Loading…
Loading…
Tender Value
₹50.0 L
EMD Value
₹50,000
Closing Date
30 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Dy.Minicipal Commissioner - West Zone
Providing & Laying New Drainage Line and Drainage related work Under Balolngar Bridge to chamundanagar digvijay factory to Chharanagar and in Newly open T.P Road Behind Kaligam Garden & other places in Ranip ward in West Zone
297529
9/25-26 (T.N.76)
Open
Civil Works - Others
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Municipal Commissioner, Ahmedabad
₹50,000
18 Apr 2026
18 Apr 2026
18 Apr 2026
30 Apr 2026
18 Apr 2026
Name of work:- Providing & Laying New Drainage Line and Drainage related work
Under Balolngar Bridge to chamundanagar digvijay factory to Chharanagar and in Newly
open T.P Road Behind Kaligam Garden & other places in Ranip ward in West Zone
Qty Item Rate Per Amount
Excavation for pipe line trenches for water supply,
sewerage lne, manhole etc. all with shoring and
struting if required as per required gradient and
line including safety provisions using site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified.
(GWSSB SOR 2022-23 Item No. 1, Page 32)
a 120.00 Upto 1.50 mt depth 89.00 Cmt
b 60.00 1.5 mt to 3 mt depth 98.00 Cmt
c 5.00 3.00 mt to 4.50 mt depth 103.00 Cmt
d 1.00 4.50 mt to 6.00 mt depth 109.00 Cmt
Extra rate over item of excavation of earth for
excavation of asphalt pavement/RCC of thickness
up to 0.20 meter including demolishing the asphalt
carpet,metal,soiling /cutting reinforcement
etc.comp. with stacking the material as directed.
(AMC approved SOR Rate Jan-2016)
a 20.00 up to 0.20 meter thickness (By Manual) 71.43 Smt
b 30.00 Up to 0.30 meter (By any type of Breaker Machine
or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete. 178.57 Smt
c 10.00 0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete. 312.50 Smt
3 Refilling the pipeline trencheds incl. ramming,
watering, consolodating desposal of surplus stuff
as directed within a radius of 3 km.
(GWSSB SOR 2022-23 Item No. 14, Page 40)
a 200.00 Refilling as directed 22.00 Cmt
b 50.00 *-do-with selected soil brought from outside incl. all
lead 175.00 Cmt
4 200.00 Conveyance charge of earth,lime,murrum, building
rubbish,manual garbage,sludge ,excavated rock,fly
ash, aggregate of any kind etc. comp. up to 5 Km.
lead (R&B SOR 23-24, P-6 - Item code-
Quantity Shoud not be more then the
quantity equal to excavation minus back 326.73 Cmt
filling. (No bulkage)
Providing and supplying ISI marked only standard
length Stoneware pipes in standard lengths of
following class and diameter including all
taxes,insurance, transportiton, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc.
complete (IS - 651 - 1989)Class AA (GWSSB SOR
2022-23 Item No. 11.2, Page 17)
Lowering, laying and jointing stone ware pipes of
following diameters with cement joints in C.M.1:1
proportion in proper position , grade and alignment
at all level as directed by Engineer-in- charge
including conveyance from stone to site of work,
Jointing material etc.comp.
(GWSSB SOR 2022-23 Item No. 14, Page 40)
7 R.C.C.Pipe Horizontal Cast
Providing and supplying ISI Standard RCC
pipes (of sulphate resisting Cement )in
standard lengths of following class and
diameter suitable for rubber ring joints
(socket and spigot) including all taxes,
insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking
Note: One collar should be supplied with each
full length plain ended RCC pipe, cost included
in rates below. One rubber ring should be
supplied with each full length socketed pipe,
cost included in rates below.
Class NP3 Test pressure 0.7 Kg/Sq.Cm
(GWSSB SOR 2022-23 Item No. 10.1 D, Page
a 320.00 300 mm dia 755.00 Rmt
c 0.00 500 mm dia 1485.00 Rmt
Lowering, laying and jointing R.C.C. pipes in
C.M.1:1 1/2 of following diameters in proper
position , grade and alignment at all level as
directed by Engineer-in- charge including
conveyance from stone to site of work, labour
giving hydraulic testing as per ISI code.
NP3 (GWSSB SOR 2022-23 Item No. 11 B,
a 320.00 300 mm dia 119.00 Rmt
b 250.00 450 mm dia 171.00 Rmt
c 0.00 500 mm dia 189.00 Rmt
d 100.00 600 mm dia 228.00 Rmt
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C. Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement
slurry, Brick masonary in CM 1:5 & excluding the
cost of chamber seat cover etc. completed.
(AMC approved SOR Rate Jan-2016)
a 35.00 0.60 X 0.45 mt. size Inside Clear, Depth from
to 0.90meter for pipe dia <=150 mm. 2261.61 No.
b 26.00 0.60 X 0.75 mt. size Inside Clear, Depth from
to 0.90meter for pipe dia <=20 mm. 2874.11 No.
c 20.00 0.75 X 0.75 mt. size (Inside Clear) Depth from
to 1.20 meter for pipe dia <=20 mm 3905.36 No.
Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of thickness
15 C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With
Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe
Coated Steps 35 Cm C/C At 35 Cm Staggered
Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of
thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway
10 mm dia.)But Excluding The Cost Of Manhole
Seat Cover Etc..Completed Of Size 0.75 X
Meter (Inside Clear, M.H. length should be parallel
(AMC approved SOR Rate Jan-2016)
a 5.00 1.00 to 2.00 meter depth, (Slab at Ground level)
(for pipe dia <=230 mm) 5651.79 No.
b 2.00 2.00 to 3.00 meter depth, (Slab at below 0.60 mt.
From G.L.) (for pipe dia <=300 mm) 11395.54 No.
Rate reduction over item of Constructing Slab
Type M.H. Chamber of size 1.00 x 0.75 mt for
constructing slab @ depth more than 0.60 mt
below Ground Level (Max. 3 unit of DM should be
reduced in this item)
(AMC approved SOR Rate Jan-2016) 460.71 DM
Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) in CM 1:3, finishing with
cement slurry, P/F 4 mm dia M.S.Steel HDPE
coated steps 35 cm c/c at 35 cm staggered in
masonary CM 1:5, RCC Slab in CC 1:1.5:3 of
thickness 23 C.M., including Cantering &
reinforcement (double jalli at 15 C.M. c/c bothway
12 mm dia.) but excluding the cost of Manhole seat
cover etc..completed. of Size 1.00 X 1.40 meter
(Inside Clear, M.H. length should be parallel to the
flow, for pipe dia <= 800 mm) (AMC approved
SOR Rate Jan-2016)
a 10.00 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No.
b 30.00 2.00 to 3.00 meter depth, (Slab at below 0.6 mt.
From G.L.) 19258.04 No.
c 5.00 3.00 to 4.00 meter depth, (Slab at below 1.00 mt.
From G.L.) 26867.86 No.
d 1.00 5.00 to 6.00 meter depth, (Slab at below 1.00 mt.
From G.L.) 44050.00 No.
e 1.00 7.00 to 8.00 meter depth, (Slab at below 1.00 mt.
From G.L.) 66632.14 No.
Extra rate over item of Constructing Slab Type
M.H. Chamber of following size for constructing
M.H. Chamber, per 1.00 Decimetre of additional
depth or part thereof. etc. complete. Of size 1.00 x
1.40 mt. (inside clear) and Depth from
(AMC approved SOR Rate Jan-2016)
a 1.00 4.00 to 5.00 meter depth, 521.43 DM
b 1.00 6.00 to 7.00 meter Depth 536.61 DM
c 0.00 8.00 to 9.00 meter Depth 551.79 DM
d 0.00 9.00 to 10.00 meter Depth 564.29 DM
Rate reduction over item of Constructing Slab
Type M.H. Chamber of size 1.00 x 1.40 mt for
constructing slab @ depth more than 0.60 mt for (
MH 2 to 3 mt depth) and 1.0 mt for (MH above
mt depth) below Ground Level (Max. 5 unit of DM
should be reduced in this item)
(AMC approved SOR Rate Jan-2016) 586.61 DM
15 Dismantling of existing Arch type manhole up to
Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and &
finished 15 mm thick cement plaster inside in CM
1:3, P/F 4 mm dia M.S.Steel HDPE coated steps
35 cm c/c at 35 cm staggered in masonry CM 1:5,
incl. cost of RCC Slab in CC 1:1.5:3, including
Cantering & reinforcement as directed by engineer
in charge. Rate includes carting of debris and
excavated soil.
(AMC approved SOR Rate Jan-2016)
1.00 x 0.75 mt (inside clear) RCC Slab of thickness
15 C.M& reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
Ground level) 5892.86 No.
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.) From 2 to 3 mt
depth (Slab at below 1.00 mt. From G.L.) 8883.93 No.
1.40 x 1.00 mt (inside clear) RCC Slab of
thickness 23 CM & reinforcement (double jalli at
15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt
depth (Slab at Ground level) 8080.36 No.
d 8.00 1.40 x 1.00 mt (inside clear) RCC Slab of
thickness 23 CM & reinforcement (double jalli at
15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt
depth (Slab at below 1.00 mt. From G.L.) 17008.93 No.
e 8.00 1.40 x 1.00 mt (inside clear) RCC Slab of
thickness 23 CM & reinforcement (double jalli at
15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt
depth (Slab at below 1.00 mt. From G.L.) 24776.79 No.
16 100.00 Provdg. & laying S.W. Gully trap with brick
masonry chamber & water tight G.T.Stone
including fixing of cover Square mouth trap
mm x100 mm size P-Trap.
(R&B SOR 23-24, P-173 - Item code-
Making connection to the ex. M.H.in running
sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any
convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
(AMC approved SOR Rate Jan-2016)
c 10.00 700 mm to 900 mm dia 3125.00 No.
Cutting the pipes of following dia coming in the
new M.H.in running sewer including cutting bars,
including removing debris /silt from the M.H. and
carting at a suitable distance etc..complete as
directed. No payment for M.H. work will be made
until pipe is not cut completely in all respect.
(AMC approved SOR Rate Jan-2016)
c 10.00 700 mm to 900 mm dia 2008.93 No.
19 Providing Kachha of Pakka Dummy in the
following dia pipes and removing the same after
completion of the connection work as directed.
(AMC approved SOR Rate Jan-2016)
a 30.00 100 mm to 300 mm dia. 199.11 No.
b 20.00 350 mm to 600 mm dia 302.68 No.
c 10.00 650 mm to 900 mm dia 642.86 No.
20 50.00 Levelling or orientation of existing gully trap
chamber incl. Nece. masonry in CM 1:6 and
plaster in CM 1:3 etc. using old G.T.stone and
cover etc. comp.
(AMC approved SOR Rate Jan-2016) 71.43 No.
Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing chamber sheet
cover, removing the debris from chamber and
carting the same as directed. (AMC approved
SOR Rate Jan-2016) 401.79 No.
Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster
in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and
carting the same as directed.
(AMC approved SOR Rate Jan-2016)
a 20.00 up to 0.15 mt. (@ Two Coarse) 732.14 No.
b 30.00 up to 0.35mt. (@ Four Coarse) 1160.71 No.
c 8.00 up to 0.65 mt. (@ Seven Coarse) 1794.64 No.
d 5.00 up to 0.90 mt. (@ Ten Coarse ) 2160.71 No.
Raising of Existing manhole item includes,cutting
of existing road surround by Manhole by diamond
cutter machine dismantling of road in confined
area by breaker machine and carting of dismantal
material.item also included necessarey brick work
to raise the manhole at road level in CM 1:3 item
also included fixing of Manhole frame at exact road
level by using MaserEmaco S 488 trowable fibre
reinforced thixotropic repair mortal material Laying
of concrete made form Master Emaco 5
flowable micro concrete material in desired
thickness and laying of hot bitumanous material in
Upper layer and compaction of hot bitumanious
material by palte compactor machine .Rate also
included necessary plaster at inside of manhole in
CM 1:3 in 20 MM thickness on raised brickwork.
(AMC approved Rate) 6846.43 No.
24 Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp. Directed.
(AMC approved Rate Central Store 2023)
a 20.00 F.R.C. Extra Heavy Duty (EHD-35) Manhole
Covers & Frames Cover : 728mm ø &
mm thick circular cover, 35.00 MT load design,
100x2mm MS flat allround, 16mm ø plain round
bar for lifting the cover & should be fitted with
plastic cups. Frame : 560 mm ø clear opening,
outer size- 888x888x175 mm. On the upper
periphery of frame 25 x 3 mm wide MS flat
should be well embed in concrete to protect the
edges of frame. FRC E.H.D.-35 manhole cover &
frame described as above. 2843.00 No.
b 21.00 FRC heavy duty cover size 730 mm. & 90 mm
thick circular Cover 20 M.T. design load and
frame size 560 mm clear opening size 890 x
c 15.00 FRC medium duty cover size 670 mm dia & 70 mm
thick 10 M.T. load design and frame size
mm clear opening outer size 780 x 780 x 120 mm 1996.00 No.
FRC medium duty Chamber seat cover (FRC)
cover 706 x 556 x 50 mm rectangular cover
frame size 600 x 450 mm clear opening outer
e 10.00 FRC light duty Chamber seat cover (FRC)
cover with rectangular frame (LD-2.5) Cover &
Frame - 600 x 450mm clear opening, 1631.00 No.
25 1.00 Suppling cast iron manhole frame of any Size.
(Market Rate) 95.00 Kg
Carting and Fixing M.H. Chamber or Catchpite
Seat and Cover in line and level to match
exisisting road level in CC 1:2:4 and finishing
smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be
supplied by A.M.C.(from any store)
(AMC approved SOR Rate Jan-2016) 750.00 No.
Providing Dead Cantering using good quality
Country Wood Planks, wall Plate of required
thickness and size including placing the nece.
supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per
standard engg. practice etc. comp. as directed.
(AMC approved SOR Rate Jan-2016) 312.50 Smt
Supplying, labour for break down repairing work for
activities like excavation, disliting, removing debris
from trench back filling etc. comp. as directed by
a 400.00 Mazdoor at day /Night
(R&B SOR 23-24, P-39 - Item code-
b 100.00 Makadam/ supervision at day / Night
(R&B SOR 23-24, P-39 - Item code-
29 25.00 Brick work using common burnt clay building bricks
having crushing strength notless than
kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:5 (1-Cement :5-fine sand) (B)
(R&B SOR 23-24, P-70 - Item code- 06001BA
Providing 15 mm thick cement plaster in single
coat on Rough (Similar) side of single or half brick
walls for interior plastering upto floor two level and
finished even and smooth in (i) Cement mortar 1:3
(1-cement:3-sand)
(R&B SOR 23-24, P-129 - Item code- 17002A
Supplying cutting, bending, binding and placing in
position steel as per plan and design and as per IS
2502 including cost of steel and binding wire for
reservoirs/ structuresonly including lift up to
meter height or depth below GL for all diameters.
(GWSSB SOR 2022-23 Item No. 9, Page 45)
a 1.00 TMT bars Fe-415 grade for all diameters 73208.00 MT
b 0.50 TMT bars Fe-500 grade for all diameters 77504.00 MT
Fixing M.S. Sections Incl. Labour charges for
lowering laying, erecting, fixing, various size of
M.S. section such as joints channel, angles plates
etc with Fabrication Complete as Directed.
(GWSSB SOR 2022-23 Item No. 16, Page 41) 8523.00 MT
Providing and laying cement concrete 1:2:4 (1-
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth
(R&B SOR 23-24, P-53 - Item code- 05010AA
Providing and laying cement concrete 1:5:10 (1-
Cement : 5-Coarse sand : 10-hand broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth
(R&B SOR 23-24, P-52 - Item code- 05006A
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item
also includes for making temporary sufficient nos
of lighting arrangement through out the work with
necessary required arrangement. ..The same shall
be removed after completion of work. (Only for
break down work from start to complete)
(AMC approved SOR Rate Jan-2016) 80.36 Rmt
36 Providing and erecting C.I. and MS ventilating
columns 15 cms. dia. with C.I. ornamental cap and
Min 6.00 Mtr. Height (Height may be varying as per
site) base fixed firmly with necessary foundation
with one coat of red lead oxide paint and one coat
of any approved colour with 15 cms, dia.10 Mt.in
length with 0.35mt*0.35mt* M100 Encasing
stoneware or R.C.C. pipe connection with M.H.
including excavation and jointing as required etc.
complete as per drawing.
(GWSSB SOR 2022-23 Page ,Section 2 D, Item
1.00 For 6 Mtr. Height ( 6 Mt MS pipe) 33836.26 No.
1.00 For 12 Mtr. Height (2 m CI and 10m MS) 41230.45 No.
Providing and operation dewatering Pump
including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each
Pump Set, No payment should be allowed for non
working condition of machinery)
(AMC approved SOR Rate Jan-2016) 600.00 Shift
Hiring and operating Mud Pumps incl. Cost of fuel
and operator including the cost of to and fro
transportation, laying of the delivery hoses as
required, lowering and lifting the pumps as and
when required etc. complete. Set Do As Directed.
(No payment should be allowed for non working
condition of machinery )
(GWSSB SOR 2022-23 Item No. 1, Page 104) 18.32 H.P/Hr
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery, and
lighting and other requirements with Arranging
diesel to run the D.G. Set Do As Directed. 8 Hrs
Shift. (No payment should be allowed for non
working condition of machinery )
(AMC approved SOR Rate Jan-2016) 2800.00 Shift
4 250.00 Providing & Supplying JCB Machine on rental
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg.incharge, rate
includes all nece. shifting, fuel and operating
charges and stacking of useful & non-useful
materials separately up to store. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and
(AMC approved SOR Rate Jan-2016) 600.00 Hour
Providing & Supplying Hitachi Machine -110
capacity on rental basis in case of emergency
situation and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges . (No payment should be
allowed for non working condition of machinery )
(AMC approved SOR Rate Jan-2016) 2000.00 Hour
Providing & Supplying Hitachi Machine -200
capacity on rental basis in case of emergency
situation and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges. (No payment should be
allowed for non working condition of machinery )
(AMC approved SOR Rate Jan-2016) 2700.00 Hour
Providing & Supplying hydra carne Machine of
tone capacity on rental basis in case of
emergency situation and break down type
work & also during unavoidable condition as
per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating
charges . (No payment should be allowed for
non working condition of machinery) (GWSSB hr
SOR 2022-23 Item No. 7, Page 105) 3334.49 Shift
16 Tone 3418.65 Shift
20 Tone 4382.53 Shift
8 25.00 Supplying electric breaker machine for RCC slab
or asphalt demolishing work on site by using
operator, fuel, power supply etc.complete as
directed. (no payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
(AMC approved SOR Rate Jan-2016) 1200.00 Shift
Supplying Pneumatic Breaker Machine for RCC
Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
(AMC approved SOR Rate Jan-2016) 600.00 Hour
10 20.00 Hiring of tractor with trolley considering 8 Hrs. as
working day hours incl.Driver
(GWSSB SOR 2022-23 Item No. 7, Page 105) 2104.09 Day
11 10.00 Hiring of Three wheeler carrier (Chakado/Rixa)
considering 10 Hrs. as working day hours
(GWSSB SOR 2022-23 Item No. 7, Page 105) 1153.24 Day
1 58.00 Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick
maso. wall in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at bottom and
15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with out jali etc. comp.
(AMC approved SOR Rate Jan-2016) 3125.00 No.
2 58.00 CatchPit Jali Fixing P/F FRC catch pit jali with
frame 600mm x 600mm clear opening etc. comp.
As directed by engineer in charge.
(AMC approved Rate Central Store 2023) 1522.00 No.
Reinstatement Work
Labour work for fixing any kind of paving with
cement pointing in CM 1:2, including watering,
ramming etc comp. as dir. For pavement (I)
Laying on Sand bedding as per requirement to
fix the C.C.Block / Nibhada Stone in Line &
Level(AMC approved SOR Rate Jan-2016) 69.64 Smt
Supplying and fixing Nimbhada ladi 37 to 50 mm
thick for walk-way, covering the activity of
excavation, ramming, Laying on sand bedding as
per requirement to fix the Nibhada Stone in Line &
Level with cement pointing in cement mortar 1:2
etc complete as directed.
(AMC approved SOR Rate Jan-2016) 236.61 Smt
P/L brickbats sand concrete (1:2) of one part of
sand and two part of old brickbats including
spreading, laying, ramming, watering and
consolidation etc complete as directed.
(AMC approved SOR Rate Jan-2016) 312.50 Cmt
3 20.00 Labour work for spreading the metal 85 mm thick
in single layer, incl. providing & applying bitumen
for semi grouting 2.5 kgs/sqm. & Providing &
spreading the key black trap aggregate of good
quality on top at the rate of 0.013 cmt. per sq.m. of
size 18 mm passing in 9.5 mm retain rolling with
10 tonne roller etc. comp. as directed.(Road SOR
4 4.00 Construction of granular Sub base using crusher
run, spreading in uniform layers with motor grader
on prepared surface mixing by mix in place method
with front end loader at OMC and compacting with
vibratory roller to achieve the desired density,
complete as per tender specification. For all grade.
RA-3 1793.00 CMT
a 1.00 Production & Supply of GSB (Crusher Run) RA-3A 1763.00 CMT
b 0.95 Laying of GSB (Crusher Run) RA-3B 30.00 CMT
5 0.00 Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material with
water at OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in uniform
layers in sub- base / base course on well prepared
surface and compacting with vibratory roller to
achieve the desired density as per Codal
Provision. 2010.00 CMT
a 1.00 Production & Supply of WMM 1975.00 CMT
b 1.00 Laying of WMM 35.00 CMT
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
West Zone, Zonal Office", 2nd Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan, Usmanpura,
Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
Municipal Commissioner invites Percentage Rate sealed tenders from interested
MEMORANDUM OF WORKS IN BRIEF
1 Name of work Providing & Laying New Drainage Line and Drainage
related work Under Balolngar Bridge to chamundanagar
digvijay factory to Chharanagar and in Newly open T.P
Road Behind Kaligam Garden & other places in Ranip
ward in West Zone
2 Time Limit 12 Months
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “E1” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.50,000/- (Demand Draft or pay order in favour of Municipal Commissioner,
Ahmedabad /) To be submitted as below. Demand Draft or Bank Guarantee shall be
from Nationalized Bank / Sheduled Bank and valid for 120 days. (As per Latest AMC
finance dept.circular).
7 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee/
Demand Draft / Local MICR Cheque. & attched ANNEXURE - 1 finance
dept.circular No- 14 Dt.4/6/13
8 Tender fees Rs.1500/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to Assistant
Manager (west zone),Ahmedabad Municipal Corporation, West Zone,
Zonal Office", Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad.
10 Tenders issue date Tenders from the AMC website www.amc.nprocure.com &
www.nprocure.com shall be down loaded from AS PER TENDER NOTICE
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.. The
Tenders. tenders received after latest schedule date and time will not be entertained
under any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum (only
Techanical Bid) to Assistant Manager / Dy.C.E.(W/Z) office, 2nd Floor,
Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013
13 Mode of sending the Document shall be physically submitted in sealed envelope By
Tender Documents and RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (One
evalution of tender Original & One Duplicate) duly sign & seal by contractor
Tenders received without EMD shall be considered as Non-Responsive and
shall be rejected outright.
14 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall
Specification be applicable..
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at his own expense
any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion, The within 15 days of receipt of
the notice. In the case of failure on the part of the contractor, the Engineer-in-
charge may rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the whole or
any part of the amount of security deposit towards the expenses, if any, Incurred
by him in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount put
tender), the period shall be 6 months from the certified date of completion or one
monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include one
(d) For building works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September may be
treated as the last date.
16 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or major
parts of work of part thereof of any amount, the contractor shall be bound to start the
works within 48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Failure of comply to start the
works in 48 hours of intimation as above by contractor the contractor shall
be levied penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs). Three times failures by contractor shall make contractor
responsible to be black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
17 Compensation for Delay 10% of Remaining work (As per Circular)
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of Tender
And The Same As to be Attached Along With The Tender Document.
19 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
20 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all
the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
AMC Finance dept. circular No – 41, Dt.08/02/2022
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to March-
2022. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee irrespective
of the date of termination of Bank Guarantee. Guarantees issued or Authorized by Ahmedabad Branch
(1) Commercial Banks:
(3) ICICI Bank.
(5) Kotak Mahindra Bank
(6) IndudInd bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the Employer”) invites
sealed Tender document from reputed and qualified bidders for the construction of Works detailed
in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No value of works Money Period
. (Rs.) Deposit
1 Providing & Laying New Rs. 49,99,999.42 Rs.50,000/- 12 Months
Drainage Line and
Drainage related work
Under Balolngar Bridge to
chamundanagar digvijay
factory to Chharanagar
and in Newly open T.P
Road Behind Kaligam
Garden & other places in
Ranip ward in West Zone
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 1500.00 in the form of Demand
Draft / Pay Order from any Nationalised Bank in favour of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in
the above Table payable at Ahmedabad and drawn in favour of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to be
specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd Floor,Dr.
Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad Municipal
Corporation, 2nd Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013. in the presence of bidders or their representatives
who choose to attend. In the event of the specified date of bid submission/opening being declared a
holiday for the Employer, the bids shall be received /opened on the next working day at the same
place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender fee
& EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/
Hand Delivery in duplicate. The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility
for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received for
the package (except those received late) containing the sealed Tender volume and other enclosures
then announce the names of bidders in the presence of bidders or their representatives who choose to
attend on the date and time mentioned in the NIT In the event of specified date of bid opening being
declared as a holiday for the Employer, the Tender will be opened at the appointed time and location
on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at
the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity
of EMD furnished with each bid, is valid registration and such other details, as the Employer may
consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation
for Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-
responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid
EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid
shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied
by the requisite certificates, undertaking and other relevant information specified in the bid documents
and is substantially responsive to the requirement of the bidding documents and provides any
clarification for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in accordance
with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria then
bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided
that such bidder has been determined to be (i) eligible in accordance with the provisions of Clause
3(General Terms and Condition); and (ii) qualified in accordance with the provisions of Clause
5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify
the successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted.
This letter shall name the sum which the Employer will pay the Contractor in consideration of the
execution, completion and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving
letter of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his bid.
Such request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison
or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced.
Any effort by a bidder to influence the Employer's processing of bids or award decisions may result in
the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself
on its own responsibility all information that may be necessary for preparing the bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at the bidder’s own
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and agents
from and against all liability in respect thereof and will be responsible for death or personal injury,
loss of or damage to property and any other loss, damage, costs and expenses incurred as a result of
the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed
in the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class and or
equivalent. If contractor is not registered with AMC in the relevant class, on award of contract he
shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of the
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder; and
General information
All individual firms must complete the information in this form. Nationality information shall be provided
for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons
are attributable to the non-performance of the contractor, consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words)
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words)
only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading
or false representations in the forms statements etc. for the period to be decided by the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
bids which are not substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished
by the bidder may be in another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of interpretation of the bid, the
English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request and
the responses thereto shall be made in writing or by fax. A bidder may refuse the request without
forfeiting his bidder agreeing to the request will not be required or permitted to modify his bid but
will be required to extend the validity of his Bid Security for the period of the extension, and in
compliance with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the
person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest
entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question. The
Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to be
awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines
that the firm has engaged in corrupt or fraudulent practices in competing for the contract, or during
“corrupt practice” means behavior on the part of officials in the public or private sectors by which
they improperly and unlawfully enrich themselves and/or those close to them, or induce others to
do so, by misusing the position in which they are placed, and it includes the offering, giving,
receiving, or soliciting of anything of value to influence the action of any such official in the
procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road
i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers,
traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on
traffic signs to be provided so that it should be visible at night. During night working hours safety in
charge personnel shall be provided with florescent jackets. This shall be Provided at no extra cost by
the bidder under attaché with specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company,
follow up and getting the supply, filling the necessary test reports to the power supply company. All
official fees including security deposits and other expenses shall be of initially paid by the contractor.
AMC may support to get the temporary connection and may at its diseretien get the same
converted to permanent connection at the same of AMC if desired do,and contractor shall as no
extra cost support the same. In this case AMC my be as the remaining cost subject to approval.
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract upon
any agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty
shall give the Municipal Commissioner the right to cancel the contract or to take any other
measure as the Municipal Commissioner may deem fit. The warranty does not apply to
commissions payable by the contractor to establish commercial or selling agent for the purpose of
securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this contract
or to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or under
this Contract against the contractor the same may be deducted by the Municipal Corporation from any
sum then due or which at any time thereafter may become due to the contractor under this contract
and failing that under any other contract with the Municipal Corporation or from any sum due to the
contractor with the Municipal Corporation (which may be available with Municipal Corporation), or
from his retention money, or he shall pay the claim on demand. The Municipal Corporation reserves
the right to carry out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected not withstanding the fact that the amount of the final bill may be included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in respect of
any work done by the Contractor or alleged to have been done by him under the contract, it shall be
recovered by the Municipal Corporation from the contractor by way of all the means prescribed
above or if any under payment is discovered by the Municipal Corporation, any amount due to the
contractor under this contract or under payment may be adjusted against any amount then due or
which may at any time thereafter become due before payment is made to the contractor from him to
the Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become
liable and which is chargeable to the contractor, the owner shall have the right to retain out of any
payment then due or thereafter to become due an amount sufficient to completely indemnify the
owner against such lien or claim or if such lien or claim be valid the owner may be or become due
and payable to the contractor. If any lien or claims remaining, unsettled after all payments are made,
the contractor shall refund or pay to the owner all money that the latter may be compelled to pay in
discharging such lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part
of the contract documents. The full consideration shall be given to such addendum or corrigendum before
submission of tender duly filled in by the contractor. Therefore, the contractors shall have to kindly refer
the tender for such addendum or corrigendum published by AMC through its website
www.amc.nprocure.com & www.nprocure.com 48 hours prior to the deadline of submission of the tender.
Tenderers shall verify the number of addendum issued and enclose the same with the tender documents
failing which the tenders shall be liable for rejection and no any complaint in respect to this shall be
entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid
for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly
as Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when
the bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful
bidder shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E.
Circular.in the form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5%
(five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a policy
is framed by Audit department of AMC to charge 4% interest for the balance period and discontinuity
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. &
As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding
GST) etc. on material procurement or any other component for the works from any source shall be
borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall
be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration
with any other state Govt. or institutions. Copy of registration should be attached with tender document.
Tenderer who was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English version)
Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by
the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean
as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific
mention for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to the
following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant
shall not absolve the contractor from the responsibility of replacing defective materials brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such materials being rejected by the Engineer in
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed
from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works & all precautionary measures during execution shall have to
be kept in sufficient numbers and in good working condition at the site of the work. All excavated trench
shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor shall be considered only if the contractor provided satisfactory evidence that
such special mode of construction and completion of work to the required strength and quality. Acceptance
of the same by the Engineer in charge shall not however, absolve the contractor from the responsibility of
any adverse effect and concordance of adopting the same in the course of exaction or completion of the
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor
Mineral Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian
Standard) shall be taken to engrave the safety of men, materials and machinery on the work and also of the
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be
executed & as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to which work
is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order shall
be issue to contractor and the time limit shall be start from the date of issue of the written work order to the
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall
be issue to contractor and the time limit shall be start from the date of issue of the written work order to the
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand draft /
cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract
paper with AMC. The contractor shall be fined 4% of interest per year for delay in submission of S.D and
shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by
M.C. Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as necessary to
fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation.
will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the rates
keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for
the construction of the works and provide a satisfactory supply of potable water for drinking, washing,
sanitation and cleaning down. The contractor will be responsible for all the costs where applicable of
connection, meter installation, water consumed, water required for testing purposes, disconnection and the
laying, maintenances and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor
must make his own arrangements with the Corporation and Electricity Supply Authorities and with other
contractors to connect and to take a supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of the
work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the work.
No compensation shall be paid for idle labor staff, machineries and for use of diesel operating sets etc. as
the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance certificate
and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance will
32. The contractor shall get the electrical works executed through the authorized Government approved
licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby
total amount of work increases/ decreases.
total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be
rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No any claim
to that effect shall be entertained. The Municipal Commissioner also reserves the right to reject any or all
the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason
(like site is not available and due to unavoidable circumstances arise), after evaluation of situation the
actual date of starting of work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done
by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu.dJobuLxlt btLg
ftuLx[[tfxhu y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft<
ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s ytvJtbtkk
ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe mJj<,ylwCJ, ûtb<t ylu
VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh mh¾gwjh,lk -
17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,heLgwyj Ve <&t yvd{uzuNl Ve ylu
btv œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath ylu JvhtNlt
ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je
juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt xuLzhbtk sKtÔgt bwscle hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz xuLzhbtk sKtÔgt bwsc hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt hnuNu.
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u
hsw fhJtlwk hnuNu.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn ylu ytJe
ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkkfzt vh Auftu bthelu <ult mtawk
jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg dKJtbkkt
ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu ylu mwaltytu vK
ft¤SvwJof JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk bwfuj Nh<
y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u
btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftu R fthKmh st
ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu fhe NfNu lrn fu ftgœtfeg
ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R NfNu lrn.
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtkk
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg htFJtbtkk ytJNu.
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk Cwj sKtg <tu yufb
œh btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk
atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 15 btk rm¾gtuhexe zevtuÍex sbt
fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk
10f: bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt 10% juFu
(jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx,
œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt
ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykkdult <ublt ftuR œtJt
ægtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb rJCtdltu fboathe ntug fu l
ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw xuLzh ChJt <&t <ubtkk swœt swœt CtJ
ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt
&<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu
ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgwrl. frb§h©e/mexe
Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx +
yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt cejbtkk&e fvt<
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ
2) xuLzh Vtubolwk CtJvºtf
z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
2) xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo Ãjtl <&t
MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo
sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl
&tg <ule sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule
sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh
Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt
sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk. Bswhtultu
rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t sYh sKtg <tu
xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt
Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb fhJt
ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch
yufx/vtujemlt ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle ftbdehe
fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc
awkfJKe fhJtbtk ytJNu.
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef vxe,rJ.
ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle hnuNu.
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk juch yufx
bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t yr^ftheytuyu ftb
mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh
ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu
su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxhekd fhJtbtk lrn ytJu
fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ
WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e 30 mÃxuBch
Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u mbgdt¤tu ctœ fhe ftble
mbgbgtoœt dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk ytJNu.
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw. ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu muÕm xuût lu jd<t
vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e Au ylu ftblu
jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t œM<tJustu ft¤SvwJof
yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (vrùb Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of work should be
in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and
instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought by
him on site. This account shall be regularly maintained and kept open for inspection by Municipal Staff.
Watering of all the items shall be as per instructions otherwise no payment shall be made to contractors.
Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C.
works if required shall have to be made by the contractor .
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He
shall be responsible for any damage to public. If any incident happen, during the execution of work. In
case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The
contractor shall have to give site clean of all rubbish during the work and at the time of completion of
work and hand over the site with final finishing of the work as directed. All the rejected materials shall be
removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his
own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and
he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg.
shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for
extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed
The tender for the work shall remain open for a period (180) days from the date of opening of the tenders
for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during
the period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of
his tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice
to any right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start
shall be recovered separately from the immediate bills payable to the contractor. Contractor has to make
his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable.
Form B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of
Gujarat booklets of Building Works & and Road Works Specifications published by Gujarat
Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and
Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is
employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child
labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court Judgement and
also will be prosecuted by concerned authority. Because of the breach of any provision of child labour prohibition and
regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date
06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining
amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same
shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These
shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly
filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published
by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same
with the tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be
entertained under any circumstances.
Clause : 6 "The contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the
prevailing AMC circulars issued from time to time.
SCHEDULE OF MAINTENANCE
Maintenance schedules for municipal drainage systems vary depending on the city and the type of
infrastructure (stormwater vs. sewage).The maintenance shall be of these two basis.: preventive
maintenance (scheduled) and reactive maintenance (complaint-based).
The contractor shall execute maintenance and upgradation works as directed by the client and through self-
inspection under the instructions of the Engineer-in-Charge.
Surveying of lines and manholes for the specified works shall be undertaken as and when required on the
designated roads, as instructed by the Engineer-in-Charge.
The inspection schedule shall be aligned with the following categories of complaints, with priorities
determined by the Engineer-in-Charge:
* CCRS complaints
* Complaints from MLAs/Councilors
* Complaints from officials
The specific lines and machinholes shall be surveyed as per below schedule as specified.
1. Ward Office: Visit Ward s office every week take the road detail on which the schedule inspection
to be done and carry the survey of machineholes ,lines as specified by EIC.
TECHNICAL SPECIFICATIONS
TECHNICALSPECIFICATIONSITEMSREQUIREDDURINGEXECUTIONOFDRAINAGELIN
1 Excavation for pipe line trenches for water supply, sewerage lne, manhole etc. all with
shoring and struting if required as per required gradient and line including safety
provisions using site rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as specified.
Excavation shall be done as per plans and alignment in all sorts of soil including all
masonary,concrete and asphalt road paving work etc. Root of trees met with during excavation
shall bestacked at lead of 4’ away from the trenches as per instruction so that it may not
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly
leveled. The excavated earth shall be stacked at any place or places shown within 50mtr. as
directed. After completion of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor
lining out and shall care to preserve the level pegs given. He shall have to arrange forshorting at
his own cost if the soil is found to be loose and sandy. He shall have to arrange forsorting out
brickbats or any serviceable materials found during excavation and shall have tostock. Nothing
extra shall be paid for this. He shall have to cart the excavated soil to site shownwithin 50 mtr. If
so ordered by officer in charge of this work. No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as
per drawing. Contractor should arrange for safely measures so that there is no danger offalling
any men or animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The
contractor should not damage any of the municipal property, water lines, electric cables etc.at
the time of excavation. Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such
damages will be recovered from him. Excavated stuff will be stacked at the siteshown or will be
carted by the contractor immediately as per the other item of this tender.Instructions of C.E. or
his representative will be strictly followed. Measurement shall be given onCmt.basis.
Excavationforfoundationupto(a)Upto0to2.0Mt(b)from2.0to3.0mtdepth(c)from3.0to
5.0mtdepth(d)above5.0mtdepthincludingsortingoutandstackingofusefulmaterialsanddisposalof
theexcavatedstuffupto50mt.lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all
masonary,concrete and asphalt road paving work etc. Root of trees met with during excavation
shall bestacked at lead of 4’ away from the trenches as per instruction so that it may not
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly
leveled. The excavated earth shall be stacked at any place or places shown within 50mtr. as
directed. After completion of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor
lining out and shall care to preserve the level pegs given. He shall have to arrange forshorting at
his own cost if the soil is found to be loose and sandy. He shall have to arrange forsorting out
brickbats or any serviceable materials found during excavation and shall have tostock. Nothing
extra shall be paid for this. He shall have to cart the excavated soil to site shownwithin 50 mtr. If
so ordered by officer in charge of this work. No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as
per drawing. Contractor should arrange for safely measures so that there is no danger offalling
any men or animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The
contractor should not damage any of the municipal property, water lines, electric cables etc.at
the time of excavation. Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such
damages will be recovered from him. Excavated stuff will be stacked at the siteshown or will be
carted by the contractor immediately as per the other item of this tender.Instructionsof
C.E.orhisrepresentative willbestrictlyfollowed.
MeasurementshallbegivenonCmt.basis.
ItemNo.2 (a) Extra rate over item of excavation of earth for excavation of asphalt pavement /
upto0.20meterincludingdemolishingtheasphaltcarpet,metal,soiling/cuttingReinforcemente
tc. comp.withstackingthematerialasdirected.(app.rate)
(b) 0.20meterto0.30meter(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
(c) 0.30meter&above(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
Extra rate for excavation of asphalt pavement of any thickness including demolishing
theasphalt carpet, metal, soiling etc. complete with stacking the materials as directed.
Theroad surface of asphalt shall carefully be opened to full width as directed by the
Engineerin charge Asphalt, popada's spouls, metals etc shall be separately deposited in
suchplaces as may be determined by the Engineer-in-charge. In case above materials
notbeing so deposited or being mixed up with the excavated materials will not be allowed
forrefilling.Thecostofmaterialsshallbechargedfromthecontractor.Thedecisionofthe
C.E.shallbefinalandbindingtothecontractor.
Theratepersq.mt.inthisitemshallbepaidextraadditiontotherateforexcavationMode
ofmeasurement:Therate shallbefora unitofSmtBasis.
ItemNo. Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuff
3 asdirectedwithin aradiusof3km.
Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuffasdirecte
dwithinaradius of3km.
--do--withselectedsoilbroughtfromoutsideincludingalllead
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
ItemNo. Conveyancecharge of earth ,lime,murrum, building rubbish, manual garbage,sludge
4 ,excavatedrock,flyash,aggregateofanykindetc.comp.Upto5.0Km.lead
Allthe surplusearthetc.shallbecarriedawayimmediatelyfromthesiteofworktoaplacewithin
5km.distanceorasdirectedandorderedbytheEngineer,soasnottocauseanyinconvenience to the
public traffic finding which in view of public safety and traffic convenience.The Corporation shall
carry out the work by any other agency at the contractor’s risk and cost. iftheinstructions
arenotcomplied within7daysfrom thedateoforder tocart the surplusmaterials and clear the site,
the said work shall be carried out by the Municipal Corporation attherisk
andcostofthecontractorandnoclaimordisputeshallbeentertainedinthisrespect.
If the filling in trenches after settlement of the earth filling in trenches is to be done
andthe sameshall becarriedoutby thecontractorwithout asking any extra rate. The
contractorshall have to cart the surplus earth after the trenches we will watered and refilled with
the sand.The rate of carting including carting of brick bats, metal, rubble vegetable and garbage,
ifnecessarytoclearthe roadsurface.
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
5-6 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling,
transportingpipes to work site, unloading lowering in trnch such as cementsand, hemp
bitumen asdirected,incl.wateringthetrenchesspreadingandcartingawayofsurplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement
jointsin C.M.1:1 proportion in proper position , grade and alignment at all level as
directed byEngineer-in- charge including conveyance from stone to site of work, Jointing
materialetc.comp.
A)…………do…….(b)10 cm dia
lineB)………do ..... (c)15cmdialine,20cmline
C)……………do….(c)23cmdialine
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved
qualitymake and shall be brought on site after approval. (The pipes shall be laid in grade as
perinstruction.)Contractorshall havetoprocurebillsforstandardpipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun
yarndipped in hot asphalt and caulking tools. The hydraulic pressure test shall be given to
thecontractor for testing pipes and jointing. No trenches shall be filled without the approval of
theengineerincharge.
Therateofthepipeworkareincludingofexcavationandrefilling.Theexcavationetc.
shallbedoneasfollows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on
theplan and section. In all sorts of soil including old masonary, asphalt roads and wet
excavation.The sewer excavation shall be commenced at the down stream end of the sewer and
becontinueduptothegradientasdirected.Thetrenchshallnotopenmorethan60mts.inadvanceof the
completed sewer only when directed by the engineer in charge looking to the progress ofthe
work in obtaining the formation of the bottom of the trenches the usual methods of using
signrails and boning roads shall be adopted during the whole of the process. The centre line
ofuniform height shall be carried clearly on each rail. The depth of the excavation and invert of
thesewer shall be checked by means of boning road of approved length and also by straight
edge.The bed of the trench shall be well rammed before starting laying of sewer lines and
cementconcreteandmasonarywork.
Where trenches are deep in bad grounds the sides shall be supported by
suitabletimbering of shorting work looking to the nature of the soil near big or important
structure, thesides of the trenches shall be closely and securely timbered, if any settlement of
the buildings inanticipated the timbering shall be left in the ground. The various materials
excavated shall beseparately stacked so that in refilling that may be relayed on the same order
as before and leastpossible damage shall be done carpet on the public roads and private
properties. Surfacecovering consisting of asphalt carpet shall be kept on side and preserved for
reinstatement. Theexcavated earth shall not be heaped near the trenches so as to caused
unnecessary obstructionalong the trenches during inspection trenches etc. shall be tunneled
under only as necessary.The side of the trenches shall be nearly vertical and plumb and red
light shall be placed at eachend at intervals and instructions and further protected by rope fence.
Necessary caution boardsshallalsobe createdandasdirectedbytheengineerincharge.
Wherever possible material excavated from the trenches of whatever kind shall not
beplacednearerthanthreemetersfromtheouteredgeoftheexcavatedtrenches.Theutmostshallhave
to be taken in refilling the trenches so that no damage may be done no sewer, no lumpshall be
allowed to be put around the sewer. The ramming of the filling shall be done and wellwatered.
The surplus earth shall be removed directed within 30 meters lead. The
measurementsof the work shall be exact length and width of the trenches as specified or as per
City Engineerinstruction and depth shall be measured vertical as per section up to invert or the
pipeline. TheCity Engineer reserves the right of extra excavation on either side if considers
necessary for thesafetyofthework.
The bottom and sides of the trench shall be dressed in level and plumb in all
directedbefore any concrete is in dia. In case the excavation is done deeper than required no
filling shallbe allowed to bring the formation to proper level but contractor shall have to lay
limeconcreteoffilingorotheracceptablematerialsasdirectedbytheCityEngineeratcontractorowncost
so as to come to proper formation. In case bad formations are met with the work shall haveto be
done as per instruction of City Engineer. Necessary arrangements for watering trenchesmust be
provided by contractor and without proper watering trenches will not be allowed to befiled to
further Contractor shall have to make arrangement for access to invert of the sewer andfor
inspection of the work as ordered by the engineer. If it is required to shift or after thealignment
section of diameter of the pipe the contractor shall carry out the altered work at therates quoted
by him for the original work for items and contractor shall not claim any expensesduetothe
In no case work shall be done at night or no Sundays & other holidays and during
therecesstimeexceptinandotherholidaythecaseofbadgroundssuchasrunningsandwherethework
must be executed vigorous day night without interruption when so ordered by the engineer.All
existing water pipe storm drains sewer line railway track, electric cables etc. which do not inthe
opinion of engineer required to be changed in location shall be supported and protected
frominjury by the contractor. The contractor shall be liable to pay all damages to water-pipe,
drainselectric and telephone cable and to private property during the execution of this contract
and thesame will be recovered from the running bills or the deposit of work change location of
anyexisting sewers drains etc. not otherwise from in these specification the contractor shall do
thework of making such change and the work shall be paid for as extra work. All places utility
etc.shallbekept accessibleforuse.
No extra payment shall be made for land sides and side stops done without prior approval of
theengineerincharge.
The excavation of trenches shall be done foot wider on each side of the pipe than
theinside diameter of the sewer in case of depth excavation exceeding 3 meters above invert,
onefeetwiderexcavatedoneithersidefortheupperdepthabove3metersshallbeallowedandpaidfor.
Wherever natural soil demands winder excavation the mentioned above the same shall begiven
after approval of City Engineer. The rate for excavation for easy jointing and caulkingnothing
extra shall be paid for this. Refilling of trenches shall be done only after the grade of
lineandhydraulictestpracticableofthelinesarecheckedandapprovedofandordergivenbythe
Engineerincharge.Therefillingshallbeaccompaniedbythroughwateringforlayersof0.50
mtrs. Further refilling shall be done thereafter and process should be repeated till trenches
arecompletely refilled. Temping and ramming with rammers shall have to be done at all place
ofimportant work where ordered by Engineer in charge. After order to refill the trench is give
thetrenchesshallhavetoberefilledwithin4dayswithcompletewatering.Ifthecontractorfailstodo
watering satisfactory corporation shall get it done at the risk and cost of the contractor with
orwithout giving any notice and the expenses incurred in doing so recovered from the
contractoreitherincost orfromhispaymentthroughbills.
Therateshallbepermeterbasis.
TherateperCmt.inthisitemshallbepaidextraadditiontotherateforexcavation
ItemNo. ProvidingandsupplyingISIStandardRCCpipes(ofsulphateresistingCement)instandardlengt
7-8 hs offollowing class anddiametersuitable for rubber ringjoints (socketand spigot)
including all taxes,insurance, transportation,treight charges,octroi,inspectioncharges,
loading,unloading, conveyance to departmental stores, stacking etc.
completeClassNP3Testpressure0.7Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in
properposition , grade and alignment at all level as directed by Engineer-in- charge
includingconveyancefromstonetositeofwork,labourgivinghydraulictestingasperISIcode.
(a)300mminternaldiameterB)450Mm Internal
Diameter(C)500MmInternalDiameter,(D)60
0MmInternalDiameter
TheRCCpipesshallbeprocuredasperISSforBClasstypespecificationsusingbestmaterials,first class
workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tenderitem. The
proportion of concrete shall be one part of cement to 2 parts sand and 4 parts of blacktrap agg.
mix. of suitable size to as to produce uniform concrete through out thicknessof thepipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458
classspecifications.
RCCspunpipecollarsforthepipesshallbemadeinthesamemanner.Theinternaldiameterofthe collar
shall be sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially
preparedformation or on concrete bed and for the purpose to extra rate shall be given making
extraexcavation forbedandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelength. For each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned
andmoisturedandthecollarshallbekeptinpositionbymeansofwedges.Semidrycementmortarofprop.
1:1 shall be forced into joints and chaucked completely by means of special cutting toolsuntil the
whole space is full. The mortar shall be sprayed around the collar joints so as
tocompletelyencasethejoint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and
ifhe has any doubt as to their soundness be may required the contractors to cut open and
clearaway the cement of any joint that he may select and to make good the same at their
expensesprovided that, unless some defect be found, they shall be required to open more than
one jointsin 18mt (60’) of pipe, though if defect be found the Engineer direct them to open as
many jointsas he may deem necessary, the joints made one day will not as a rule, be inspected
until thefollowingdayandthe cementmayhassufficienttimetosetwellbeforebeingcoveredup.
Trenches shall not be filled until alignment and levels are examined by the Engineer or
hissubordinatesandthepermissionforrefillingisgranted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using
bestmaterials first class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line
Theproportionofconcreteshallbeonepartofcementto2partsofsandand2partsofblacktrapagg.Mixofs
uitablesize soastoproducingfirmconcretethoughtthicknessofthepipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/
classspecifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of
thecollar shall be sufficiently large to allow a perfect joint around the outside of the pipes
withcement mortarandotherplasticmaterials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on
speciallyprepared formation and for the purpose no extra rate shall be given for claming such
hollows inbendsandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelengthforeachjointdipedisnotasphaltafterthejointhasbeenproperlycleaned&moistureand
collarkeptinpositionbymeansofwedges,semi-drycementmortarprop.1;1shallbefacedinto
it and caulked completely by means of specials caulking tools until the whole space in full.
Themortarshallbesprayedoff intheformof filleraroundthepipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly
togradient. M/SshallbeinRMT.
Trenches shall not be filled in until the line has been tested and alignment and levels
areexaminedbytheEngineerorhissubordinatesandthepermissionforrefillingisgranted.
Contractor shall be held responsible for any damage or defect to the pipe line in
satisfactoryworking of the same for 12months after it is put into commission, contractor must
satisfy IS458/1971andIS783/1959withreferencetoRCCpipe.
ItemNo.9 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10)
forfoundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM
1:3,finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of
chamberseatcoveretc..completed.
(A) 0.60X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60X0.75mt.sizeInsideClear,Depthfrom0.0to0.90meterforpipedia<=20mm.
(C) 0.75x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part
brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsi
ssufficentlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quickly rammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurin chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as requiredusing
measurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all
materials shall be stacked on the site as not to obstruct tra fic in any way the masonaryshould
be constructed in proper workmanship like manner with joints plunb etc. to conform withgeneral
specification No.45 P.W.D hand book. The face work should be neatly finished.
Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.Therateincludesallnecessarymaterualsmixinglayingandremainandwateringtheexpos
facestobefinishedwithneatcementasperinstructionthechannelshallbehalfroundandas
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneral specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more than300 mm
above the benching. The manhole/inspection chamber frame and cover shall be of castiron of
specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They
shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirected
byengineerinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item ConstructingSlabTypeM.H.ChamberOfTheFollowingSizeIncludingExcavation,Refilling,
No.10 Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
ofthickness10C.M.,finished15mmthickcementplasterinside&outside(Onlyforshaft)InCm
1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 CmC/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness
15C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway
mmdia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X
1.00Meter(InsideClear, M.H. lengthshouldbeparalleltotheflow)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)(forpipedia<=230mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
Cementusedshallbegotapprovedbytheenginreinchargebeforestartingtheworkthisshallcom
plywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbatstobeusedforconcretemustbethoroughlywellburntandfreefromanyimpuritiesa
ndsizefrom 20to25m.m.
Thepreparationofconcreteshallbeonepartofcement5partofsand&10partbroken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsi
ssufficentlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quickly rammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurin chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as requiredusing
measurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all
materials shall be stacked on the site as not to obstruct tra fic in any way the masonaryshould
be constructed in proper workmanship like manner with joints plunb etc. to conform withgeneral
specification No.45 P.W.D hand book. The face work should be neatly finished.
Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.The rate includes all necessary materuals mixing laying and remain and watering
the exposedfaces tobe finished with neat cement as per instruction the channel shall be half
round and asper drawing & instruction of Engineer in charge. proper bunching shall be provided
at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneral specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more
than300mmabove thebenching. Themanhole/inspectionchamberframeand covershallbeofcast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers
andframes shall be cleanly cast and they shall be free from air and sand holes and from clod
shuts.They shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirected
byengineerinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item RatereductionoveritemofConstructingSlabTypeM.H.Chamberofsize1.00x0.75mtforconstruc
No.11 [email protected](Max.3unit\ofDM
shouldbereducedinthisitem)(AsPerR.A.BasedonBuildingSOR2015-16)
Item Constructing Slab type M.H. Chamber of the following size including excavation,
No.12 refilling,brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in
CM 1:3,finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c
at 35cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
includingCantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but
excludingthecostofManholeseatcoveretc..completed.ofSize1.00X1.40meter(InsideClear,
M.H.lengthshouldbeparalleltotheflow,forpipedia<=800mm)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)
2) 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG.L.)
3) 3.00to4.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
4) 5.00to6.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
5) 7.00to8.00meterdepth,(Slabatbelow1.00mt.FromG.L.)(a)Ex
cavation:ThisbedoneasspecificationinItem No.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part
brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsi
ssufficentlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quickly rammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurin chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasursboxesforsandandcementbagof1.25cft.or1cft.asmeasuredthecasemay
be all materials shall be stacked on the site as not to obstruct tra fic in any way the
masonaryshould be constructed in proper workmanship like manner with joints plunb etc. to
conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly
finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.The rate includes all necessary materuals mixing laying and remain and watering
the exposedfaces tobe finished with neat cement as per instruction the channel shall be half
round and asper drawing & instruction of Engineer in charge. proper bunching shall be provided
at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneral specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more than300 mm
above the benching. The manhole/inspection chamber frame and cover shall be of castiron of
specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They
shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedb
yengineerinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item ExtrarateoveritemofConstructingSlabTypeM.H.Chamberoffollowingsizeforconstructing
No.13 M.H. Chamber, per 1.00 Decimetre of additional depth or part thereof.
etc.complete.Ofsize1.00x1.40mt.(insideclear)andDepthfrom
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Item Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x
No.14 mtfor constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt
for(MHabove3.0mtdepth)belowGroundLevel(Max.5unitof DMshouldbereducedinthis
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Item Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
No.15 manholeof following size incl. excavation, refilling and & finished 15 mm thick cement
plasterinside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggeredinmasonryCM1:5,incl.costofRCCSlabinCC1:1.5:3,includingCantering&reinforce
ment as directed by engineer in charge. Rate includes carting of debris andexcavated soil
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalliat15C.M. c/cbothway10mmdia.)From0to2mtdepth(SlabatGroundlevel)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slabatbelow
1.00mt.FromG.L.)
3) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth(Slab atGround level)
4) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab atbelow1.00mt.
5) 1.40x 1.00 mt(insideclear) RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab atbelow1.00mt.
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part
brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsi
ssufficentlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quickly rammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurin chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as requiredusing
measurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all
materials shall be stacked on the site as not to obstruct tra fic in any way the masonaryshould
be constructed in proper workmanship like manner with joints plunb etc. to conform withgeneral
specification No.45 P.W.D hand book. The face work should be neatly finished.
Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
TheworkshallbeasperP.W.DhandbookspecificationNo.20aspergeneralinstructions.
The rate includes all necessary materuals mixing laying and remain and watering the
exposedfaces tobe finished with neat cement as per instruction the channel shall be half round
and asper drawing & instruction of Engineer in charge. proper bunching shall be provided at
both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneral specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more than300 mm
above the benching. The manhole/inspection chamber frame and cover shall be of castiron of
specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They
shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkor
asdirectedbyengineerinchargeorAdditionalCityEngineer(southzone)Mode
Therateshallbeforaunit ofonenumberbasis.
ItemNo. Provdg.&layingS.W.Gullytrapwithbrickmasonry chamber &
16 watertightG.T.StoneincludingfixingofcoverSquaremouthtrap100mmx100mmsizeP-
ConstructingGullyTrapChamberWithMasonryInCementMortar1:5&PlasteringInCementMortar
1:3UsingG.T.StoneIncl.FixingCoverEtc.CompletedAsDirected.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Making connection to the ex. M.H.in running sewer incl. Dewatering and otherrequired
17 machinery etc. of following dia pipes at any convenient time. All damaged
workshallbewellrepaired asperinstructions. etc..complete.
Rateincludesconnectioninthesewerlineatanyconvenienttimewhentheloadonthedrainageline in
less. All damaged work shall be well repaired as per instruction of officer in charge.Proposed
R.C. C. line should be connected with the existing M.H. as directed. Holes made inthe well of
existing M.H. should be finished smooth and in circular shape as directed. Rate alsoincludes
making new channel or repairing existing damaged channel if instructed. Rate
isinclusiveofwateringetc.as directed.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Cutting the pipes of following dia coming in the new M.H.in
18 runningsewerincludingcuttingbars,includingremoving debris /silt from the M.H. and
carting at a suitabledistance etc..complete as directed. No payment for M.H. work will be
made until pipe isnotcutcompletelyinall respect.
ng in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is
foundemptyalldamageworkshall bewellrepairinstruetionsetc.comp.
material shallbe cut as pes requirement to Cutting thepipe in existing manhole reinforcementbars
shall also have to be cut in existing manhole as per requirement and making good thesame. the
dis mental materials shall be carried ti placesat all lead as directed by engineer
inchargeIfdirectedtheworkshallhavetobedoneatnightthemeasurementshallbeaspernos
Modeofmeasurement:
herateshall beforaunitofNosBasis
ItemNo. ProvidingKachhaOfPakkaDummyIn The Following Dia Pipes And Removing
19 TheSameAfterTheConnectionOfTheWorkAs Directed.
Providing kachcha or pakka dummy in the following dia pipes and removing the
sameafter the connecting of the work as per instruction of engineer in charge. If kachcha or
pakkadummy is not removed by the contractor then the penalty shall be laid as per municipal
rules orderived bythemunicipalcorporationofficer'sin-charge.
Measurementsshallbegivenonno.basis.
ItemNo. Levelling or orientation of existing gully trap chamber incl. Nece. masonry in CM 1:6 and
20 plaster in CM 1:3 etc. using old G.T.stone and cover etc. comp.
Work done as per Site Engineer Incharge Instruction
Measurementsshallbegivenonno.basis.
Item Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in
No.21- C.M.1:5andplasterinC.M.1:3andfixingC.I.stepsandM.H.andcartingthesameasdirected.A)…
B) ………………do ......................... Upto0.35mt.(@Fourcoarse)
C)………………do…………………Upto0.65mt.(@Sevencoarse)D)…
RepairingdamagedI.C./Raisinremovingdamagedbrickworkandrepairingbybrickmasonr
y in C.M. 1:5 and plasterinC.M.1:3andfixingC.I. steps and existingchamber sheet
cover,removing the debris from chamber andcartingthesameasdirected.
Required level shall be achieved in brick work as specified including plaster, the thickness
ofjoints shall not exceed 10 mm (3/9”). In no case the frame shall be supported by chips or
brokenbrickorasphaltmix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface
ofan asphalt road/concrete pavement. The frame shall be bedded in cement mortar on the
brickworkwithsplayedfillerall around.
Water:Gullyframesbeingontheedgeofroadshallbefixedtothecorrectroadlevelatitsupperendandthes
lopeshouldbesuchitmustbeabout(12mm)(1/2”)lowerthanwatertable.
A concrete pavement should be case around the frames and covers of man-
holes,chambersetc. incaseof asphlaticroad.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4)
asspecified and directed. The pavement shall be at least 8 mm (3”) wider than the outer most
edgeof the circular frame no pavement will be made of this pavement under the item of
cementconcrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’)
inexternal measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the
longerdimensionbeingalongthedirectionofthemain.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4
C.C.No payment will be made for the pavement should be at least 8 cm (3”) wider than the
outermostedgeoftheframe.
After removing the top portion of the manholes, the proper brick masonry layer with
c.m.(1:4) should be constructed for proper bondage with old masonry and 8 cms thick PCC
work(1:2:4) should be laid on the top of brick layer an up to the bottom of the seat. After fixing
theseatthemanholeshouldbeproperlyleveledwithroadlevel.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall
becleanwithin48hoursofconcretingday.
M/SshallbegivenonNobasis.
ItemNo. Raising of Existing manhole item includes,cutting of existing road surround by
23 Manholeby diamond cutter machine dismantling of road in confined area by breaker
andcartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanhole
at road level in CM 1:3 item also included fixing of Manhole frame at exact roadlevel by
using MaserEmaco S 488 trowable fibre reinforced thixotropic repair mortalmaterial
Laying of concrete made form Master Emaco 5 346 flowable micro concretematerial in
desired thickness and laying of hot bitumanous material in Upper layer andcompaction of
hot bitumanious material by palte compactor machine .Rate also
includednecessaryplasteratinsideofmanholeinCM1:3in20MMthicknessonraisedbrickwork.
Raising of Existing manhole item includes,cutting of existing road surround by
Manholeby diamond cutter machine dismantling of road in confined area by breaker machine
cartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanholeatroadlevelin
CM1:3itemalsoincludedfixingofManholeframeatexactroadlevelbyusingMaserEmacoS488
trowable fibre reinforced thixotropic repair mortal material Laying of concrete made formMaster
Emaco 5 346 flowable micro concrete material in desired thickness and laying of
hotbitumanousmaterialinUpperlayerandcompactionofhotbitumaniousmaterialbypaltecompactor
machine .Rate also included necessary plaster at inside of manhole in CM 1:3 in
20MMthicknessonraisedbrickwork.
Measurementsshallbegivenonno.basis.
ItemNo. Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
Work done as per Site Engineer Incharge Instruction
Measurementsshallbegivenonno.basis.
ItemNo. F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø &
25 mm thick circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain
round bar for lifting the cover & should be fitted with plastic cups. Frame : 560 mm
ø clear opening, outer size- 888x888x175 mm. On the upper periphery of frame 25 x 3 mm
wide MS flat should be well embed in concrete to protect the edges of frame. FRC
E.H.D.-35 manhole cover & frame described as above.
Work done as per Site Engineer Incharge Instruction
Measurementsshallbegivenonno.basis.
ItemNo. FRC heavy duty cover size 730 mm. & 90 mm thick circular Cover 20 M.T. design load
26 and frame size 560 mm clear opening size 890 x 890 x 120 mm.
Work done as per Site Engineer Incharge Instruction
Measurementsshallbegivenonno.basis
ItemNo. Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to
27 matchexisisting road level in C.C. 1:2:4andfinishing smooth, watering and protectingfor
7days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from anystore)
Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to
matchexisisting road level in C.C. 1:2:4 and finishing smooth, watering and protectingfor 7 days
etc.completeasdirected.M.H.seatcoverwillbesuppliedbyA.M.C.(fromanystore)
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequiredthickne
28 ss and size including placing the nece. supports of reqd. size, nailing, fixing withmortar,
levelling. All specification for dead centring as per standard engg. practice etc.comp.
ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequired
thickness and size including placing the nece. supports of reqd. size, nailing, fixing withmortar,
levelling. All specification for dead centring as per standard engg. practice etc. comp.
Therateshallbefor aunit ofSmtBasis
ItemNo. Brickworkusingcommonburntclaybuildingbrickshavingcrushingstrengthnotlessthan35kg/
29 Sq.cm.incementmortar1:5(1cement:5finesand)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-
6.Brickshall conformtoM-15Cementmortarshall conformtoM-11.
Theproportionofthecementmortarshallbe1:6(1cement:5finesand)byvolume.
Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean
waterfor about two hours before use or as directed. The cessation of bubbles, when the bricks
arewettedwithwaterisanindicationofthroughwettingof bricks.
BricksshallbelaidinEnglishbondunlessdirectedotherwise.Halforcutbricksshallnotbeusedexcept
when necessary to complete to bond; closer in such case shall be cut to required
sizeandusedneartheendsofwalls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each
brickshall first be properly bedded and set home by gently tapping with handle of trowel or
woodenmallet.Itsidefaceshallbeflushedwithmortarbeforethenextbrickislaidandpressedagainst
it.Oncopletionofcourse,theverticaljointsshallbefullyfilledformthetopwithmortar.
Thewallsshallbetakenuptrulyinplumb.Allcoursesshallbelaidtrulyhorizontalandallverticaljoint shall
be truly vertical. Vertical joints in alternate course shall generally be directly one
overtheother.Thethicknessof brickcourseshallbekeptuniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight
edges,mason’s sprit level, square half meter rub, and pins, string and plumb shall be kept on the
site ofworkforfrequent checkingduringtheprogressofwork.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All
theconnectedbrickworkshallbekeptnotmorethanonemeterovertherestofthework.Wherethisis not
possible, the work shall be raked back according to bond (and not left toothed) at an anglenot
steeperthan45degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to
bebuiltinwallshallbeembeddedincement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall
notexceed 12 mm. The face joints shall be raked out as directed by taking tools daily during
theprogress of work, when the mortar is still green so as to provide key for plaster or pointing
The face of brick shall be cleaned the very day on which the brick work is laid and all
mortardroppingremoved.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all
thefaces for a period seven days. The top of masonry work shall be kept well wetted at the close
Preparationoffoundationbed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared
ofall loose materials, cleaned and wetted before starting masonry. If masonry is to be laid
onconcrete footing, the top of concrete shall be cleaned and moistened. The contractor shall
obtainthe engineer'’ approval for the foundation bed, before foundation masonry is started.
Whenpuccas flooring is to be provided flush with the top to plinth, the inside plinth offset shall be
keptlowerthantheoutsideplinthtopbythethicknessoftheflooring.
Modeofmeasurementsandpayment:
Themeasurementsofthisitemshallbetakenforthebrick
masonryfullycompletedinfoundationuptoplinth.
Thelimitingdimensionsnotexceedingthoseshownontheplansorasdirectedshallbefinal.Battered,
tapered andcurvedportionsshallbemeasurednet.
No deduction shall be made from the quantity of brick work nor any extra payment made
forembedding in masonryormakingholesinrespectoffollowing items:
Endsofjoints,beams,posts,girders,rafters,purlins,trusses,corbelstepsetc.wherecrosssectionalarea
doesnotexceed500Sq.cm.
Openingnotexceeding1000Sq.cm.
Wallplatesandbedplates,bearingofslabs,chhajasanthelikewhosethicknessdoesnotexceed10Cms.a
nd thebearingdoesnotextendto thefullthicknessofwall.
Drainageholes,andrecessesforcementconcreteblockstoembedholdfastsfordoors,windowsetc.
Ironfixtures,pipesupto300mmdiaholdfastsanddoorsandwindowsbuiltintomasonryandpipesetc.forco
Formingchasesofsectionnotexceeding350Sq.Cm.inmasonry.
Aperturesforfireplacesshallnotbedeductednorshallextralabourrequiredtomakesplayingofjambs,thro
atingandmakingArchesovertheaperturebepaidforseparately.
Therateshallbeforaunit ofonecubicmeter.
ItemNo. Providing15mmthickcementplasterinsinglecoatonRough(Similar)sideofsingleorhalfbrickw
30 allsforinteriorplasteringuptofloortwolevelandfinishedevenandsmoothin
(i)Cementmortar1:3(1-cement:3-sand)finishingwithafloatingcoatofneatcementslurry.
WaterM-1.TheCementmortarofproportion1:3shallconformtoM-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be
sound.These shall be properly examined before erection and use Stage scaffolding shall be
providedforceilingplaster, whichshall beindependent ofthewalls.
Preparationofback-ground:
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae,
afflorescenceand other foreign matter by water or by brushing. Smooth surface shall be
roughened by wirebrushing if it is not hard and by racking if it is hard. In case of concrete
surface, if a chemicalretarder has been applied to the form work, the surface shall be roughened
by wire brushing andall the resulting dust and loose particles cleaned off and care shall be taken
theretarderisleftonthesurface.Trimmingofprojectionsonbrick/concretesurfacewherenecessaryshal
lbecarried outtogetanevensurface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for
sufficientperiodbeforecarryingout theplasterwork.
The work shall not be soaked but only damped evenly before applying the plaster. If the
surfacebecomesdrysuchareashallbemoistenedagain.
Forexternalplaster,theplasteringoperationshallbestartedfromtopfloorandcarrieddownwards. For
internal plaster, the plastering operations may be started wherever the buildingframe and
cladding work are ready and the temporary supporting ceiling resting on the wall
ofthefloorhavebeenremoved,Ceilingplastershallbecompletedbeforestartingplastertowalls.
ApplicationsofPlaster:
Theplasterabout15x15cms.Shallbefirstappliedhorizontallyandverticallyat notmorethan2metre
intervals over the entire surface to serve as gauge. The surfaces of these gauges shall betruly
inplane of the finished plastered surface. The mortar shall then be applied in uniformsurface
slightly more than the specified thickness, then brought to a true surface by working
awoodenstraightedgereachingacrossthegaugeswithsmallupwardandsidewaysmovementata
time. Finally, the surface shall be finished off true with a trowel or wooden float according as
asmooth or a sandy granular texture is required. Excessive trowelling or overworking the
floatshall be avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as
thecase may be and shall be carefully finished. Rounding or chamfering corners, arrises
junctionsetc.shallbe carriedoutwithpropertemplatestothesizerequired.
Cement plaster shall be used within half an hour after addition of water. Any mortar or
plasterwhich ispartiallysetshallberejectedandremovedforthwithfromthe site:
In suspending the work at the end of the day, the plaster shall be left out clean to the line
bothhorizontally and vertically. When recommending the plaster, the edges of the old work shall
bescraped clean and wetted with cement putty before plaster is applied to the adjacent area
toenable the two to properly joint together. Plastering work shall be closed at the end of the day
onthe body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints
inplasterworkshallnotalsooccuronparapettopsandcopingsastheseinvariablyleadtoleakage.Noporti
onofthesurfaceshallbeleftoutinitiallytobepackeduplateron.
Eachcoatshallbekeptdamcontinuously tillthenextcoatisappliedorforaminimumperiodof7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of wallsshall be
avoided and only as much water as can be readily absorbed shall be used
excessiveevaporation onthesunny orwindwardsideofbuildingin hot airordry weather shall
beprevented by handling mattings or gunny bags on the outside of the plaster and keeping
Modeofmeasurement&payment:
The rate shall include the cost of all materials, labour and scaffolding etc, involved in
theoperationsdescribedunderworkmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth
orheight shallbemeasuredcorrecttoacentimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open
jointsin brick work, stone work etc. or space between laths. Thickness of plaster shall be
averagethicknesswithminimum 10mm.atanypointonthissurface.
Thisitemincludesplasteringuptofloortwolevel.
The measurement of wall plastering shall be taken between the walls or partition
(dimensionsbefore plastering being taken) for length and from the top of floor or skirting to
ceiling for height.Depthof coverof cornicesif anyshallbededucted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be
measuredseparately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of
joints,beams, posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for
openingsexceeding 0.5 sq.mt. and not exceeding 3.0 sq. mt. in each area deductions and
additions shallbemadeinthefollowingmanner:
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding
0.5sq. mt. each and no addition shall be madefor reveals, jambs, soffits, sills etc. of these
openingforfinishtoplasteraround endsof joints,beams,postsetc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made
asfollowsandnoadditionshallbemadeforreveals,jambs,soffitsetc.sillsetc.oftheseopenings.
When both faces of all wall are plastered with same plaster,
deductionshallbemadeforonefaceonly.
When two faces of wall are plastered with different types of plasters or
ifone faces is plastered and the other pointed, deductions shall be made from the plaster
orpointing on the side of frame for door, window etc. on which width or reveals is less than that
ontheothersidebutnodeductionsshallbemadeontheotherside.Wherewidthofrevealsonbothfaces of
all are equal, deductions of 50% of area of opening on each face shall be made fromareaof
plasterand/orpointingasthecase maybe.
For openings having door frames equal to projecting beyond the thickness of wall, full
deductionforopeningshallbemadefrom eachplastered faceofthewall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening
butjambs, soffitsandsillsshallbemeasured.
The rate shall be for a unit of one sq.
metre.finishingwithafloatingcoatofnetcementslurr
y.Materials &Workmanship:
Thisworkisonlyofprovidingsmoothcementfinishwithfloatingcoatofneatcementslurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be
appliedto the plastered surface with a trowel to provide uniform texture while the base coast is
In any continuous face of wall the finishing treatment should be carried out continuously and
daytodaybrakedmadetocoincidewitharchitecturalbreaksinordertoavoidunsightlyjunctions.
Curing:Alltheplasterworkshallbekeptdampcontinuouslyforaperiodof7days.
Modeofmeasurements&payment:
Thepaymentshallbemadeforaunit of 1.0sq. mt. ofworkdone overandabovethe finishingofworkof
Therelevantspecificationsofitemofbasecoatshallbefollowedformeasurements andpayment.
Therateshallbeforaunit ofonesq.metre.
ItemNo. Supplying cutting, bending, binding and placing in position steel as per plan and
31 designand as per IS 2502 including cost of steel and binding wire for reservoirs/
structuresonlyincluding lift up to 6 meter height or depth below GL for all diameters TMT
bars Fe-415gradeforalldiameters
The scope of work consists of providing and laying mild steel reinforcement and
TMTCRS Fe-500 reinforcement for RCC works of various components of the structure. This
beTiscooranyotherapprovedmanufacturerbranchandcorrosionresistantsteelbarsapprovedbythe
Engineer Incharge. This includes cuttings, bending, binding, placing, with all equipments
andlabour required for the work as directed by the City Engineer, Ahmedabad and all
operationscovered withintheintentandpurposeofthespecification.
BeingofReinforcement
Therateshallbeforaunit of MT
ItemNo. Fixing M.S. Sections Incl. Labour charges for lowering laying, erecting, fixing, various size
32 of M.S. section such as joints channel, angles plates etc with Fabrication Complete as
The Work done as per Engineer Incharge
BeingofReinforcement
Therateshallbeforaunit of MT
ItemNo. Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
33 stoneaggregates20mmnominalsize)andcuringcompleteexcludingcostofformworkandreinfo
rcementforreinforcedconcreteworkin
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4proportion
measured by volume shall conform to relevant specification or ordinary grade1:2:4concrete.
The cement concrete flooring of 50 mm. thick (average) is to be laid as per the sitecondition.
The concrete shall be mixed in a mechanical mixer at the work. Hand
mixermayhoweverbeallowedforsmallerquantitiesofworkandincaseoffailureofmachinesor as
permitted by the engineer-in-charge. It shall carried out on a water tight platformand care shall be
taken to ensure that mixing is continued until the mass is uniform incolourand
consistency.Howeverin such cases 10% more cement than
otherwiserequiredshallhavetobeusedwithoutanycost.Themechanicalmixingshallbedone
foraperiodof /to2minutes.Thequantityofwatershallbethussufficientofproducea
dense concrete required workability for the purpose. Flooring of specified thickness
shallbelaidinaccordancewithapprovedpatternorasdirected.Finishingoperationshallstartsh
ortly after the cessation of beating and shall be spread over a period of one to
sixhoursdepending upon the temperature and atmospheric conditions. The surface
shallbe left for some time till moisture disappears from it. Fresh quantity of cement shall
bemixed with water to form a thick slurry and spread over the surface while the concrete
isstill green. Use of dry cement or cement and sand mixture sprinkled on this surface
tostiffen the concrete or absorb excessive moisture shall not be permitted. The
cementslurry shall than be properly paste twice by means of iron flats, once, when the
slurry isapplied and the second time when cement starts setting and finished smooth.
Thesurface shall be marked with string or B.R.C. fabric jali to make the surface non
slipperyas and when directed. The junction of floors with wall plaster dado or skirting
shall berounded where so required upto 25 mm. radius. Flooring in lavatories and bath
roomsshallbelaidafterfixingofwaterclosetandsquattingpansandfloortraps,whichshallbeplu
gged while laying the floors and opened after the floors, are completed. Any
damage,donetowatersupplysanitaryfittingsduringtheexecutionofworkshallbemagegood.
Afterthefinalset,theconcreteshallbekeptcontinuouslywet,ifrequiredpondingfora
periodofnotlessthan7daysfromthedateofplacement.
The form work shall be provided if necessary as directed by the engineer in
charge.Concreting shall be done as per alternate bay method with necessary centering
witherbymasticorcementmortarasdirected.
Modeofmeasurement&payment:
The rate shall include the cost of all material and labour involved in all the
operationsdescribed above. No deduction shall be made or extra paid for any opening upto
sq.metreinareainthefloor,nothingextrashallbepaidforlayingtheflooratdifferentlevelsinthesameroom
or thecourt yard.
TherateshallbeforunitofoneCmt
ItemNo. Provdg. & laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 hand
34 brokenstoneaggregates40mmnominalsize)andcuringcompleteexcludingcostofformworkin
.(Bldg.Sor2015-16,itemno.5.3.4,pageno-49)
(A)Foundationandplinth
Before starting the concrete the bed of the foundations trenches shall be cleared of all
loosematerialsandwateredandrammedasdirected.
The proportion of cement, sand and coarse aggregate shall be one part of cement, 3 parts
ofsand,6partsof stone aggregatesandshallso measuredbyvolume.
The concreteshall be mixedin a mechanical mixer at the site of work. Hand mixing mayhowever
be allowed for smaller quantity of work if approved by the Engineer-incharge. Whenhand mixing
is permitted by the Engineer-in-charge incase of breakdown of machinery’s and inthe interest of
the work. it shall be carried out on a water tight platform and care shall be taken toensure that
mixing is continued until the mass is uniform in colour and consistency. However insuch cases
10% more cement than otherwise required shall have to be used without any extracost. The
mixing in mechanical mixer shall be done for a period 1 to 2 minutes. The quantity
ofwatershallbesufficienttoproduceadenseconcreteofrequiredworkabilityforthepurpose.
The concrete shall be handled from the place of mixing to the final position in not more than
15minutes by the method as directed and shall be placed into its final position, compacted
andfinishedwithin 30minutesofmixingwithwateri.e.beforethesetting commences.
Theconcreteshallbelaidinlayersof15cms.to20cms.
Theconcreteshallberammedwithheavyironrammersandrapidlytogettherequiredcompaction
andtoallow allthe interstrieestobe filledwithmortar.
Afterthefinalset, theconcreteshall bekept continuously wet, ifrequiredby pounding foraperiodof
not lessthan7daysfromthedateof placement
Theconcreteshallbemeasuredforitslengthbreadthanddepth,limitingdimensionstothosespecifiedonp
lanor asdirected.
Therateshallbeforaunit ofonecubicmeter.
ItemNo. Barricading the entire break down or excavated area on rental basis using wooden ballies
35 / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out
side to avoid accident & for smooth traffic diversion & movement including cautionary
board etc. Item also includes for making temporary sufficient nos of lighting arrangement
through out the work with necessary required arrangement. ..The same shall be removed
after completion of work. (Only for break down work from start to complete)
The Work is executed as per site Engineer Incharge
Therateshallbeforaunit of RMT
ItemNo. Manufacturing,and supplaying steel vantilation colums 15 cms dia medium class
36 pipewith 60 x 60cm 20 mm thick base plate and stiffeners C.I ormamental cap 50 Kg
andnecessarey foundationnut bolts with one coat or red lead oxide paint etc as per
drawingand carting to theworksiteetc.
Modeofmeasurements&payment:
Therateshallbefor aunitofNos
ItemNo. Providing and operation dewatering Pump including fuel charges & operator Charges
1 etc.asdirected etc.comp. (ShiftforEightHour)(ForEachPumpSet)
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost
2 oftoand fro transportation, laying of the delivery hoses as required, lowering and
liftingthe pumps as and when required etc. complete. Set Do As Directed. (No
paymentshouldbeallowedfornonworking conditionofmachinery)
Modeofmeasurements&payment:
TherateshallbeforaunitofHP/Hr.
ItemNo. Hiring and operatingthe 20 KV 3 Phase Electric Generator
3 foroperatingdesiltingmachinery,andlighting and other requirements with Arranging
diesel to run the D.G.SetDoAsDirected.8HrsShift.(Nopaymentshouldbeallowedfornon
workingconditionofmachinery )
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Providing & Supplying JCB Machine on rental basis in case of emergency situation
4 andbreak down type work & also during unavoidable condition as per
instructionof engg.incharge,rateincludesallnece.shifting,fueland operatingcharges
andstackingof useful & non-useful materials separately up to store. (No payment
shouldbe allowed for non working condition of machinery and for pipelineexcavation
The item is for supplying JCB on rent for various construction activities The rate includes
variousoperational cost such asoperating generater/electricity diesel,petrol, operater's salary,
when machine is in working condition all precautions shall be taken by contractor to avoid
theaccident.if any accident occurs contractor shall be fully resonsible for that. the payment shall
begiven on hour basis.No payment shall be given for idle hour and no time shall be counted
forcarrying machinetositeandfromshiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-110capacityonrentalbasisincaseofemergency
5 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesall nece. shifting, fuel and operatingcharges
TheitemisforsupplyingMachinerentforvariousconstructionactivitiesTherateincludes
various operational cost such as operating generater/electricitydiesel,petrol, operater's salary,etc
comp. when machine is in working condition all precautions shall be taken by contractor
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall
be given on hour basis.No payment shall be given for idle hour and no time shall
becountedforcarryingmachineto siteand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-200capacityonrentalbasisincaseofemergency
6 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesall nece. shifting, fuel and operatingcharges.
The item is for supplying Machine rent for various construction activities The rate
includesvarious operational cost such as operating generater/electricitydiesel,petrol, operater's
salary,etc comp. when machine is in working condition all precautions shall be taken by
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall
be given on hour basis.No payment shall be given for idle hour and no time shall
becountedforcarryingmachineto siteand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case
7 ofemergency situation and break down type work & also during unavoidable condition
asper instruction of engg.incharge , rate includesall nece. shifting, fuel and
operatingcharges.
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in
caseof emergency situation and break down type work & also during unavoidable condition as
perinstructionofengg.incharge,rateincludesallnece. shifting,fuelandoperatingcharges.
thepaymentshallbegivenonPer8hrShiftbasis.
ItemNo. SupplyingElectricBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusing
8 Operator, fuel, power Supply etc. Complete as Directed. (No payment should beallowed for
non working condition of machinery and for pipe line excavation and M.H.work.Allowed
onlyforbreak downwork)
Modeofmeasurements&payment:Th
erateshallbefor aunitofShift
ItemNo. SupplyingPneumaticBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusin
9 gOperator,fuel,powerSupplyetc.CompleteasDirected.(Nopaymentshouldbeallowed for
non working condition of machinery and for pipe line excavation and M.H.work.Allowed
onlyforbreak downwork)
Modeofmeasurements&payment:
Therateshallbeforaunit ofHour
ItemNo. Hiringoftractorwithtrolleyconsidering8Hrs.asworkingdayhoursincl.Driver
11 Modeofmeasurements&payment:Th
erateshallbefor aunitofShift
ItemNo. HiringofThreewheelercarrier(Chakado/Rixa)considering10Hrs.asworkingdayhoursincl.Driv
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
Reinstatement Work
ItemNo. Labour work for fixing any kind of paving with cement pointing in CM 1:2,
1 including watering, ramming etc comp. as dir. For pavement (I) Laying on Sand
bedding as per requirement to fix the C.C.Block / Nibhada Stone in Line & Level
Modeofmeasurements&payment:
Therateshallbefor aunitofSmt
ItemNo. Labour work for spreading the metal 85 mm thick in single layer, incl. providing
3 & applying bitumen for semi grouting 2.5 kgs/sqm. & Providing & spreading the key black
trap aggregate of good quality on top at the rate of 0.013 cmt. per sq.m. of size 18 mm
passing in 9.5 mm retain rolling with 10 tonne roller etc. comp. as directed.(Road SOR
Modeofmeasurements&payment:
Therateshallbefor aunitofSmt
ItemNo. Construction of granular Sub base using crusher run, spreading in uniform
4 layers with motor grader on prepared surface mixing by mix in place method with front
end loader at OMC and compacting with vibratory roller to achieve the desired density,
complete as per tender specification. For all grade. RA-3
Modeofmeasurements&payment:
Therateshallbefor aunitof Cmt
ItemNo. Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
5 specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base
course on well prepared surface and compacting with vibratory roller to achieve the
desired density as per Codal Provision.
Modeofmeasurements&payment:
Therateshallbefor aunitof Cmt
Important Note:-
As well as Considered Item Specifications as Per
Item Given, not by serial number
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
Contractor signature Additional City Engineer
Contractor signature Additional City Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 76.pdf
Download all tender documents and submit your bid