Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC JATUDIH MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.3 L+₹25,677.51 (1.97%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.4 L+₹38,452.39 (2.95%)Rejected-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | L3 | Rejected-AOC L3 |
Tender Value
₹12.8 L
EMD Value
₹15,969
Closing Date
3 Mar 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Lifting (by chain pulling) of pumps from DR3 4th dip to DR3 ROK level and loading into arm trolly XVI seam, at Moonidih Colliery W.J Area
2026_BCCL_354094_1
BCCL/WJA/MND/SUR/2025-26/125
Open Tender
Miscellaneous Works
Percentage
20 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹15,969
19 Mar 2026
21 Feb 2026
5 Mar 2026
21 Feb 2026
3 Mar 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Lifting (by chain pulling) of pumps from DR3 4th dip to DR3 ROK level and loading into arm trolly XVI seam, at Moonidih Colliery W.J Area | |||||
| 1.01 | manual transport or lifting from DR3 4dip 200m to DR3 rock level, 02
numbers of pumps, 02 numbers motors, 02 numbers switchs, 02
numbers baseframe, cable (200m X2) = 400m ,6' pipes 400m 4 dip
DR3 to "O" levelby (by chain and pulley). (i) Analysis For every 12 mt Shiftng of pump, motor,baseframe each/Lowering or riseing 6
unskilled manshift is required. manshift is required (200/12) x 6
manshift X 6 item = 600 manshift. (ii) Analysis: Manshift required for
manual transportation of starter/switch =8 unskilled man shift is
require. 8 man shift 2 switch = 16manshift (iii) analysis 100m
hanging cable shifting /rising, 6 unskilled manshift is required total manshift is required for staging 400m cable at 0 level = (400 /100) × 6=
24 manshift. (iv) mannual transportation 200m of 6' pipe (400/5) = 80
numbers, 6 unskilled is required for transport 4 pipes. manshift is
required = (80/4) x6 = 120 manshift total manshift = 600+16+24+120=
760manshift. | 760 | unskilled manshift | 1,402.6 | ₹10,65,976 |
| 1.02 | for loading at DR3 level and manuall pussing rock st in arm trolly, 02 numbers of pump, 02 motors by track and haulage. 04 arm trolly is required. Analysis loading chain pully for 01 trolly, 8 unskilled manshift is required and 1 shift. Cost/ trolly= (8x1402.6x 1 shift) = Rs11220.8/trolly | 4 | trolley | 11,220.8 | ₹44,883.2 |
| 1.03 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR | 1 | Units | 1,66,628.88 | ₹1,66,628.88 |
| 2CMPF | |||||
| 2.01 | CMPF, Pension and admin. Charge of Employee Un Skilled | 792 | Heads | 268.36 | ₹2,12,541.12 |
| 3 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_366917.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .