILITY PERIOD
The defect liability period of whole work shall be 01 (one) year from the date of
completion and acceptance of the work, as certified in writing by the Engineer-in-
During defect liability period, if any defect arises in jobs which have been already
executed, shall be rectified by the contractor at free of cost within seven days on
receiving the intimation from Engineer-in-charge failing which GIPCL may take
suitable action and also engaged third party to carry out rectification work at the risk
and cost of the contractor.
13. QUANTITY OF WORK
The quantities specified are estimated and for tendering purpose only. Payment will
be made, based on actual work done as certified by Engineer-in-charge of GIPCL.
Quantities of individual items may be revised during the course of contract period
based on plant operational & maintenance requirements as well as extent of
deterioration of structure taken up for repairing in this contract as directed by
Engineer-in-charge. Contractor shall not be entitled for any compensation on ground
of such alteration in given estimated quantities within overall limits of awarded
contract price. GIPCL reserves the right to operate or increase/decrease quantities
in each item or omit any item included in Schedule of Quantity at its discretion.
Contractor shall have no claim, whatsoever, on grounds of loss of anticipated profit
etc. on account of the same.
Contractors shall engage suitable manpower/workers of required nos. (skilled / semi
skilled / unskilled as per scope of work) along with required tools & tackle,
consumables, materials as per work load and emergency situations throughout the
contract period to perform his contractual duties/scope up to the full satisfaction of
Engineer-in-charge.
In case, contract quantity/amount exhausted before completion of contract period,
GIPCL reserve the rights to increase the quantities or contract amount for successful
completion of entire contract period. Contractor shall responsible to complete the
particular job up to entire satisfaction of Engineer-in-charge.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
The item rates remain firm & unchanged till completion of the contract and any agreed
extensions thereafter and shall not be subject to any escalation, idle charges for
labor, machinery, overhead expenses etc… for any reason whatsoever. The quantum
of work of individual item may be up to any extent depending upon requirement.
However, item rate remains unchanged. Under this contract, contractor has to
execute all work as per the Plant requirement.
14. OTHER TERMS & CONDITIONS
a) Within 15 days of award, the contractor shall submit a detailed Quality Assurance Plan (QAP),
Inspection & Test Plan (ITP), Method Statement and Work Procedure for approval by GIPCL.
No repair work shall commence without written approval
b) Quality Control Instruments: The contractor shall deploy, at his own cost, all necessary
calibrated quality control instruments at site, including but not limited to Digital Concrete
Moisture Meter, Digital Dry Film Thickness (DFT) Gauge, Wet Film Thickness (WFT)
Gauge, Surface Temperature Meter (Infrared Thermometer), Digital Hygrometer
(Temperature & Relative Humidity Meter), Crack Width Gauge and Pull-Off Adhesion
Tester, complete with valid calibration certificates from a NABL accredited laboratory or the
manufacturer's authorized calibration agency. All instruments shall be made available for
inspection by GIPCL at any time during execution.
c) Surface moisture, ambient temperature, relative humidity, substrate temperature, wet film
thickness (where applicable), dry film thickness and coating adhesion shall be measured and
jointly recorded with the Engineer-in-Charge at the specified stages of work and before
proceeding to the next stage. The contractor shall maintain location-wise quality inspection
records, duly signed by the Engineer-in-Charge, and submit the same along with the
running/final bills. Any work executed without the prescribed quality checks or not conforming
to the specified acceptance criteria shall be rejected and shall be rectified by the contractor
at his own cost without any additional financial implication to GIPCL.
d) Mandatory Tools, Tackles and Equipment: The contractor shall deploy and maintain, at his
own cost, sufficient numbers of all tools, tackles, machinery and equipment required for safe,
efficient and timely execution of the work. The minimum equipment shall include, but not be
limited to, electric/pneumatic chipping hammers, concrete breakers, rotary hammer
drills, angle grinders, concrete surface grinders, needle scalers, power-operated wire
brush machines, industrial vacuum cleaners, high-pressure air blowers, air
compressors with accessories, high-pressure water jet cleaning machines (where
required), slow-speed mechanical mortar mixers, epoxy injection pumps, injection
packers, grouting pumps, micro-concrete pouring equipment, measuring containers,
digital weighing scales, core cutting/cutting machines (where required), airless spray
painting machines of WAGNER/GRACO or equivalent approved make, conventional
spray guns, paint agitators, mechanical mixing paddles, approved brushes and rollers,
along with all associated accessories, consumables, hoses, fittings and ancillary
equipment necessary for complete execution of the work as per specifications and
manufacturer's recommendations. The contractor shall ensure that all equipment is
maintained in good working condition throughout the contract period and shall mobilize
additional equipment, if required, to achieve the desired quality and progress. No additional
payment shall be made on this account.
e) The bidder shall submit, along with the Technical Bid, a list of the above tools, tackles,
machinery, testing instruments and safety equipment proposed to be deployed for execution
of the work, clearly indicating ownership, quantity, make/model and calibration status (where
applicable). GIPCL may physically verify the availability of these equipment before award of
work and at any stage during execution. Failure to mobilize the committed equipment shall
constitute a material breach of contract and GIPCL shall have the right to withhold work fronts,
suspend the work or take any other action as deemed appropriate without any financial
implication to GIPCL.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
f) Safety clauses
Working at Height: All work at a height of 1.8 m and above shall be carried out
strictly in accordance with GIPCL Safety Rules and applicable statutory requirements.
The contractor shall ensure use of full body safety harness with double lanyard
and shock absorber, independent lifeline, approved anchorage, safety helmet with
chin strap, safety shoes and other PPE. Work at height shall be undertaken only after
obtaining a valid Work at Height Permit from GIPCL. The contractor shall deploy
only trained and medically fit personnel for such activities and maintain documentary
evidence of training and fitness. GIPCL reserves the right to stop the work in case of
unsafe practices without any time or cost implication.
Scaffold Inspection: All scaffolding shall be of standard tubular steel construction
with base plates, sole plates, double guard rails, toe boards, working platforms and
safe access ladders. Scaffolding shall be erected, altered and dismantled only by
trained personnel under competent supervision. Every scaffold shall be inspected
jointly by the Contractor's Safety Officer and GIPCL Safety/civil Department before
initial use and thereafter at regular intervals or after any modification or adverse
weather conditions. Only Green Tagged scaffolds shall be permitted for use.
Defective scaffolding shall be immediately withdrawn from service.
Suspended Platform: Wherever suspended platforms are used, the equipment shall
be of approved make with valid third-party inspection and load test certificates. The
contractor shall submit manufacturer certificates, operating procedures and rescue
plan for approval before commencement of work. Operators shall be trained and
authorized. Independent lifelines with full body harness shall be mandatory for every
person working on the platform. Overloading of suspended platforms shall be strictly
Hot Work: All welding, gas cutting, grinding or any activity capable of
generating sparks or heat shall be carried out only after obtaining a valid Hot
Work Permit from GIPCL. The contractor shall provide suitable fire
extinguishers, fire blankets, spark arrestors and fire watch personnel
throughout the duration of hot work. Combustible materials shall be removed
or adequately protected prior to commencement of work. The work area shall
be inspected after completion of hot work to ensure that no fire hazard exists.
15. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the
company will be applicable for this contract. The same is enclosed herewith. Bidders
are advised to go through the same. Where any portion of the general conditions of
contract is repugnant to or at variance with any provisions of the special conditions
of contract, then unless a different intention appears, the provision of the special
conditions of contract shall prevail to the extent of such repugnancy of variance.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
SCHEDULE OF RATE CUM BOQ (SoR)
(Bidder’s offer in % to be quoted online only through website:
https://tender.nprocure.com)
Sr. Description Estimated Unit Estimated Rate Estimated
No. Quantity without GST for Amount (Rs.)
1 Chipping off loose and damaged plaster and /
or cover concrete up to good parent concrete
or up to reinforcement level using chisel &
hammer/Breaker and cleaning the
reinforcement & concrete surfaces with wire 130.000 Sqm 256.52
brush to receive further treatment. MS
Scaffolding will be paid at actual as per GIPCL
approval in specific item of scaffolding work.
(a) ELHS Stacker Beam
2 Same as above Item No.
(b) Phase-2 (Unit-3 & 4) Fly Ash Silos 84.000 Sqm 256.52
3 Same as above Item No.
(c) Phase-2 (Unit-3 & 4) PCH & SCH Crusher 75.000 Sqm 256.52
4 Same as above Item No.
(d) In-Plant Stacker Beam 191.000 Sqm 256.52
5 Same as above Item No.
(e) Phase-2 (Unit-3 & 4) Cooling Towers & 50.000 Sqm 256.52
6 CORROSION REPAIR:
A). Surface preparation by removal of all
disintegrated materials, cleaning the concrete
surface with metal wire brush, cleaning of
reinforcement and applying 1 coat of alkaline
rust converter followed by 1 coat of Migratory
corrosion Inhibitor to arrest the corrosion in
embedded concrete. The rust remover shall
be alkaline in nature and its PH shall be
The Migratory corrosion inhibitor shall be
tested by premier research institute/approved
laboratory and shall have a successful case
history in Indian condition. 130.000 Sqm 343.48
B). Applying 2 coats of interpenetrating
polymer network rebar coating to the exposed
reinforcement as directed by Engineer-in-
charge and as per manufacturer’s
recommendations.
MS Scaffolding will be paid at actual as per
GIPCL approval in specific item of scaffolding
Material: "Fosroc" make "Reebarklens RR" &
"Nitozinc primer std" or equivalent approved
materials from "Sika", "MYK Arment" or
"Krishna Conchem".
(a) ELHS Stacker Beam
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Sr. Description Estimated Unit Estimated Rate Estimated
No. Quantity without GST for Amount (Rs.)
7 Same as above Item No.
(b) Phase-2 (Unit-3 & 4) Fly Ash Silos 84.000 Sqm 343.48
8 Same as above Item No.
(c) Phase-2 (Unit-3 & 4) PCH & SCH Crusher 75.000 Sqm 343.48
9 Same as above Item No.
(d) In-Plant Stacker Beam 191.000 Sqm 343.48
10 Same as above Item No.
(e) Phase-2 (Unit-3 & 4) Cooling Towers & 50.000 Sqm 343.48
11 Providing & applying single component, dual
shrinkage compensated, fibre reinforced
thixotropic polymer modified repair mortar in
varying thickness from 10 mm to 40 mm (44
KG repair mortar used shall be considered as
1 m2) as directed by Engineer-in charge and
as per manufacturer’s recommendations. MS
Scaffolding will be paid at actual as per GIPCL 130.000 Sqm 2,130.43
approval in specific item of scaffolding work.
Material: "Fosroc" make "Renderoc SP40" or
equivalent approved materials from "Sika",
"MYK Arment" or "Krishna Conchem".
(a) ELHS Stacker Beam
12 Same as above Item No.
(b) Phase-2 (Unit-3 & 4) Fly Ash Silos 84.000 Sqm 2,130.43
13 Same as above Item No.
(c) Phase-2 (Unit-3 & 4) PCH & SCH Crusher 75.000 Sqm 2,130.43
14 Same as above Item No.
(d) In-Plant Stacker Beam 191.000 Sqm 2,130.43
15 Same as above Item No.
(e) Phase-2 (Unit-3 & 4) Cooling Towers & 50.000 Sqm 2,130.43
16 STRENGTHENING OF RCC WITH EPOXY
GROUTING:Drilling holes of 16 mm dia into
concrete to required depth, cleaning the holes,
fixing suitable standard nozzles (SS grouting
nozzles or injection packers for high pressure
injection grouting) for grouting purpose,
sealing the gap around the nozzle at about
0.50M spacing in cracks and sealing the
cracks with epoxy putty of approved makes.
MS Scaffolding will be paid at actual as per
GIPCL approval in specific item of scaffolding
work.For Phase-2 (Unit-3 & 4) Cooling
Towers, Silos, Crusher, etc...
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Sr. Description Estimated Unit Estimated Rate Estimated
No. Quantity without GST for Amount (Rs.)
17 Grouting to be carried out by injecting very low
viscosity (2 - 5 CPS), High Molecular Weight
Thermoset Polymer or GIPCL approved
quality EPOXY GROUT with a pressure up to
2 Kg/cm2. Grouting is to be continued till
nozzle refuses to accept further grout. MS
Scaffolding will be paid at actual as per GIPCL 25.000 KG 1,260.87
approval in specific item of scaffolding work.
Material: "Fosroc" make "Conbextra EP10 M"
or equivalent approved materials from "Sika",
"MYK Arment" or "Krishna Conchem".
For Phase-2 (Unit-3 & 4) Cooling Towers,
Silos, Crusher, etc...
18 Providing & repairing cracks by using epoxy
resin-based putty including making 'V’ groove
by using grinder machine etc. complete as
directed by Engineer-In-Charge and
manufacturer specifications. MS Scaffolding
will be paid at actual as per GIPCL approval in
specific item of scaffolding work.
Material: "Fosroc" make "Nitocote VF" or
equivalent approved materials from "Sika",
"MYK Arment" or "Krishna Conchem".
For Phase-2 (Unit-3 & 4) Silos, Cooling
19 Providing & applying three coats (primer,
middle & top coat) of approved manufacturer
make anti corrosive & anti carbonation coating
system (Base: Solvent based pure Aliphatic
Acrylate System) on RCC structural members
by using mechanical sprayer of “WAGNER”,
“GRACO” or equivalent make as approved by
GIPCL, including preparation of surface by
thoroughly cleaning of depositions, ash, oil,
dirt, dust, rust, scraping of all external RCC
surfaces by wire brushing, power tool
cleaning, sealing the cracks with polymer
putty, providing & applying three successive
coats of approved anti corrosive & anti 9000.000 Sqm 386.96
carbonation coating system, each coat of 65-
70 micron DFT, as per manufacturer's
specifications, including MS scaffolding,
arrangement of approved working platform for
working at height, etc... complete as per detail
specifications and as directed by Engineer-in-
charge (MS Scaffolding included). Material:
"Fosroc" make "Dekguard S" or equivalent
approved materials from "Sika", "MYK
Arment" or "Krishna Conchem" make
(a) External RCC structural members of
Phase-2 (Unit-3 & 4) Cooling Towers.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Sr. Description Estimated Unit Estimated Rate Estimated
No. Quantity without GST for Amount (Rs.)
20 Same as above Item No.
(b) Phase-2 (Unit-3 & 4) Crusher Foundations 400.000 Sqm 386.96
21 Same as above Item No.
(c) Phase-2 (Unit-3 & 4) Fly Ash Silos 3100.000 Sqm 386.96
22 Same as above Item No.
(d) Phase-2 (Unit-3 & 4) Bed Ash Silos 200.000 Sqm 386.96
23 Same as above Item No.
(e) Other Misc. 100.000 Sqm 386.96
SPECIAL RCC REHABILITATION UNIT-3 ID FAN
24 Crack Stitching + Injection
Drill holes @ 300–500 mm c/c across cracks,
Insert U-shaped shear dowels (Fe500, 10–12
mm dia), Seal surface. MS Scaffolding will be 25.000 Nos 391.30
paid at actual as per GIPCL approval in
specific item of scaffolding work.
25 Drilling holes of 16 mm dia into concrete to
required depth, cleaning the holes, fixing
suitable standard nozzles (SS grouting
nozzles or injection packers for high pressure
injection grouting) for grouting purpose,
sealing the gap around the nozzle at about
0.50M spacing in cracks and sealing the 25.000 Nozzle 195.65
cracks with epoxy putty of approved makes.
MS Scaffolding will be paid at actual as per
GIPCL approval in specific item ofscaffolding
26 Grouting Low viscosity epoxy grout “Fosroc
Nitofill EPLV”, "Fosroc Conbextra EP10 M",
“Sika Injection-201 CE”
MS Scaffolding will be paid at actual as per 25.000 KG 1,260.87
GIPCL approval in specific item of scaffolding
27 Chipping off loose and damaged plaster and /
or cover concrete up to good parent concrete
or up to reinforcement level using chisel &
hammer/Breaker and cleaning the
reinforcement & concrete surfaces with wire 25.000 Sqm 256.52
brush to receive further treatment. MS
Scaffolding will be paid at actual as per GIPCL
approval in specific item of scaffolding work.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Sr. Description Estimated Unit Estimated Rate Estimated
No. Quantity without GST for Amount (Rs.)
28 CORROSION REPAIR:
A). Surface preparation by removal of all
disintegrated materials, cleaning the concrete
surface with metal wire brush, cleaning of
reinforcement and applying 1 coat of alkaline
rust converter followed by 1 coat of Migratory
corrosion Inhibitor to arrest the corrosion in
embedded concrete. The rust remover shall
be alkaline in nature and its PH shall be
The Migratory corrosion inhibitor shall be
tested by premier research institute/approved
laboratory and shall have a successful case 25.000 Sqm 343.48
history in Indian condition.
B). Applying 2 coats of interpenetrating
polymer network rebar coating to the exposed
reinforcement as directed by Engineer-in-
charge and as per manufacturer’s
recommendations.
MS Scaffolding will be paid at actual as per
GIPCL approval in specific item of scaffolding
work. Material: "Fosroc" make "Reebarklens
RR" & "Nitozinc primer std" or equivalent
approved materials from "Sika", "MYK
Arment" or "Krishna Conchem".
29 Providing & fixing in position watertight
shuttering from good quality shuttering ply for
column, beams, slab etc. at all heights,
application of de-shuttering oil, extra care for
water tightness, removing after completion
work etc. completed as per specification &
directed. All the crevices in the form work shall
be arrested using Plaster of Paris so as to
ensure water tight form at various required
locations as directed by Engineer-in-charge.
MS Scaffolding will be paid at actual as per
GIPCL approval in specific item of scaffolding
30 Micro-Concrete Jacketing (Preferred)
Use flowable, shrinkage-compensated micro-
concrete with Fosroc Renderoc RG /
Microcrete or SikaGrout-214
/ Sika MonoTop-615 Methodology:
Fix formwork (leak-proof) as per above item
Apply bonding agent:
Nitobond EP / Sika Latex
Pour micro-concrete (NOT hand plastering) 50.000 Sqm 5,652.17
Ensure proper venting for air escape
Thickness: Average 75 mm jacketing.
MS Scaffolding will be paid at actual as per
GIPCL approval in specific item of scaffolding
work. Material: "Fosroc" make "Renderoc
RGS" or equivalent approved materials from
"Sika", "MYK Arment" or "Krishna Conchem".
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Sr. Description Estimated Unit Estimated Rate Estimated
No. Quantity without GST for Amount (Rs.)
31 Providing & applying three coats (primer coat
DFT 55-65 micron, middle coat DFT 100-125
micron & top coat DFT 40-50 micron) of
"IPNET High Build" anti-corrosive protective
epoxy coating system (IPNET primer one coat
and IPNET Hi-Build Epoxy coating two coat of
approved manufacturer) on external RCC
structural members of ID Fan foundations by
using mechanical sprayer of “WAGNER”,
“GRACO” or equivalent make as approved by
GIPCL, including preparation of surface by
thoroughly cleaning of depositions, ash, oil,
dirt, dust, rust, scraping of all external RCC 400.000 Sqm 477.02
surfaces by wire brushing, power tool
cleaning, sealing the cracks with polymer
putty, providing & applying three successive
coats of "IPNET" as per manufacturer's
specifications, etc... complete as per detail
specifications and as directed by Engineer-in-
charge. MS Scaffolding will be paid at actual
as per GIPCL approval in specific item of
scaffolding work.Material: "Fosroc" make
"Nitocote BCS 300" or equivalent approved
materials from "Sika", "MYK Arment" or
"Krishna Conchem" make "IPNET".
PROVIDING, FIXING, ERECTION & REMOVAL OF
32 Charges for providing & fixing standard MS
scaffolding as per site & safety requirements
for the work needs to be executed by providing
safe MS scaffolding. Approx. size of
scaffolding requirement shall be pre-approved
through GIPCL before execution. Charges
includes providing & fixing approved double
layer scaffolding materials (MS pipes with
clamps, base plates, etc), erection of standard
scaffolding as approved by GIPCL, make
proper & safe approach & platform with safe
guard and dismantling & demobilization of the
same after completion of given scope of work.
No any idle charges will be considered due to
delay from either side due to whatsoever
reason. For measurement of double layer
scaffolding, height up to top working platform
level and approved length will be measured.
In case of single layer scaffolding, 50% of
measured quantity will be considered.
TOTAL ESTIMATED SOR VALUE WITHOUT GST
TOTAL ESTIMATED SOR VALUE WITH GST >>>
Note: Bidders have to quote their offer in % (+, - or equal) on above total estimated SoR value in
online Price Bid only through website: https://tender.nprocure.com. The quoted percentage rate on
above SoR item rates (Section-E of this tender) shall be inclusive of all labour cost, equipments,
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
materials, supervision, consumables, tools, tackles, profit & overheads, all taxes & duties (including
GST), etc… as per this tender. Item rate shall be firm for entire duration of contract period and any
approved extensions.
My rates are as under (only to be quoted online on (n)Procure).
At estimated value
OR _______ %age above the estimated value
OR _______%age below the estimated value.
Note:- (1) Percentage rate offer/bid price on SoR value including GST shall be quoted through online (n)-
Procure only. Hard copy of price bid shall not be considered/accepted.
(2) Evaluation of tender & E-Reverse Auction will be done on gross total quoted amount with GST.
SEAL & SIGNATURE OF TENDERER : __________________________________
NAME OF AUTHORISED PERSON : __________________________________
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labour License : Valid up to for
6) Details of E.C Policy : Valid up to for
7) Documents attached for verification : Wage & Attendance Sheets.
for the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final Bill) Yes/No
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Date : Signature of Contractor
with official stamp
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE
BY SELLER / CONTRACTOR
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office at PO:
Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter referred to
as “The Company/Owner” which expressions shall unless repugnant to the
subject or context includes its legal representatives, successors and assigns)
has entered into a contract with M/s. ………………………………..
………………………….(hereinafter referred to as “Contractor(s)/ Seller(s)”
which expression shall unless repugnant to the subject or context includes their
legal representatives, successors and assigns ) for
…………………………….on the terms and conditions as set out inter alia, in
the Company’s contract No./ work order
No.……………………………………………..date …………and various
documents forming part thereof hereinafter referred to as the “said contract”
which expression include all amendments, modifications and/ or variations
thereto and where as the Contractor(s)/ Seller(s) has agreed for due execution
of the entire contract and guarantees its performance including any parts
executed through any other agencies/ subcontractors
AND WHEREAS one of the conditions of the “said contract” is that
“contractor(s)/seller(s) shall furnish to the owner a Bank Guarantee from a
bank for….% (……….percent) of the total value of the “said contract” against
due and faithful performance of the “said contract” including performance
guarantee obligations of the contractor(s)/seller(s) for execution/ supplies
made under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do
hereby agree and undertake to pay the amount due and payable under this
guarantee without any demur merely on a demand from the Company stating
that in the opinion of the Company, which is final & binding, the amount claimed
is due by reason of default made by the Contractor(s)/ Seller(s) in performing
any of the terms & conditions of the said Contract including defect liability
obligations, in fulfilling the performance guarantee obligation or loss or damage
caused to or would be caused to or suffered by the Company by reason of any
breach by the said Contractor (s)/ Seller(s) of any of the terms & conditions of
the contract. Any such demand made on the Bank by the owner shall be
conclusive as regards the amount due and payable by the Bank under this
guarantee. However our liability under this guarantee shall be restricted to Rs.-
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the contractor(s)/ Seller(s) in
any suit or proceeding pending before any office, court or tribunal relating
thereto our liability under this present guarantee being absolute and
unequivocal. The payment so made by us under this bond shall be a valid
discharge of our liability for payment there under. Our liability to pay is not
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
dependent or conditional on the owner proceeding against the Contractor(s)/
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in all
respect and for all purposes be binding and operative until payment of all
money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke this
guarantee during its currency without previous consent of the
OWNER/PURCHASER and further agrees that if this guarantee is extended
for a period as mutually agreed between contractor & owner/purchaser, the
guarantee shall be valid for a period so extended provided that a written
request for such extension is received before the expiry of validity of
6. We ……………Bank further agree with the Company that the company shall
have the fullest liberty without our consent and without affecting in any manner
our obligations hereunder to vary any of the terms and conditions of the said
Contract(s)/ Order(s) or to extend the time of performance by the said
Contractor(s) Seller(s) from time to time or to postpone for any time or from
time to time any of the powers exercisable by the Company against the said
Contractor(s)/ Seller(s) and to forbear or enforce any of the terms and
conditions relating to the said Contract(s)/ Order(s) and we shall not be
relieved from our liability by reason of any such variation, or extension being
granted to the said Contractor (s) / Seller(s) or for any forbearance, act or
omission on the part of the Company or any indulgence by the Company to
the said Contractor(s)/ Seller(s) or by any such matter or thing whatsoever
which under the law relating to sureties would, but for this provision, have
affect of so relieving us.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………….(Rupees…………only) and shall remain in force
till..……..Unless a demand or claim under this Guarantee is made on us within
three months from the date of expiry we shall be discharged from all the
liabilities under this guarantee.
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate
Office at PO: Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter
called “The Company Owner” which expression shall unless repugnant to the subject
or context includes its legal representatives, successors and assigns) has issued
tender paper vide its Tender No…………………………for ------------------------
(hereinafter called “the said tender”)to M/s.……………………………(hereinafter
called the said Tenderer(s)” which expression shall unless repugnant to the subject
or context includes their legal representatives, successors and assigns and as per
terms and conditions of the said tender, the tenderer shall submit a Bank guarantee
for Rs.………. (Rupees……………..only) towards earnest money in lieu of cash.
2. We ……………………………..Bank having its branch office at
……… do hereby undertake to pay the amount due and payable under this guarantee
without any demur, merely on a demand from the Company stating that in the opinion
of the company which is final and binding, the amount claimed is due because of any
withdrawal of the tender or any material alteration to the tender after the opening of
the tender by way of any loss or damage caused to or would be caused or suffered
by the Company by reason of any breach by the said tenderer(s) of any of the terms
and conditions contained in the said tender or failure to accept the letter of Intent
Agreement or that the amount covered under this Guarantee is forfeited. Any such
demand made on the Bank by the owner shall be conclusive as regards the amount
due and payable by the Bank under this guarantee, However, our liability under this
guarantee shall be restricted to an amount not exceeding
Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not withstanding any
dispute or disputes raised by the tenderer (s) in any suit or proceeding pending before
any office, court or tribunal relating thereto our liability under this present guarantee
being absolute and unequivocal. The payment so made by us under this bond shall
be a valid discharge of our liability for payment there under. Our liability to pay is not
dependent or conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended by
the liquidation or winding up, dissolution or change of constitution or insolvency of
the said tenderer(s) but shall in all respect and for all purposes be binding and
operative until payment of all money due or liabilities under the said contract(s)/
Order(s) are fulfilled.
5. We ……………..Bank Ltd. further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the finalization
of the said tender and that it shall continue to be enforceable till the said tender is
finally decided and order placed on the successful tenderer(s) and or till all the dues
of the company under or by virtue of the said tender have been fully paid and its
claims satisfied or discharged or till a duly authorized officer of the company certifies
that the terms and conditions of the said tender have been fully and properly carried
out by the said tenderer (s) and accordingly discharges the guarantee.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
6. That the Owner Company will have full liberty without reference to us and without
affecting this guarantee to postpone for any time or from time to time the exercise of
any of the power of the owner under the tender.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission of
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
PERFORMA CERTIFICATE
(No claim, No arbitration)
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept
this, and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract and
extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will
not resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL
against non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the
works for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of
settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out above
referred work as per prevailing Minimum wages act. We have also fulfilled all
requirements of the P.F. Act. We have maintained all records necessary as per the
statutory requirements. We hereby indemnify GIPCL from any disputes arising in future
related to payment of labours, Provident Fund, etc.. and confirm that all liabilities of
settlements of disputes and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
TOOLS AND TACKLES TO BE PROVIDED BY CONTRACTOR (INDICATIVE)
Sr. Tools and equipments Purpose/Use
Putty knife For applying putty to cover dents, undulations,
cracks, knots in wooden surfaces.
Scrapping knife For removing old paints and hard materials form
surface and not to use on oily or greasy surface
Chisel knife For cutting hard old thick paint
Moulding knife or contour For scrapping or rubbing on peculiarly
knife shaped/contours like statue, ornamental carving,
curved protions, etc.
Pallet knife For mixing the paint in drums
Stencil knife For cutting stencils
2 Mechanical sprayer of For application of specified coating materials
approved make and of
sufficient capacity for
spraying of specified coating
3 Blow lamp For removing thick old paint form metal surfaces
by heating and not used on wood, glass, cement
4 Pallet board For mixing various colours by artists.
5. Plumb ball For drawing vertical lines
6. Emery sheets available in For removing unwanted materials and creating
four types: Sand papers, surface roughness.
Cloth emery, Waterproof
emery, Abrasive stones
7. Shade card For choosing shades of a single colour.
8. Stencil paper For cutting or making stencil
9. Viscosity For measuring the consistency or flow of paint.
10. Elcometer For measuring dry film thickness (DFT) of paint in
microns and this works on eltromagnetic
principle.( 1 micron =0.001 mm)
11. Gloss meter For measuring gloss value of dry paint film.
12. Wet flatting machine For flattening the putty applied areas.
13. Drop sheet Available in the form of paper, gunny bag,
polythene paper etc. to protect flooring and
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Sr. Tools and equipments Purpose/Use
furniture form paint particularly used for ceiling
and interior works.
14. Ladder Essentially used for painting ceiling, side walls,
15. Masking tape For covering areas which are not to be treated.
16. Handling buckets For containing & mixing of materials.
17. Straight edge/ruler For drawing straight line bands, border line, etc.
18. Strainer For filtering the surface to remove dust, dirt and
other insoluble materials before applying any new
treatment on the surface.
19. Rubber block For flatting small, curved areas where wet flatting
machine can not be used.
20. Spray Gun (Mechanical For coating the surfaces by mode of spraying.
sprayer) with compressor
21. Scaffolding Materials For working at height as required.
22 Shuttering Materials As per scope & requirement
23 Breaker Machine For chipping & breaking as per requirement (1
24 Tractor with trolley For shifting of materials, tools & tackles,
equipments, scaffolding, staging materials, etc…
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
(Surat Lignite Power Plant)
Schedule of Deviation from Technical Specification and Commercial Terms
All the deviations from the terms & conditions of contract shall be filled by BIDDER
clause by clause in this schedule.
Sr. No SECTION CLAUSE AS PER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from OWNER’s
Tender enquiry. The bidder further confirms that in the events any other data and information
presented in the BIDDER’s proposal and accompanying documents are at variance with
specific requirements laid out in the OWNER’s Tender Document, then the latter shall govern
and will be binding on the BIDDER for quoted price.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
Declaration cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm,
agree and undertake that all the Statutory and Safety Laws and Regulations of the applicable
Authority/ies shall be strictly followed for all types of works at the site during the period of the Contract,
if awarded to me.
Signed and Stamped by the
Authorized Signatory of the Bidder
Declaration for Contractual Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm that
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings
/ Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations for the last three( 03) years. There are no ongoing/pending legal
matter(s) with any of the Govt. of Gujarat Undertakings / GoG supported
Companies, including GIPCL.
Please Tick ( )
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations for the last three( 03) years.
Please Tick ( )
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard
shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory of the Bidder
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
CERTIFICATE OF COMPLIANCE BY CONTRACTOR
(To be submitted with each monthly bill on letter head along with labour compliance records)
of.........................to .......................... at Gujarat Industries Power Company Limited – Surat
Lignite Power Plant, Nani Naroli. I undertake to be bound by all the provisions of the Contract
Labour (Regulation & Abolition) Act 1970 and the Contract Labour (Regulation & Abolition)
Rules 1972, The Employees’ Provident Funds and Miscellaneous Provisions Act
Minimum Wages Act 1948, Payment of Wages Act 1936 and Payment of Bonus Act
and all other applicable labour laws in so far as the provisions are applicable to me in respect
of the employment of contract labour by me for the month of ................................
Authorized Signature with Stamp
Place: Nani Naroli
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
10.0 ANNEXURE-J
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of EMD/SD, Advance for Ash, Advance for DM
(The link is visible as horizontal highlighted in “orange” shade below Tenders - News &
Update Section).
3. After clicking the link the new page will open. On this page, No need to enter User Name
and Password. Directly click on “Payment Form” given below the sign in option.
4. After clicking the “Payment Form”, the vendor has to enter the details asked which will be
self explanatory. It is desired that all the information may be filled correctly so that the
payment made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available” and
then proceed. E.g. some information like Party code is not available to vendor or GST No.
not available with vendor.
Optional Note: Although mentioned as above can be proceeded with “Not available”, It will
be appreciated that regular vendors may obtain the party code from Materials Dept. or
Concerned Person, so that the vendor can be identified. The same party code may be used
for future transactions also.
After entering the details, click on SUBMIT Button.
5. The vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared with
Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above gateway,
the charges* as below will be applicable, which has to be borne by Vendor/Party making the
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
11.0 ANNEXURE-K
PARTICULARS OF THE BIDDER
Sr. Particulars Please provide
No. information here.
1. Name of Bidder
2. a. Registered Office Address:
b. Address for Correspondence:
3. Contact Details:
Contact Person Name
Telephone No. :
Year of establishment
5. User ID for e-reverse auction on website:
https://e-auction.nprocure.com
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
12.0 ANNEXURE-L
(To be submitted on Company’s Letter Head on six monthly and with final bill)
Declaration & Undertaking for disposal of empty CHEMICAL drums/barrels/scrap
of contractor) hereby confirm that I/We have taken all our empty chemical drums, barrels & old
tarfelt/APP membrane to outside of SLPP premises on date ___________ through our vehicle/s no./s.
___________________________________. We also declare & confirm that all these empty paint
drums/barrels/scrap have been disposed as per prevailing GPCB (Gujarat Pollution Control Board)
norms/guidelines and shall indemnify, keep harmless the GIPCL against any future liabilities or
consequences in this regard.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard
shall amont to legal action, including forfeiting of our security deposit/pending dues and also to
disqualification for future bid participation of GIPCL.
Signed and Stamped by the
Authorized Signatory of the Contractor
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
List of qualifying staff to be submitted with physical documents
Sr. No. Name of Supervisor Qualification Experience
*add rows if required
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
List of Tools & Tackles to be submitted with physical documents
Sr. No. Description Nos. Status
*add rows if required
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
15.0 ANNEXURE-M
(To be submitted on Company’s Letter Head)
Chief General Manager (Thermal),
Surat Lignite Power Plant,
Gujarat Industries Power Company Limited (GIPCL),
At: Nani Naroli, Taluka – Mangrol, Dist. Surat – 394110, Gujarat.
Subject: Undertaking for Deployment of Full-Time Site Civil Engineer or Experienced
Site-in-charge (having specific similar work experience for minimum
years) for Scope of work of Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
With reference to the above-mentioned Tender Bid No. SLPP/Civil/Str. Repair &
Coating/2026 issued by Gujarat Industries Power Company Limited (GIPCL) for “RCC
structural repairs & external protective anti - corrosive & anti - carbonation coating on RCC
surfaces of Phase-2 Cooling Towers and affected areas of Crusher foundations, Silos, critical
RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating on affected
areas of ID Fan foundations, etc... (Year: 2026-27)”, we, the undersigned, hereby submit this
Undertaking in the manner and to the extent set forth herein.
DECLARATION BY THE BIDDER
We hereby unconditionally and irrevocably undertake that:
If the work under the above Bid No. SLPP/Civil/Str. Repair & Coating/2026 is awarded to
us, we shall deploy, on a full-time basis, at least one (1) experienced Civil Engineer /
Experienced Site-in-charge (having specific similar work experience for minimum
years) exclusively at the Project Site, GIPCL Surat Lignite Power Plant, Nani Naroli,
Surat, for the entire duration of the execution of the scope of work assigned to us under the
Contract, until the issuance of the Job Completion Certificate by GIPCL / acceptance of
SPECIFIC COMMITMENTS
1. Full-Time Deployment: The Civil Engineer / Site-in-charge proposed to be deployed
shall be present at the Project Site on all working days throughout the contract phase of
the Job independently & exclusively for this contract. Any absence exceeding three (3)
consecutive working days shall require prior written approval from GIPCL.
2. Qualification & Experience:
The Civil Engineer / Site-in-charge so deployed shall possess the following minimum
qualifications and experience:
■ For Civil Engineer: Degree / Diploma in Civil Engineering from a recognized University
/ Institute with Minimum 03 (three) years of post-qualification experience in execution
and supervision of similar works in proper line & level, quality control, following
Technical specifications, etc…).
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
■ For Experienced Site-in-charge: Site-in-charge must have Minimum 03 (three) years
of experience in execution and supervision of similar works in proper line & level,
quality control, following Technical specifications, etc… with reputed specialized
agencies for such type of works.
■ Prior experience in similar projects shall be preferred.
3. Scope of Responsibility: The deployed Civil Engineer / Site-in-charge shall, inter alia,
be responsible for following:
■ Day-to-day supervision and quality control of all activities at site.
■ Co-ordination with GIPCL's Site Engineer / Engineer-in-Charge on all technical and
■ Ensuring compliance with technical specifications.
■ Reviewing and approving contractor's methodology.
■ Maintaining site records, inspection registers, material approval logs and quality
documents, material inward & consumption records.
■ Reporting progress and raising flagging any non-conformances or deviations to
4. Substitution: In the event it becomes necessary to substitute the deployed Civil Engineer
/ Site-in-charge due to compelling circumstances, the replacement personnel shall be of
equivalent or higher qualification and / or experience. Such substitution shall be made
only with prior written intimation and approval of GIPCL, and the replacement shall be
deployed without any gap in site coverage.
5. Additional Deployment: The above commitment is for a minimum of one (1) full-time
deployment. We acknowledge that GIPCL may, depending on the volume and pace of
construction activities, request deployment of additional site personnel, and we shall
comply with such requests within a reasonable timeframe.
6. Proposed Civil Engineer / Site-in-charge (if identified at Bid Stage): We provide
below the details of the Civil Engineer / Site-in-charge proposed to be deployed at site (if
available at this stage). This information is indicative; GIPCL's approval shall be obtained
prior to deployment.
Sr. Particulars Details
2 Qualification
3 Specialization
4 Total Experience (Years)
5 Experience in Similar works
6 Current Employer
7 Contact Number & Email ID
7. Breach of Undertaking: We understand and agree that failure to deploy the committed
full-time Civil Engineer / Site-in-charge at site after award of the Contract shall constitute
a breach of Contract, and GIPCL shall be entitled to invoke the remedies available under
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
the Contract, including deduction from the Running Account Bills, non-acceptance of
executed works, invocation of Performance Bank Guarantee and / or termination of the
Contract, as GIPCL may deem appropriate.
8. Confirmation: We confirm that the above commitment is unconditional, is not subject to
any precondition or qualification, and shall form part of the Contract between GIPCL and
ourselves upon award of the work.
We, the undersigned, solemnly declare and confirm that the above undertaking is made in
good faith, that all information provided herein is true and correct to the best of our knowledge
and belief, and that we are fully authorized to execute this Undertaking on behalf of the
Yours faithfully,
For and on behalf of:
Signature: Name:
Official Seal / Stamp of the Firm:
INSTRUCTIONS TO BIDDERS:
• This Undertaking must be submitted on the official letterhead of the Bidder.
• It must be signed by the Authorized person only.
• This document must be included in the Technical Bid (Part-1) envelope.
• Any Undertaking that is unsigned, undated, unstamped, or submitted on plain paper shall be
treated as non-compliant and may result in disqualification of the Bid.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
16.0 ANNEXURE-N
BANK MANDATE FORM FOR ONLINE PAYMENT
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
17.0 ANNEXURE-O
GUJARAT INDUSTRIES POWER CO LTD
H.O: P.O. Ranoli-391350 District:
Vadodara Email:
Phone No: 0265-
VENDOR REGISTRATION FORM (for 1st time participant bidders of GIPCL’s Tender)
(*Mandatory field)
1. Registered Name of the Firm*
2. Legal Status of the firm*
- Proprietor/Partnership/ Public/Private
3. Year of Establishment Registration Date
4. H.O/Registered/Regional Office
b. Name of the Contact person*
c. Phone No. (Off.)
d. Phone No. (Resi)
5. Item Manufactured/Item Stocked/Import
Dealership/Services offered*
6. Factory/Godown
b. Name of the Contact person
c. Phone No. (Off.)
d. Phone No. (Resi)
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
7. a. MSME Registration (Yes or No) *
b. MSME Registered, then submit registration
8. Correspondence Address*
9. Items offering to GIPCL
a. Details of Machinery/ Instrument & Other
equipments, etc.
b. Lab & Testing Facilities
10. Whether able to submit Test Certificate along
with each consignment
13. GST Registration No.*
14. Income Tax/PAN No.*
15. IEX code (in case of import export vender)
16. a) Name & Address of the Bankers*
b) Account No.*
c) IFSC Code: *
d) Copy of Cancelled cheque) *
17. Last Three years Annual financial
18. Name & Address of Chief Executive/
Directors/Partners/Proprietors
19. Name of Associate Companies (if
20. Please provide credentials as well as list
of customers (enclose
PO COPIES of reputed companies)
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: RCC structural repairs & external protective
anti - corrosive & anti - carbonation coating on RCC surfaces of Phase-2 Cooling Towers and affected areas of
Crusher foundations, Silos, critical RCC structures of LHS, AHS & ELHS and anti - chloride/anti - sulphate coating
on affected areas of ID Fan foundations, etc... (Year: 2026-27)”. Bid No.: SLPP/Civil/Str. Repair & Coating/2026.
21. Please provide performance and completion
certificate from customer
22. Submit authorization certificate in case Of
being a dealer*
* * field are mandatory to create vendor code.
I declare that the information furnished above are correct to the best of my knowledge. Signature
& Seal of the Authorized person. (By Vendor)
by Recommended Dept.
Checked/Verify by Respective Department Approved by Respective HOD
HOD (M&C): For Vendor approval
For GIPCL M&C Office Use Only:
Supplier Code Date of Registration
Authorized Person Name and Signature:
(Vendor code creator)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
EMD BG Format.pdf
Tender Document_Civil Str. Repairs and Coating_2026.pdf
Download all tender documents and submit your bid