Tender Value
₹9.1 L
EMD Value
₹9,500
Closing Date
26 Jun 2026, 3:00 pm
EE OFFICE -BHIMAVARAM
BHIMAVARAM
Maintenance of MDR & ODR Roads in (R&B) Section, Mogaltur for the year 2026-2027
946962
NIT No.2(22)/T.O./ BVRM /2026-27, Dated:03.06.2026 of the Executive Engineer (RandB) Division, Bhimavaram
OPEN - NCB
Similar Work
WEST GODAVARI
9 documents required · 9 mandatory
₹323
₹9,500
11 Jun 2026
11 Jun 2026
11 Jun 2026
Providing B.T. patchwork using 1.20 Cum of 40mm IRC size HBG metal to get compacted quantity of 1 Cum precoated with bitumen 80/100 grade using a total quantity of 42 Kgs. including tack coat, cost and conveyance of all materials to site, sectioning to camber and spreading 9.50mm to 11.20mm HBG machine crushed chips at the rate of 0.13 Cum. per 1 Cum. of metal as key stone and consolidation with 8-10 T power road roller and labour charges for picking, brushing and dusting the existing road surface and hire charges of T&P etc., complete for finished item of work as per standard specification APSS No.1510.
B.T. patch work using 1.33 cum of 9.5 to 11.20mm IRC size HBG machine crushed chips to get compacted quntity of 1 cum using total quantity of 80/100 grade 72 kgs /1 cum including cost, conveyance of all materials including labour charges for all operations such as trimming the edges of the pot holes, cleaning the surface, applying tack coat with hot bitumen, and premixing the bitumen and chips spreading the mix to camber and required profile and rolling wih power road roller 8 to 10 T capacity including fuel charges for heating bitumen and hire and all other incidental charges and operational charges of bitumen boiler etc.,complete for finished item of work as per standard specification APSS No.1510.
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers in base courses on well prepared surface and compacting with Smooth wheeled roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
Providing W.B.M patch work with 40 to 45mm IRC size HBG machine crushed metal and stone dust & Gravelfor blindage including cost, conveyance of all materials and labour charges for picking 50 to 100mm deep old metalled B T surface and spreading 40mm IRC size hard blasted granite Machine crushed metal sectioning to proper camber and consolidation with power roller 8 to 10 Tones, watering and spreading stone dust, and gravel , complete for finished item of work
Clearing light jungle from road margins and removal from Road boundary complete for finished item of work.
Stripping the excess soil from the shoulder surface / Making up loss of material / irregularities on the shoulder to the design level by adding fresh approved soil and compacting with appropriate equipment for sectioning the berms / shoulders as per MORT&H Specification No. 3003
Providing Quarry rubbish irrespective of thickness in layers including cost and conveyance to site and all labour charges for spreading gravel, watering and rolling with hand roller etc., complete for finished item of work for filling Scours / low berms
Painting to KM stones Synthetic Enamel Paint over primary coat of cement primer (total Three coats) including cost of Paintt, conveyance to site and labour charges for all operations viz., cleaning, washing, painting etc., complete for finished item of work including painting letters and figures of size upto 10cm with best Synthetic enamel paint on KM stones and village name pedestals including cost of paint, brushes and all labour charges for painting lthe letters neatly line marking etc., complete for finished item of work as directed by the departmental officers in charge of the work..SS 1207 & 1212
Painting to HM stones Synthetic Enamel Paint over primary coat of cement primer (total Three coats) including cost of Paint, conveyance to site and labour charges for all operations viz., cleaning, washing, painting etc., complete for finished item of work including painting letters and figures of size upto 10cm with best Synthetic enamel paint on HM stones including cost of paint, brushes and all labour charges for painting lthe letters neatly line marking etc., complete for finished item of work as directed by the departmental officers in charge of the work.SS 1207 & 1212
Engaging Front End Loader for clearaing deposits / Clearing wind fallen trees and also using emergency purpose including all charges i.e., Fuel and Crew charges, etc., complete for finished item of work as directed by the Engineer-in-charge.
Engaging labour for removing dead and wind fallen trees, Vegetation in expansion joints of Bridges and Culverts etc; complete for finished item of work as directed by the Engineer-in-charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
declaration.pdf
TENDER_DOCUMENT • 0.59 MB
DTS.doc
TENDER_DOCUMENT • 0.53 MB
NIT.doc
TENDER_DOCUMENT • 0.05 MB