Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | -0.15% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹26,618.67 (0.13%)Admitted-Finance 26 98 2ND FLOOR RAILWAY BAZAR RAILWAY BAZAR RAILWAY BAZAR HALDWANI NAINITAL UTTARAKHAND 263139 UDYAM UK 07 0004605 | NAINITAL | UTTARAKHAND | 263139 | -0.02% | ₹2.0 Cr+₹26,618.67 (0.13%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹30,713.85 (0.15%)Admitted-Finance | +0.00% | ₹2.0 Cr+₹30,713.85 (0.15%) | L3 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
30 Jul 2026, 5:00 pmClosed
DC ENGR SHQ HGI ITBP
OFFICE OF THE DIG SHQ HGI
Construction of 03 Rooms for GOAccommodation kitchen and toilet bathroom, Dining hall THQ Office, OPS Room with Sand Model Stores at THQ Gelemo of 10th BN, ITBP Kimin Arunachal pradesh
2026_ITBP_916260_1
NO-560-67 DTD-07/07/26
Open Tender
Civil Works
Works
540 days
10TH BN ITBP KIMIN
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.1 L
22 Aug 2026
7 Jul 2026
31 Jul 2026
7 Jul 2026
30 Jul 2026
7 Jul 2026
7 Jul 2026 - 30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | - | Cum | 397.23 | - |
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 1 | Cum | 582.52 | ₹581.94 |
| 3.01 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1 | Cum | 438.63 | ₹438.19 |
| 4.01 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 0.8 | Cum | 4,752.74 | ₹3,802.19 |
| 5.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | 17,631.29 | - |
| 6.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | 16,324.8 | ₹16,308.48 |
| 7.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | Cum | 14,587.98 | ₹14,573.39 |
| 8.01 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal Size).complete as directed. | 1 | Sqm | 1,109.43 | ₹1,108.32 |
| 9.01 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | - | Sqm | 1,676.86 | - |
| 10.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | - | Cum | 20,243.47 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_962914.xls
BOQ • 0.40 MB
TDGELEMO.pdf
Tender Documents • 2.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .