Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC 5 9 35 HAZARHAT KALITALALANE HOWRAH 711104 | HOWRAH | HOWRAH | WEST BENGAL | 711104 | ₹2.5 Cr Quoted ₹2.6 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.7 Cr+₹10.9 L (4.16%)Rejected-Finance | ₹2.7 Cr+₹10.9 L (4.16%) | L2 | Rejected-Finance Higher Bid |
| 3 | L3₹2.8 Cr+₹20.0 L (7.61%)Rejected-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹2.8 Cr+₹20.0 L (7.61%) | L3 | Rejected-Finance Higher Bid |
Tender Value
₹2.5 Cr
EMD Value
₹5.1 L
Closing Date
16 Dec 2024, 4:00 pmClosed
General Manager (KTPS)
KTPS,Mecheda,Purba Medinipur, PIN-721137
Rate Contract for Maintenance jobs of Unit#3 under BM, KTPS.
2024_WBPDC_766804_1
GM(K)/CC /BM/ 2330(Vol-10)/E3141/24-25
Open Tender
Support/Maintenance Service
Item Rate
730 days
KTPS, Mecheda, Purba Medinipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5.1 L
Yes
Conference Hall,GM bldg,KTPS
4 Sept 2025
2 Nov 2024
19 Dec 2024
2 Nov 2024
16 Dec 2024
26 Nov 2024
25 Nov 2024
Amount
Job: Part:A
COAL MILL WORK: Insertion of Filling Balls & if required, Damaged Balls are to be removed from the Coal Mill
COAL MILL WORK: Insertion of Filling Balls.
COAL MILL WORK: Replacement of Stirrup assembly & if required Swivel Balls of Stir-rup Assembly are to be changed
COAL MILL WORK: Loading Block of Spider replace-ment & allied work as necessary
COAL MILL WORK: Total Set of Grinding Ball re-placement
COAL MILL WORK: Measurement of wear of GRINDING ZONE: Ring & Ball
COAL MILL WORK: Checking of Coal Mill internals
COAL MILL WORK: Replacement of Throat Plate & allied work as necessary
COAL MILL WORK: Readjustment of Throat Gap & if required necessary repairing jobs between Mill Housing & Throat Plate are to be done
COAL MILL WORK: Classifier Blade adjustment
COAL MILL WORK: Replacement of Classifier Blade
COAL MILL WORK: Total set of Throat Plate replace-ment & allied work as necessary
COAL MILL WORK : Replacement of Loading Unit assembly
COAL MILL WORK: Replacement of Loading Cylinder
COAL MILL WORK: Repairing of Walker Seal/Loading cylinder servicing
COAL MILL WORK: Bolt tightening of Mill Housing
COAL MILL WORK: Bolt tightening of Loading Units
COAL MILL WORK : Cleaning of Rejection passage
COAL MILL WORK: Cleaning of Rejection passage along with Scrapper Plate fitting
COAL MILL WORK: Replacement after fabrication of Brush Plough Door
COAL MILL WORK: Repairing / replacement of knife Gate assembly including all associated work
COAL MILL WORK: Repairing / replacement of pyrite Gate assembly including all associated work /SA fan anti vibration pad replacement with associated job
COAL MILL WORK: Thorough repairing & refitting of Gravity Damper assembly
COAL MILL WORK: Replacement of Mill Housing Lin-er
COAL PIPE WORK: Replacement of “Y” piece
COAL PIPE WORK: Replacement of Coal Carrying Pipe (CCP) Bends
COAL PIPE WORK: Replacement of Straight CCP
COAL PIPE WORK: Replacement of NRV after repairing including Hard Facing at corners
COAL PIPE WORK: Fabrication & fitting / replacement of Coal Sampler
COAL PIPE WORK: Dismantling & refitting of John-son’s Coupling (JC) & Sealing rings. Rockwell coupling fitting with seal rings. Eroded portion of straight CCP carrying JC is to be replaced by welding fresh part of CCP.
COAL PIPE WORK: : Coal dust leakage to be stopped by inserting asbestos rope or by tightening the Johnson’s Coupling
COAL PIPE WORK: Coal dust leakage to be stopped by application of Sodium silicate / jute packing with grease on leakage point/Burner cleaning / oil top up
COAL CLEANING WORK: Cleaning of choked Coal Carrying Pipe
COAL CLEANING WORK: Cleaning of Coal Mill inside
COAL CLEANING WORK:Cleaning of Coal Feeder box & if required Coal Bunker is to be iso-lated by operating the gates
COAL CLEANING WORK: Cleaning of choked Feeder to Mill drop pipe & chute/Loading unit servicing
COAL CLEANING WORK:Cleaning of choked Coal Burner Mouth
FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material from inside the Coal Feeder box
FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material from Coal Mill after necessary checking of Mill inside & Ring, Ball measurement to be carried out if required
FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material after necessary checking from rotary throt of modified Mill, if required by gas cutting.
AIR SEAL SYSTEM WORK: Replacement / readjustment of Air Seal system as a whole (upper & lower outer seal)
AIR SEAL SYSTEM WORK: Air Seal pipe cleaning & meas-urement of Bottom Air Seal gap
PATCH REPAIRING WORK: Patch repair in position by re-quired portion of MS plate weld-ing
PATCH REPAIRING WORK:Welding of leakage joints
COAL FEEDER WORK: Through repairing of Coal feeder with all necessary work as per scope of work
COAL FEEDER WORK: Complete removal of Drag Link Chain & refitting the same after thorough repairing of the chain
COAL FEEDER WORK: Bed Height adjustment & if required partial cleaning of coal feeder
COAL FEEDER WORK: Replacement of Scrapper bar & Chain link of Drag link chain of Coal Feeder in situ
COAL FEEDER WORK : Replacement of Conical Chute
COAL FEEDER WORK : Replacement of Drop pipe including fitting of man holes after fab-rication of the same
COAL FEEDER WORK : Feeder chain checking & all pin tacking
COAL FEEDER WORK : Feeder bearing greasing (4 nos.)
COAL FEEDER WORK : Feeder chain tension checking & tightening
COAL FEEDER WORK : Replacement of Duplex chain
ALIGNMENT WORK: Alignment of Coal Mill motor with Mill Gear box. Gear box holding down bolts tightness to be done.
ALIGNMENT WORK: Alignment of Motor with PA Fan. Tightening of Fan bearings are to be done./PA or FD fan bearing replacement work with associated job.
ALIGNMENT WORK: Alignment of Motor with FD Fan. Tightening of Fan bearings are to be done.
ALIGNMENT WORK: Realignment of Hydraulic Cou-pling with Motor & ID Fan includ-ing tightening of Fan bearing bolts
ALIGNMENT WORK: Alignment of Hydraulic Coupling with Motor & ID Fan & if re-quired Hydraulic Coupling is to be shifted / replaced. Tightening of Fan bearing bolts are to be done/Hydraulic coupling servicing
ALIGNMENT WORK: Removal & repositioning of Coal Mill / PA Fan motor
ALIGNMENT WORK: Alignment of Seal Air Fan with Motor
ALIGNMENT WORK: Seal Air Fan bearing replacement with Motor alignment
ALIGNMENT WORK: Mill / PA Fan Coupling replacement with Motor alignment
FAN & DAMPER WORK: Servicing of Gas Damper & if re-quired bearing are to be replaced
FAN & DAMPER WORK: Servicing of Air Damper & if re-quired bearings are to be re-placed/Feeder radicon gear box servicing
FAN & DAMPER WORK: PA / FD Fan RVC adjustment
FAN & DAMPER WORK: Repairing & Hard facing of ID Fan runner as per scope of work. Only Hard facing electrodes will be supplied by WBPDCL.
FAN & DAMPER WORK: Part repairing & Part hard facing of ID Fan runner. Only hard facing electrode will be supplied by WBPDCL. Scope of work is as per enclosed sheet.
FAN & DAMPER WORK: PA Fan Impeller checking
FAN & DAMPER WORK: Seal Air Fan / PA Fan balancing
FAN & DAMPER WORK: ID Fan runner checking & balancing
COAL BURNER WORK: Rotation of PF Impeller regulating rod
COAL BURNER WORK: Replacement after repairing of Coal nozzle, Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing in the following areas with ESAB 600B electrode:
COAL BURNER WORK: Replacement after repairing of Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing like serial no. E/2/b
COAL BURNER WORK: Replacement / rotation of Coal nozzle, Impeller, Impeller regulating rod, PA liner & repairing, hard facing of Guard plate. 75% of the Guard plate is to be hard faced with 3 – 4 mm heights. (Hard facing electrode will be supplied by WBPDCL)
COAL BURNER WORK: Hard facing of Coal nozzle - 60” X 8” X 3 - 4 mm at the flange end (Hard facing electrode will be supplied by WBPDCL and hard facing is to be done as per direction of Control Engineer)
BURNER WORK: Oil burner barrel replacement & associate work
WIND BOX WORK: Part repair of Air Register in situ
OTHER WORK: Greasing of PA Fan / Mill Coupling
OTHER WORK: Attending PA leakage from flange joint between PA Fan & Mill
OTHER WORK: Replacement of Mill Gear box oil after thorough cleaning of Gear box internals & its auxiliaries
OTHER WORK: Seal Air Fan bearing greasing & coupling checking
OTHER WORK: ID / FD / PA / Mill lub oil strainer cleaning
OTHER WORK: Replacement of Radicon Gear box
OTHER WORK: Oil replacement of Hydraulic Coupling & working oil cooler of ID Fan
OTHER WORK: For cooler leakage testing cooling water line isolation & normalisa-tion.
OTHER WORK: Replacement of Air seal & cooling water hose of PA Fan
OTHER WORK: Fabrication & repairing of Feeder Conical chute
PART: B
Minimum Monthly Lumpsum Value including labour charge as per minimum wage rate w.e.f 01.01.2024(09 nos category and 12 nos no category worker), 5 nos supervisor charge, 1 no company's own worker, Safety PPEs, tools, tackles, night allowance, consumables charge, other allowances and benefits as per MOS dtd 04.10.2021 and profit (Part: B is excluded of evaluation of tender)
ASSOCIATE ENGINEERS (BID ID -5838960)
TECHNO ENGINEERING (BID ID -5837726)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .