Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-Finance PAHARGANJ SECOND COLONY LAL SAGAR JODHPUR 342001 RAJ | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹20.3 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹21.5 LRejected-Finance | ₹21.5 L | L2 | Rejected-Finance Rejected due to bidder not L1 |
| Sl No | Description | Qty | Unit | Shree Karni Construction L1 | DMA PROJECTS L2 |
|---|---|---|---|---|---|
| 1.00 | Demolition of brick work built in CM including all quions, arches, pillars etc complete all as specified. | 3 | Cum | 100 ₹300 | 300 ₹900 |
| 2.00 | M&L brickwork with subclass ‘B’ bricks, straight or curved on plan to any radius in half brick thick walls built in CM 1:4 by using old sized bricks complete all as all as specified and directed. | 4 | Sqm | 4,500 ₹18,000 | 900 ₹3,600 |
| 3.00 | M & L brick work with sub class "B"brick (old size) straight or curved on plan exc 6m mean radius in CM 1:6 completed all as specified. | 2 | Cum | 4,000 ₹8,000 | 5,800 ₹11,600 |
| 4.00 | Taking down cement or lime plaster of any description from stone or brick walls etc including raking out joints, hacking for key scrubbing down with water and disposing off the rubbish complete all as specified or directed. | 570 | Sqm | 10 ₹5,700 | 30 ₹17,100 |
| 5.00 | M & L for rendering 15mm thick on fair faces of brick/ concrete surfaces in CM (1:4) mixed with water proofing compound in top @ 3% by weight of cement or as per manufacturers instruction finishing the surface fair and even without using extra cement complete all as specified and directed. (WPC measured and paid seperately). | 200 | Sqm | 250 ₹50,000 | 290 ₹58,000 |
| 6.00 | Supply only integral water proofing compound conforming to IS: 2645 - 1975 specification complete all as specified and as directed. | 18 | Kg | 50 ₹900 | 40 ₹720 |
| 7.00 | Material & Labour for preparation of new plasteres surfaces on walls and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified and directed. | 200 | Sqm | 100 ₹20,000 | 90 ₹18,000 |
| 8.00 | M & L for 15mm thick rendering on fair faces of brick/ concrete surfaces in CM (1:6) finished even and smooth without using extra cement complete all as specified and directed. | 220 | Sqm | 250 ₹55,000 | 290 ₹63,800 |
| 9.00 | M & L for preparation of new plastered surfaces on walls and applying two coats of oil bound distemper with priming plastered and other surfaces with alkali resistant priming paint with 02 mm wall care putty complete all as specified and directed. | 220 | Sqm | 110 ₹24,200 | 90 ₹19,800 |
| 10.00 | M & L for complete removal of existing treatment on walls and applying two coats of oil bound distemper over with 2mm wall care putty with priming plastered and other surfaces with alkali resistant priming paint complete all as specified and directed. | 900 | Sqm | 100 ₹90,000 | 95 ₹85,500 |
Updated dates
Tender Value
₹23.2 L
EMD Value
₹46,500
Closing Date
12 May 2026, 6:00 pmClosed
GE (A) AHMEDABAD
Office of the GE (Army) Camp Hanuman, Ahmedabad - 380 004
SPECIAL REPAIR TO BLDG NO P-498 OF GKOI AT AHMEDABAD CANTT
2026_MES_760032_1
8337/E8
Open Tender
Civil Works
240 days
GE A AHMEDABAD
AS PER NIT
8 documents required · 8 mandatory
₹500
GE A AHMEDABAD
₹46,500
Yes
15 May 2026
11 Apr 2026
14 May 2026
11 Apr 2026
12 May 2026
25 Apr 2026
11 Apr 2026 - 25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Demolition of brick work built in CM including all quions, arches, pillars etc complete all as specified. | - | Cum | - | - | |
M&L brickwork with subclass ‘B’ bricks, straight or curved on plan to any radius in half brick thick walls built in CM 1:4 by using old sized bricks complete all as all as specified and directed. | - | Sqm | - | - | |
M & L brick work with sub class "B"brick (old size) straight or curved on plan exc 6m mean radius in CM 1:6 completed all as specified. | - | Cum | - | - | |
Taking down cement or lime plaster of any description from stone or brick walls etc including raking out joints, hacking for key scrubbing down with water and disposing off the rubbish complete all as specified or directed. | - | Sqm | - | - | |
M & L for rendering 15mm thick on fair faces of brick/ concrete surfaces in CM (1:4) mixed with water proofing compound in top @ 3% by weight of cement or as per manufacturers instruction finishing the surface fair and even without using extra cement complete all as specified and directed. (WPC measured and paid seperately). | - | Sqm | - | - | |
Supply only integral water proofing compound conforming to IS: 2645 - 1975 specification complete all as specified and as directed. | - | Kg | - | - | |
Material & Labour for preparation of new plasteres surfaces on walls and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified and directed. | - | Sqm | - | - | |
M & L for 15mm thick rendering on fair faces of brick/ concrete surfaces in CM (1:6) finished even and smooth without using extra cement complete all as specified and directed. | - | Sqm | - | - | |
M & L for preparation of new plastered surfaces on walls and applying two coats of oil bound distemper with priming plastered and other surfaces with alkali resistant priming paint with 02 mm wall care putty complete all as specified and directed. | - | Sqm | - | - | |
M & L for complete removal of existing treatment on walls and applying two coats of oil bound distemper over with 2mm wall care putty with priming plastered and other surfaces with alkali resistant priming paint complete all as specified and directed. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TENDER8337.pdf
Tender Documents • 2.32 MB
BOQ_851303.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid