Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹74.1 LAccepted-AOC GRAM TITOLI POST O KUHIIL DISTRICT ALMORA | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹78.8 L+₹4.8 L (6.42%)Accepted-AOC GRAM TITOLI POST O KUHEEL DISTRICT ALMORA | 2 | Accepted-AOC REJECT | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹75.0 L
EMD Value
₹1.5 L
Closing Date
27 Sept 2024, 5:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER BHIKIYASAIN NOULA
SUPPLY MAIN DISTRIBUTION PIPE LINE UNDER MASI PUMPING WATER SUPPLY SCHEME
2024_MDPEY_76052_1
2031/vividh-5/221 date 11-09-2024
Open Tender
Civil Works - Water Works
Item Rate
60 days
BLOCK BHIKIYASAIN
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
EXECUTIVE ENGINEER
₹1.5 L
OFFICE OF THE EXECUTIVE ENGINEER BHIKIYASAIN NOULA
18 Jun 2025
19 Sept 2024
30 Sept 2024
19 Sept 2024
27 Sept 2024
20 Sept 2024
20 Sept 2024
Amount
Survey, design (The contractor has to survey the site, take levels with total station, measure the length of pipe with metalic tape on prescribed alignment and submit the design of Supply Main for checking the dia of pipe before ordering for supply of pipe. On completion of this work, the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor), supplying, carting, laying & jointing of Supply Main of following size of G.I. (Medium) pipe confirming to IS 1239 Part I : 2004 including provision of specials and other appurtenant works such as fixing of air valve, sluice valve etc. at suitable points including making scouring arrangement at suitable locations by fixing tee & gate valve etc. complete and also testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete.
Excavation of earth for Pipe Line trenches of Clear Water Rising/ Feeder / Supply Main/ Distribution system in following strata requiring the use of special T&P such as Pick Axes, Sabbals etc. or by blasting or by crow bars with a lift up to 1.5 m and lead upto 30 m including refilling, watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth upto a distance of 60 m from the trenches including supply of all materials, labour, T&P etc. complete assuming that 90% Pipeline is laid in trenches .
Soil mixed with boulder and bajri
Supply and fixing of the following fittings including cartage of materials, labour, T&P etc. complete .Gate/Wheel Valve ( Brass )/G.M.Valve
20 mm dia
25mm dia
32 mm dia
40 mm dia
C.I. Air valve 25 mm (Screwed)
Supply of all materials, labour, T&P etc. and construction of 0.6 m x 0.6 m x 0.6 m size Wheel Valve/Sluice valve/air valve chamber.
BORA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_90818.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .