Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical | Rejected-Technical Single Bid |
Tender Value
₹25.6 L
EMD Value
₹2.6 L
Closing Date
24 Aug 2026, 2:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD PALIA KALAN
WARD NO 13 MOHALLA KISAN 1 ME SHIV MANDIR ME TEEN SHED/VISHRAMALAY KA NIRMAN WORK
2026_DOLBU_1174353_2
988/NPPPALIA/2026-27 DATED 11.08.2026
Open Tender
Civil Works
Item Rate
60 days
PALIA KALAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EXECUTIVE OFFICER
₹2.6 L
9 Sept 2026
12 Aug 2026
25 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
12 Aug 2026 - 24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation soil (Loam clay or sand) including left upto 1.5 meter (Sfts) and lead upto 30 Mtr (100 fts) & including filling watering and ramming of excavated earth in to the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surplus earth as director Engineer in charge up to distance of 30m (100 fts) from. the foundation trenches. (As S.I. No. 01 ) 2.6.1 | 103.68 | Cum | 189.53 | ₹19,650.47 |
| 2 | Providing & Laying cement concrete with 1:6:12 (1 cement 6 fine and & 12 graded brick ballast aggregete 40mm nominal size etc) as per SI No 273 | 14.81 | Cum | 4,520 | ₹66,941.2 |
| 3 | Class 150 brick work in 1:4 cement and C-sand etc. As per SOR CHIP 06 ITEM NO 1.0 (6,11) | 14.8 | Cum | 5,366.79 | ₹79,428.49 |
| 4 | 12mm thick plaster with cement approved C-sand in 1.4 including supply of all materials labour and T&P etc, required for proper completion of the work (As per SI No 02 | 42.6 | Sqm | 260.19 | ₹11,084.09 |
| 5 | R.C.C. work with cement approved coarse sand & 3cm (3/4") gauge approved stone ballast in propotion 1:1.5:3 in slab excluding supply of rainforcement & its bending the same with 24 B WG binding wire & nescessary centering & shuttering etc, & also including supply of all materials, labour & tools & plants etc required for proper completion of the work strength of the concrete shal not be less then M-150 S.l No. DAR 5.2.2 | 18.74 | Cum | 7,902.36 | ₹1,48,090.23 |
| 6 | Reinforcement steel work in RCC [email protected]% of cc including all labour, materials, T&P etc complete as per direction of E/I. AR | 17.65 | Qtl | 7,700 | ₹1,35,905 |
| 7 | Mild steel in work in small size & section such as wrought to required from drililing holes riviting or weldingh where necessary and their fixing required for proper… etc as per DSR 10.2.2023 | 2,096.92 | Kg | 97.35 | ₹2,04,135.16 |
| 8 | S/F of gauge corrugated C.G.T. Sheet in roofing including materials labour & T&P etc as per DSR 12.1.1 2023 | 225 | Sqm | 1,060.99 | ₹2,38,722.75 |
| 9 | Plain cement concreet floor with cement 1:2:4 approved c sand and 20mm stone balast as per DSR 11.3.1 2023 | 165 | sqm | 447.2 | ₹73,788 |
| 10 | Supply & Fixing of stone Granite board size 910x610x20mm with fixing V shape Letters (3'x2'….Etc all comp.. | 6 | Sq/Fit | 1,634 | ₹9,804 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
NIT.pdf
Tender Documents • 1.02 MB
BOQ_2210862.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .