| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹41.3 L+₹1.5 L (3.64%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹41.3 L+₹1.5 L (3.68%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹43.0 L+₹3.2 L (7.99%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹52.6 L+₹12.8 L (32.0%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SYNERGY POWER TECH L2 | SATHEESH KUMAR S L5 | Ajayakumar.D L4 | D SURESH L3 | Best Power Controls L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Electrification | ||||||||
| 1.00 | OD182129/2022-2023:Supply, installation, testing and commissioning of 160 KVA UPS with PRS kit three phase in and out with isolation transformer & surge protection system even in ESS mode Indoor (IP20) type with Input pf 0.99 ,Input THDi<3%,with DC flexibility from 32-40 batteries with necessary battery circuit breaker,MTTR should be <5 min,overload 102-110% 60 min,double conversion technology with input 400V,50Hz three phase ,output 400V,50Hz three phase,it shall be 100% generator compatible ,with efficiency >96% AC to AC and Advanced Battery management will increase 50% of battery life=90% resting,10% floating /charging (typical) Capacitor temperature monitoring,East load test at site without load(160KVA=160KW),ESS mode Efficiency 99% and including all accessories etc as required.85 degree celcius & 85% RH 1000h-should be test certified capacitor,Enhanced ECT with battery capacity test,back feed protection,bypass fuse and 35kA Icc rating .The accoustic noise at 1m of the system should be <65dB.The system shall comply to EN/IEC 62040-1,2 and seismic test report and relevant IS standard.The system shall be true online double conversion DSP based UPS system and UPS shall be with automatic & manual bypass switch.The system shall have IGBT rectifier and inverter including interconnecting cable if necessary. | 2 | set | 13,40,000 ₹26,80,000 | 16,00,000 ₹32,00,000 | 14,00,000 ₹28,00,000 | 13,40,000 ₹26,80,000 | 12,94,000 ₹25,88,000 Lowest |
| 1.00 | OD180713/2022-2023:SMF FR C 10 rated battery 12V ,150AH x40 Nos in PRS(Min VAH 72000 each UPS) | 2 | set | 7,00,000 ₹14,00,000 | 10,00,000 ₹20,00,000 | 7,25,500 ₹14,51,000 | 7,01,000 ₹14,02,000 | 6,73,000 ₹13,46,000 Lowest |
| 1.00 | 2.2.8:Providing and fixing following rating and breaking capacity and pole MCCB in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required.315 Amp., 35 KA,TPMCCB | 2 | each | 25,000 ₹50,000 | 30,000 ₹60,000 | 26,000 ₹52,000 | 24,770 ₹49,540 Lowest | 25,406 ₹50,812 |
Tender Value
₹42.4 L
EMD Value
₹50,000
Closing Date
17 Jul 2025, 6:00 pmClosed
Executive Engineer
O/o Executive Engineer, PWD Electrical Division , PMG , Near planetaurium,695033
DEPOSIT SITC OF UPS Supply Installation Testing and commissioning of UPS upgradation of panel board in Super Specialty Block at Medical College Thiruvananthapuram General Electrical Work
2025_PWD_775543_1
EDT_ET_19_2025_26
Open Tender
Electrical Works
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
1 Sept 2025
8 Jul 2025
21 Jul 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
Amount
Electrification
OD182129/2022-2023:Supply, installation, testing and commissioning of 160 KVA UPS with PRS kit three phase in and out with isolation transformer & surge protection system even in ESS mode Indoor (IP20) type with Input pf 0.99 ,Input THDi<3%,with DC flexibility from 32-40 batteries with necessary battery circuit breaker,MTTR should be <5 min,overload 102-110% 60 min,double conversion technology with input 400V,50Hz three phase ,output 400V,50Hz three phase,it shall be 100% generator compatible ,with efficiency >96% AC to AC and Advanced Battery management will increase 50% of battery life=90% resting,10% floating /charging (typical) Capacitor temperature monitoring,East load test at site without load(160KVA=160KW),ESS mode Efficiency 99% and including all accessories etc as required.85 degree celcius & 85% RH 1000h-should be test certified capacitor,Enhanced ECT with battery capacity test,back feed protection,bypass fuse and 35kA Icc rating .The accoustic noise at 1m of the system should be <65dB.The system shall comply to EN/IEC 62040-1,2 and seismic test report and relevant IS standard.The system shall be true online double conversion DSP based UPS system and UPS shall be with automatic & manual bypass switch.The system shall have IGBT rectifier and inverter including interconnecting cable if necessary.
OD180713/2022-2023:SMF FR C 10 rated battery 12V ,150AH x40 Nos in PRS(Min VAH 72000 each UPS)
2.2.8:Providing and fixing following rating and breaking capacity and pole MCCB in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required.315 Amp., 35 KA,TPMCCB
SYNERGY POWER TECH (BID ID -2250999)
D SURESH (BID ID -2253945)
Ajayakumar.D (BID ID -2253828)
SATHEESH KUMAR S (BID ID -2253524)
Bidder Name
D SURESH
Ajayakumar.D
SYNERGY POWER TECH
SATHEESH KUMAR S
Best Power Controls
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1267568.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .