EXECUTIVE ENGINEER, NH DIVISION, GUMLA
EXECUTIVE ENGINEER, NH DIVISION, GUMLA
Construction of All Weathered Diversion for Khatwa Nadi Bridge at Km 64.670 of NH-143A (GumlaGhaghra Road) under NH division Gumla for the year 2026-27.
2026_MoRTH_928854_1
NH/GUMLA/03/2026-27
Open Tender
Civil Works - Roads
Item Rate
180 days
Gumla
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
PAO (NH) Kolkata code number -034756 and DDO Code
₹4.3 L
CE, NH WING, JHARKHAND, RANCHI
5 Oct 2026
5 Oct 2026
27 Oct 2026
5 Oct 2026
26 Oct 2026
5 Oct 2026
16 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. by manual means | 0.4 | Hec | 1,27,329.1 | ₹50,676.98 |
| 2 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 7,686.49 | m3 | 72.2 | ₹5,54,964.22 |
| 3 | Construction of Embankment with Material Deposited from Roadway Cutting. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. Rate per cum after adding royalty @Rs 27.48/cum | 801.45 | m3 | 66.78 | ₹53,520.56 |
| 4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. Rate per cum for grading V material. | 379.5 | m3 | 2,877.26 | ₹10,91,920.17 |
| 5 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 277.4 | m3 | 3,171.65 | ₹8,79,815.71 |
| 6 | Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 1,387 | m2 | 107.88 | ₹1,49,629.56 |
| 7 | Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,330 | m2 | 19.54 | ₹25,988.2 |
| 8 | Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,387 | m2 | 24.27 | ₹33,662.49 |
| 9 | Dense graded Bituminous Macadam Grading-II With VG-30Packed Bitumen Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Packed Bitumen.. | 66.5 | m3 | 14,548.5 | ₹9,67,475.25 |
| 10 | Bituminous concrete Grading- II With VG-30 Packed Bitumen Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with VG-30 Packed Bitumen. | 53.2 | m3 | 16,273.69 | ₹8,65,760.31 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Addendum-_e-compliant MoRTH portal Diversion.pdf
Tender Documents • 1.23 MB
SBDPart-1 _e-compliant MoRTH portal.pdf
Tender Documents • 1.94 MB
SBDPart2_e-compliant MoRT&H portal.pdf
Tender Documents • 1.72 MB
BOQ_976122.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .