| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.2 LAccepted-AOC RHODE S KHANCHA CORNER RAJMAHAL ROAD VADODARA 390001 | VADODARA | VADODARA | GUJARAT | 390001 | L1 | Accepted-AOC Lowest quoted agency | |
| 2 | L2₹81.2 L+₹3.0 L (3.86%)Rejected-Finance | L2 | Rejected-Finance Not the Lowest quoted agency | |
| 3 | L3₹82.2 L+₹4.0 L (5.16%)Rejected-Finance E76 LGF KALKAJI BHAIRAV MANDIR NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | L3 | Rejected-Finance Not the Lowest quoted agency | |
| 4 | L4₹85.2 L+₹7.0 L (8.97%)Rejected-Finance E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | L4 | Rejected-Finance Not the Lowest quoted agency | |
| 5 | L5₹94.6 L+₹16.4 L (21.0%)Rejected-Finance | L5 | Rejected-Finance Not the Lowest quoted agency |
Tender Value
₹100.0 L
EMD Value
₹2.0 L
Closing Date
15 Nov 2019, 6:00 pmClosed
Asst. Gen. Manager Engg. (Electrical
Asst. Gen. Manager Engg. (Electrical), O/o The Airport Director, 2nd Floor, AAI, SVPI, Airport Ahmedabad -382475
Operation and Annual Comprehensive Maintenance of Central AC plant of Terminal 1 Building at SVPI Airport Ahmedabad
2019_AAI_35003_1
AAI/AH/JtGM/AGMIII/eNIT2/19-20
Open Tender
Electrical Works
Item Rate
365 days
SVPI airport Ahmedabad
As per NIT
15 documents required · 15 mandatory
₹1,180
Yes
Airports authority of India
₹2.0 L
Yes
24 Jun 2020
5 Nov 2019
21 Nov 2019
6 Nov 2019
15 Nov 2019
6 Nov 2019
6 Nov 2019 - 13 Nov 2019
Amount
Running and Operation of AC plant: Operation and up keeping of HVAC system of T-1 building involving operation, attending to the complaints, ensuring serviceability, maintaining records/ documentation as per the scope of work and terms & conditions of contract on all days including Sundays & holidays of the month on round the clock basis etc. complete all as required. The man power to be deployed in each shift of 8 hrs as detailed in General & Special Condition of Contract. The list of Equipment’s to be operated and upkeep shall be as per special condition of contract.
Comprehensive Maintenance of AC plant: Comprehensive maintenance of AC Plant for Terminal-1 Domestic Airport Building (Departure and Arrival) having 3 X 425 TR Daikin Make centrifugal chiller, 1 X 375 TR York make Centrifugal chiller and 2 X 375 TR Carrier make Screw chillers i/c Comprehensive maintenance of all equipments, machineries and accessories related to HVAC system as detailed in the special condition of contract which includes repair, replacement of defective components, carrying preventive maintenance as per manufacturer's & AAI guidelines, maintenance of records/documentation, supplying consumables for electrical and mechanical maintenance and for softening of condenser water, chemical dosing to keep chilled and condenser water quality within permissible limit as per OEM standard etc complete as required. The work shall be carried out as per conditions of contract.
Comprehensive maintenance of 7 X 11 TR Split type Air cooled AC condenser unit with DX coil type 20000 CFM AHU & Electrical panel i/c all equipments, machineries and accessories related to Air conditioning system as detailed in the special condition of contract which includes repair, replacement of defective components, carrying preventive maintenance as per manufacturer's & AAI guidelines, maintenance of records/ documentation, supplying consumables for electrical and mechanical maintenance as per OEM standard etc complete as required. The work shall be carried out as per conditions of contract.
Carrying out Inspection of following capacity & make Chillers from Original Equipment Manufacturer (OEM) and submission of Inspection Reports to Engineer-In-Charge as specified in SCC & Technical Specifications. (Rate are per chiller)
375 TR Centrifugal Chillers (York Make) - 1 No.
375 TR Screw Chillers (Carrier Make) - 1 No.
425 TR Centrifugal Chillers (Daikin Make) - 1 No.
Supplying and fixing of 19mm thickness of mat finish closed cell Nitrile rubber (Class “O”) insulation on existing duct after applying suitable adhesive for Nitrile rubber. The joints shall be sealed with 50 mm wide and 3 mm thick self-adhesive nitrile rubber tape insulation complete as per specifications and as required.
Supply of Aluminum frame box type pre filter for AHUs with thickness of 50 mm with synthetic non-woven media sandwich between two layer of HDPE mesh held by suitable adhesive (Polyurethane or equivalent) and supported by rigid GI separators. The construction of Pre-Filter shall be robust and rigid, suitable for water jet pressure cleaning from the opposite side of Airflow having efficiency 90-95% down to 10 micron and face velocity not exceeding to 500 FPM for following size of filters:
610 mm X 610 mm X 50 mm
600 mm X 600 mm X 50 mm
600 mm X 500 mm X 50 mm
500 mm X 500 mm X 50 mm
610 mm X 305 mm X 50 mm
305 mm X 305 mm X 50 mm
PAN POLAR ENGINEERS PVT. LTD.
Skyline Airconditioning Engineers Pvt. Ltd.
Supertech Engineers
Anzen Projects Private Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .