| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.9 LAccepted-AOC | 1 | Accepted-AOC Agreement Executed | |
| 2 | 2₹16.2 L+₹28,794.74 (1.81%)Rejected-AOC EDAMCHERYKUNNU HOUSE CHENGALA PO KASARGOD | KANNUR | KERALA | 670511 | 2 | Rejected-AOC Agreement Executed | |
| 3 | 3₹16.6 L+₹73,435.99 (4.62%)Rejected-AOC | 3 | Rejected-AOC Agreement Executed | |
| 4 | 4₹17.5 L+₹1.6 L (9.99%)Rejected-AOC | 4 | Rejected-AOC Agreement Executed | |
| 5 | 5₹17.9 L+₹2.0 L (12.7%)Rejected-AOC | 5 | Rejected-AOC Agreement Executed |
Tender Value
₹22.3 L
EMD Value
₹33,482
Closing Date
1 Nov 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer PWD Roads Division Palakkad
Construction of Retaining wall at Km 4/400 to 4/500 of Pathiripala - Kongad road.
2021_PWD_447269_1
PWD/RB/4344/2021-2022
Open Tender
Civil Works - Roads
Item Rate
180 days
KONGAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹33,482
Yes
28 Dec 2021
22 Oct 2021
5 Nov 2021
22 Oct 2021
1 Nov 2021
22 Oct 2021
Amount
Retaining wall
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
OD50537/2021-2022:PVC WEEP HOLES- Providing weep holes using 100mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
Culvert
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
MOHAMMED KUNHI C A
SATHEESH BABU N
MUHAMMED ALI P.S.
MK CONSTRUCTIONS CO
ABDUL NASAR. M
Bidder Name
MUHAMMED ALI P.S.
SATHEESH BABU N
ABDUL NASAR. M
MOHAMMED KUNHI C A
A.P. SUBAIR
MK CONSTRUCTIONS CO
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_638116.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .