Loading…
Loading…
Tender Value
₹8.7 Cr
EMD Value
₹8.7 L
Closing Date
15 May 2026, 6:00 pmClosed
Executive Engineer, P.H.Works Division, JalBhavan, 1st Floor, Dahod-389151
Carrying out Remaining Incopmlete Work level Survey, Soil Investigation, Detailed Survey Work, Designing etc for Lowering, Laying and Jointing PVC GI Rising Gravity Pipeline from Village Level UG Sump to Faliya, Designing and Constructing of RCC Cistern ESR UGS at Faliya Level, and Pumping Machinery and Supply, Installation, Testing and Commissioning of Pumping Machineries at Existing UG Sump etc. under Remaining Incomplete Work Of Faliya Connectivity of DDSA Package 5 Part 1 and Part 2 Kanjeta Pipero RWSS including Operation and Maintenance For 24 Months For Existing Work and This Tender Scope Work. Tal:-D Baria, Dhanpur Dist.:-Dahod, Gujarat.
300116
11/2025-26 (2nd Trial)
Open
Civil - All
Works
Dahod
2 documents required · 1 mandatory · 1 optional
₹12,000
Executive Engineer, P.H. Works Division, GWSSB,Dahod
₹8.7 L
1 May 2026
1 May 2026
1 May 2026
15 May 2026
1 May 2026
1 The Contractor Submitting the tender shall be see that the rate in the schedule-A are filled by the Engineer In
Charge at the time of issue of the tender
2 The contractor while submitting the tender shall provide his own arrangement at his own cost for
loading,unloading and transporting with safety to the site of work.The item shown in Schedule-A
3 Binding wire of 15 gauge or thinner gauge required for placing the reinforcement in position will be provided at
4 All the materials required for the item and labour mentioned in schedule-B and materials not in Schedule-A
but available with the Department will be issued on request of the contractor ( for use in this contract only )at
prevalling market rate departmenta
5 All the surplus materials supplied by the department mentioned in schedule -A should be handed over by the
contractor at the Government store as directed by EIC failling which it will be recovered by the double rate.If it
is mentioned as free of cost (F.O.C.)
6 The materials mentioned in schedule-A shall have to be checked for their correctness and soundness by the
contractor before taking the delivery of materials from the Government store
7 Cement supplied by the contractor and use shall be of following companies.or any other approved brand by
(1) Narmada cement Co.Ltd.
(2) Gujarat Ambuja cement CO.Ltd.
(3) Saurastra cement CO.Chem.Ltd.
(4) Shree Digvijay Cement Co.Lted.
(5) Gujarat Sidhi cement Co.
(6) J.K Cement Co.
8 Steel used shall be secoundry rolling as may be approved by the GWSSB
9 Contractor shall have to buy and bring cement and steel from open market of ISI mark and board approved
brand produce the bill of purchase along with necessary test certificiate at the time of claiming running
Date and Signature of the Deputy Ex.Engineer Ex.Engineer
P.H. San. Sub Division, Limkheda P.H.Works Division,Dahod
GUJARAT WATER SUPPLY & SEWERAGE BOARD
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero Regional
water supply scheme Part-1 & Part-2
TALUKA- Dhanpur/D'Baria DIST-DAHOD
DDSA 5 PART-1 & PART-2 FALIYA CONNECTIVITY
Sr.No. Name of Component PART-1 PART-2 Amount
Carrying out level Survey, Soil Investigation, Detailed Survey Work,
SCHEDULE B-1 Designing etc for Rising/Gravity Main Pipeline for Hamlet/ Faliya 10,445,919.35 16,080,399.72
Carrying out level Survey, Soil Investigation, Detailed Survey Work,
SCHEDULE B-2A Designing etc for Designing & Construction of RCC ESR/HGLR for 14,394,413.42 16,140,786.73
Carrying out level Survey, Soil Investigation, Detailed Survey Work,
SCHEDULE B-2B Designing etc for Designing & Construction of RCC GSR/SUMP for - 838,798.12
SCHEDULE B-3 Pumping Machinery 12,418,158.75 14,322,752.23
Total Amount of Schedule B 37,258,491.52 47,382,736.81
Total Amount of Schedule B 37,258,491.52 47,382,736.81
SCHEDULE-C Operation & Maintenance (For 24 Months) 1,081,500.00 1,346,976.00
Rebate on above tender (if any)…………%
Net Considering Rebate
Dy.Ex.Engineer Dy.Ex.Engineer
P.H.Mech.Sub Division P.H.Sani.Sub Division
Limkheda Limkheda
Executive Engineer Executive Engineer Superintending Engineer
P.H.Mech. Division P.H.Works Division P.H.Circle
Dahod Dahod Godhra
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero Regional water supply scheme Part-1 & Part-2
TALUKA- Dhanpur/D'Baria DIST-DAHOD
Carrying out level Survey, Soil Investigation, Detailed Survey Work, Designing etc for Rising/Gravity Main Pipeline for Hamlet/ Faliya Connectivity
Tender Qty Executed Qty Remaining And New Qty
ITEM. Part-1 Part-2 Total Part-1 Part-2 Total Part-1 Part-2 Total Work AMOUNT.
Providing and supplying in standard length ISI mark rigid unplasticised PVC pipes
suitable for potable water with ring fit joint including cost of rings, as per IS
specification no. 4985/1988 including all local and central taxes, transportation, freight
charges, octroi, inspection charges, loading, unloading, conveyance to the
departmental stores and including cost of jointing meterial etc. complete. -
1.One coupler / ring shall be provided with each full length pipe cost of which is
included in rates below.
2. 3% (Three) Discounted rate to be consider for Coupler jointed pipe
3. Rate for PVC Resin as Rs. 91739/ MT (Price Without GST)
Providing and supplying at store or site of work incl. freight, loading, unloading,
stacking, insaurance & all taxes etc. complete
1.A) P. V. C. Bend 90 degree (Fabricated) 6.0 kg
2.B) P. V. C. Bend 90 degree (Moulded) Heavy
Providing and supplying C. I. Air valves of approved make & quality of following class
and diameter including all taxes, insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to departmental stores, stacking
etc. complete.& Lowering, laying and jointing in position following C. I. / D/F Reflux
valves, Butterfly valves, Sluice valves and Air valves including cost of all labour,
jointing material, including nut bolts and giving satisfactory hydraulic testing, etc.
At Every 400 Mtr Interval (46920/300=157)
Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with
shoring and struting if required as per required gradient and line including safety
provisions using site rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as specified.
(a) From 0 to 1.5 mt depth
(ii)In hard murrum,boulders includingmacadam rosd 10362.1 15848.35 26210.45 2136.80 1709.96 3846.76 8225.30 14826.49 23051.79 Cum 141.75
(iii)In soft rock and or masonary in CM or LM or Lime Concrete 7401.5 11320.25 18721.75 1078.18 572.34 1650.52 6323.32 11239.41 17562.73 Cum 171.15
ITEM. Part-1 Part-2 Total Part-1 Part-2 Total Part-1 Part-2 Total Work AMOUNT.
Lowering, laying, fixing and jointing PVC/uPVC/cPVC pipes and specials of following
class and diameter including cost of conveyance from stores to site of works including
cost of labour, material, cement solvent, giving satisfactory hydraulic testing as per ISI
Providing C.C.M.:100 for encasing pipes using trap metal size 12 mm to 50 mm incl.
form work curing consolidation etc. complete for various location on pipe line using 276.44 420.31 696.74 0.00 0.00 0.00 276.44 420.31 696.74 M3 4319.49
trap metal 20 mm nominal size
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of
surplus stuff as directed within a radius of 3 km.
Erection of airvalve riser by installing new M.S pipe of 6mm thick and 3.2mt length with
necessary fittings such as flange of appropriate size,nut bolts and embeded the pipe in
R CC M;15 with offset of 10 cm around pipe with necessary steel etc complete
To carry out survey work Co-Ordination liasation for "Standing crop compensation"in
land for laying water supply pipeline along the alignment of Hirola Regional Water
Supply Scheme including shifting of center line marking it on village map and hissa to
be taken for Standing crop compensation and submission of drawing in 4 sets drawn
in the scale of 1 cm=25 mt.along with original tracing showing and marking their own
survey numbers with CD 4 nos. etc. and defining Standing crop compensation strip of
15.00 m. along the cross country in width on the map and showing revenue survey
number wise area and other details as per detailed specifications. For Job work for
legal formalities including getting copy of 7/12, 6-A,form of perticular land non judicial
Stamp paper, & all required activities with all documents.
For Job work for legal formalities including getting 7/12, 6-A, non judicial Stamp
paper, & all required activities with all documents.
Woltman Type Bulk Water Meter- Standard: Design, Supply, Installation, Testing,
Commissioning of Woltman type Bulk Water Meter, CI/ Brass/ Bronze body material,
totalizer made of copper can/ suitable anti corrosive metallic material, totaliser metalic
shall have 5 mm thick glass cover suitable against antifraud attempts, Flange End
process connection, IP 68 protection class, Woltman type Water Meter with
removable mechanism, magnetic drive, dry dial, and be fitted with a low mass rotor
which is parallel to the direction of water flow and exhibits dynamic thrust relief, water
meters complete with T Type strainer, ISO 4064 : 2005 with valid CE mark mentioning
notified body number along with MlD / OIML / ISO certification from a recognized
International laboratory
For Village Level Sump to Faliya /Habitation ESR/HGLR
Ball or stop Valves
Threaded ends, Metallic to metallic chrome coated wedge PVC seat rings
ITEM. Part-1 Part-2 Total Part-1 Part-2 Total Part-1 Part-2 Total Work AMOUNT.
Providing & Supplying & Errection of 168.3 mm dia with 2 mtr length MS Header Pipe
line at suitable place as per design & directed by Engineer-in charge including M.S.
flange pipe,sluice valve, with 4 nos of branch/outlet 2x 65 mm,80mm ,&100 mm dia 30 30 60.00 0.00 0.00 0.00 30.00 30.00 60.00 Nos 21536.00
with .50 m length each of branch/ outlet and fixing of valves including errect MS
Header to outlet of ESR Pipe line etc. complete with satisfactory hydraulic testing.
Providing and supplying ISI mark G. I. pipes with Couplings of following class and
diameter including all taxes,insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to departmental stores, stacking
etc. complete. (IS -1239) (Not for well/tube well column pipe) & Lowering, laying and
jointing G. I. pipes with G. I. specials of following diameters in proper position, grade
and alignment as directed by Engineer-in-charge including conveyance from stores to
site of work, labour, giving hydraulic testing, etc. complete
Drilling of Horizontal borehole for watermain pipeline crossing under the railway / road
tracks in all strata with required length incl. fixing of M.S( or as specified by railway /
road authority) / RCC. casing pipe of suitable size and thickness. Rate includes the
cost of drilling of borehole, casing pipe and welding pushing etc. complete but
excluding cost of water main, valves and other items entire work should be as per as
per approved drawing and as per inst. of railway/ road authority for following dia of
borehole for MS pipe
Horizontal Drilling-250:& MS Casing Pipe-200 thick:5 20 20 40.00 0.00 0.00 0.00 20.00 20.00 40.00 Rmt 2255.4
Horizontal Drilling-200:& MS Casing Pipe-150 thick:5 220 350 570.00 0.00 0.00 0.00 220.00 350.00 570.00 Rmt 1585.5
Making job connection for old pipes in connecting the pipeline with existing main and
inserted of special incl. Cost of excavation cutting of pipes, dewatering testing refitting
etc. complete incl. All jointing materials etc. comp. (excl. cost of specials pipes and
fittings) job work in cement joint only.
Providing and supplying ISI mark C.I.D.F.sluice valve,butterfly
valves,refluxe valves of following class and diameter including all
taxes,insurence,transportation,freight charges, octroi, inspection charges,
loading, unloading, conveyance to departmental store
PN 1.6 with Hand wheel/ Cap Operated (PD Type Short Body)
Lowering laying and jointing in position following C.I./D.F.refluxe valve ,sluice valve &
Air Valves Including Cost of all Labour, Jointing Material Including Nut Bolts and
Giving Satisfactory Hydraulic testing etc.complete.
ITEM. Part-1 Part-2 Total Part-1 Part-2 Total Part-1 Part-2 Total Work AMOUNT.
Construction of valve chamber in brick or bella stone masonry locally available in C.M
1:6 foundation concrete 150 mm thick in C.C. (1:4:8) of trap metal of size 25 mm to
mm thick inside cement plaster in C.M (1:3) and cement pointing outside in C.M. 1:3
and top cover of precast slab 100 mm thick. (With Key hole in two part, each with
handle of M.S. Bar etc. completed. As given size) Up to 1.00 mt. Depth from G.L. to
pipe invert level incl. complete civil works. But excl. cost of excavation and refilling.
with cast in situ RCC slab in one single piece with fixing of C.I.M.H. frame and cover
(excl. cost of CIMH frame and cover) with 23 cm thick brick masonary wall in C.M. 1:6.
Size of Chamber 0.90m x 0.90m & 1 mtr Deep (With Pre Cast Slab In Two Parts) 0 0 0.00 0.00 0.00 0.00 56.00 56.00 112.00 Nos 8124.9
Labour charges for repariing of leakage in PVC pipeline of Following diameter at
different places including necessary excavation manually or by mechanized excavation
removing of mud, cleaning of pipe and leakage portion cutting the the pipeline &
removing piece of pipe from trench with inclussive of mechanical deviced JCB,
Hydra/crain if necessary & labours required with providing material such Coupler,
Solution etc.comp.(incl. all material but Exclu.cost of pipe)
Executive Engineer Deputy Executive Engineer
P.H. Work Division P. H. San. Sub Division
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero Regional water supply scheme Part-1 & Part-2
TALUKA- Dhanpur/D'Baria DIST-DAHOD
Schedule B - 2A
Carrying out level Survey, Soil Investigation, Detailed Survey Work, Designing etc for Designing & Construction of RCC ESR/HGLR for Hamlets/Faliya
Tender Qty Executed Qty Remaining/New Qty
Proof Strengthenin
Item Description Unit Rate Checking g Amt Of In Amount
Part-1 Part-2 Total Part-1 Part-2 Total Part-1 Part-2 Total
ITEM NO. 1 ::- As Per Board
Designing structurally (and aesthetically) complying provisions of relevant Indian standards and constructing RCC Elevated service Reservoir of the following capacity and height using data of S.B.C of
proposed site Seismic zone Wind speed Zone. Including (1) Container shape any suitable type (or as specified) (2) Staging consisting of column brace trestle / shaft / combination column- brace trestle and
shaft as appropriate (or as specified) and (3) Appropriate foundation system. This includes excavation in all types of soil strata (including hard rock) casting100 mm thick P.C.C. levelling course in M-10
Refilling the pit with proper soil and disposing of the surplus stuff within a lead of 50 meters. (4) This will also include cement plaster in CM 1:2 with approved water proofing compound to inside face of
container. (5) All types of labour & material charges of lowering laying erecting / hoisting & joining of pipe assembly of Inlet Outlet overflowwashout and bye pass arrangement as per hydraulic design are
including.(6) Providing and fixing accessories(specified) CI Manhole frame and covers water level indicator lightening conductor GI Pipe railing around walk way at roof level at gallery and around landing of
inside shaft Adequate cowl type ventilators or lantern type ventilator with stainless steel jali. (7) Scope of work includes constructing RCC spiral staircase with adequate tie beams staircase footing,RCC
chambers for valves. ventilating shaft and ventilators as well as door in shaft .SS grating to be provided to outlt pipe (inside container)for safety(8) including providing and applying three coats of cement
paint/snowcem (as specified) to the whole structure. (9) It also includes satisfactory water tightness test as per relevant I.S. Code and painting name of scheme & capacity on the tank as per direction of
engineer in charge. List of Indian Standards for design of ESR: Note:The structural design of ESR shall be in accordance with provisions of relevant Indian Standards (1) I.S. 3370 part I to II 2009 or Its latest
revision (1.1) IS 3370 part III & IV 1965 or Its latest revision (2) IS 456-2000 or ts latest revision (3) IS 11682- 1985 orts latest revision (4) IS 1893-2002 part I to V or ts latest revision (5) IS 13920-1993 or ts
latest revision (6) IS 875 part I to III1987 or lts latest revision (7) IS 11089- 1987 or ts latest revision General specifications:(1) The Min. concrete grade for RCC shall be M:30. Proportion of concrete
ingredients shall be as per Mix design using weigh batching .
(2) HYSD(Fe 415) or higher grade reinforcing bars confirming to IS 1786/1139 or TMT bars shall be used as per detailed specification.
(3) Incase of column –brace trestle type staging having more than 6 columns internal horizontal bracing is obligatory. One bracing shall be at foundation level incase of Individual footings.
(4) Min. size/ thickness of various components shall be provided as per design criteria/specifications Is code (or as per std. practice) . Capacity of the ESR shall be considered excluding free board
(5) Minimum dimensions specified for various components in tender data/specifications shall be provided . (6) The Safe bearing capacity (SBC) /allowable pressure on soil shall be referred from SBC test
report or tender datasheet. If poor soil strata is met with or ground water table is met with the SBC shall have to be re ascertained scientifically and the design should be rivised accordingly.
(7) Maximum spacing between horizontal bracings shall be 5 m (storey height) .
(8) The BB Masonry cabin with MS door shall be constructed when spiral staircase is outside the staging.
(9) RCC Staircase/MS Staircase shall be provided and fixed for access to roof when height of roof from G.L. is up to 10 m. For ESR having more than 10 m height RCC spiral staircase or suitable RC C
staircase shall be constructed.Railling should be provided through out the staircase and around the top ning beam.
(10) For ESR-having staging height more than 15 m the spiral staircase shall be provided inside the staging with effective tie beams in more than one direction. (11) Water level indictor shall be provided and
fixed float type /electronic (as specified) .
(12)The rate shall include providing and fixing pipes specials and valves required for inlet outlet wash out over flow and bye pass arrangement. The scope of work includes constructing supporting RCC pillars
erecting laying fixing and joining pipes and specials etc up to 5m length from face of staging (outer most column)
(13) DIpipes & specials shall only be used .
(14) The rate shall include cost of dewatering during execution making all arrangement and any dewatering technic.
(15) The structure shall be designed properly for uplift due to Ground water table specified in data or GWT met with during execution. No extra payment shall be paid for the same.
(16) Effective curing shall be carried out up to require period as per specifications.
ESR of .15 Lac Litres 12 m Height (Pipariya) 1 0 1 Nos. 450607.50 4506.08 45060.75
On Design submission: 2.5% 1 0 1 1.00 0.00 1.00 0 0 0 Nos. 11265.19
On Completion of Satgging: 22.5% 1 0 1 0.00 0.00 0.00 1 0 1 Nos. 101386.69
On completion of floor:22.5% 1 0 1 0.00 0.00 0.00 1 0 1 Nos. 101386.69
On completion of walls:22.5% 1 0 1 0.00 0.00 0.00 1 0 1 Nos. 101386.69
ESR of .20 Lac Litres 12 m Height (Dungarpur (to), Zapatiya) 1 1 2 Nos. 600810.00 6008.10 60081.00
On Design submission: 2.5% 1 1 2 1.00 1.00 2.00 0 0 0 Nos. 15020.25
On Completion of Satgging: 22.5% 1 1 2 0.00 0.00 0.00 1 1 2 Nos. 135182.25
On completion of floor:22.5% 1 1 2 0.00 0.00 0.00 1 1 2 Nos. 135182.25
On completion of walls:22.5% 1 1 2 0.00 0.00 0.00 1 1 2 Nos. 135182.25
ESR of .25 Lac Litres 12 m Height (Andarpura, Nadatod) 1 1 2 1 Nos. 751007.67 7510.08 75100.77
On Design submission: 2.5% 1 1 2 1.00 1.00 2.00 0 0 0 Nos. 18775.19
On Completion of Satgging: 22.5% 1 1 2 0.00 1.00 1.00 1 0 1 Nos. 168976.73
On completion of floor:22.5% 1 1 2 0.00 1.00 1.00 1 0 1 Nos. 168976.73
On completion of walls:22.5% 1 1 2 0.00 1.00 1.00 1 0 1 Nos. 168976.73
ESR of .30 Lac Litres 12 m Height (Nansalai,Nadatod, Panam(New)) 1 1 2 1 Nos. 856900.17 8569.00 85690.02
On Design submission: 2.5% 1 1 2 1.00 1.00 2.00 0 1.00 1 Nos. 21422.50
Tender Qty Executed Qty Remaining/New Qty
Proof Strengthenin
Item Description Unit Rate Checking g Amt Of In Amount
No. On Completion of Satgging: 22.5% 1 1 2 0.00 1.00 1.00 1 1.00 2 Nos. 192802.54
On completion of floor:22.5% 1 1 2 0.00 1.00 1.00 1 1.00 2 Nos. 192802.54
ESR of .45 Lac Litres 12 m Height (Lakhan Gojiya) 1 0 1 1 Nos. 1174577.67 11745.78 117457.77
On Design submission: 2.5% 1 0 1 1.00 0.00 1.00 0.00 0 0 Nos. 29364.44
On Completion of Satgging: 22.5% 1 0 1 0.15 0.00 0.15 0.85 0 0.85 Nos. 264279.98
On completion of floor:22.5% 1 0 1 0.00 0.00 0.00 1.00 0 1 Nos. 264279.98
On completion of walls:22.5% 1 0 1 0.00 0.00 0.00 1.00 0 1 Nos. 264279.98
ESR of .50 Lac Litres 12 m Height (Dabhva) 1 0 1 1 Nos. 1280476.92 12804.77 128047.69
On Design submission: 2.5% 1 0 1 1.00 0.00 1.00 0 0 0 Nos. 32011.92
On Completion of Satgging: 22.5% 1 0 1 0.67 0.00 0.67 0.33 0 0.33 Nos. 288107.31
On completion of floor:22.5% 1 0 1 0.00 0.00 0.00 1 0 1 Nos. 288107.31
On completion of walls:22.5% 1 0 1 0.00 0.00 0.00 1 0 1 Nos. 288107.31
ESR of .65 Lac Litres 12 m Height (Modhva, Nagvav, Panam(New)) 1 1 2 Nos. 1459869.42 14598.69 145986.94
On Design submission: 2.5% 1 1 2 1.00 1.00 2.00 0 1.00 1 Nos. 36496.74
On Completion of Satgging: 22.5% 1 1 2 0.00 0.00 0.00 1 2.00 3 Nos. 328470.62
On completion of floor:22.5% 1 1 2 0.00 0.00 0.00 1 2.00 3 Nos. 328470.62
On completion of walls:22.5% 1 1 2 0.00 0.00 0.00 1 2.00 3 Nos. 328470.62
ESR of .75 Lac Litres 12 m Height (Simlaghasi) 0 1 1 1 Nos. 1579464.42 15794.64 157946.44
On Design submission: 2.5% 0 1 1 0.00 1.00 1.00 0 0 0 Nos. 39486.61
On Completion of Satgging: 22.5% 0 1 1 0.00 1.00 1.00 0 0 0 Nos. 355379.49
On completion of floor:22.5% 0 1 1 0.00 1.00 1.00 0 0 0 Nos. 355379.49
On completion of walls:22.5% 0 1 1 0.00 1.00 1.00 0 0 0 Nos. 355379.49
ESR of .80 Lac Litres 12 m Height (Tokarva(New)) 1 0 1
On Design submission: 2.5% 0 0 0 0.00 0.00 0.00 1.00 0 1 Nos. 40981.55
On Completion of Satgging: 22.5% 0 0 0 0.00 0.00 0.00 1.00 0 1 Nos. 368833.93
On completion of floor:22.5% 0 0 0 0.00 0.00 0.00 1.00 0 1 Nos. 368833.93
On completion of walls:22.5% 0 0 0 0.00 0.00 0.00 1.00 0 1 Nos. 368833.93
ESR of 1.45 Lac Litres 12 m Height (Fulpura) 0 1 1 1 Nos. 2285950.93 22859.51 228595.09
On Design submission: 2.5% 0 1 1 0.00 1.00 1.00 0 0 0 Nos. 57148.77
On Completion of Satgging: 22.5% 0 1 1 0.00 0.40 0.40 0 0.6 0.6 Nos. 514338.96
On completion of floor:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 Nos. 514338.96
On completion of walls:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 Nos. 514338.96
ESR of 1.85 Lac Litres (Ruparel) 0 1 1 1 Nos. 2647990.93 26479.91 264799.09
On Design submission: 2.5% 0 1 1 0.00 1.00 1.00 0 0 0 Nos. 66199.77
On Completion of Satgging: 22.5% 0 1 1 0.00 0.00 0.00 0 1 1 Nos. 595797.96
On completion of floor:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 Nos. 595797.96
Tender Qty Executed Qty Remaining/New Qty
Proof Strengthenin
Item Description Unit Rate Checking g Amt Of In Amount
No. On completion of walls:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 Nos. 595797.96
ESR of 2.10 Lac Litres (Shadra) 0 1 1 1 Nos. 2867692.93 28676.93 286769.29
On Design submission: 2.5% 0 1 1 0.00 1.00 1.00 0 0 0 Nos. 71692.32
On Completion of Satgging: 22.5% 0 1 1 0.00 0.80 0.80 0 0.2 0.2 Nos. 645230.91
On completion of floor:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 Nos. 645230.91
On completion of walls:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 Nos. 645230.91
HGLR of .10 Lac Litres 3 m Height (Taramkach, Bhindol) 1 1 2 1 No 306309.51 3063.10 30630.95
On Design submission: 2.5% 1 1 2 1.00 1.00 2.00 0 0 0 Nos. 7657.74
On Completion of Satgging: 22.5% 1 1 2 1.00 0.00 1.00 0 1 1 Nos. 68919.64
On completion of floor:22.5% 1 1 2 1.00 0.00 1.00 0 1 1 Nos. 68919.64
On completion of walls:22.5% 1 1 2 0.00 0.00 0.00 1 1 2 Nos. 68919.64
HGLR of .20 Lac Litres 3 m Height (Modhva, Lukhadiya(2 Nos.), Redhana,Bhindol(3 Nos.), Kanjeta(2 Nos.)) 3 6 9 1 3 No 415416.98 4154.17 41541.70
On Design submission: 2.5% 3 6 9 3.00 6.00 9.00 0 0 0 No 10385.42
On Completion of Satgging: 22.5% 3 6 9 1.00 2.00 3.00 2 4 6 No 93468.82
On completion of floor:22.5% 3 6 9 1.00 2.00 3.00 2 4 6 No 93468.82
On completion of walls:22.5% 3 6 9 1.00 1.00 2.00 2 5 7 No 93468.82
HGLR of .30 Lac Litres 3 m Height (Khokhbed, Taramkach, Lakhan Gojiya, Gadvel, Vadbhet) 4 1 5 3 1 No 487937.68 4879.38 48793.77
On Design submission: 2.5% 4 1 5 4.00 1.00 5.00 0 0 0 No 12198.44
On Completion of Satgging: 22.5% 4 1 5 2.00 1.00 3.00 2 0 2 No 109785.98
On completion of floor:22.5% 4 1 5 2.00 1.00 3.00 2 0 2 No 109785.98
On completion of walls:22.5% 4 1 5 2.00 1.00 3.00 2 0 2 No 109785.98
HGLR of .40 Lac Litres 3 m Height (Rampur, Modhva, Ghada, Chari, Limdi Mendri) 4 1 5 3 1 No 517415.08 5174.15 51741.51
On Design submission: 2.5% 4 1 5 4.00 1.00 5.00 0 0 0 No 12935.38
On Completion of Satgging: 22.5% 4 1 5 1.50 1.00 2.50 2.5 0 2.5 No 116418.39
On completion of floor:22.5% 4 1 5 1.00 1.00 2.00 3 0 3 No 116418.39
HGLR of .50 Lac Litres 3 m Height (Kothariya, Ghada, Kundavada, Limdi Mendri) 3 1 4 1 1 No 581570.19 5815.70 58157.02
On Design submission: 2.5% 3 1 4 3.00 1.00 4.00 0 0 0 No 14539.25
On Completion of Satgging: 22.5% 3 1 4 1.00 1.00 2.00 2 0 2 No 130853.29
On completion of floor:22.5% 3 1 4 1.00 1.00 2.00 2 0 2 No 130853.29
On completion of walls:22.5% 3 1 4 0.00 1.00 1.00 3 0 3 No 130853.29
HGLR of .60 Lac Litres 3 m Height (Rampur, Ved, Redhana) 2 1 3 1 1 No 700060.92 7000.61 70006.09
On Design submission: 2.5% 2 1 3 2.00 1.00 3.00 0 0 0 No 17501.52
On Completion of Satgging: 22.5% 2 1 3 1.00 1.00 2.00 1 0 1 No 157513.71
On completion of floor:22.5% 2 1 3 1.00 1.00 2.00 1 0 1 No 157513.71
Tender Qty Executed Qty Remaining/New Qty
Proof Strengthenin
Item Description Unit Rate Checking g Amt Of In Amount
No. On completion of walls:22.5% 2 1 3 1.00 1.00 2.00 1 0 1 No 157513.71
Tender Qty Executed Qty Remaining/New Qty
Proof Strengthenin
Item Description Unit Rate Checking g Amt Of In Amount
No. HGLR of .70 Lac Litres 3 m Height (Khokhra) 1 0 1 1 No 719872.18 7198.72 71987.22
On Design submission: 2.5% 1 0 1 1.00 0.00 1.00 0 0 0 No 17996.80
On Completion of Satgging: 22.5% 1 0 1 1.00 0.00 1.00 0 0 0 No 161971.24
On completion of floor:22.5% 1 0 1 1.00 0.00 1.00 0 0 0 No 161971.24
On completion of walls:22.5% 1 0 1 0.00 0.00 0.00 1 0 1 No 161971.24
HGLR of .80 Lac Litres 3 m Height (Sevaniya) 0 1 1 No 829923.77 8299.24 82992.38
On Design submission: 2.5% 0 1 1 0.00 1.00 1.00 0 0 0 No 20748.09
On Completion of Satgging: 22.5% 0 1 1 0.00 0.00 0.00 0 1 1 No 186732.85
On completion of floor:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 No 186732.85
On completion of walls:22.5% 0 1 1 0.00 0.00 0.00 0 1 1 No 186732.85
Executive Engineer Deputy Executive Engineer
P.H. Work Division P. H. San. Sub Division
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero Regional water supply scheme Part-1 & Part-2
Structure Execution Details
Tender & New Qty DDSA PKG-5 PART-1 DDSA PKG-5 PART-2
Sr No Structure Details
Part-1 Part-2 Total Executed Qty Executed Qty
1 ESR of .15 Lac Litres 12 m Height (Pipariya) 1 0 1 Pipariya Total Total
On Design submission: 2.5% 1 0 1 1 1
On Design Approval: 2.5% 1 0 1 1 1
On Excavation: 7.5% 1 0 1 0 0
On Completion of Satgging: 22.5% 1 0 1 0 0
On completion of floor:22.5% 1 0 1 0 0
On completion of walls:22.5% 1 0 1 0 0
On complete:20.00% 1 0 1 0 0
2 ESR of .20 Lac Litres 12 m Height (Dungarpur (to), Zapatiya) 1 1 2 Total Zapatiya Total
On Design submission: 2.5% 1 1 2 1 1 1
On Design Approval: 2.5% 1 1 2 1 1 1
On Excavation: 7.5% 1 1 2 0.2 0.2 0
On Completion of Satgging: 22.5% 1 1 2 0 0 0
On completion of floor:22.5% 1 1 2 0 0 0
On completion of walls:22.5% 1 1 2 0 0 0
On complete:20.00% 1 1 2 0 0 0
ESR of .25 Lac Litres 12 m Height (Andarpura, Nadatod) 1 1 2 Andarpura Total Nadatod Total
On Design submission: 2.5% 1 1 2 1 1 1
On Design Approval: 2.5% 1 1 2 1 1 1
On Excavation: 7.5% 1 1 2 0.2 0.2 1
On Completion of Satgging: 22.5% 1 1 2 0 0 1
On completion of floor:22.5% 1 1 2 0 0 1
On completion of walls:22.5% 1 1 2 0 0 1
On complete:20.00% 1 1 2 0 0 0
ESR of .30 Lac Litres 12 m Height (Nansalai,Nadatod,
1 2 3 Nansalai Total Nadatod Total
On Design submission: 2.5% 1 2 3 1 1 1
On Design Approval: 2.5% 1 2 3 1 1 1
On Excavation: 7.5% 1 2 3 0.2 0.2 1
On Completion of Satgging: 22.5% 1 2 3 0 0 1
On completion of floor:22.5% 1 2 3 0 0 1
On completion of walls:22.5% 1 2 3 0 0 0.72
On complete:20.00% 1 2 3 0 0 0
ESR of .45 Lac Litres 12 m Height (Lakhan Gojiya) 1 0 1 Total Total
On Design submission: 2.5% 1 0 1 1 1
On Design Approval: 2.5% 1 0 1 1 1
On Excavation: 7.5% 1 0 1 1 1
On Completion of Satgging: 22.5% 1 0 1 0.15 0.15
On completion of floor:22.5% 1 0 1 0 0
On completion of walls:22.5% 1 0 1 0 0
On complete:20.00% 1 0 1 0 0
ESR of .50 Lac Litres 12 m Height (Dabhva) 1 0 1 Dabhva Total Total
On Design submission: 2.5% 1 0 1 1 1
Tender & New Qty DDSA PKG-5 PART-1 DDSA PKG-5 PART-2
Sr No Structure Details
Part-1 Part-2 Total Executed Qty Executed Qty
On Design Approval: 2.5% 1 0 1 1 1
On Excavation: 7.5% 1 0 1 1 1
On Completion of Satgging: 22.5% 1 0 1 0.67 0.67
On completion of floor:22.5% 1 0 1 0 0
On completion of walls:22.5% 1 0 1 0 0
On complete:20.00% 1 0 1 0 0
ESR of .65 Lac Litres 12 m Height (Modhva, Nagvav,
1 2 3 Modhva Total Nagvav Total
On Design submission: 2.5% 1 2 3 1 1 1
On Design Approval: 2.5% 1 2 3 1 1 1
On Excavation: 7.5% 1 2 3 0.2 0.2 0
On Completion of Satgging: 22.5% 1 2 3 0 0 0
On completion of floor:22.5% 1 2 3 0 0 0
On completion of walls:22.5% 1 2 3 0 0 0
On complete:20.00% 1 2 3 0 0 0
ESR of .75 Lac Litres 12 m Height (Simlaghasi) 0 1 1 Total Simlaghasi Total
On Design submission: 2.5% 0 1 1 1
On Design Approval: 2.5% 0 1 1 1
On Excavation: 7.5% 0 1 1 1
On Completion of Satgging: 22.5% 0 1 1 1
On completion of floor:22.5% 0 1 1 1
On completion of walls:22.5% 0 1 1 1
On complete:20.00% 0 1 1 0
ESR of .80 Lac Litres 12 m Height (Tokarva(New)) 1 0 1 Total Total
On Design submission: 2.5% 1 0
On Design Approval: 2.5% 1 0
On Excavation: 7.5% 1 0
On Completion of Satgging: 22.5% 1 0
On completion of floor:22.5% 1 0
On completion of walls:22.5% 1 0
On complete:20.00% 1 0
ESR of 1.45 Lac Litres 12 m Height (Fulpura) 0 1 1 Total Fulpura Total
On Design submission: 2.5% 0 1 1 1
On Design Approval: 2.5% 0 1 1 1
On Excavation: 7.5% 0 1 1 1
On Completion of Satgging: 22.5% 0 1 1 0.4
On completion of floor:22.5% 0 1 1 0
On completion of walls:22.5% 0 1 1 0
On complete:20.00% 0 1 1 0
ESR of 1.85 Lac Litres (Ruparel) 0 1 1 Total Ruparel Total
On Design submission: 2.5% 0 1 1 1
On Design Approval: 2.5% 0 1 1 1
On Excavation: 7.5% 0 1 1 1
On Completion of Satgging: 22.5% 0 1 1 0
On completion of floor:22.5% 0 1 1 0
On completion of walls:22.5% 0 1 1 0
On complete:20.00% 0 1 1 0
Tender & New Qty DDSA PKG-5 PART-1 DDSA PKG-5 PART-2
Sr No Structure Details
Part-1 Part-2 Total Executed Qty Executed Qty
ESR of 2.10 Lac Litres (Shadra) 0 1 1 Total Shadra Total
On Design submission: 2.5% 0 1 1 1
On Design Approval: 2.5% 0 1 1 1
On Excavation: 7.5% 0 1 1 1
On Completion of Satgging: 22.5% 0 1 1 0.8
On completion of floor:22.5% 0 1 1 0
On completion of walls:22.5% 0 1 1 0
On complete:20.00% 0 1 1 0
HGLR of .10 Lac Litres 3 m Height (Taramkach, Bhindol) 1 1 2 Taramkach Total Bhindol-1 Total
On Design submission: 2.5% 1 1 2 1 1 1
On Design Approval: 2.5% 1 1 2 1 1 1
On Excavation: 7.5% 1 1 2 1 1
On Completion of Satgging: 22.5% 1 1 2 1 1
On completion of floor:22.5% 1 1 2 1 1
On completion of walls:22.5% 1 1 2 0 0
On complete:20.00% 1 1 2 0 0
HGLR of .20 Lac Litres 3 m Height (Modhva, Lukhadiya(2 Lukhadiy
3 6 9 Modhva Lukhadiya-2 Total Redhana Bhindol-2 Bhindol-3 Bhindol-4 Kanjeta-1 Kanjeta-2 Total
Nos.), Redhana,Bhindol(3 Nos.), Kanjeta(2 Nos.)) a-1
On Design submission: 2.5% 3 6 9 1 1 1 3 1 1 1 1 1 1
On Design Approval: 2.5% 3 6 9 1 1 1 3 1 1 1 1 1 1
On Completion of Satgging: 22.5% 3 6 9 1 1 1 1 0 0 0 0
On completion of floor:22.5% 3 6 9 1 1 1 1 0 0 0 0
On completion of walls:22.5% 3 6 9 1 1 1 0 0 0 0 0
HGLR of .30 Lac Litres 3 m Height (Khokhbed, Taramkach, Taramka Lakhana
4 1 5 Khokhbed Gadvel Total Vadbhet Total
Lakhan Gojiya, Gadvel, Vadbhet) ch Gojiya
On Design submission: 2.5% 4 1 5 1 1 1 1 4 1
On Design Approval: 2.5% 4 1 5 1 1 1 1 4 1
On Completion of Satgging: 22.5% 4 1 5 0 1 1 2 1
On completion of floor:22.5% 4 1 5 0 1 1 2 1
On completion of walls:22.5% 4 1 5 0 1 1 2 1
On complete:20.00% 4 1 5 0 0 0
HGLR of .40 Lac Litres 3 m Height (Rampur, Modhva, Limdi
4 1 5 Rampur Modhva Ghada Chari Total Total
Ghada, Chari, Limdi Mendri) Mendri
On Design submission: 2.5% 4 1 5 1 1 1 1 4 1
On Design Approval: 2.5% 4 1 5 1 1 1 1 4 1
On Excavation: 7.5% 4 1 5 1 1 0.6 2.6 1
On Completion of Satgging: 22.5% 4 1 5 0.5 1 1.5 1
On completion of floor:22.5% 4 1 5 1 1 1
On completion of walls:22.5% 4 1 5 1 1 0.38
On complete:20.00% 4 1 5 0 0 0
Tender & New Qty DDSA PKG-5 PART-1 DDSA PKG-5 PART-2
Sr No Structure Details
Part-1 Part-2 Total Executed Qty Executed Qty
HGLR of .50 Lac Litres 3 m Height (Kothariya, Ghada, Limdi
3 1 4 Kothariya Ghada Kundavada Total Total
Kundavada, Limdi Mendri) Mendri
On Design submission: 2.5% 3 1 4 1 1 1 3 1
On Design Approval: 2.5% 3 1 4 1 1 1 3 1
On Excavation: 7.5% 3 1 4 1 1 1
On Completion of Satgging: 22.5% 3 1 4 1 1 1
On completion of floor:22.5% 3 1 4 1 1 1
On completion of walls:22.5% 3 1 4 0 1
On complete:20.00% 3 1 4 0 0
HGLR of .60 Lac Litres 3 m Height (Rampur, Ved, Redhana) 2 1 3 Rampur Ved Total Redhana Total
On Design submission: 2.5% 2 1 3 1 1 2 1
On Design Approval: 2.5% 2 1 3 1 1 2 1
On Excavation: 7.5% 2 1 3 1 1 1
On Completion of Satgging: 22.5% 2 1 3 1 1 1
On completion of floor:22.5% 2 1 3 1 1 1
On completion of walls:22.5% 2 1 3 1 1 1
On complete:20.00% 2 1 3 0 0 0
HGLR of .70 Lac Litres 3 m Height (Khokhra) 1 0 1 Khokhra Total Total
On Design submission: 2.5% 1 0 1 1 1
On Design Approval: 2.5% 1 0 1 1 1
On Excavation: 7.5% 1 0 1 1 1
On Completion of Satgging: 22.5% 1 0 1 1 1
On completion of floor:22.5% 1 0 1 1 1
On completion of walls:22.5% 1 0 1 0 0
On complete:20.00% 1 0 1 0 0
HGLR of .80 Lac Litres 3 m Height (Sevaniya) 0 1 1 Total Sevaniya Total
On Design submission: 2.5% 0 1 1 0 1
On Design Approval: 2.5% 0 1 1 0 1
On Excavation: 7.5% 0 1 1 0 0
On Completion of Satgging: 22.5% 0 1 1 0 0
On completion of floor:22.5% 0 1 1 0 0
On completion of walls:22.5% 0 1 1 0 0
On complete:20.00% 0 1 1 0 0
Executive Engineer
P.H. Work Division
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero Regional water supply scheme Part-1 & Part-2
TALUKA- Dhanpur/D'Baria DIST-DAHOD
Schedule - B-2B
Carrying out level Survey, Soil Investigation, Detailed Survey Work, Designing etc for Designing & Construction of RCC GSR/SUMP for Hamlets/Faliya
10% Strengthening
Tender Qty Executed Qty Remaining Qty Amt Of In Complete
ITEM. PER RATE AMOUNT.
As Per Board TPC
Part-1 Part-2 Total Part-1 Part-2 Total Part-1 Part-2 Total Resolution No/288/6- Lump Sum
1 ITEM NO. 1 ::-
Preparing structural design of RCC Under Ground / Partially under ground / above high ground level Reservoir of required capacity as per relevant I.S. standards and constructing the same, including excavation in all types of soil strata (including rock)
including shoring strutting if required, for loose soil / to protect from collapse, casting 100 mm thick P.C.C. levelling course in M-15, Refilling the pit with proper soil and disposing of the surplus stuff at all lead. Including cement plaster in CM 1:2 with
approved water proofing compound to all over inside container (i.e. walls, base, top slab/dome bottom etc. all). Including all types of labour and material charges of lowering, laying, erecting / hosting and jointing of pipe assembly to inlet, outlet
overflow, washout and bye pass arrangement as per hydraulic design. Providing and fixing accessories, CI Manhole frame and cover, water level indicator, adequate cowl type ventilators or lantern type ventilator with stainless steel jail. RCC chambers
Providing and applying three coats of cement paint / snowcem to the out side face of structure. It also includes satisfactory water tightness test as per relevant I.S. code and painting name of scheme and capacity on the tank as per direction of
engineer in charge.
List of Indian Standards for Design of GSR / SUMP:-
The structural design of GSR shall be in accordance with provisions relevant I.S standards
(1) I.S. 3370 part I & II 2009 or Its latest revision
(1.1) I.S. 3370 part III & IV 1965 or Its latest revision
(2) I.S. 456 – 2000 or Its latest revision.
(3) I.S. 1893 – 2000 – 1984 or Its latest revision.
(4) I.S. 875, Part – 1 to 3, 1987 or Its latest revision.General Specifications:- (1) Water depth in container shall be adopted as per data of tender. Capacity shall be calculated excluding free board of the reservoir. If water depth is not specified, the
suitable water depth / acceptable to field engineer in accordance with hydraulic requirement (2) Shape of schoanltl abine eard (oinp tpeladn f)o rs pceacpiaficeidty .by in data shall be adopted in absence circular shape shall be adopted. (3) Size shall
be fixed as per availability of space (land area) at site / acceptable engineer in charge. (4) Effect of overlapping of pressure bulbs on soil due near by structure and proposed sump should be considered. (5) Care shall be taken that no damage should
occur to nearby existing structure. Compensation shall be paid for the same by agency. (6) The minimum concrete grade for RCC shall be M-30. (7) HYSD Fe 415 / 500 grade reinforcing bars confirming to I.S. 1786 / 1139 shall be considered in design.
CRS / TMT bars shall be provided. In saline atmosphere corrosion resistance stainless steel / HCR rebar shall be provided. Any other steel can be used with approval of C.E./ in situation of non availability in market without extra cost. (8) Minimum size
(or thickness) of various components shall be provided as per tender criteria / specifications in absence as per I.S./ Std. practice of G.W.S.S.B. Minimum dimensions specified for various components in tender data / specifications shall be provide
(9)The Safe bearing Capacity (SBC) shall be referred from SBC test report. in absence of report it shall be reffered from data sheet. If poor soil is found/ water table is met with during excavation SBC shall be scientifically ascertained and design shall
be revise. No Extra shall be paid for increase in quantity. (10) DI pipes and special shall only be used if type is not specified in tender.(11) The rate shall include cost of dewatering during excavation making all arrangement when water table meets
within depth. (12) The structure shall be designed properly to resist uplift due to ground water table specified in data or actual ground water table meets with during excavation. If GWT / Uplift is mentioned in tender and during excavation it dose
not meet 7.5% rate shall be reduced. (13) SS pipes railing shall be provided over sump perifery when sump height is ≥ 1.5 meter above ground level. (14.a) RCC staircase/RCC Steps should be provided from GL to sump top slab based on the height of
the GSR above/below the ground. (14.b) RCC Staircase with SS railing to be provided inside reservoir container. BB Masonry staircabin to be provided to cover the same with MS safety door having locking arrangement. (15) Appearance of structure
should be aesthetically good looking acceptable to authority. (16) Any change in size, shape, depth below GL, height above GL, water depth, F.B., size of member etc can be permitted in exceptional case due to site condition or hydraulic design
requirement by C.E. No extra shall be paid for change. (17) Any change in data, dimensions, shape, water depth, reduction in size if permitted by competent authority and if it reduces quantity then payment shall be reduced prorate.(18) When
capacity of GSR / Sump is > 20 lakh litres two or suitable compartments acceptable to executive engineer shall be designed and provided.(19) Agency shall engage qualified (at least graduate) consulting engineer for designing the structure and he /
she shall visit the site for guidance of work. (20) 75% part rate shall be payable for concrete, reinforcement and plastering items of container until satisfactory hydraulic testing for water tightness is performed as per tender condition. Till the work
shall be treated as incomplete.Above conditions / general specifications Sr. No. 1 to 20 are part and parcel of tender (contact) and prevail over other provisions in tender.
1.1 GSR of .30 Lac Litres (Zapatiya) 0 1 1 1 No 171360.00 1028.16 17136.00
On approval of designs 0 1 1 0 1 1 0 0 0 No 3427.20 -
On completion of excavation and base slab 0 1 1 0 0 0 0 1 1 No 30844.80
On completion of vertical wall and braces 0 1 1 0 0 0 0 1 1 No 34272.00
Full supporting structure including column, ring beam and completion of top slab / dome 0 1 1 0 0 0 0 1 1 No 25704.00
Plastering inside & outside with epoxy etc. Complete 0 1 1 0 0 0 0 1 1 No 17136.00
Procurement and fixing of inlet, outlet, washout,overflow pipes, valves, specials, chambers, lighting arrester conductor and specials at site 0 1 1 0 0 0 0 1 1 No 25704.00
Water level indictor, painting of letters, M.S ladder, pipes, railing and all miscellaneous items such as exterior whether proof emulsion paint in three coats etc
(Completed with all respect) including water tightness test
On hydraulic testing 0 1 1 0 0 0 0 1 1 17136.00
1.2 GSR of .35 Lac Litres (Nadatod) 0 1 1 1 No 199920.00 1199.52 19992.00
On approval of designs 0 1 1 0 1 1 0 0 0 No 3998.40 -
On completion of excavation and base slab 0 1 1 0 0 0 0 1 1 No 35985.60
On completion of vertical wall and braces 0 1 1 0 0 0 0 1 1 No 39984.00
Full supporting structure including column, ring beam and completion of top slab / dome 0 1 1 0 0 0 0 1 1 No 29988.00
Plastering inside & outside with epoxy etc. Complete 0 1 1 0 0 0 0 1 1 No 19992.00
Procurement and fixing of inlet, outlet, washout,overflow pipes, valves, specials, chambers, lighting arrester conductor and specials at site 0 1 1 0 0 0 0 1 1 No 29988.00
Water level indictor, painting of letters, M.S ladder, pipes, railing and all miscellaneous items such as exterior whether proof emulsion paint in three coats etc
(Completed with all respect) including water tightness test
On hydraulic testing 0 1 1 0 0 0 0 1 1 19992.00
1.3 GSR of 1.25 Lac Litres (Panchiyashal) 0 1 1 1 No 479428.04 2876.57 47942.80
On approval of designs 0 1 1 0 1 1 0 0 0 No 9588.56 -
On completion of excavation and base slab 0 1 1 0 0 0 0 1 1 No 86297.05
On completion of vertical wall and braces 0 1 1 0 0 0 0 1 1 No 95885.61
Full supporting structure including column, ring beam and completion of top slab / dome 0 1 1 0 0 0 0 1 1 No 71914.21
Plastering inside & outside with epoxy etc. Complete 0 1 1 0 0 0 0 1 1 No 47942.80
Procurement and fixing of inlet, outlet, washout,overflow pipes, valves, specials, chambers, lighting arrester conductor and specials at site 0 1 1 0 0 0 0 1 1 No 71914.21
Water level indictor, painting of letters, M.S ladder, pipes, railing and all miscellaneous items such as exterior whether proof emulsion paint in three coats etc
(Completed with all respect) including water tightness test
On hydraulic testing 0 1 1 0 0 0 0 1 1 47942.80
Deputy Executive Engineer
P. H. San. Sub Division
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero Regional water supply scheme Part-1 & Part-2
TALUKA- Dhanpur/D'Baria DIST-DAHOD
Pumping Machinery
Sr. Tender Execute g&
Description Rate unit Amount
No. Qty d Qty Revised
Supply, installation, testing & commissioning of electro-mechanical equipment of (1) Monoset sub. pump 3 phase 400/440 vott, 50 c/s. A.C. Supply & 2900 RPM, following IS
14220 ,MOC : Casing: CI-FG260, Impeller : Bronze & Shaft : SS:41,
(2) DOL/Star Delta starter suitable for local & remote pump control application consisting of MPCB, overload relay and contactors as per Type II coordination including digital
voltmeter, analogue ammeter with selector switch, run hour meter, required protective relays & control accessories. and
(3)Auto transformer starter suitable for local & remote pump control application consisting of Auto Transformer
(4) Providing and supplying ISI mark Heavy Duty G.I. pipes with Couplings of following Class and diameter including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to departmental stores, stacking etc. complete.
(5) Butter Fly Valve : Providing and supplying ISI mark CI D/F Butterfly Valves as per IS:13095 (Latest Edition) of following class anddiameter including all taxes, insurance,
transportation, freight charges, octroi, nspection charges, loading, unloading, conveyance to departmental stores, stacking etc. complete and giving satisfactory hydraulic
testing etc. complete.
(6) Providing and supplying ISI mark CI D/F Reflux Valves as per IS:5312 (Latest Edition) of following class and diameterincluding all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading,conveyance to departmental stores, stacking etc. complete
(7) Supply, Installation, testing & commissioning of flange ends Expansion Bellow as per EJMA standards of overall length of minimum 300 mm, designed for 15 mm axial
compression and 5 mm axial extension with tie rods etc. of following MOC & pressure ratings. MOC: Bellows: SA 240 Gr. 304; Internal Sleeve: SA 240 Gr. 304; Weldends: IS
2062 Gr. B; Flanges: IS 2062 Gr. B (Drilling as per IS 1538 /IS 6392 ) & Limit Rods & Nuts: CS - IS
(8) MS Specials - Manufacturing, Supply, Delivery, Lowering & Laying of M.S. Specials from MS plate of 5.6 mm thick confirming to relevent IS including all taxes, duties,
1 insurance, transformation, freight, octoroi, inspection, loading, unloading,convey to site,stacking etc. compete.
(9) Design, supply, installation, testing and commissioning of Bourdon type pressure gauge ± 1 accuracy, direct bottom 1/2", NPT (M) Process connection, IP 67, Glycerine
filled, SS 304 case with Bayonet type Bezel, SS 316 L Bourdan tube, SS 316 movement material, Aluminium dial with black graduations on white background, Micro Zero
adjustable pointer, neoprene gasket, blow out disc, shatter proof glass, SS tag plate etc as per IS 3624, as per requirement
(10) PVC insulated Flat submersible cable as per detailed technical specifications of R/C of GWSSB conforming to IS 694, IEC 60227/60228. Supply, laying, testing &
commissioning 1.1 kV grade, XLPE insulated, stranded Aluminium conductor, galvanised steel flat strip / round wire armoured, extruded PVC type ST2 sheathed, heavy duty
cable conforming to IS: 7098 (Part-1) & IEC: 60502 (Part-1) of following sizes:
(11) Providing following type of Modular type accessories mounted with PVC/ metallic/Wooden box, single mounting base frame covered with textured/ metallic/White front
plate, modules erected with necessary connection as desired by Engineer In charge : 6A/ 10A/ 16A/ 20A/ 25A/ 32A double pole modular MCB switch, Cat.III for illumination
(12) Supplying rubber matting of following thickness as per IS:15652/IEC
(13) Providing & erecting Approved make RCCBs conforming to IS: 12640 and having sensitivity of 30 mA and Short Circuit withstand capacity of 10 KA and suitable for
operation on 3 phase and neutral 415 V, 50 Hz. having characteristics of quick action & tripping with all advance feature & do not incorporate any electronic component for
following Max. rating erected as directed.
(14) Supply,Installation,Testing and Commissioning of Main wiring, Internal Wiring Etc.
(15) Supplying and erecting LED indoor fittings with LEDs of wattage 0.2 Watt to 0.5 Watt assembled on single MCPCB, with housing used as a heat sink shall be made of thick
sheet Steel conforming to IS: 513/CRCA/ aluminium die cast powder coated and high U.V. & corrosion resistance with diffuser with company mark/name
(16) Supplying and erecting LED street light / Flood light fittings with High power White LEDs wattage of 1Watt and above assembled on single MCPCB, efficiency more than
130 lm/w and corrosion free High pressure die cast aluminum housing with smooth finish powder coated and heat sink extruded aluminium with diffuser and Polycarbonate
for DDSA FC Pakg -5, Part-1 558 0 559.5 22195.1005 KW
for DDSA FC Pakg -5, Part-2 448 0 545.326 26264.5688 KW
Executive Engineer Deputy Executive Engineer
P. H. Mech. Division P. H. Mech. Sub Division
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero Regional water supply scheme Part-1 & Part-2
TALUKA- Dhanpur/D'Baria DIST-DAHOD
SCHEDULE C - Operation & Maintenance for 2 years (Civil & Electromechanical )
Executed Remaining
m Description of work Tender Qty
Unit Rate Amount
Distribution of water from village level sump to existing storages / Mini pipe / newly constructed cistern - ESR / HGLR by operation
and maintenance of pumping machineries installed at sump including maintenance of all the components of the project including
existing pipeline & storage / newly constructed cistern - ESR / HGLR , SITC of pumping machinery and its manifold system as
directed , rising main pipe line , gravity pipeline of various sizes and class to feed water to included faliyas of all beneficial village and
other population and existing mini water supply scheme of all beneficial village population of DDSA Package-5 Kanjeta Pipero
Regional Water Supply Scheme, for the period of 24 months; including supply of skilled manpower as operator cum lineman cum
valve man at each of villages, materials , tools & plants articles , vehicles etc. including o & M charges for all type of valves with
valve chamber. The job includes operation of pump and its repairing , maintenance of pipeline with repairing of CID joint and other
ancillary component includes convey drinking water in such a way to supply net water at 100 LPCD for all the faliyas of villages duly
chlorinated with 0.20 PPM available residual chlorine at tail end service point. It also includes chlorination of water if required with
1.1 material supply , cleaning of sump, existing storage / ESR , newly constructed storage / HGLR periodically etc. and also maintaining
all components in original position with repairing to structure.
The scope also includes operation and maintenance of Pipeline, Pumping Machineries @ sump / HGLR Machineries without
interruption of drinking water problems to people of included faliyas of all beneficial village population of DDSA Package-5 Kanjeta
Pipero Regional Water supply scheme. the scope also includes the effective operation and maintenance by carrying out terms and
conditions of preventive measures indicated in respective volume of this tender.
The scope of work also include dismantling / reinstallation of all new and old machinery including all kind of repairing and
maintenance , all type of record keeping , water meter installation / repairing, reading and data collection & also record keeping and
any instruction for o & M as directed by department. For Two Years (Civil and Electromechanical)
Note: Agency must not quote rates less than rates quoted in BOQ, i.e. the amount should not be less than Rs. 24,28,476.00 For
for DDSA FC Pakg -5, Part-1 (Civil) 12 0 12 Months 17432.00
for DDSA FC Pakg -5, Part-2 (Civil) 12 0 12 Months 24256.00
for DDSA FC Pakg -5, Part-1 (Mech) 12 0 12 Months 1759.00
for DDSA FC Pakg -5, Part-2 (Mech) 12 0 12 Months 2029.00
for DDSA FC Pakg -5, Part-1 (Civil) 12 0 12 Months 17432.00
for DDSA FC Pakg -5, Part-2 (Civil) 12 0 12 Months 24256.00
for DDSA FC Pakg -5, Part-1 (Mech) 12 0 12 Months 53502.00
for DDSA FC Pakg -5, Part-2 (Mech) 12 0 12 Months 61707.00
Total of Schedule-C
Deputy Exe. Engineer Deputy Executive Engineer
P. H. Mech.Sub.Division P. H. San. Sub Division
Limkheda Limkheda
Executive Engineer Executive Engineer
P. H. Mech. Division P.H. Work Division
Remaining/Incomplete Work Estimate Of Faliya Connectivity of DDSA Package 5 Kanjeta - Pipero
Regional water supply scheme Part-1 & Part-2
TALUKA- Dhanpur/D'Baria DIST-DAHOD
Rate Analysis of MS Header Pipe 168.3 mm main pipe with 4 outlet 2x65mm,1x80mm& 1x100 ABSTARCT
QTY. UNIT ITEM RATE PER AMOUNT
Manufacture, Supply & Delivery of Electric Resistance Welded (Up to
400mm)/Submerged Arc Welded(Above 400mm) M.S.Pipe having beveled
ends plate or coil conforming to IS-3589-2001 or its latest revision/
ammendment for following thickness outside diameter at GWSSB store or
site anywhere in Gujarat State including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading, unloading conveyance
to Departmental stores, stacking etc. all complete. (Rate for MS Pipe based
on the ex. works price of HR Coil as Rs.58500 per MT- Without GST (Above
3.15 mm to 10 mm) & Rs. 59000.00 per MT without GST (Above 10 mm) as
on Jan-2023.( WPI Index of H. R Coil of Dec-22 is 144)
2.00 Rmt 168.30 mm dia 4 mm thick 1145 Rmt
Providing and supplying ISI mark G. I. pipes with Couplings of
following class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, stacking etc.
complete. (IS -1239) (Not for well/tube well column pipe)
1 Rmt 65 mm 429 Rmt
0.5 Rmt 80 mm 502 Rmt
0.5 Rmt 100 mm 701 Rmt
M. S. Specials flanged ends
Providing and supplying ISI mark CI D/F Sluice Valves as per IS:14846
(Latest Edition) of following class and diameter including all taxes,
insurance, transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to departmental stores, stacking etc.
PN-1.6 With hand wheel /cap operated (PD type short body)
Lowering, laying, Jointing & welding in position to correct line & level
M.S. Pipe with outer gunniting & inside lining/Epoxy painting on
pedestal or chairs upon prepared formation or prepared bedding in
trenches the rates include conveyance from store to site of work
loading, unloading, joint plastering, hydrotesting etc.complete.
2.00 Rmt 168.30 mm dia 4 mm thick 189 Rmt
(GWSSB SOR ITEM NO.4(A),4a1. Part-1&2 B (Labour Sec),P-33)
Lowering, laying and jointing G. I. pipes with G. I. specials of following
diameters in proper position, grade and alignment as directed by
Engineer-in-charge including conveyance from stores to site of work,
labour, giving hydraulic testing, etc. Comple
1 Rmt 65 mm 21 Rmt
0.5 Rmt 80 mm 28.35 Rmt
0.5 Rmt 100 mm 35.7 Rmt
QTY. UNIT ITEM RATE PER AMOUNT
Lowering, laying and jointing in position following C. I. / D/F Reflux
valves, Butterfly valves, Sluice valves and Air valves including cost of
all labour, jointing material, including nut bolts and giving
satisfactory hydraulic testing, etc. complete.
Welding in all positions with required number runs, for M.S.Pipes
internally and/or externally including gauging wherever necessary,
fixing appurtenances and other accessories in connection with pipe
laying work as per specification.
As above for Butt Joints
3.00 Rmt Plate thickness 1 Welding for Pipe thickness 4 mm to 7mm 715.05 Rmt
Gas cutting(Either square cut or V cut) pipes, plates etc. including all
costs for the followng thickness
5 Rmt 1 Up to 5 mm 37.8 Rmt
Painting Two coats (excluding priming coat) on new steel surface and
other metal surface with enamel paint, brushing, interior to give an
even shade including cleaning the surface of all dirt, dust and other
foreign matter.
Exra over item 19 and 21 for every subsequent cost of paint.(Total
1.055 Sqm 123.91 Sqm
Deputy Executive Engineer
P.H. Civil Unit
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GCC Part1.pdf
GCC Part5.pdf
Price Bid.pdf
Tech Data.pdf
Technical Bid.pdf
1.DMO_2876_01-May-2025_273.pdf
3. G.S.T. all Circular.pdf
4. Insurance-GR.pdf
6. Labour cess GR.pdf
8. Vol. IB Part -7 Circular 10 Excess.pdf
9 .I.P Address GR.pdf
10. Submission of Doc GR.pdf
Acceptance of SD and EMD Circuler 16-Mar-2024.pdf
Changes in tender clause_Circular_11022021.pdf
Circular for inviting tenders at estimated rates without GST (1).pdf
DDSA PKG - 5 PART 1 and 2DWG.pdf
DDSA PKG-5 Combined Estimate (Part-1 To Part-2) Schedule-B.pdf
DDSA PKG-5 PART-1 Structural Drawing.pdf
DDSA PKG-5 PART-2 Structural Drawing.pdf
ERP Entry Letter-1.pdf
GST Corrigendum 17.12.21 final.pdf
GWSSB GST Paripatra 36 dt 07-01-22_0001 (1).pdf
Price variation for Excess extra_30112021_220110_122504.pdf
VOL 2A Extent of work 20.02.2026.pdf
VOL 2B Tech Spec Civil 20.02.2026.pdf
Vol 2C Tech Spec Mech. 20-02-2026.pdf
VOL 5 A O and M MECHANICAL 20.02.2026.pdf
VOL 5 B O and M CIVIL 20.02.2026.pdf
5. VOL. IB GCC Part-4 20.02.2026.pdf
4. VOL. IB GCC Part-3 20.02.2026.pdf
DMO_2941_01-Apr-2026_744.pdf
3. VOL. IB GCC Part-2 20.02.2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .