Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | ₹5.7 L | L1 | Accepted-Finance Due to lowest rate |
| 2 | L2₹5.8 LRejected-Finance | ₹5.8 L | L2 | Rejected-Finance Due to highest rate |
| 3 | L3₹6.1 LRejected-Finance | ₹6.1 L | L3 | Rejected-Finance Due to highest rate |
| Sl No | Description | Qty | Unit | TILAK GULERIA GOVT CONTRACTOR L1 | Ashwani L2 | sunil balouria govt contractor L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc.(in pipes and pits) in all kinds of soils such as pick work, jumper work, blasting in soft/hard rock, chiselling/wedging out of rock/where blasting prohibited) saturated soil stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer –in-charge with in all leads and lifts. | 18.62 | Cum | 300 ₹5,586 | 325 ₹6,051.50 | 350 ₹6,517 |
| 2.00 | Providing and laying Cement concrete 1:4:8(1 cement: 4sand: 8graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts. | 14.7 | Cum | 5,000 ₹73,500 | 5,050 ₹74,235 | 6,000 ₹88,200 |
| 3.00 | Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring,shuttering,propping etc.height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for in situ work:- In duct of kuhl with in all leads and lifts. | 323.4 | Sqmt | 150 ₹48,510 | 180 ₹58,212 | 200 ₹64,680 |
| 4.00 | Providing and laying cement concrete work 1:2:4 (1cement 2sand 4 graded stone aggregate 20mm thick nominal size)and curing complete excluding cost or form work and reinforceed concrete work in foundation footing and base columns and the like with in all leads and lifts. | 41.16 | Cum | 8,000 ₹3.3 L | 8,050 ₹3.3 L | 8,100 ₹3.3 L |
| 5.00 | Providing tor/mild steel reinforcement for RCC work i/c bending ,binding and placing in position complete upto floor two level with in all leads and lifts. | 1,234.8 | Kg. | 90 ₹1.1 L | 92 ₹1.1 L | 94 ₹1.2 L |
Tender Value
₹5.0 L
EMD Value
₹9,930
Closing Date
23 Mar 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Shahpur
Restoration of FIS Dhamul Kuhal in Tehsil Shahpur, Distt. Kangra, (HP)
2026_HPIPH_130930_1
EE/JSDS/NIT/2025-11140-89 dated- 09/03/2026
Open Tender
Civil Works
90 days
Shahpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Executive Engineer
₹9,930
9 Apr 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
10 Mar 2026 - 23 Mar 2026
Excavation in foundation and trenches etc.(in pipes and pits) in all kinds of soils such as pick work, jumper work, blasting in soft/hard rock, chiselling/wedging out of rock/where blasting prohibited) saturated soil stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer –in-charge with in all leads and lifts.
Providing and laying Cement concrete 1:4:8(1 cement: 4sand: 8graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts.
Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring,shuttering,propping etc.height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for in situ work:- In duct of kuhl with in all leads and lifts.
Providing and laying cement concrete work 1:2:4 (1cement 2sand 4 graded stone aggregate 20mm thick nominal size)and curing complete excluding cost or form work and reinforceed concrete work in foundation footing and base columns and the like with in all leads and lifts.
Providing tor/mild steel reinforcement for RCC work i/c bending ,binding and placing in position complete upto floor two level with in all leads and lifts.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_193599.pdf
techsummary_193599.pdf
finance_193599.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Form6and8.pdf
Tender Documents • 0.80 MB
Termsandconditions.pdf
Tender Documents • 0.34 MB
BOQ_193599.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid