Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.0 L
EMD Value
₹2,025
Closing Date
25 Nov 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Electrical and Mechanical Division, Vadodara
Repair along with dismantling and installation of the 600 Cusecs water discharge capacity Pumping Station at MRBC near NMC Ch 149.81 km for SCF pump no. 10. PS II. (2nd Attempt)
362430
13 of 2026-27
Open
Electrical - Motors and other equipment
Works
Vadodara
19 documents required · 16 mandatory · 3 optional
₹708
Executive Engineer, Electrical and Mechanical Division, Vadodara
₹2,025
3 Nov 2026
3 Nov 2026
3 Nov 2026
25 Nov 2026
3 Nov 2026
120 days
Estimated cost: Rs. ₹
GOVERNMENT OF GUJARAT
SARDAR SAROVAR NARMADA NIGAM LIMITED
THIS PAGE HAS BEEN KEPT BLANK
Sr No Section Description PageNo
1 INVITATION FOR BID
2 Section-1 Instructions to Bidders
3 Section-2 Qualification Information
4 Section-3 Conditions of Contract
5 Section-4 Contract Data
6 Section-5 Technical Specification
7 Section-6 Form of Bid
8 Section-7 Bill of Quantities
9 Section-8 Securities and Other Forms
10 Section-9 Drawings
11 Section-10 Documents to be furnished by Bidder
THIS PAGE HAS BEEN KEPT BLANK
INVITATION FOR BID
THIS PAGE HAS BEEN KEPT BLANK
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer (E&M), Electrical & Mechanical Division, Vadodara invites
bids for the construction of works detailed in the table. The bidders may submit bids for any
or all of the following works.
Approximate value
Package Bid security Cost of Period of Class of
Name of work of works
No. (Rs.) document completion Registration
1. The works of Repair ₹ 202464 2025/- 708/- 01 Month “E1” Class
along with (600/- +
dismantling and 108 (18 %
installation of the GST))
600 Cusecs water
discharge capacity
Pumping Station at
Ch 149.81 km for
1. Prospective / Interested bidder may download the Bid Documents from website
https://tender.nprocure.com free of cost till the Time and Date as mentioned on online NIT
at website https://ssnnltender.nprocure.com.
a. The concerned Bidder shall submit the certificate of registration or renewal receipt as approved
bidder in “E1” Class issued by Electrical Division in Sardar Sarovar Narmada Nigam Limited
(SSNNL) / Narmada, Water Resources, Water Supply & Kalpsar Department (NWRWS & K
Dept.) / R&B Department of Gujarat State or equivalent class in CPWD / Railway / Other State
b. The Bidder registered outside Gujarat shall apply for getting registered themselves in “E1”
Class issued by Electrical Division either with the SSNNL or with the state of Government of
Gujarat before the date of submission of tender. The proof of the application for the registration
shall be attached with the tender online.
c. The Bidder registered in CPWD / Railway / Other State Government equivalent to class of
Gujarat mentioned above, will be eligible to quote for the tender with the condition that the
concerned Bidder shall get themselves registered in “E1” Class issued by Electrical Division
either with the SSNNL or in the state of Gujarat on or before the date of acceptance (approval)
2. However, Bidder who is submitting the Bid Online will have to pay the Bid Document
Fee/Tender Fee through Demand Draft only of any Schedule Bank payable at Vadodara and
in favour of “Executive Engineer, Narmada Project Hydro Power, Vadodara ”. Once
the Bid is received online, Bid Document / Tender Fee will not be refundable.
As Per GoG R&B Department’s Circular No. PARACH/102/000/IB/221/(59)/C
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid
Security / EMD shall be submitted in electronic format through online (by scanning) while
uploading the bid, this submission shall mean that bid document / tender fee and Bid
Security / EMD has been received. Accordingly, the offer of only those shall be opened
whose Bid Document / Tender Fee and Bid Security / EMD have been received
electronically. However, for the purpose of realization of Demand Draft, and FDR / Bank
Guarantee bidder shall send the same in original through R.P.A.D. so as to reach to
‘Executive Engineer, Electrical & Mechanical Division, Vadodara’ within 7 (seven)
Days from the last day of bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in
original to Executive Engineer / Tender Inviting Authority by bidder shall be initiated.
WRD GR No. PRC-102014-1-MICell-K.1 Dated: 29/10/2014.
3. Bids received online, will be opened on the time, date and place as specified in the online
NIT at website https://tender.nprocure.com in the presence of the bidders or their authorized
representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids
will be opened on the next working day at the same time and venue.
4. A pre bid meeting will be held on ………………………………at
………………………..hrs. at the office of ………………………………………to clarify
the issues and to answer questions on any matter that may be raised at that stage as stated in
clause 9.2 of ‘instructions to Bidders’ of the bidding documents.
5. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be
rounded off to the next thousand rupees.
6. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the bidder
cannot modify / edit / withdraw their submitted offer in any case. No written or online
request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of
submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender are
liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the
bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the format
given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked strictly in
electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the past, it
shall not be deemed to be a ground / reason for not giving required information for this
L. Information supplied for earlier projects shall not be considered while evaluation of this
bid. The Government will not ask for any other information, unless it is found
absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation.
# For the works costing up to Rs. 7.5 crore (WRD Works), Rs. 7.0 crore (ROAD/ BRIDGE/
BUILDING WORKS), Rs. 0.5 Crore (Electrical Works) kindly refer to GoG NWRWS &
K Department’s Circular No. Paracha/1097/1397(11)/pa.fa./ MICELL(k-1) dated
7. List of Documents required for work
Following documents shall be submitted in electronic format only through online by
scanning and the (i) Bid Document Fee / Tender Fee (ii) Bid Security / EMD should be
sent in original to the Tender opening authority through RPAD/By Hand/Speed
Post/Courier, so as to reach to Executive Engineer (E&M), Electrical & Mechanical
Division, Vadodara within 7 (seven) Days from last day of submission of Bid.
1. Scanned copy of DD of Tender Fee (of amount as prescribed in tender notice)
2. Scanned copy of EMD (of amount as prescribed in tender notice)
3. Scanned copy of Valid Registration certificate/renewal receipt of registration fee (for
those bidders who are registered in equivalent to ‘E1’ Class and above of Gujarat State).
4. Scanned copy of Valid Bank certificate/ Undertaking (as per Format specified in
QUALIFICATION INFORMATION)
5. Scanned copies of a Power of Attorney duly authorized by a notary public, if power is
delegated for signing the Bid to other person by the Bidder.
6. JV/Consortium Agreement (if applicable)
7. Scanned copy of the Audited Balance Sheets of last Five years/CA Certificate.
8. Scanned copy of GST Certificate.
9. Scanned copy of Labour License (if applicable)
10. Scanned copy of EPF and ESI Registration certificate with paid challan for
(Month)(Year) which is paid before end of (Month)(Year) of (Nos)
11. Details of Technical Staff employed along with educational qualification certificate and
appointment letter.
12. Any other documents as per requirement of the tender/SBD.
13. Scanned copy of Valid electrical contractor license.
INSTRUCTIONS TO BIDDERS
THIS PAGE HAS BEEN KEPT BLANK
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 14 19. Sealing & Marking of Bids
2. Source of Funds 14 20. Deadline for Submission of
3. Eligible Bidders 14 21. Late Bids
4. Qualification of the 18 22. Modification and
Bidder Withdrawal of Bid
5. One Bid per Bidder 18 E. Bid Opening and Evaluation
6. Cost of Bidding 18 23. Bid Opening
7. Site Visit 18 24. Process to be Confidential
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 19 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 19 27. Correction of Errors
10. Amendment of Bidding 20 28. Deleted
C. Preparation of Bids 29. Evaluation and Comparison
of Financial Bids
11. Language of Bid 21 30. Deleted
12. Documents Comprising 21 F. Award of Contract
13. Bid Prices 21 31. Award Criteria
14. Currencies of Bid and 22 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 22 33. Notification of Award and
Signing of Agreement
16. Bid Security 22 34. Performance Security
17. Alternative Proposals By 23 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 23 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works (as
defined in these documents and referred to as ‘the works”) detailed in the table given in
IFB. The bidders may submit bids for any or all of the works detailed in the table given in
1.2 The successful bidder will be expected to complete the works by the intended completion
date specified in the Contract Data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat / Govt. of
India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project Manager
for the Contract. A firm that has been engaged by the Employer to provide consulting
services for the preparation or supervision of the works, and any of its affiliates, shall not be
eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including drawings and
charts, as necessary. The proposed methodology should include a program of construction
backed with equipment planning and deployment duly supported with broad calculations
and quality assurance procedures proposed to be adopted justifying their capability of
execution and completion of work as per technical specifications, within stipulated period
4.5 QUALIFICATION CRITERIA:
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/ fail
criteria regarding the Applicant’s general and particular experience, personnel and
equipment capabilities and financial positions, as demonstrated by the applicant’s responses
in the forms attached to the letter of application ( specified requirement for joint ventures
are given under para 4.6 below ) Subcontractors experience and resources shall not be taken
in to account in determining the applicants compliance with the qualifying criteria.
To qualify for more than one contract, the applicant must demonstrate having experience
and resources sufficient to meet the aggregate of the qualification criteria for each contract
given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year.
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting
Applicant should indicate actual figures of costs and amount for the works executed
by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency the
above enhanced multiplying factors will not be applied. Instead, the current market
exchange rate (State Bank of India BC Selling rate as on the last date of submission of the
bid) will be applied for the purpose of conversion of the amount in foreign currency into
4.5.3 General Experience.
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum annual financial turnover of Rs. 202464 for works in progress
and completed in all classes of Civil Engineering construction works in any one year,
over the last five financial years.
(b) Work Experience:
Experience in successfully completing or substantially completing at least one
contract of similar work (i.e. SITC/ITC/repairing of pump-motor set with minimum
capacity of 2 MW) in Major/large dams of at least 40 percent of the value of
proposed contract within the last five financial years.
The works may have been executed by the applicant as a prime contractor or as a
member of a joint venture or as a nominated sub-contractor. As subcontractor, he
should have acquired the experience of execution of all major items of work under
the proposed contract. In case a project has been executed by a joint venture, weight
towards experience of the project would be given to each joint venture in proportion
to their financial participation in the joint venture. if work executed jointly otherwise
as per the scope of work define in Joint Venture agreement.
Substantially completed works means those works which are at least 90 % completed
as on the date of submission (i.e. gross value of work done up to the last date of
submission is 90 % or more of the original contract price) and continuing
satisfactorily. For these, a certificate from the employers shall be submitted along
with the application in corporating clearly the name of the work, contract value,
billing amount, date of commencement of works, satisfactory performance of the
contractor and any other relevant information. (the experience certificate should be
signed by the officer not below the rank of EE)
4.5.4 Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5 Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major equipment
to attain the completion of works in accordance with the prescribed construction schedule
are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their bid,
a detailed construction planning and methodology supported with layout and necessary
drawings and calculations to allow the employer to review their proposals. The numbers,
types and capacities of each plant/equipment shall be shown in the proposals along with the
cycle time for each operation for the given production capacity to match the requirements.
4.5.6 Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets
(aggregate of working capital, cash in hand and uncommitted bank guarantees) and / or
credit facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7 The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If
necessary, the employer will make inquiries with the applicant’s bankers.
4.5.8 Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting
from contracts completed or under execution by him over the last five financial years. A
consistent history of awards against the Applicant or any partner of a joint venture may
result in failure of the applicant.
4.5.9 Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified if
Made misleading or false representation in the forms, statements submitted, and / or Record
of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non – performance of the contractor; consistent history of
litigation awarded against the applicant or financial failure due to bankruptcy. The
rescinding of contract of a joint venture on account of reasons other than non –
performance, such as Most Experienced partner of joint venture pulling out, court directions
leading to breaking up of a joint venture before the start of work, which are not attributable
to the poor performance of the contractor will, however, not affect the qualification of the
individual partners.
4.5.10 The bidder who have applied for corporate Debt Restructuring (CDR) / facing
recovery proceedings from financial institutions / facing winding up processing / those
under BIFR in the last 5 financial year shall be considered for bid qualification.
However if the bank / financial institution has accepted the proposal of debt
restructuring on or before the last date of online submission, the same shall be
considered for further evaluation. An affidavit by bidder along with certificate from
bank must be produced in such cases. In case of Joint Venture agreement, this
provision shall be applicable for both lead partner and JV partner.
4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others)
(Applicable only for estimated project cost of 50 Crore and above)
4.6.1 Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para
4.5.3& 4.5.6 above. The joint venture must collectively satisfy the criteria of para
4.5.3 & 4.5.6 above. The experience of the other joint venture partners shall be
considered if it is not less than 30 percent of the qualifying criteria in para 4.5.3
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and shall be
submitted with a copy of the joint venture agreement providing the joint and several
liabilities with respect to the contract.
4.6.2 Qualification of a joint venture does not necessarily qualify any of its partners individually
or as a partner in any other joint venture. In case dissolution of a joint venture, each one of
the constituent firms may qualify if they meet all the qualification requirements, subject to
the written approval of the Employer.
4.7 Bid Capacity
Applicants who meet the minimum qualification criteria will be qualified only if their
available bid capacity at the expected time of bidding is more than the total estimated cost
of the works. The available bid capacity will be calculated as under:
Assessed Available Bid Capacity = (A*N*2-B), where
A = Maximum value of works executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into
account the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works
to be completed during the next 01 (One) month ( period of completion of
work for which bids are invited );
N = Number of years prescribed for completion of the works for which the bids
Note :- In Case of joint venture, the available bid capacity will be applied for
each partner to the extent of his proposed participation in the execution
4.8 Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made misleading or false representation in the forms, statements and Attachments the
submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly completing the
contract, inordinate delay in completion, litigation history, or financial failures etc.; and/
- Participated in the previous bidding for the same work and had quoted unreasonably high
bid prices and could not furnish rational justification to the employer.
5. One bid per bidder
5.1 Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of alternatives
that have been permitted or requested) will cause all the proposals with the bidder’s
participation to be disqualified.
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and submission of his Bid,
and the Employer will in no case be responsible and liable for those costs.
7.1 The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine
the Site of work and its surrounding and obtain all information that may be necessary for
preparing the Bid and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda issued in
accordance with Clause 10:
Particulars Volume
- Invitation for Bids
1) Instructions to Bidders
2) Qualification Information, and other forms I
3) Conditions of Contract
4) Contract Data
5) Technical Specifications II
7) Bill of Quantities III
8) Securities and other forms
10) Documents to be furnished by bidder V
8.2 Volumes I, II, III and IV are available online and documents to be furnished by the bidder
in compliance to Section 2 will be prepared by him and furnished as Volume- V in two
parts (refer Clause 12).
8.3 The bidder is expected to examine carefully all instructions, conditions of contract, contract
data, forms, terms, technical specifications, bill of quantities, forms, Annexes and drawings
in the Bid Document. Failure to comply with the requirements of Bid Documents shall be at
the bidder’s own risk. Pursuant to Clause 26 hereof, bids which are not substantially
responsive to the requirements of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify the
Employer in writing or through E-mail at the Employer’s address indicated in the invitation
to bid. The Employer will respond to any request for clarification which he received earlier
than 15 Days prior to the deadline for submission of bids. Employer’s response will be
published on website including a description of the enquiry but without identifying its
9.2 Pre-bid meeting
9.2.1 The bidder or his official representative is invited to attend a pre-bid meeting which will
take place at the address, venue, time and date as indicated in the appendix.
9.2.2 The purpose of the meeting will be to clarify issues and to answer questions on any matter
that may be raised at that stage.
9.2.3 The bidder shall be required to submit any questions in writing or e-mail to reach the
Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source of
enquiry) and the responses given will be published without delay on the tender website i.e.
www.nprocure.com Any modification of the bidding documents listed in sub-Clause
which may become necessary as a result of the pre-bid meeting shall be made by the
Employer exclusively through the issue of an Addendum pursuant to Clause 10 and not
through the minutes of the pre-bid meeting.
9.2.5 Non-attendance at the pre-bid meeting will not be a cause for disqualification of a Bidder
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2 Any addendum thus issued shall be part of the bidding documents. The Employer will
assume no responsibility for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his discretion, extend as necessary the deadline
for submission of bids, in accordance with Sub-Clause 20.2 below.
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1 The bid be submitted by the bidder as Volume V of the bid document (refer Clause 8.1)
shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2 The Bidder shall submit the details / information pertaining to each part i.e. technical as
well as financial and must be submitted online only.
12.3 Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the
priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words) for all
items of the Works described in the Bill of Quantities along with total bid price (Both in
figures and words). Items for which no rate or price is entered by the bidder will not be paid
for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the contract,
or for any other cause shall be included in the rates, prices and total Bid Price submitted by
the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the performance
of the Contract in accordance with the provisions of Clause 47 of the Condition of Contract
(Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees. All
payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline date forbid
submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer may
request that the bidders may extend the period of validity for a specified period. A bidder
may refuse the request without forfeiting his bid security. A bidder agreeing to the request
will not be required or permitted to modify his bid, but will be required to extend the
validity of his security for a period of the extension, and in compliance with Clause 16 in all
16. Bid Security
16.1 The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
Column 4 of the table of IFB for this particular work. This Bid security shall be in favor of
Employer as named in Appendix and may be in one of the following forms;
(a) Bank Guarantee from any scheduled Indian bank, in the format given in Volume III
(Bank Guarantee is applicable only for Bid Estimated Amount of 01 Crore and
above) and Bank Guarantee of Schedule and Private Banks shall be considered as per
GoG Finance Department’s Circular No. FD/MSM/e-file/4/2025/2712/DMO Date
01/04/2026 or as per their latest amendment.
(b) Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar
Department of Govt of Gujarat. Exemption Certificate is applicable only when
Registration Certificate of Appropriate Class and Category of Approved
Contractors is required as eligible criteria of bidder.
16.2 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 45 days beyond the validity of the bid i.e. total validity of 120+45 =
16.3 Any bid not accompanied by an acceptable Bid Security and not secured as indicated in
Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-responsive.
16.4 The Bid Security of unsuccessful bidders will be returned within 28 days of the end of the
bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed the
Agreement and furnished the required Performance Security.
16.6 The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be intimated
maximum three times within the validity period for negotiation, If contractor does not
respond in time, his Bid Security (EMD) will be forfeited and his tender will be
rejected. Punitive action will be taken on such contractors. (As per GoG R&B Dept’s
17. Alternative Proposals by Bidders.
17.1 Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or time for
completion), basic technical design as indicated in the drawing and specifications.
Conditional offers or alternative offers will not be considered further in the process of
tender evaluation.
18. Format and Signing of Bid
18.1 The Bidder shall prepare documents comprising the bid as described in Clause 12 of these
Instructions to bidder as the “Technical Bid” and “Financial Bid” in separate parts to be
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1 Complete Bids must be received online by the Employer at the tender website specified
above not later than the date indicated in appendix.
20.2 The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with Clause 10, in which case all right and obligation of the Employer and the
bidders previously subject to the original deadline will then be subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1 Bidders may modify or withdraw their bids online before the deadline prescribed in Clause
20 or pursuant to Clause
22.3 No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4 Withdrawal or modification of a bid between the deadline for submission of ids and the
expiration of the original period of bid validity specified in Clause 15.1 above or as
extended pursuant to Clause 15.2 may result in the forfeiture of the Bid security pursuant to
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant to
Clause 22, in the presence of the Bidders or their representatives who choose to attend at
time, date and the place specified in Appendix in the manner specified in Clauses 20 and
23.3, In the event of the specified date of Bid opening being declared a holiday for the
Employer, the Bids will be opened at the appointed time and location on the next working
23.3 The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished with each bid will be announced. If the bid security furnished does not conform to
the amount and validity period as specified in the invitation for bid (ref. Column 4 and
Paragraph 3), and has not been furnished in the form specified in Clause 16, the technical
bid will not be opened.
(i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied with
valid bid security will be taken up for evaluation with respect to the Qualification
information and other information furnished in Part-I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification Documents with
respect to any required clarification.
(iii)The bidders will respond in not more than 7 days of issue of the clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the Evaluation
Committee will finalize the list of responsive bidders whose financial bids are eligible for
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found responsive
in accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will
be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
discount and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.7 The time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will be
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
discount, and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the “Financial
Bid” shall be in order of estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of Bids
and recommendations for the award of a contract shall not be disclosed to Bidders or any
other persons not officially concerned with such process until the award to the successful
Bidder has been announced. Any effort by Bidder to influence the Employer’s processing of
Bids or award decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1 To assist in the examination, evaluation, and comparison of Bids, the Employer may, at his
discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit rates.
The request for clarification and the response shall be in writing or by e- mail, but no
change in the price or substances of the Bid shall be sought, offered, or permitted except as
required to confirm the correction of arithmetic errors discovered by the Employer in the
evaluation of the Bids.
25.2 Subject to Sub-clause 25.1, no Bidder shall contact the Employer on any matter relating to
his Bid opening to the contract is awarded. If the Bidder wishes to bring additional
information to the notice of the Employer, it should do so in writing.
25.3 Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid
comparison or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether each
Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly signed;
(c) is accompanied by the required securities and; (d) is substantially responsive to the
requirements of the Bidding document. During the detailed evaluation of the “Financial
Bid”, the responsiveness of the bids will be further determined with respect to the
remaining bid conditions, i.e., priced bill of quantities, technical specifications, and
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms, conditions
and specifications of bidding documents, without material deviation or reservation. A
material deviation or reservation is one (a) which affects in any substantial way the scope,
quality, or performance of the Works; (b) which limits in any substantial way, inconsistent
with the Bidding documents, the Employer’s rights or the Bidder’s obligations under the
Contract; or (c) whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and
may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1 The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
29.3 The Employer reserves the right to accept or reject any variation or deviation. Variation and
deviations and other factors, which are in excess of the requirements of the Bidding
documents or otherwise result in unsolicited benefits for the Employer, shall not be taken in
to account in Bid evaluation.
29.4 The estimated effect of the price adjustment conditions under Clause 47 of the Conditions
of Contact, during the period of implementation of the Contract, will not be taken in to
account in Bid evaluation.
29.5 If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may require
the Bidder to produce detailed consistency of those prices with the construction methods
and schedule proposed. After evaluation of the price analyses, the Employer may require
that the amount of the performance security set forth in Clause 34 be increased at the
expense of the successful /bidder to a level sufficient to protect the Employer against
financial loss in the event of default of the successful Bidder under the Contract.
29.6 A bid which contains several items in the bill of Quantities which are unrealistically priced
low and which cannot be substantiated satisfactorily by the bidder may be rejected as non-
F. AWARD OF CONTRACT
31. Award Criteria
31.1 Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has
been determined.
(i) to be substantially responsive to the Bidding documents and who has offered the
lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price which
is the lowest evaluation in any of the packages opened earlier than the one
In no case, the contract shall be awarded to any bidder whose available bid capacity is
less than the evaluated bid price, even if the said bid is the lowest evaluated bid. The
contract will in such cases be awarded to the next lowest bidder at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1 Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid, and
to cancel the Bidding process and reject all Bids, at any time prior to the award of contract,
without thereby incurring any liability to the affected bidder or Bidder or any obligation to
inform the affected Bidder or Bidders of the grounds for the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1 The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by cable, telex or facsimile confirmed by
registered letter. This letter (hereinafter and in the condition of contract called the “Letter of
Acceptance”) will state the sum that the Employer will pay the Contractor in consideration
of the execution, completion, and maintenance of the Works by the Contractor as prescribed
by the Contract (hereinafter and in the Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to the
furnishing of a performance security in accordance with the provisions of Clause.
33.3 The Agreement will incorporate all agreements between the Employer and the successful
Bidder. It will be signed by the Employer and to the successful Bidder, within 28 days
following the notification of award along with the Letter of Acceptance. Within 21 days of
receipt, the successful Bidder will sign the Agreement and deliver it to the Employer.
33.4 Upon the furnishing by the successful Bidder of the Performance Security, the Employer
will promptly notify the other Bidders that their Bids have been unsuccessful.
34. Performance Security
(A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall
furnish to the Employer an irrevocable and unconditional guarantee from a Bank in the
form set forth in Section-8 (the “Performance Security”) for an amount equal to 5% (five
percent) of its Contract Price. In case of bids mentioned below, the successful Bidder,
along with the Performance Security, shall also furnish to the Authority an irrevocable and
unconditional guarantee from a Bank in the same form given at Section 8 towards an
Additional Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but up to 20%
of the Estimated Project Cost, then the Additional Performance Security shall be
calculated @ 20% of the difference in the (i) Estimated Project Cost (as mentioned
in Bid Document) - Minus 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be calculated
@ 30% of the difference in the (i) Estimated Project Cost (as mentioned in Bid
Document) - Minus 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the Performance
(B) The Performance Security shall be valid beyond 60(sixty) days from the stipulated date of
completion of the Project and Additional Performance Security shall be valid beyond
(twenty-eight) days of Project Completion Date.
Performance Security shall become refundable/ releasable within 15 days after certified
project completion date subject to Fulfillment of contractual obligation and settlement of all
dues and claims.
(C) Defects Liability Period and the Additional Performance Security shall be valid beyond
(twenty-eight) days of Project Completion Date.
34.2 If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a Nationalized/Scheduled
Indian bank or (b) by a foreign bank located in India and acceptable to the Employer. As
per GoG Finance Department’s Circular No. FD/MSM/e-file/4/2025/2712/DMO Date
01/04/2026 or as per their latest amendment.
34.3 Failure of the successful Bidder to comply with the requirement of Sub-Clause 34.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
35. Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated in the
Conditions of Contract, subject to maximum amount, as stated in the Contract Data.
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended for award
has engaged in corrupt or fraudulent practices in completing for the contract in question and
will declare the firm ineligible, either indefinitely or for a stated period of time, to be
awarded a contract with National Highways Authority of India/ State PWD and any other
agencies, if it at any time determines that the firm has engaged in corrupt or fraudulent
practices in completing for the contractor, or in execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub-Clause-59.2 of the
Conditions of Contract.
APPENDIX TO ITB
Clause Reference With respect to Section –I
1. The Name of the Employer is “Executive Engineer (E&M), [ Cl.1.1]
Electrical & Mechanical Division, Vadodara”.
2. The last five financial years.
3. This Annual Financial Turnover Amount is ₹ 202464 [Cl.4.5.3(a)]
4. Value of work is ₹
9. Price level of the financial year: 2026-27 [Cl. 4.5.2]
10. The pre-bid meeting will take place at …………. Not Applicable [Cl. 9.2.1]
11. The technical Bid will be opened on date and time as stated on online
NIT at the office of Executive Engineer (E&M), Electrical &
Mechanical Division, Vadodara.
12. Address of the Employer: Executive Engineer, Electrical &
Mechanical Division, A Block, Narmada Bhavan, Dist.-Vadodara
Email ID [email protected]
(Mobile No. 8780085995)
14. The bid should be submitted latest by As stated on online NIT. [Cl. 20.1& 20.2]
15. The bid will be opened in the office of Executive Engineer (E&M), [Cl. 23.1 ]
Electrical & Mechanical Division, VadodaraAs stated on online NIT.
16. The Bank Draft in favor of Executive Engineer (E&M), Electrical &
Mechanical Division, Vadodara
18. Escalation factors (for the cost of works executed and financial figure [Cl.4.5.2]
to a common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2026-2027
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Machinery Approximate Remark
Location Make Capacity
No. machinery (maximum Value s
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work
1. Two graduate Electrical Engineers, Two diploma Electrical Engineers and Two graduate
Mechanical Engineers, when the cost of the work to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is
more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum two Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but
more than Rs.5 lakhs.
4. Minimum One Diploma Electrcial/Mechanical Engineer for the work when the cost of work
to be executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer shall
have to stay at the site of work and he shall not be entrusted with other duty except this
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer, Employment
of a separate Engineer will not be necessary provided that the Engineer partner himself attends the
execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy Executive
Engineer-in-charge of the work the Name, Qualifications, copy of mark sheet, Colour Photograph
and the appointment order issued such engineers engaged for this contract work. If 15 days after
issue of work order such designated Site Engineers do not resume or do not remain present on site
of work, the recovery at the rate of Rs.15, 000-00 per month per Engineer will be made from the
bills/deposit/dues of the contractor. Such recovery shall be non-refundable.
Sr. Designation No. of Minimum Experience
No. person Qualification
1 Engineer 1 Diploma Experience in the field of
Electrical/Mechani maintenance of all the electrical
cal with 07 years & mechanical equipments
of experience. associated with entire system of
submerged motor-pump set,
compressors, motor, electrical
motor starter panel ,LT panel &
HT VCB Panel etc.
2 Skilled 2 to assist for daily & preventive
Helper maintenance activity
QUALIFICATION INFORMATION
THIS PAGE HAS BEEN KEPT BLANK
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the
purpose of post qualification as provided for in Clause-4 of the Instruction to Bidders. This
information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach Copy)
Place of registration ___________________________
Principal place of business ___________________________
Power of attorney of signatory of Bid
1.2 Total value of Civil Engineering construction Works 2025-2026
performed in the last five years 2024-2025
(in Rs. Lakhs) 2022-2023
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub-
contractor will also be considered the sub-contract involved execution of all main items of
work described in the bid documents, provided further that all other qualification criteria are
satisfied (in the same name) on works of a similar nature over the last five years** and in
current year before the submission of the bid.
Value of of Actual date
Name of Stipulated reasons
Project Description Contract contract issue of
the period of for delay&
Name of work No. (Rs. of completion
Employer completion work
*Attach certificate(s) from the Engineer(s)-in-charge
** Immediately preceding the financial year in which bids are received.
1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a nominated
sub-contractor, will also be considered provided the sub-contract involved execution of all
main items of work described in the bid document, provided, further that all other
qualification criteria are called (in the same name and style) in the last five years** and in
current year before the submission of the bid.
Quantity of Work Performed
Name of Cement Masonary Earth Bituminous
Name of Concrete Works Work (Indicate
Year the (Item 2)
Project/work (iuncluidng Contract
Employer (Item (Item 4)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which
are yet to be completed) as on the date of this bid.
A. Existing commitments and on-going works:
Place Name & Value Stipulated Anticipated
Description Contract remaining
& Address of Contract Period of of
of works No. to be
State Employer (Rs. Cr) Completion completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref. Clause
4.5.5). The Bidder should list all the information requested below.
Requirement Remarks
Availability Proposal
Item of (from whom
Equipment Owned/Leased Nos./ Age/ to be
to be procured Capacity Conditions purchased)
1.6 Qualifications and experience of key personnel required for administration and execution of
the contract. Attach biographical data. Refer also to Sub Clause 9.1 of the Conditions of
Year of experience in
Position Name Qualification Experience
the proposed position
Diploma Elect. Engine Diploma in
Engineer er Electrical/Me
1.7 Proposed sub-contract and firms involved.
Sections of Value of Sub- Experience in
the works Contractor similar work
Attach copies of certificates on possession of valid license for executing water supply/
sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors’
reports (in case of companies/corporations), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in
hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, Email address and fax numbers of the Bidders bankers
who may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party/ Cause of Amount
Employer showing Present
(ies) Dispute Involved
1.12 Statement of compliance under the requirements of Sub-Clause 3.2 of the instruction to
Bidders. (Name of Consultant engaged for project preparations is *…………………..)
* Fill the name of Consultant
1.13 Proposed work method and schedule. The Bidder should attach descriptions, drawings and
charts as necessary to comply with the requirements of the Bidding documents. (Refer ITB
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the requirements of
Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR AVAILABILITY
OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s._________________is a reputed company with a good financial
If the contract for the work, _____________________________________namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs.______________to meet their working capital requirements for executing the above during the
contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required attachments
are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
abandoned any work of Government of Gujarat/Government of India/any Board or
Corporation under Government of Gujarat/Government of India nor any contract awarded to
us for such works have been rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or corporation to
furnish pertinent information deemed necessary and requested by the Department to verify
this statement or regarding any (our) competence and general reputation.
4. The Undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the Department/
Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake that our firm
minimum cash up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized Officer of the Firm)
Title of Officer
CONDITIONS OF CONTRACT
THIS PAGE HAS BEEN KEPT BLANK
Conditions of Contract
Table of Contents
A. General Page D. Cost Control Page
1. Definitions 48 37. Bill of Quantities
2. Interpretation 49 38. Changes in the Quantities
3. Language and Law 50 39. Variations
4. Engineer’s Decisions 50 40. Payments for Variations
5. Delegations 50 41. Cash Flow Forecasts
6. Communications 50 42. Payment Certificates
7. Sub-Contractors 50 43. Payments
8. Other Contractors 50 44. Compensations Events
9. Personnel 51 45. Tax
10. Employer’s & Contractor Risk 51 46. Currencies
11. Employers Risks 51 47. Price Adjustment
12. Contractor’s Risk 51 48. Retention
13. Insurance 51 49. Liquidated damages
14. Site Investigations Reports 52 50. Bonus
15. Queries about the Contract 52 51. Advance Payment
16. Contractors to Construct the works 52 52. Securities
17. The Works to be Completed By the 53. Deleted
Intended Completion Date
18. Approval by the Engineer 52 54. Cost of Repair
19. Safety 53 E. Finishing the Contract
20. Discoveries 53 55. Completion
21. Possession of the Site 53 56. Taking Over
22. Access to the Site 53 57. Final Account
23. Instructions 58. Operating and Maintenance
24. Disputes 53 59. Terminations
25. Procedure for Disputes 54 60. Payment upon Terminations
26. Deleted 54 61. Property
B. Time Control 62. Release from Performance
27. Programme 55 F. Special Conditions of Contract
28. Extensions of the Intended completion 63. Labour
29. Deleted 64. Compliance with labour
30. Delays Ordered by The 65. Arbitration
31. Management Meetings
32. Early Warning
C. Quality Control
33. Identifying Defects
35. Correction of Defects
36. Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions of
Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part of the
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the Engineer in
accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute, complete and
maintain the Works till the completion of Defects Liability Period. It consists of the
documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which comprise the
Contract. The Contractor is a person or corporate body whose Bid to carry out the Work
has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the Contractor to
the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter as adjusted
in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated from
the Completion Date.
The Employer is the party who will employ the Contractor to carry out the Works.
The Engineer is the person named in the Contract Data (or any other competent person
appointed and notified to the contractor to act in replacement of the Engineer) who is
responsible for supervising the Contractor, administering the Contract, certifying payments
due to the Contractor, issuing and valuing Variations to the Contract, awarding extensions
of time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the site to
construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of
Acceptance. The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in the
Contract Data. The Intended Completion Date may be revised only by the Engineer by
issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for incorporation
Plant is any integral part of the work which is to have mechanical, electrical, electronic or
chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding documents and
are factual interpretive reports about the surface and subsurface conditions at the site.
Specifications means the Specifications of the works included in the Contract and any
modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor shall
commence execution of the works. It does not necessarily coincide with any of the Site
Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the Contractor to
carry out a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the
Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install, and turn over
to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also means
female or neuter and the other way around. Heading have no significance. Words have their
normal meaning under the language of the Contract unless specifically defined. The
Engineer will provide instructions clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the Conditions of
Contract to the Works, the Completion date, and Intended Completion Date apply to any
Section of the Works (other than references to the Completion Date and Intended
Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the Contract.
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the Contract
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual matters
between the Employer and the Contractor in the role representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other people after
notifying the Contractor and may cancel any delegation after notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions are effective only
when in writing. A notice shall be effective only when it is delivered (in terms of Indian
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in Contract
Data, with the approval of the engineer but may not assign the Contract without the
approval of the Employer in writing. Subcontracting shall not alter the Contractor’s
obligations. Sub-contracting of supply or specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for the part of work
to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public authorities,
utilities and the Employer between the dates given in the Schedule of other Contractor. The
Contractors shall as refer to in the Contract Data, also provide facilities and services for
them as described in the Schedule. The employer may modify the schedule of other
contractors and shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as
referred to in the Contract Data to carry out the functions stated in the Schedule or other
personnel approved by the Engineer. The Engineer will approve any proposed replacement
of key personnel only if their qualifications, abilities, and relevant experience are
substantially equal to or better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the Contractor
Staff or his work force stating the reasons the Contractor shall ensure that the person leaves
the Site within seven days and has no further connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks, and the
Contractor carries the risks which these Contracts states are Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they directly
affect the execution of the Works, the risks of war, hostilities, invasion, act of foreign
enemies, rebellion, revolution, insurrection or military or usurped power, civil war, riot
commotion or disorder (unless restricted to the Contractor’s employees), and contamination
from any nuclear fuel or nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and death which
arise during and in consequence of the performance of the Contract other than the excepted
risks are the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the Contractor,
insurance cover from the Start date to the end of the Defects Liability Period, in the
amounts and deductibles stated in the Contract Data for the following events which are due
to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
(d) Equipment) in connection with the Contract; and
(e) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the Engineer
for the Engineer’s approval before the Start Date. All such insurance shall provide for
compensation to be payable in the types and proportions of currencies required to rectify the
loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required, the
Employer may affect the insurance which the Contractor should have provided and recover
the premiums the Employer has paid from payments otherwise due to the Contractor or, if
no payment is due, the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the approval of the
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports referred to in
the Contract Data, supplemented by any information available to the Bidder.
15. Queries about the Contract Data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the specification
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and shall carry out
the Works in accordance with the programme submitted by the Contractor, as updated with
the approval of the Engineer, and complete them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary
works to the Engineer, who is to approve them if they comply with the Specifications and
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of the
Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of theTemporary works
where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or permanent
work are subject to prior approval by the Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly discovered on
the site is the property of the Employer. The contractor is to notify the engineer of such
discoveries and carry out the Engineer’s instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If possession of
a part is not given by the date stated in the Contract Data the Employer is deemed to have
delayed the start of the relevant activities and this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not handed
over to the Contractor, then contractor/ Employer may fore-close the contract.
Contractor/Employer has to foreclose the work within 30 days after lapse of 25%-time limit
and after 30 days foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the Engineer access
to the Site, to any place where work in connection with the Contract is being carried out or
is intended to be carried out and to any place where materials or plants are being
manufactured/ fabricated/ assembled for the works.
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to works which
comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts and records
relating to the performance of the Contractor and to have them audited by auditors
appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either outside the
authority given to the Engineer by the Contract or that the decision was wrongly taken, the
decision shall be referred to Superintending Engineer, Electrical & Mechanical Circle,
Vadodara within 14 days of the notification of the Engineer's decision. If the issue is not
resolved, any party can refer the matter for conciliation within 15 days from the decision
given by the Superintending Engineer, Electrical & Mechanical Circle, Vadodara.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of
the Superintending Engineer, Electrical & Mechanical Circle, Vadodara, both the
parties have to refer to the Chief Engineer (E&M), NPHP, Vadodara concern for the
conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Superintending Engineer, Electrical & Mechanical Circle,
Vadodara, both the parties have to refer to the Sardar Sarovar Narmada Nigam
H.O., Block No. 12, Gandhinagar, Government of Gujarat for the conciliation
If the dispute is not resolved through the conciliation process, he may refer the dispute to
Gujarat Public Works Contract Dispute Arbitration Tribunal. If the Contractor fails to refer
a claim / dispute to the Higher Authority within 14 days of the notification of the Engineer's
decision, the Contractor shall not be entitled to any additional payment/claim if he doesn’t
follow the above sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure stated in the
Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the Engineer for
approval a Programme showing the general methods, arrangements orders, and timing for
all the activities in the works along with monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual progress achieved on
each activity and the effect of the progress achieved on the timing of the remaining work
including any changes to the sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated programme at
intervals no longer than the period stated in the Contract Data. If the Contractor does not
submit an updated programme within this period, the Engineer may withhold the amount
stated in the Contract Data from the next payment after the date on which the overdue
programme has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s obligations. The
Contractor may revise the programme and submit it to the Engineer again at any time. A
revised programme is to show the effect of Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation Event occurs or
a Variation is issued which makes it impossible for completion to be achieved by the
Intended Completion Date without the Contractor taking steps to accelerate the remaining
work and which would cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended Completion
Date within 35 days of the Contractor asking the Engineer for a decision upon the effect of
a compensation event or Variation and submitting full supporting information. If the
Contractor has failed to give early warning of a delay or has failed to cooperate in dealing
with a delay, the delay by this failure shall not be considered in assessing the new Intended
Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the contractor for
extension of Intended Completion Date refer to the Employer his decision. The employer
shall in not more than 21 days communicate to the engineer the acceptance or otherwise of
the Engineer’s decision. If the employer fails to give his acceptance, the Engineer shall not
grant the extension and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any activity
within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a management
meeting. The business of a management meeting shall be to review the plans for remaining
work and to deal with matters raised in accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to provide copies of
his record to those attending the meeting and to the Employer. The responsibility of the
parties for actions to be taken is to be decided by the Engineer either at the management
meeting or after the management meeting and stated in writing to all who attended the
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely future
events or circumstances that may adversely affect the quality of the work, increase the
Contract price or delay the execution of works. The Engineer may require the contractor to
provide an estimate of the expected effect of the future event or circumstance on the
contract price and completion date. The estimate is to be provided by the Contractor as soon
as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering proposals for
how the effect of such an event or circumstance can be avoided or reduced by anyone
involved in the work and in carrying out any resulting instruction of the Engineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liability period
33.1 Defect liability period: The contractor shall be responsible to make good and remedy at his
own expense any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion. The Engineer in charge shall give the
contractor a notice in writing about the defects and the contractor shall make good the same
within 15 days of receipt of the notice. In the case of failure on the part of the contractor, the
Engineer- in-charge may rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the whole or any part of
the amount of security deposit towards the expenses, if any, Incurred by him in rectification,
removal or re-execution. The Defects Liability period shall be as under….
A. For works Except Building
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be
Months from the certified date of completion.
(1) For works likes Check Dam/ Canal / Drainage / Road Structure tender amount from
RS. 50,000 to 10,00,000, the defect liability period shall be 12 months from the
certified date of completion.
(2) For work except likes Check Dam/ Canal / Drainage / Road Structure tender amount
from RS. 50,000 to 10,00,000, the defect liability period shall be 6 months from the
certified date of completion.
(1) For works likes Check Dam/ Canal / Drainage / Road Structure tender amount more
than RS. 10,00,000, the defect liability period shall be 3 Years from the certified date
(2) For work except likes Check Dam/ Canal / Drainage / Road Structure tender amount
from RS. 10,00,000 to 1 Crore, the defect liability period shall be 12 months from the
certified date of completion
(d) For all works of tender amount more than RS. 1 Crore, the defect liability period shall
be 3 Years from the certified date of completion
B. For Building works:-
For Building works of WRD, Follow the R&B Circular dated.03/12/2009
For original building works the defect liability period will be 4 years or elapse of
monsoon period following date of possession of building taken over by user agency
following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be treated as the
WRD Circular No Matas/102013/MICELL(K-1) dated 13/12/2013.
33.2 For Road works :
Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year from the date
(b) In case of widening of the road/strengthening of the road/bridge, the contractor shall
have to give four years free maintenance guarantee from the certified date of
completion. During this period the contractor shall visit the site every six months along
with the concerned Section Officer / Deputy Executive Engineer and will examine the
work already carried out in this contract like road work, jungle cutting, side shoulders,
side gutter, road furniture, patta etc. and will prepare Km. wise inspection report duly
signed by all concerned and any defect observed shall be done within 15 days by the
contractor at his risk and cost as per the direction of Engineer in charge. The contractor
needs to do videography of these visits and require to submit at the time of release of
FMG. If B.T. the surface during the maintenance period of 4 years is worn out then
agency shall have to provide renewal coating as per tender item as directed by the
Engineer-in- charge. The amount equivalent to 5% of each running bill shall be
withheld and will be released after the free maintenance guarantee period (i.e. 4 years)
However, this amount shall be released against fixed deposit or bank guarantee
pledged in the name of Executive Engineer after completion certificate of work is
(1) The flakiness and elongation index (combined) for coarse aggregates under no
circumstances shall exceed the allowable limit set forth in the relevant clause for the
material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be withheld till the
miscellaneous items like earthwork in embankment / cutting for side shoulders, side
gutters, kilometer / indicator / guard stones, sign boards etc. are completed in all
respect by the contractor. After completion of the miscellaneous items, the above said
2% withheld amount shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd. 13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as per Govt.
letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing more than Rs.
(4) Setting up of adequate laboratory & deployment of quality engineers. The contractor
shall have to set up the laboratory with adequate equipment. Till the setting up of
adequate laboratory is completed & reported of this to the engineer (subject to due
verification by engineer’s representative) by contractor in writing, Rs.2,00,000/- shall
be withheld. The qualified quality Engineer shall be deployed exclusively for this
contract by the contractors. If quality Engineer is not deployed by contractor within one
month after the date of work order, the amount equivalent to Rs.20,000 per month shall
be recovered till the actual deployment of quality engineer. The amount so recovered
towards the deployment of quality engineers shall not be refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.: RGN/60/2006/35/C,
dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk and cost,
the existing lane(s) of the road so that the traffic worthiness and safety thereof are at no
time materially inferior as compared to their condition 10 (ten) days prior to the date of
the Agreement, and shall undertake the necessary repair and maintenance works for
this purpose; provided that the Contractor may, at his cost, interrupt and divert the flow
of traffic if such interruption and diversion is necessary for the efficient progress of
works and conforms to Good Industry Practice; provided further that such interruption
and diversion shall be undertaken by the Contractor only with the prior written
approval of the Executive Engineer which approval shall not be unreasonably withheld.
For the avoidance of doubt, it is agreed that the Contractor shall at all times be
responsible for ensuring safe operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of any defects
that are found. Such checking shall not affect the Contractor’s responsibilities the Engineer
may instruct the Contractor to search for a Defect and to uncover and test any work that the
Engineer considers may have a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the Specification
to check whether any work has a Defect and the test shows that it does, the Contractor shall
pay for the test and any samples. If there is no defect the test shall be a Compensation
34.2 1% of the amount of work done for works upto Rs. 10 crore of estimate cost should be
deducted from R.A. Bill of the contractor for testing the quality of material workmanship.
Whereas for estimated cost of works more than 10 crore, the charges for testing of quality
of material workmanship shall be deducted from R.A. bill of contractor as per actual
charges. As Per GoG NWRWS & K Department’s Circular No.
PARCH/132023/401/MICELL Dated: 05/10/2023
34.3 Agency has to establish testing laboratory on site for the various test to be carried out in the
work for this purpose agency shall construct a pukka laboratory building with all facility on
site at location specified by the engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of the defects
Liability Period, which begins at Completion and is defined in the Contract Data. The
Defects Liability Period shall be extended for as long as Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified defect within
the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the Engineer’s
notice, the Engineer will assess the cost of having the Defect corrected, and the Contractor
will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation, testing and
commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is paid for the
quantity of the work done at the rate in the Bill of Quantities for each item.
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the original
specifications , drawings, designs and instructions that may appear to him to be necessary or
advisable during the progress of the work and the contractor shall be bound to carry out the
work in accordance with any instruction in this connection which may be given to him in
writing signed by the Engineer and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner above specified
as part of the work shall be carried out by the contractor on the same conditions in all
respects on which he agreed to do the main work and at the same rate as are specified in the
tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender by more
than 130%, the contractor will be paid for the quantity in excess of 130%, at the rate entered
in the SOR of the year during which the excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the Contractor.
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is specified in
this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the one
involving additional or altered class of work; where there are more than one
comparable items, the item of the contract which is nearest in comparison with regard
to class or classes of the work involved shall be selected and the decision of the
Superintending Engineer as to the nearest comparable item shall be final and binding
on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be
carried out at the rate entered in the Schedule of Rates of the division for the year in
which the tender was received, increased or decreased by the percentage by which the
tender amount is more or less as compared to the amount arrived at the rates in the
“Schedule of Rates” of the Division in the year in which the tender was received. If
the Schedule of rates of the Division does not contain all the items, the percentage
increase or decrease of the tender shall be calculated considering such items which
were included in the “Scheduled Rates” of the division for the year and for materials
consumed on such item the rate to be charged would be the basic rate taken into
account for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work shall
be carried out at the rate decided by the competent authorities on the basis of detailed
rate analysis after hearing the contractor before a Committee of two Superintending
Engineers stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of Rates” of
the Division is ordered to be carried out before the rate is agreed upon, then the contractor
shall within seven days of the date of receipt by him of the order to carry out the work,
inform the Engineer-in-charge of the rate, which it is his intention to charge for such class
of work and if the Engineer in charge does not agree to this rates, he shall by notice in
writing be at liberty to cancel his order to carry out such class of work and arrange to carry
it out in such manner as he may consider it advisable, provided always that if the contractor
shall commence work or incur any expenditure in regard thereof before the rates shall have
been determined as lastly herein before mentioned, then in such cases he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by him prior to
the date of the determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Engineer-in-charge. In the event of the dispute, the decision of the
Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and
specifications recommended by the contractor and accepted by the competent authority, the
alternation above referred to shall be within the scope of such designs, drawings and
specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion
that the increase in the cost occasioned by alterations bears to the cost of the original work
and the certificate of the Engineer-in-charge as to such proportion shall be final and
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with an updated
cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated value of
the work completed less the cumulative amount certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and certify the
amount to be paid to the Contractor after taking in to account any credit or debit for the
month in question in respect of materials for the works in the relevant amounts and under
conditions set forth in Sub-Clause 32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items in the
Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and compensation
42.6 The Engineer may exclude any item certified in a previous certificate or reduce the
proportion of any item previously certified in any certificate in the light of later information
43.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries
in terms of the contract and taxes at source, as applicable under the law. The Employer shall
pay the Contractor the amounts certified by the Engineer within 28 days of the date of each
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to the
Contractor will be made by the Employer. Hence, it is the responsibility of the contractor to
pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid by the
Employer and shall be deemed covered by other rates and prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site Possession date
stated in Contract Data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed beyond the
Intended Completion Date then Authority will approve EOT with eligible contractual price
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of
bid submission except GST. However, any subsequent changes in the tax structure by
Government after due date of bid submission will be compensated (+/-) on availability or
submission of actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the contractor fails to provide
such information and if any financial obligation may arise due to change in tax structure,
same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the contractor to
pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of labour,
materials, fuels and lubricants in accordance with the following principles and procedures
and as per formula given in the Contract Data:
(a) The price adjustment shall apply for the work done from the start date given in the
Contract Data up to end of the initial intended completion date or extensions granted by
the Engineer and shall not apply to the work carried out beyond the stipulated time for
reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the formula given in
the contract data.
(c) Following expressions and meanings during to the work done during each month.
R = Total value of work done during the month. It would include the amount of secured
advance granted, if any, during the month less the amount of secured advance
recovered, if any during the month. It will exclude value for works executed under
variations for which price adjustment will be worked separately based on the terms
mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractor is not
covered by the provisions of this or other clause in the contract, the unit rates and prices
included in the contract shall be deemed to include amounts to cover the contingency of
such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the proportion stated in the
Contract Data until Completion of the whole of the Works.
48.2 On Completion of the whole of the Works half the total amount retained is repaid to the
48.2 On Completion of the whole of the Works half the total amount retained is repaid to the
Contractor and half when the Defects Liability Period has passed and the Engineer has
certified that all Defects notified by the Engineer to the Contractor before the end of this
period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention money with an
“on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by the
Employer under the provision of this clause, Employer shall consider the said request of the
Contractor provided that the refund hereunder shall be made in tranches of not less than 1%
(One Percent) of the Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to 60 day beyond
the scheduled / extended Defects Liability Period. On completion of the whole works, the
contractor has however an option to submit a fresh irrevocable and unconditional Bank
Guarantee for an amount equal to 5% of the total value of work executed substantially in
the format of Bank Guarantee for Performance Guarantee enclosed with SBD and valid up
to 60 days beyond the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per day stated in
the Contract Data for each day that the Completion Date is later than the Intended
Completion Date (for the whole works or the milestone as stated in the Contract Data). The
total amount of liquidated damages shall not exceed the amount defined in the Contract
total amount of liquidated damages shall not exceed the amount defined in the Contract
Data. The Employer may deduct liquidated damages from payment due to the Contractor.
Payment of liquidated damages does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have been paid, the
Engineer shall correct any overpayment of liquidated damages by the Contractor by
adjusting the next payment certificate. The Contractor shall not be entitled for any interest
on the over payment calculated from the date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in the tender,
then the contractor shall pay to the employer the relevant sum stated in the Contract Data as
Liquidated damages for such default and not as penalty for everyday or part of day which
shall elapse between relevant time for completion and the date stated in the taking over
certificate of the whole of the works on the relevant section, subject to the limit stated in the
The employer may, without prejudice to any other method of recovery deduct the
amount of such damages from any monies due or to become due to the contractor. The
payment or deduction of such damages shall not relieve the contractor from his obligation
to complete the works on from any other of his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable any Section,
a Taking Over Certificate has been issued for any part of the Works or of a Section, the
liquidated damages for delay in completion of the remainder of the Works or of that Section
shall, for any period of delay after the date stated in such Taking-Over-Certificate, and in
the absence of alternative provisions in the Contract, be reduced in the proportion which the
value of the part so certified bears to the value of the whole of the Works or Section, as
applicable. The provisions of this Sub-clause shall only apply to the rate of liquidated
damages and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the intended
Completion Date prescribed in Contract Data the Employer shall pay to the contractor a
sum stated in Contract Data as bonus for every completed month but subjected to
maximum amount as stated in Contract Data; which shall elapse between the date of
completion of all items of works as stipulated in the contract, including variations ordered
by the Engineer and the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time limit of the
works is equal or more than 6 months. The bonus would be paid as under
% of Initial Contract
% of Time Saved Price entitled for
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two installments
except in special circumstances for which the reason to be Recorded in writing) to the
Contractor of the amounts stated in the Contract Date by the date stated in the Contract
Date, against provision by the Contactor of an Unconditional Bank Guarantee in a form and
by a bank acceptable to the Employer in amounts and currencies equal to be at least 110%
of the advance payment. The guarantee shall remain effective until the advance payment
has been repaid, but the amount of the guarantee shall be progressively reduced by the
amounts repaid by the Contractor. The Mobilization advance would be deemed as interest
bearing advance at an interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment, plant and
Mobilization expenses required specifically for execution of the Works. The Contractor
shall demonstrate that advance payment has been used in this way by supplying copies of
invoices or other documents to the engineer.
51.3 The advance payment shall be repaid by deduction proportionate amount from payments
otherwise due to the Contractor, following the schedule of completed percentages of the
Works on a payment basis. No account shall be taken of the advance payment or its
repayment in assessing valuations of work done, variations, price adjustments,
Compensation Events, or Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids) shall be
provided to the Employer no later than the date specified in the Letter of Acceptance and
shall be issued in an amount and form and by a bank or surety acceptable to the Employer,
and denominated in Indian Rupees. The performance Security shall be valid until a date
days from the date of expiry of Defects Liability Period and the additional security for
unbalanced bids shall be valid until a date 28 days from the date of issue of the certificate of
Performance and Additional Performance Security shall become refundable/releasable
within 15 days after project certified completion date subject to fulfillment of contractual
obligation and settlement of all dues and claims.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the
Start date and the end of Defects Correction periods shall be remedied by the Contractor at
the Contractor’s cost if the loss or damages arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion of the works
and the Engineer will do so upon deciding that the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the Engineer
issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the total amount that
57.1 The Contractor shall supply to the Engineer a detailed final account of the total amount that
the Contractor considers payable as full and final settlement of all claims under the Contract
for items before the end of the Defects Liability Period. The Engineer shall issue a Defect
Liability Certificate and certify any final payment that is due to the Contractor within
days of receiving the Contractor's account if it is correct and complete. If it is not, the
Engineer shall issue within 56 days a schedule that states the scope of the corrections or
additions that are necessary. If the Final Account is still unsatisfactory after it has been
resubmitted, the Engineer shall decide on the amount payable to the Contractor and issue a
payment certificate, within 56 days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses and savings
in final account is observed, the Engineer/Employer shall be at liberty to restrict the final
payment of BOQ items to the lowest amount evaluated of the bids considering the final
quantities and the rates quoted including the rebates if any. Payment of variation items shall
however be made at the rates approved by the Employer, within 90 days from the physical
completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required, the
Contractor shall supply them by the dates stated in the Contract Data.
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates stated in the
Contract Data, or they do not receive the Engineer’s approval, the Engineer shall withhold
the amount stated in the Contract Data from payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the following:
1. The contractor stops work for 28 days when no stoppage of work is shown on the
current programme and the stoppage has not been authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the Works and the
instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation other than
for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the Contractor
within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a fundamental
breach of Contract and the Contractor fails to correct it within a reasonable period of
time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days for which
the maximum amount of liquidated damages can be paid as defined in the Contract
8. If the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent
practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering, giving,
receiving or soliciting of anything of value to influence the action of a public official in the
procurement process or in contract execution. “Fraudulent practice” means a
misrepresentation of facts in order to influence a procurement process or the execution of a
contract to the detriment of the borrower, and includes collusive practice among Bidders
(prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Borrower of the benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the Engineer for a
cause other than those listed under Sub Clause 59.2 above, the Engineer shall decide
whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for convenience.
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by the Contractor,
the Engineer shall issue a Certificate for the value of the work done less advance payments
received up to the date of the issue of the certificate, less other recoveries due in terms of
the contract, less taxes due to deducted at source as per applicable law and less the
percentage to apply to the work not completed as indicated in the Contract Data. Additional
Liquidated Damages shall not apply. If the total amount due to the Employer exceeds any
Liquidated Damages shall not apply. If the total amount due to the Employer exceeds any
payment due to the Contractor the difference shall be a debt payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a fundamental
breach of Contract by the Employer, the Engineer shall issue a certificate for the value of
the work done, the cost of balance material brought by the contractor and available at site,
the reasonable cost of removal of equipment, repatriation of the Contractor’s personnel
employed solely on the works, and the Contractor’s cost of protecting and securing the
Works and less advance payment received up to the date of the certificate, less other
recoveries due in terms of the contract and less taxes due to deducted at source as per
applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are deemed to be
property of the Employer, if the Contract is terminated because of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event entirely outside the
control of either the Employer or the Contractor the Engineer shall certify that the Contract
has been frustrated. The Contractor shall make the Site safe and stop work as quickly as
possible after receiving this certificate and shall be paid for all work carried out before
receiving it and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his own
arrangements for the engagement of all staff and labour, local or other, and for their payment
of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a return in
detail, in such form and at such intervals as the Engineer may prescribe, showing the staff
and the numbers of the several classes of labour from time to time employed by the
Contractor on the site and such other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor shall abide at
all times by all existing labour enactments and rules made thereunder, regulations,
notification and bye laws of the State or central Government or local authority and any other
labour law (including rules), regulations, bye laws that may be passed or notifications that
may be issued under any labour law in future either by the State or the Central Government
or the local authority. Salient features of some of the major labour laws that are applicable to
the construction industry are given below. The Contractor shall keep the Employer
indemnified in case any action is taken against the Employer by the competent authority on
account of contravention of any of the provisions of any Act or rules made thereunder,
regulations or notifications including amendments. If the Employer is caused to pay or
reimburse, such amounts as may be necessary to cause or observe, or for observance of the
provisions stipulated in the notifications/bye laws/Acts/Rules/regulations including
amendments, if any, on the part of the Contractor, the Engineer/employer shall have the right
to deduct any money due to the Contractor including his amount of performance security.
The Employer/Engineer shall also have the right to recover from the Contractor any sum
required or estimated to be required for making good the loss or damage suffered by the
The employees of the Contractor and the Sub-Contractor in no case shall be treated as
the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE
TO ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS
A) Workmen Compensation Act 1923:-
The Act provides for compensation in case of injury by accident arising out of and during the
course of employment.
B) Payment of Gratuity Act. 1972:-
Gratuity is payable to an employee under the Act on satisfaction of certain conditions on
separation if an employee has completed 5 years’ service or more on death, the rate of
days wages for every completed year of service. The Act is applicable to all establishments
employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:-
The Act Provides for monthly contributions by the employer plus workers @ 10% or 8.33%.
The benefits payable under the Act are:
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :-
The Act provides for leave and some other benefits to women employees in case of
confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970:
The Act provides for certain welfare measures to be provided by the Contractor to contract
labour and in case the Contractor fails to provide, the same are required to be provided, by
the Principal Employer by Law. The principal Employer is required to take Certificate of
Registration and the Contractor is required to take license from the designated Officer. The
Act is applicable to the establishments or Contractor of Principal Employer, if they employ
20 or more contract labour.
F) Minimum Wages Act 1948 :-
The Employer is supposed to pay not less than the Minimum Wages fixed by appropriate
Government as per provisions of the Act, if the employment is a scheduled employment.
Construction of Building, Roads, and Runways are scheduled employment.
G) Payments of wages Act 1936:-
It lays down as to by what date the wages are to be paid, when it will be paid and what
deductions can be made from the wages of the workers.
H) Equal remunerations Act 1979 :-
The Act provides for payment of equal wages for work of equal nature to Male and Female
workers and for not making discrimination against female employees in the matter of
transfer, training and promotions etc.
I) Payments of Bonus Act 1965:-
The Act is applicable to all establishments employing 20 or more employees. The Act
provides for payments of annual bonus subject to a minimum of 8.33% of wages and
maximum of 20 % of wages to employees drawing Rs. 3500/- per month or less. The bonus
to be paid to employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not apply to certain
establishments. The newly set-up establishments are exempted for five years in certain
circumstances. Some of the State Governments have reduced the employment size from 20 to
10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :-
The Act lays down the machinery and procedure for resolutions of Industrial disputes, in
what situations a strike or lock-out becomes illegal and what are the requirements for laying
off or retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :-
It is applicable to all establishments employing 100 or more workmen (employment size
reduced by some of the State and Central Government to 50). The Act provides for laying
down rules governing the conditions of employment by the Employer on matters provided in
the Act and get the same certified by the designated Authority.
L) Trade Unions Act 1926:-
The Act lays the procedure for registration of trade unions of workmen and employers. The
Trade Unions registered under the Act have given certain immunities from civil and criminal
M) Child Labour (Prohibition & Regulation Act 1986 :-
The Act prohibits employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other occupations and
processes. Employment of Child labour is prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of service)
The Act is applicable to an establishment which employs 5 or more inter-state migrant
workmen through an intermediary (who has recruited workmen in one state for employment
in the establishment situated in another state).The inter-state migrant workmen, is an
establishment to which this Act becomes applicable, are required to be provided certain
facilities such as housing, medical aid, traveling expenses from home up to the establishment
O) The Building and Other Construction workers (Regulation of employment and
Conditions of Service) Act 1996 and the Cess Act of 1996:-
All the establishments who carry on any building or other constructions work and employ
or more workers are covered under this Act. All such establishments are required to pay cess
at the rate not exceeding 2% of the cost of construction as may be modified by the
government. The Employer of the establishment is required to provide safety measures at the
Building or construction work and other welfare measures, such as canteens, First Aid
facilities, Ambulance, Housing accommodations for workers near the workplace etc. The
Employer to whom the Act applies has to obtain a registration certificate from the
Registering Officers appointed by the Government.
P) Factories Act 1948 :-
The Act lays down the procedure for approval of plans before setting up a factory, health and
safety provisions, welfare provisions, working hours, annual earned leave and rendering
information regarding accidents or dangerous occurrences to designated authorities. It is
applicable to premises employing 10 persons or more with aid of power or 20 or more
persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges–
The contractor shall pay the royalty to the competent authority as per rule. The royalty
charges paid shall be borne by the contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from time to time shall
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act1981
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for best
energy use, waste management, the reduction of pollution as in EMS (Environmental
Management system) ISO-14001-2015
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
65.1 If the Contractor is of the view that a decision taken by the Engineer was either outside the
authority given to the Engineer by the Contract or that the decision was wrongly taken, the
decision shall be referred to Superintending Engineer, Electrical & Mechanical Circle,
Vadodara (Higher Authority) within 14 days of the notification of the Engineer's decision.
If the issue is not resolved, any party can refer the matter for conciliation within 15 days
from the decision given by the Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of the
Superintending Engineer, both the parties have to refer to the concerned Chief Engineer
for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the decision
of the Superintending Engineer, both parties have to refer to the Sardar Sarovar
Narmada Nigam H.O., Block No. 12, Gandhinagar, Government of Gujarat for the
conciliation process.
If the dispute is not resolved through the conciliation process, contractor may refer the
dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the Contractor fails
to refer a claim / dispute to the Higher Authority within 14 days of the notification of the
Engineer's decision, the Contractor shall not be entitled to any additional payment/claim if he
doesn’t follow the above sequence in stipulated time. However, during such period, he would
not stop the work in any case
THIS PAGE HAS BEEN KEPT BLANK
Item marked “N/A” do not apply to this Contract. With respect
1. The Employers is [CL.1.1]
Name: Executive Engineer (E&M), Electrical & Mechanical
Division, Vadodara
Address: Office of The Executive Engineer (E&M), Elect. &
Mech. Division, A-Block, Narmada Bhavan, Vadodara (Mobile
Email id: [email protected]
Name of authorized Representative (will be intimated later)
2. The Engineer is Executive Engineer (E&M), Electrical &
Mechanical Division, Vadodara
Name of Authorized Representative: …………..
3. The Defects Liability Period is 1 years from the date of completion. [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice to [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is 01 (One) [CL.1.1, 17&
month after start of work with the following milestones: 2]
Physical works to be completed Period from the start date
Milestone1 i.e. 25% …. Days
Milestone2 i.e. 50% …. Days
Milestone3 i.e. 75% …. Days
Milestone4 i.e. 100 % …. Days
6. The Site is located at Pumping Station at MRBC near NMC Ch [CL.1.1]
149.81 km for SCF pump no. 10. PS II. Village: Padal, Taluka:
Galteshwar, District: Kheda, State: Gujarat.
7. The name and identification number of the Contract is: As per Tender [CL.1.1]
8. The works consist of items as per B.O.Q. The works shall, inter alia, [CL.1.1]
include the following, as Specified or as directed:
Site clearance; setting out and Layout Construction and
Maintenance of all types of dams and its component, earthen
dam; spillway; installation of gate; excavation and earth work,
approach road, Inspection Bunglows, checkdams, bandhara, T.R.,
weir, barrages, Flood Protection & Anti Sea Erosion work, canal
lining and structures, , CD Works, structure repairing, Jungale
cutting, Desilting, etc. other WRD works.
Site clearance; setting – out and layout; widening of existing
carriageway and strengthening including camber corrections;
construction of new road/ Parallel service road; bituminous
pavements remodeling/construction of Junctions, intersections,
bus bays, lay-bays; supplying and placing of drainage Channels,
flumes, guard posts and guard other related items;
construction/extension of cross drainage works, bridge,
approaches and other related stones; protective works for
roads/bridge; all aspects of quality assurance of various
components of the works; rectification of The defects in the
completed works during the Defects Liability Period; submission
of “As- built’’ drawings and any other related documents; and
other item of work as may be required to be carried out for
completing the work in accordance with the drawings and the
provisions of the contract and to ensure safety.
(C) Bridge Works
provision of foundations, piers abutments and bearing;
prestressed/reinforced cement concrete superstructure; wearing
coat, hand railings, expansion joints, approach slabs, drainages
spouts/ down take pipes, arrangements for fixing light posts,
water mains, utilities etc.; provision of suitably designed
protective works; providing wing/return walls; provision of road
markings, road signs etc.; all aspects of quality assurance;
clearing the site and handing over the works on completion;
rectification of the defects during the Defects Liability Period and
submission of “As-built” drawings and other related documents;
and other items of work as may be required to be carried out for
completing the works in accordance with the drawings and the
provisions of the contract and to Insure safety.
(D) Other Items
Any Other Items as required to fulfill all contractual obligations as
per the Bid documents.
10. The following documents also form part of the Contract: [CL.2.3(9)]
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price. [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death [CL13]
is Rs. 5 lakhs per occurrence with the number of occurrences limited
to four. After each occurrence, the contractor will pay an additional
premium necessary to make insurance valid for four occurrences
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be ……………….. [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be ……. days [CL. 27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs. …….Lacs
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the
course of execution of work not provided for in the bidding
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring
additional mobilization by the contractor, e.g. ordinary soil to
rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc.
not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or
military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such
that the gross % weight of the components shall remain as 100%.
R = value of work as defined in Clause 47.1 of Conditions of
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to labour shall be paid
in accordance with the following formula:
VL= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for local labour
L0 = The consumer price index for industrial workers for the State on 28 days
preceding the scheduled date of opening of technical Bids as published by
Labour Bureau, Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the State for the
month under consideration as published by the Labour Bureau, Ministry of
Labour, Government of India.
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of cement procured by the
Vc= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for cement.
C0 = The all India wholesale price index for Ordinary Portland Cement on
days preceding the scheduled date of opening of technical bid as published
by the Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Ci= The all India average wholesale price index for Ordinary Portland Cement
for the month under consideration as published by Office of the Economic
Adviser, Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii)Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars) on 28 days preceding the date of opening of Bids as published by
the Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long
Products Rebars) for the month under consideration as published by Office
of the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long products
Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in accordance
with the following formula
Vb = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest center
on the day 28 days prior to the scheduled date of opening of technical bid.
Bi= The official retail price of bitumen of IOC depot at the nearest center :
For the first 15 days of the month under consideration, the price
declared on the 1st day of that month.
For the remaining days of the month under consideration, the rate
declared on the 16th day of that month.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and lubricant)
shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest center on the day 28 prior to the
date of opening of Bids.
Fi= The official retail price of HSD at the existing consumer pumps of IOC at
the nearest center for the 15th day of the month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has
been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and Machinery
spare procured by the Contractor shall be paid in accordance with the following
Vp= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of machinery for
mining, quarrying and Construction for the month under consideration
as published Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of Commerce &
Pi= The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month under
consideration as published Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry of Commerce
Pp= Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts has
been chosen to represent the Plant and Machinery Spares group.
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials other than
cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than cement,
steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on 28 days
preceding the scheduled date of opening of technical Bids, as published by
the Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the month under
consideration as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry
of Commerce & Industry.
Pm = Percentage of local material components (other than cement, steel, bitumen and POL)
The following percentage will govern the price adjustment for the entire
1. Labour -Pl 35.00%
2. Cement – Pc 0.00%
3. Steel - Ps 0.00%
4. Bitumen – Pb 0.00%
6. Plant & Machinery Spares Pp 55.00%
7. Other Materials - Pm 10.00%
Total = 100.00%
25. The proportion of payments retained (retention money) shall be 6% [CL. 48]
from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for delay For Whole of work [CL.49]
in completion of works (1/2000)th of the Initial contract price,
rounded off to the nearest Thousand, per
For sectional Completion (wherever
specified In item 6 of Contract data)
(1/2000)th of initial contract price for #5 km
Section, rounded off to the nearest thousand
27. Maximum limit of liquidated damages 10 percent of the Initial [CL.49]
For delay in completion work Contract Price rounded off to the nearest
28. Amount of Bonus for early completion Amount of bonus for early completion of
work shall be given as per CL.50 of Section-
29. Maximum limit of bonus for early 5 percent of the Contract [CL.50] Price
Completion of work
30. The amount of the advance payment are [CL. 51&52] N/A
#Nature of Advances Amount (Rs.)
Mobilization 10% of the On submission of
contract unconditional Bank
Price Guarantee. (to be drawn
before the end of 20% of
the contract period). The
contractor may furnish
four bank guarantees of
2.5 % of each valid for
the full period.
Equipment 90% for new After equipment is
and 50% of brought to site
depreciated (provided the
value for old Engineer is satisfied
equipment. That the equipment is
Total amount required for
Total amount required for
will be subject performance of the
to a maximum contract) and on
of 5% of the submission of
Contract Price unconditional Bank
Guarantee foramount
iiiSecured Deleted
Advance for Non-perishable
material Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after fulfillment of
the above conditions)
31. Repayment of advance payment for mobilization and [CL. 51.3]
The advance loan shall be repaid with percentage deduction from
the interim payments certified by the Engineer under the Contract.
Deduction shall commence in the next Interim Payment Certificate
following that in which the total of all such payments to the
Contractor has reached not less than 20 percent of the Contract
Price or 6 (six) months from the date of payment of first
installment of advance, whichever period concludes earlier, and
shall be made at the rate of 20 percent (collectively for both
Mobilization Advance and Equipment Advance)of the amounts
of all Interim Payment Certificate until such time as the loan has
been repaid, always provided that the loan shall be completely
repaid prior to the expiry of the original time for completion
pursuant to Clause 17 and
33. The securities shall be for the following minimum amounts [CL. 52]
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs.
…………….. (to be decided after evaluation of the bid) as
additional security in terms of ITB Clause 29.5.
The standard form of Performance security acceptable to the
Employer shall be an unconditional Bank Guarantee of the type as
presented in Section 8 of the Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…... [CL. 58]
35. The date by which “as– built” drawings (in scale as directed) in 2 [CL. 58]
sets {CL. 58} are required within 28 days of the issue of certificate
of completion of the whole or section of the work, as the case may
36. The amount to be withheld for failing to supply “as built” [CL. 58]
drawings by the Date required is Rs. ……….. Lakhs.
37. The following events shall also be fundamentals breach of [CL. 59.2]
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of
38. The percentage to apply the value of the work not completed [CL. 60]
representing the Employer’s additional cost for completing the
Works shall be 20 per cent.
TECHNICAL SPECIFICATION
THIS PAGE HAS BEEN KEPT BLANK
Sr. No. Particulars Page No.
1.0 INTRODUCTION
3.0 OBLIGATIONS OF THE SSNNL
5.0 WORK & SAFETY REGULATIONS
6.0 SCOPE OF WORK
I. Repair/Rectification of Pump-Set Installed at Pumping Station-1:
7.0 General Terms & Condition:
1.0 INTRODUCTION
SSNNL is looking for conducting the work of Repair along with dismantling and
installation of the 600 Cusecs water discharge capacity Pumping Station at MRBC
near NMC Ch 149.81 km for SCF pump no. 10. PS II. A Scope of work is
described herewith for conducting the Repair/Rectification at our facilities. The
scope contains the objectives, scope of work methodology to be adopted, time
schedule and payment terms details are presented in the following section:
Technical Details of MRBC Pump station Phase-II SCF pumps:
2. Rated discharge (cusecs)
3. Design Head (m)
4. Motor Rating (kW)
The primary objective is to repair along with dismantling and installation of the
600 Cusecs water discharge capacity Pumping Station at MRBC near NMC Ch
149.81 km for SCF pump no. 10. PS II.
3.0 OBLIGATIONS OF THE SSNNL
a) Water supply if available from the Bore shall be made available.
b) Internal Roads and clear access will be available in the Pump House and the
same shall be maintained by Contractor at their own cost.
c) Services for Civil engineering required for addition/alteration shall be arranged
by the SSNNL if required.
d) Any addition/alteration in the Control Room, Cable routes or equipment
positions shall be done by the SSNNL if required.
The Contractor shall obtain and maintain the necessary labour license, electrical license
from Government of India/Government of Gujarat and any other statutory license required
for the faithful performance of the contract and he must be in possession of the P.F.
Account Number. The Contractor has to comply all rules & regulations of the Government
of India and Government of Gujarat pertaining to this contract. Contractor shall have to
arrange visit of Inspector and charges for the same for all licenses as mentioned above.
5.0 WORK & SAFETY REGULATIONS
5.1 It will be the responsibility of contractor to take required steps to adequate safe
guard their personnel during carrying out the work and to ensure that the work is
carried out in such a manner that maximum safety to the staff is ensured.
The Contractor shall also be responsible for the provision of all safety notices and
safety equipment required both by the relevant legislations and the Engineer, as he
may deem necessary.
5.2 All equipment used in Repair/Rectification by the Contractor shall meet
Indian/International Standards and where such standards do not exist, the
Contractor shall ensure these to be absolutely safe. All equipment shall be strictly
operated and maintained by the Contractor in accordance with manufacturer’s
Operation Manual and safety instructions and as per the State Transmission Utility
Approved Guidelines/rules in this regard.
5.3 The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
5.4 The Contractor shall provide safe working conditions to all workmen and
employees at the Site including safe means for maintenance & repair activity as per
5.5 No electric cable in use by the Contractor/Owner will be disturbed without prior
permission. No weight of any description will be imposed on any cable and no
ladder or similar equipment will rest it against or attached to it.
5.6 No repair work shall be carried out on any live equipment. The equipment must be
declared safe by the Engineer deployed by the contractor and a permit to work shall
be issued by the Engineer deployed by the contractor before any repair work is
carried out by the Contractor. While working on electric lines/equipment, whether
live or dead, suitable type and sufficient quantity of tools will have to be provided
by the Contractor to electricians/workmen/officers working on it.
5.7 In case any accident occurs during the Maintenance/Repair or other associated
activities undertaken by the Contractor thereby causing any minor or major or fatal
injury to his employees/any persons due to any reason, whatsoever, it shall be the
responsibility of the Contractor to promptly inform the same to the Engineer in
prescribed form and also to all the authorities envisaged under the applicable laws.
For any fatal/non-fatal electrical/mechanical accident, the SSNNL will have no
5.8 The Engineer in charge of SSNNL shall have the right at his sole discretion to stop
the work, if in his opinion the work is being carried out in such a way that it may
cause accidents and endanger the safety of the persons and/or property, and/or
equipment. In such cases, the Contractor shall be informed in writing about the
nature of hazards and possible injury/accident and he shall comply to remove
shortcomings promptly. The Contractor after stopping the specific work can, if felt
necessary, appeal against the order of stoppage of work to the Engineer in charge of
SSNNL within 3 days of such stoppage of work and decision of the Engineer in this
respect shall be conclusive and binding on the Contractor.
5.9 The Contractor shall not be entitled for any damages/compensation for stoppage of
work due to safety reasons and the period of such stoppage of work will not be
taken as an extension of time and will not be the ground for waiver of levy of
liquidated damages.
5.10 It is mandatory for the Contractor to observe during the operation & maintenance of
the works, requirements of Safety Rules which would generally include but not
limited to following:
a) Each employee shall be provided with initial indoctrination regarding safety by
the Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him
without proper introduction as to the hazards incident thereto, both to himself
and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be
permitted around fire prone areas and adequate firefighting equipment shall be
provided at crucial location.
d) There shall be a suitable arrangement at the site under the contract for
rendering prompt and sufficient ‘First aid’ services for the injured.
e) Requirements of ventilation in under-water working to licensed and
experienced divers, use of gum boots for working in slushy or in inundated
conditions are essential requirements to be fulfilled. Requirement of divers is
included in the scope of work as and when required during the M & R period.
5.11 The Contractor shall follow and comply with all State Transmission Utility
approved Safety Rules, relevant provisions of applicable laws pertaining to the
safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any
discrepancy between statutory requirement and State Transmission Utility
approved Safety Rules referred above, the latter shall be binding on the Contractor
unless the statutory provisions are more stringent.
a. Fatal injury or accident (These are causing Rs. 5,00,000 per Person
b. Major injuries or accident causing injury to Rs. 20,000 per person
25 % or more permanent disablement to any
person, Workmen or employees.
Permanent disablement shall have same meaning as indicated in Workmen’s
Compensation Act. The compensation mentioned above shall be in addition to the
compensation payable to the workmen/employees under the relevant provisions of
the Workmen’s Compensation Act and rules framed there under or any other
applicable laws as applicable from time to time. In case the Owner is made to pay
such compensation then the Contractor is liable to reimburse the Owner such
amount in addition to the compensation indicated above.
5.12 SSNNL reserves the right to reject/keep company under watch for a period of three
month in case of default on account of safety.
5.13 The Station Engineer should be posted who will make himself available at site as
and when required by the SSNNL within shortest time on intimation in addition to
his normal daily visits in connection with relevant work of Contract.
5.14 If work Repair/Rectification is to be carried out by outside agencies, they should be
the State Transmission Utilityapproved/Government approved/ Original
equipment manufacturer/ Authorized Dealers of OEM under prior approval of
Engineer in Charge.
5.15 The time limit for the work of Repair/Rectification is (3) Three months. However,
trial period of one months shall be considered to observe the performance of
Contractor. The Contract may be terminated within one months trial period by
issuing a notice to Contractor in case of unsatisfactory performance.
5.16 The Repair/Rectification records during this period should be properly maintained
by the Contractor and shall be handed over to the SSNNL.
5.17 Should any damage to any equipment / system during Repair/Rectification period,
the bidder shall replace the equipment system to the original condition.
5.18 After completion of Repair/Rectification work, i.e. just before handling over, the
Contractor shall clean the entire system.
5.19 Prior to taking over at the end of the Repair/Rectification period, Contractor shall
be demonstrating the proper operation of all the equipment and systems and to the
satisfaction of the owner.
5.20 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the HOTO formalities,
it shall be the responsibility of the contractor to maintain adequate insurance at all
time at least to cover:
Workmen’s compensation in accordance with the law in force from time to
Third party liability including SSNNL personnel on duty with a cover of
minimum Rs. 5 lac for each person in case of fatal accident/permanent
disability and with a total cover of Rs. 200 lac.
5.21 Following will be the responsibility of Contractor during the period of work of
Repair/Rectification.
a) Providing of technical advice & support to the owner regarding
Repair/Rectification issue followed by technical discussion.
b) Maintaining of records of quantity & quality of consumables.
c) Maintaining of record & data require to be maintained under the prudent utility
d) Maintaining all fire protections & safety equipment.
e) Taking of Anti-erosion measures.
f) Hire, train, administer & supervise the work force necessary to perform
Repair/Rectification work.
g) Maintaining of records of maintenance inspections, operational checks &
financial transaction relating to facility, as per the requirement of Authorities.
h) Performing of calibration of all instruments loop checking on a regular basis.
i) Submission of monthly report of work carried out (Maintenance & Repair) and
inventory record.
j) Preparing of schedule for preventive maintenance of equipment and
performing of preventive maintenance of equipment to avoid the major break
k) Maintaining of auxiliary power consumption.
l) Minimizing of all unscheduled outages and their duration.
m) Maintaining of all financial transaction relating to facility.
n) Establishment of system for maintaining the inventory of spares parts and a
o) Co-ordination with GETCO/UGVCL, SSNNL Canal/E&M division & other
organization etc.
5.22 Used spares, scrap and consumable shall be the property of SSNNL. Contractor
shall have to inform periodically to SSNNL regarding stock of used spares, scrap
and consumable.
5.23 On signing of Repair/Rectification contract, the contractor has to submit the CV of
all persons deployed for the purpose of M&R (excluding unskilled persons)
5.24 GENERAL FACILITIES: -
Medical Aids: -Government and private Hospital facilities are available at Rapar.
However, the contractor will have to make his own arrangement for medical
services for his labours and staff.
Supply of Diesel, Petrol and Oil: -Contractor shall have to make his own
arrangements for procuring the fuel required by him.
6.0 SCOPE OF WORK
I. Repair/Rectification of Pump-Set Installed at Pumping Station-1:
Technical Specification of Pumps:-
1. Make : M/s Aqua Machineries Pvt. Ltd.
2. Total Number of Pumps :
3. Rated Discharge Flow (Design point) : 40 Cusec at 50 Hz
4. Total head at Rated Flow in MRBC :
6. Type of pump : SCF
The scope of work includes dismantling of complete Submersible Centrifugal
Pump of 40 Cusecs pump assembly stage-wise, with proper alignment marking
and safe handling of all components including HT motor, pump bowls,
discharge elbow, couplings, column pipes, line shaft, shaft sleeves, bearings,
Aligned Cooling & Lubrication Pump System and all mechanical and electrical
The work shall also include decoupling & coupling of motor, Cleaning of all
rusted parts and application of anticorrosive paint to components, Filling of
Porosity/Cavitation spots in impeller guide piece by welding with suitable
welding rods and then finishing of same, Overhauling of pump includes
examination of parts, internal inspection, replacement of worn out spare part,
etc. and Reassembly of complete pump as per pump assembly, outline and
final assembly drawing, Levelling of Discharge elbow and correction within
specified value, Reassembly of motor and motor pedestal, Pump motor
coupling alignment, Refitting of Pump with recording lift & internal clearances
step by step along with Lube Pump Dismantling & Re-erection.
All works shall be carried out using suitable cranes, tools, tackles, and skilled
manpower, following OEM guidelines and standard safety norms.
7.0 General Terms & Condition:
1. The bidder shall visit at site before quoting the rates on own cost.
2. The quantities mentioned in the Schedule-B under this item are approximate only and
may be operated as per requirement of site situation. The contractor shall be paid for the
actual works carried out at the rates quoted by him. The rates are inclusive of all other
applicable taxes except GST.
3. In case if work will not be found satisfactory than contractor shall have to perform the
re-work. In such case, no extra payment towards re-work will be paid by SSNNL. The
rate shall be quoted accordingly.
4. After completion of work, agency has to clean all surrounding area and surfaces.
5. If any damages to existing structure during handling of parts will be done by agency
then agency have to fix it at own cost and if he fails to repair then recovery shall be
done from account running bill/Final Bill. This repair amount will be decided by EIC
and will have to borne by the agency.
6. The Contractor shall have to take all necessary safety precaution while executing of
work. SSNNL will neither be responsible for any fatal accident which may results in
loss of life or machinery nor will any reimbursement towards losses be paid to
Contractor. The Contractor shall be sole responsible for all safety precaution while
executions of work.
7. The Contractor shall have to quote the rate by inclusive of Accommodations &
transportation, SSNNL will not pay for any amount for transportation and
Accommodation to Contractor.
8. Detailed photographs with latitude, longitude, date and time at each stage shall be
submitted to the EIC on mail as well as in hard copies.
9. In case of any discrepancy between the description of an item in the Schedule B and the
specifications, the latter shall prevail. In case any feature of the work is not fully
described and set forth or read drawings and specifications, the seller shall forthwith
apply to the Engineer-in -Charge for further instruction, drawings or specifications.
10. The Contractor shall have to quote the rate by considering Stand-By Charges. No
standby charges other than Rate quoted in the tender item will be paid to contractor by
11. Contractor has to raise the RA bill with the photographs of completed work with the
details like longitude, latitude, date and time in copy compulsory. Along with the R.A
Bill, the contractor should submit site wise work details.
12. Under the contract, the contractor should either himself be present at the site or should
nominate persons in writing, who must be available at site and who should be
authorized to take decisions about the works and receive the instructions from
Engineer-in-Charge of the work at any time. In absence of any responsible man of
contractor at the time of any emergency, adhoc decision of Engineer-in-Charge will be
binding on the contractor.
13. The contractor will have to make his own arrangement for storing his material tools and
tackles, equipment’s, accommodation and transportation for his works.
14. All safety precaution will have to take by contractor as per safety rules & regulation. In
case if any accident takes place, SSNNL will not be responsible for it. However, any
damages occurred due to accident, recovery of actual amount of damage will be
recovered from contractor.
15. If the contractor or his working people or servants will break, deface injure or destroy
any part of machinery in which they may be working or premises, the same shall be
rectified by the contractor within seven days from the date of receipt of letter from the
SSNNL. In case or it is not attended within seven days the engineer in charge at his
discretion can fix the cost of damage etc. and recover the same from contractor bill or
security deposit.
16. The method of execution of the items shall conform to the relevant specifications as per
the latest version of the Indian Standard unless specified otherwise and so far as is
applicable. Where a reference to any Indian Standard appears in the code, it shall be
taken to mean as reference to the latest version of standard and of relevant items.
17. The Bidder must visit the site before bidding the tender at his own cost.
18. All work shall be carried out, in a workman like manner and as per the best technique
for the particular item.
19. Servicing / Repair/Rectification work shall be performed and completed in a workman
like manner and to the entire satisfaction to the representative of the Engineer-in-
Charge. The contractor shall be responsible for workmanship, material and equipment’s
purchased and/or supplied by him.
In case of requirement for emergency fault repairing, the work should be
completed within 10 days of intimation to contractor. Failing to attend the fault in
stipulated time limit, Engineer In Charge may impose penalty up to Rs. 1000 per day.
All the item quantity consider is the tentative and actual may be vary as per site
requirement. The agency has to carry out the work as per actual site
The above Item rates are inclusive of all other applicable taxes except GST.
Workmanship and Material:-
Repair/Rectification work shall be performed and completed in a workman like
manner and to the entire satisfaction to the representative of the Engineer-in-Charge.
The contractor shall be responsible for workmanship, material and equipments
purchased and/or supplied by him.
Transportation, Unloading and Storing:-
Contractor shall have to transport the equipments and machineries require on
respective structure during the contract period during Repair/Rectifications.
Safety Measures:-
Safety precautions as laid down by the safety manual published by the central water
and power commission shall followed by the contactor. A copy of the manual will be
available for reference in the office of the Engineer-in-Charge.
The contractor shall take necessary precautions for the safety of the workers and
preserving their health while working in such jobs as required special protection and
precaution. The following are some of the measures listed but these are not
exhaustive and the contractor shall add to and augment these precautions on his own
where necessary band comply with the directions issued by the Engineer-in-Charge
in his behalf from time to time and at all time.
CERTIFICATE FROM CONTRACTOR
It is certified that, we have read the tender documents scope of works and other technical
specifications, visited the site and the materials / services offered will be in accordance with the
tender criteria, specification, as per the site requirements and will be guaranteed to give the
satisfactory performance for the said contract works.
Signature of the Contractor
THIS PAGE HAS BEEN KEPT BLANK
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Approve Draft Tender Document MRBC REpair of Pump 10.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .