| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹30.1 L+₹88,017.90 (3.01%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹35.1 L+₹5.9 L (20.1%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹35.7 L+₹6.4 L (21.9%)Rejected-Finance RAMAKRISHNA COLONY PO MAJHIPARA DIST 24 PARGANAS NORTH PIN 743145 STATE WEST BENGAL | 24 PARAGANAS NORTH | WEST BENGAL | 743145 | L4 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | R.S. COMPANY L4 | CHATTERJEE ENTERPRISE L2 | M/S KARTICK CHANDRA CHAKRABORTY L3 | INDUSTRIAL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning and de-sludging, excreta, night soil etc of existing septic tank, soak well and sewage sump completely of solid/liquid sludge by pumping or manually from inside the septic tank, soak well and sewage sump and removal of sludge and depositing in excavated pits (required size and depth) exceeding 50m but not exceeding 100m. Top layers of excavation pit covered by layers of 150mm depth earth spreading with bleaching powder @ 500 gm per Sqm for disinfections purpose complete all as specified and directed. | 1,200 | CUM | 720 ₹8,64,000 | 635 ₹7,62,000 | 702 ₹8,42,400 | 625 ₹7,50,000 Lowest |
| 2.00 | De-sludging/de-silting and cleaning of existing manholes and gully traps etc of any depth including taking out sludge/ slit and other foreign materials from manholes and gully traps of any size and staking the removed silt/sludge and depositing in excavated pits (required size and depth) exceeding 50m but not exceeding 100m including taking precautionary measured such as safty belts, cell torch for lighting inside the manholes and gully traps, etc. Top layers of excavation pit covered by layers of 150mm thick earth spreading with bleaching powder @ 100 gm per Sqm on the slit/ sludge to remove to avoid bad smell and disposal of slit/ sludge by transport upto 50m complete all as specified and directed. | 500 | CUM | 640 ₹3,20,000 | 535 ₹2,67,500 | 636 ₹3,18,000 | 520 ₹2,60,000 Lowest |
| 3.00 | Systematically cleaning and de-silting/de-sludging of blocked sewage/ waste pipe line 200/300mm dia of any description by rodding with using steel rod or split bamboo sticks thoroughly from both sides between adjacent manholes still to get clear flow of sewage line is observed, passing knots, kamti and disc of required size or pumping out liquid waste /sewage, plugging and diverting the flow to the drain if necessary and stacking the removed silt/sludge and depositing in excavated pits (required size and depth) exceeding 50m but not exceeding 100m. Top layers of excavation pit covered by layers of 150mm thick earth spreading with bleaching powder @ 200 gm per Sqm for disinfections purpose complete all as specified and directed. | 500 | RM | 100 ₹50,000 | 53 ₹26,500 | 98 ₹49,000 | 50 ₹25,000 Lowest |
| 4.00 | Systematically cleaning and de-silting/de-sludging of blocked sewage/ waste pipe line 150mm dia of any description by rodding with using steel rod or split bamboo sticks thoroughly from both sides between adjacent manholes still to get clear flow of sewage line is observed, passing knots, kamti and disc of required size or pumping out liquid waste /sewage, plugging and diverting the flow to the drain if necessary and stacking the removed silt/sludge and depositing in excavated pits (required size and depth) exceeding 50m but not exceeding 100m. Top layers of excavation pit covered by layers of 150mm thick earth spreading with bleaching powder @ 200 gm per Sqm for disinfections purpose complete all as specified and directed. | 4,000 | RM | 85 ₹3,40,000 | 55 ₹2,20,000 | 83 ₹3,32,000 | 48 ₹1,92,000 Lowest |
| 5.00 | Systematically cleaning and de-silting/de-sludging of blocked sewage/ waste pipe line 100mm dia of any description by rodding with using steel rod or split bamboo sticks thoroughly from both sides between adjacent manholes still to get clear flow of sewage line is observed, passing knots, kamti and disc of required size or pumping out liquid waste /sewage, plugging and diverting the flow to the drain if necessary and stacking the removed silt/sludge and depositing in excavated pits (required size and depth) exceeding 50m but not exceeding 100m. Top layers of excavation pit covered by layers of 150mm thick earth spreading with bleaching powder @ 200 gm per Sqm for disinfections purpose complete all as specified and directed.
(Note for Item No. 1.00 to 5.00 : Excavation of trenches, disposal of surplus soil and bleaching powder is deemed to be included in the quoted unit rates however quantity of sludge portion only will be measured and paid. ) | 1,000 | RM | 87 ₹87,000 | 52 ₹52,000 | 86 ₹86,000 | 45 ₹45,000 Lowest |
| 6.00 | Cleaning of chocked/blocked WC, bath & kitchen trap upto IC/gulley trap of any size including bailing out water/sewage manually and removing the deposited residual sludge/debris and depositing in excavated pits (required size and depth) exceeding 50 m but not exceeding 100m / upto 1st manhole. Top layers of excavation pit covered by layers of 150mm thcik earth spreading with bleaching powder @200gm per Sqm for disinfection purpose ground to a distance not exceeding 50 mtr complete all as specified and directed. | 750 | EACH JOB | 98 ₹73,500 | 65 ₹48,750 | 97 ₹72,750 | 50 ₹37,500 Lowest |
| 7.00 | Demolition of breaking up 100mm dia drain pipe (salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed. | 100 | RM | 85 ₹8,500 | 55 ₹5,500 | 76 ₹7,600 | 49 ₹4,900 Lowest |
| 8.00 | Demolition of breaking up 75mm dia drain pipe (salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed. | 40 | RM | 82 ₹3,280 | 60 ₹2,400 | 81 ₹3,240 | 50 ₹2,000 Lowest |
| 9.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillar etc but excluding ashlars facing dressed stonework & precast concrete articles complete all as specified and directed. | 40 | CUM | 1,230 ₹49,200 | 1,187 ₹47,480 Lowest | 1,211 ₹48,440 | 1,189 ₹47,560 |
| 10.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth for foundation or for shafts, well, cesspits, pier holes etc not exceeding 10 Sqm on plan and not exceeding 1.5 mtr in depth and getting out in soft/loose soil complete all as specified and directed. | 250 | CUM | 400 ₹1,00,000 | 385 ₹96,250 | 396 ₹99,000 | 380 ₹95,000 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
29 Aug 2025, 6:00 pmClosed
GE BARRACKPORE
Office of the GE BARRACKPORE, KOLKATA - 700120
CLEANING AND REPAIR/REPLACEMENT OF DAMAGED SEWAGE LINES, MANHOLES, SUMPS AT MIL STATION KANCHRAPARA UNDER GE BARRACKPORE
2025_MES_722002_1
8156/E8
Open Tender
Civil Works
Item Rate
180 days
Barrackpore
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹500
GE BARRACKPORE
₹60,000
Yes
20 Nov 2025
22 Jul 2025
1 Sept 2025
22 Jul 2025
29 Aug 2025
5 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .