Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Fee/PreQual/Technical/Finance COLLEGE TILLA AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799001 | -15.12% | ₹3.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.3 L+₹1.2 L (37.8%)Admitted-Fee/PreQual/Technical/Finance KATHALIA RANIRIKHAMAR AGARTALA TRIPURA | AGARTALA | TRIPURA | +16.99% | ₹4.3 L+₹1.2 L (37.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.6 L
EMD Value
₹7,279
Closing Date
16 Sept 2026, 3:00 pmClosed
Executive Engineer IE Division Agartala
Office of the Executive Engineer IE Division Agartala
Replacement of service cable of Shibnagar Feeder from Transformer to main panel at Nazrul Kalakshetra Agartala Tripura
2026_CEPWD_76800_1
EE_IED_AGT_96_2026_27
Open Tender
Electrical Works
Percentage
30 days
NAZRUL KALAKSHETRA
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹7,279
17 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying & Laying of 3.5 C 240 sq. mm. XLPE insulated, PVC sheathed, 1.1 kV cable, materials of H2//H4 Grade aluminium as paer class 2 of IS:8130, impedance of cable 0.177 ohm/km & continuous current carrying capacity in Air 392 amps i/c necessary connection etc as required
Approve Make: Polycab/ Havells/Finolex | 140 | mtrs | 2,418 | ₹3,38,520 |
| 2 | Excavation of earth for cable trench of 800mm depth & 300mm width in all kinds of soil including back filling of cable trench with the excavated soil with 20cm layer of sand, 3.5 nos bricks per metre for protection including ramming, consolidating to the original shape as per dirrection of Site Engineer :- | 10 | mtrs | 150 | ₹1,500 |
| 3 | Drawing of armoured/un-armoured cable with proper saddling etc as required:- | 110 | mtrs | 23 | ₹2,530 |
| 4Supplying and fixing of heat shrinkable cable end termination kits of following sizes : - | |||||
| 4.01 | 3.5 core or 4 core 240/300 sqmm size:- | 8 | each | 2,496 | ₹19,968 |
| 5Supplying and fixing of aluminium terminal ends (LUGS) - long barrel of following sizes : - | |||||
| 5.01 | 240 sq mm | 12 | each | 107 | ₹1,284 |
| 5.02 | 120 sq mm | 4 | each | 42 | ₹168 |
stage.html
html • 0.02 MB
finance_78183.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
DNIT96.pdf
Tender Documents • 2.20 MB
BOQ_78183.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .