| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.8 CrAdmitted-Finance VILLAGE DHAURAPALI P O P S KISHORENAGAR DIST ANGUL PIN 759122 | ANGUL | ANGUL | ODISHA | 759122 | +8.99% | ₹22.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹22.9 Cr+₹10.7 L (0.47%)Admitted-Finance | +9.50% | ₹22.9 Cr+₹10.7 L (0.47%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹21.0 Cr
EMD Value
₹21.0 L
Closing Date
21 Jan 2026, 5:00 pmClosed
CE AND BM MB BURLA
Chief Engineer and Basin Manager Mahanadi Basin Burla At Po Burla Dist Sambalpur Odisha Pin 768017
Renovation of Canal System of Hirakud Dam Project of Barpali Canal Section Barpali Irrigation Division Barpali
2025_CEBBU_124046_1
CE AND BM MB 40-2025-2026(Online)
Open Tender
Civil Works - Canal
Percentage
730 days
At Barpali Po Barpali Dist Bargarh
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹21.0 L
27 Mar 2026
1 Jan 2026
22 Jan 2026
1 Jan 2026
21 Jan 2026
1 Jan 2026
1 Jan 2026 - 21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area with all leads, lifts, sundries, T&P required for the work etc. complete as per the direction of Engineer-in-charge. | 1,04,093.6 | Sqm | 2.8 | ₹2,91,462.08 |
| 2 | Dismantling and removing Cement Concrete including stacking, the useful materials for reuse and removing debris abate from worksite with all leads etc. complete as per direction of the Engineer-in-charge. | 106.76 | Cum | 858.6 | ₹91,667.57 |
| 3 | Earthwork in Oridinary soil within initial lead of 50M. and initial lift of 1.5M. Including rough dressing, levelling the bed and depositing the excavated earth away from worksite etc. complete as per specification and direction of the Engineer-in-charge. | 98.22 | Cum | 171.7 | ₹16,863.69 |
| 4 | Earthwork excavation in all kind of soil including dressing and levelling the bed and depositing the excavated materials away from worksite with all leads, lifts, sundries, T&P required for the work etc. complete as directed by the Engineer-in-charge. | 26,908.16 | Cum | 276.9 | ₹74,50,870.06 |
| 5 | Filling in foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. | 4,369.95 | Cum | 713.5 | ₹31,17,959.32 |
| 6 | Cement Concrete M-15 using 40 mm & down graded H.G.C.B. Chips free from weathered skin surface including cost, carriage royalty and taxes of all materials to the work site mixing and laying of concrete in position and compacted properly with all leads, lifts, sundries, T & P required for the work etc. complete as per the direction of the Engineer in charge. | 3,184.26 | Cum | 5,269.5 | ₹1,67,79,447.53 |
| 7 | Cement Concrete M-20 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 11,553.28 | Cum | 6,101.7 | ₹7,04,94,666.88 |
| 8 | RCC work of M-25 with 20 mm downgraded hard granite crusher broken metal including cost, conveyance, royalty and other taxes of all meterials to the work site, mixing and laying of concrete inposition and compacted properly with all leads, lifts, sundries with all hires and running charges of mechaniries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 2,920.45 | Cum | 6,510.1 | ₹1,90,12,447.59 |
| 9 | Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge . A-Centering and Shuttering for Foundation & Footing | 96,864.36 | Sqm | 248.7 | ₹2,40,90,165.34 |
| 9.1 | B-Centering and Shuttering for Slab | 1,248.34 | Sqm | 762.1 | ₹9,51,356.87 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.99 MB
DTCNBarpaliCS.pdf
Tender Documents • 7.46 MB
BOQ_573956.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .