| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC H NO 52 CENTRAL SCHOOL KE PAAS RAMPUR POST BAIKUNTHPUR DISTRICT KORIA CHHATTISGARH PIN 497335 | KOREA | CHHATTISGARH | 497335 | ₹13.3 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical 497339 | KOREA | CHHATTISGARH | 497339 | - | - | Rejected-Technical Technically Rejected |
| 3 | Rejected-Technical DOUBLE STORY ADARSH NAGAR PO KOTMA COLLIERY DISTT ANUPPUR MADHYA PRADESH 484336 | KOTMA COLLIERY | ANUPPUR | MADHYA PRADESH | 484336 | - | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | ARUN KUMAR JAISWAL L3 | rakesh prasad L1 | SIDDHARTHA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock | 232.5 | cum | 231.28 ₹53,772.60 | 167 ₹38,827.50 | 172 ₹39,990 |
| 2.01 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 186 | cum | 87.75 ₹16,321.50 | 60 ₹11,160 | 65 ₹12,090 |
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.52 | cum | 4,198.38 ₹1.1 L | 2,920 ₹77,438.40 | 3,122 ₹82,795.44 |
| 4.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 87.95 | cum | 4,842.05 ₹4.3 L | 3,235 ₹2.8 L | 3,732.5 ₹3.3 L |
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 344.4 | sqm | 454.38 ₹1.6 L | 270 ₹92,988 | 337 ₹1.2 L |
| 6.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 10,554 | kg | 65.82 ₹6.9 L | 47 ₹5.0 L | 53 ₹5.6 L |
| 7.01 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6(1 cement: 6 coarse sand) | 16.56 | cum | 4,705.35 ₹77,920.60 | 3,143 ₹52,048.08 | 36.27 ₹600.63 |
| 8.01 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 140 | kg | 75.76 ₹10,606.40 | 51 ₹7,140 | 58 ₹8,120 |
| 9.01 | 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) | 346 | sqm | 211.44 ₹73,158.24 | 153 ₹52,938 | 165 ₹57,090 |
Tender Value
₹26.3 L
EMD Value
₹33,000
Closing Date
19 Jan 2026, 5:00 pmClosed
SO(Civil), SECL, Baikunthpur Area
SO(Civil), SECL, Baikunthpur Area
SCHEME FOR CONSTRUCTION OF VERTICAL EVASEE AT CHURCHA MINE RO OF BAIKUNTHPUR AREA
2026_SECL_350683_1
SECL /BKP/ DGM(C) / e-T / 77
Open Tender
Civil Works - Others
90 days
Churcha
Please refer Tender documents.
3 documents required · 3 mandatory
₹33,000
17 Feb 2026
8 Jan 2026
21 Jan 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
8 Jan 2026 - 12 Jan 2026
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6(1 cement: 6 coarse sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade . New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_363433.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 1.38 MB
Tendernotice_3.pdf
PDF • 0.66 MB
BOQ_363433.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid