Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC 234 PKT 8 SEC 12 SURYODAYA APARTMENT DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | ₹37.5 L | L1 | Accepted-AOC Accepted for acceptance being lowest. |
| 2 | L2₹38.3 LRejected-Finance | ₹38.3 L | L2 | Rejected-Finance Not L1. |
| 3 | L3₹39.0 LRejected-Finance | ₹39.0 L | L3 | Rejected-Finance Not L1. |
| 4 | L4₹39.5 LRejected-Finance | ₹39.5 L | L4 | Rejected-Finance Not L1. |
| 5 | L5₹39.8 LRejected-Finance | ₹39.8 L | L5 | Rejected-Finance Not L1. |
| Sl No | Description | Qty | Unit | Sukhi Electricals L4 | Krishna Bhoomi Enterprise L3 | Indice Technologies L2 | Sagathiya Builders L7 | JAMNAGAR ELECTRIC AND MACHINERY CO L9 | Prime Decor L6 | jagdish machinery stores L8 | Pooja Enterprise L5 | RACON CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work / stone work / PCC block masonry built in cement mortar complete all as specified and directed. | 2 | Cum | 488 ₹976 | 510 ₹1,020 | 500 ₹1,000 | 536 ₹1,072 | 550 ₹1,100 | 380 ₹760 | 480 ₹960 | 520 ₹1,040 | 300 ₹600 |
| 2.00 | Forming jambs,with cement mortar 1:6 etc., to openings (to foregoing item), including cutting, toothing and properly bonding into old work, also facing, jointing and pointing to match existing work, complete all as specified and directed. | 1 | Sqm | 346 ₹346 | 357 ₹357 | 350 ₹350 | 375 ₹375 | 500 ₹500 | 400 ₹400 | 370 ₹370 | 364 ₹364 | 200 ₹200 |
| 3.00 | Excavation in trenches not exceeding 1.5 meters wide and 1.5 meters in depth and getting out in hard/dense soil including cutting of tree roots any size / dia complete all as specified and directed.
Note: The entire excavation work will be carried out by manual / labours (mechanical / mechinery will not be use). | 12 | Cum | 332 ₹3,984 | 337 ₹4,044 | 330 ₹3,960 | 354 ₹4,248 | 450 ₹5,400 | 320 ₹3,840 | 333 ₹3,996 | 343 ₹4,116 | 300 ₹3,600 |
| 4.00 | Returning, filling including spreading, watering and well ramming in layers n.exc 25cm in soft / loose and hard / dense soil complete all as specified and directed. | 152 | Cum | 75 ₹11,400 | 71 ₹10,792 | 70 ₹10,640 | 75 ₹11,400 | 120 ₹18,240 | 100 ₹15,200 | 111 ₹16,872 | 73 ₹11,096 | 50 ₹7,600 |
| 5.00 | Removing excavated material exc 1.5 km but n.exc 5.0 km and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and directed. | 9 | Cum | 194 ₹1,746 | 204 ₹1,836 | 200 ₹1,800 | 214 ₹1,926 | 250 ₹2,250 | 125 ₹1,125 | 136 ₹1,224 | 208 ₹1,872 | 200 ₹1,800 |
| 6.00 | M & L for pre-cast cement concrete block masonry with solid blocks, exc. 10 cm in width and setting in mortar 1:4 type C1 (1:5:8) (using 20mm graded stone aggreagate), complete all as specified and directed. | 30 | Cum | 4,250 ₹1.3 L | 4,590 ₹1.4 L | 4,500 ₹1.4 L | 4,821 ₹1.4 L | 5,200 ₹1.6 L | 4,250 ₹1.3 L | 5,000 ₹1.5 L | 4,682 ₹1.4 L | 3,500 ₹1.1 L |
| 7.00 | Taking down cement plaster on brick or concrete or stone walls including racking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 50 | Sqm | 100 ₹5,000 | 51 ₹2,550 | 50 ₹2,500 | 54 ₹2,700 | 50 ₹2,500 | 70 ₹3,500 | 76 ₹3,800 | 52 ₹2,600 | 30 ₹1,500 |
| 8.00 | M&L for rendering 15 mm thick in cement mortar 1:6 on fair faces of brick work or concrete surfaces, finished fair and even etc complete all as specified and directed. | 150 | Sqm | 220 ₹33,000 | 214 ₹32,100 | 210 ₹31,500 | 225 ₹33,750 | 295 ₹44,250 | 280 ₹42,000 | 252 ₹37,800 | 218 ₹32,700 | 180 ₹27,000 |
| 9.00 | M&L for rendering 15 mm thick in cement mortar 1:4 on fair faces of brick work or concrete surfaces, finished even and smooth without using extra cement complete all as specified and directed. | 167 | Sqm | 225 ₹37,575 | 224 ₹37,408 | 220 ₹36,740 | 236 ₹39,412 | 295 ₹49,265 | 290 ₹48,430 | 262 ₹43,754 | 229 ₹38,243 | 200 ₹33,400 |
| 10.00 | M&L for preparation of new undecorated surface of wall and applying two coats of cement base paint complete all as specified and directed. | 150 | Sqm | 65 ₹9,750 | 61 ₹9,150 | 60 ₹9,000 | 64 ₹9,600 | 60 ₹9,000 | 75 ₹11,250 | 95 ₹14,250 | 62 ₹9,300 | 20 ₹3,000 |
Updated dates
Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
10 Feb 2026, 6:00 pmClosed
GE (AF) JAMNAGAR NO.2
Air Force-II, Udhyog Nagar
IMPROVEMENT TO MEDICAL FACILITIES, PROVN OF AIR CONDITIONER FOR OTM ACCN AND WATER SUPPLY PIPELINE AT BCR ALONG WITH OTHER ASSOCIATED WORKS AT AF STATION UNDER GE (AF) JAMNAGAR NO.2
2026_MES_748090_1
8618/E8
Open Tender
Miscellaneous Works
180 days
JAMNAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE (AF) JAMNAGAR NO.2
₹84,000
Yes
1 Apr 2026
12 Jan 2026
12 Feb 2026
12 Jan 2026
10 Feb 2026
27 Jan 2026
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
56PTenderDocs.pdf
Tender Documents • 1.10 MB
BOQ_837760.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid