Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,856
Closing Date
30 Sept 2026, 6:00 pm3d left
Executive Engineer REW Baramulla
REW BARAMULLA
C/O 09 NO. CULVERTS NHO AB KHALIQ MIR,MOHD ASHOOR GANAI,AB HAMID MIR,FAROOQ AH DAR,AB MAJEED MIR,GH MOHD GANAI,FAYAZ AH GANAI,SULAIMAN DAR, GH NANI DAR AT DANGERPORA A, UNDER ADP PRI FOR THE 2026-27 BLOCK -ZAINGEER
2026_RDPR_325830_27
237/Xen/Rew/Bla/2026-27 Dated 24/09/2026 (RETENDER)
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,856
24 Sept 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in weidth) Including disposil of excavated soil up to 1 Mtr and lift up to 1.50 Mtr | 5.89 | cum | 479.3 | ₹2,823.08 |
| 2 | Providing and laying of stone solling hand Packed including Carriage by Mt up to 30 Kms | 1.1 | cum | 1,435 | ₹1,578.5 |
| 3 | Providing and laying ofCement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.73 | cum | 5,202.9 | ₹3,798.12 |
| 4 | Providing and laying ofCement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 10.82 | cum | 5,733.6 | ₹62,037.55 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of it for foundation in Footing up to plinth level | 68.88 | sqm | 286.35 | ₹19,723.79 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of it for suspending floors/ Slabs | 13.35 | sqm | 718.45 | ₹9,591.31 |
| 7 | Providing and laying of rainforment Cement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:1.50:3 (1 cement : 1.50 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7 | cum | 9,820 | ₹68,740 |
| 8 | Providing and Fixing of M/S rainforcement including cutting, bending and binding and placing in postion | 8.4 | qtls | 11,500 | ₹96,600 |
| 9 | Providing anf Filling of RBM, nallah Makh or Khakh Bajri in layers as back filling and making approach road etc. I/C Carriage by MT up to 30 Kms | 12.52 | cum | 1,100 | ₹13,772 |
| 10 | Carriage of Stone Agg/Sand for an avg lead of 20 kms | 26.11 | cum | 465 | ₹12,141.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_1101647.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .